Title: The provision of meter move, upgrade and Meter LPU & SPU audits for various zones within the Limpopo Operating Unit on an "as and when" ...

Page created by Russell Davidson
 
CONTINUE READING
Title: The provision of meter move, upgrade and Meter LPU & SPU audits for various zones within the Limpopo Operating Unit on an "as and when" ...
Tender number: 59 CON 1881
  Title: The provision of meter move, upgrade
and Meter LPU & SPU audits for various zones
 within the Limpopo Operating Unit on an “as
 and when” required basis for the period of 36
                     months
             19 September 2018
Title: The provision of meter move, upgrade and Meter LPU & SPU audits for various zones within the Limpopo Operating Unit on an "as and when" ...
Tender Information

• Project title: The provision of meter move, upgrade and Meter LPU & SPU
  audits for various zones within the Limpopo Operating Unit on an “as and
  when” required basis for the period of 36 months

• C3.1 Works information”

• Type of contract: NEC 3 - ECSC

• Buyer: Shele Mogale

• Clarification date: 19 Sept

• Closing date: 16 Oct 2018

• Quality Requirements: check Pages 26-28 of the Tender Enquiry – category 3
  requirements – Category 3 criteria; Form A ;QM 58 document; CQP and QCP

• Quality evaluation to be done after Technical/ Price & BBBEE - only on successful
  supplier shortlisted for award.

    2018/10/02                                                                    2
Title: The provision of meter move, upgrade and Meter LPU & SPU audits for various zones within the Limpopo Operating Unit on an "as and when" ...
Quality Requirements Returnable

1. QM 58 for reference only- NB: do not print and submit;

2. Category 3 Quality requirements - submit listed items;

3. Category 3 Form A- complete Section A & D ; sign and return

4. Templates provided -

    • Category 3 - CQP; QCP/ITP to be completed and returned based on the
      NEC Scope of Work

 2018/10/02                                                                 3
Title: The provision of meter move, upgrade and Meter LPU & SPU audits for various zones within the Limpopo Operating Unit on an "as and when" ...
Quality requirements for the tender (based on
new QM 58- Category 3)
                                                                              Unique Identifier                       QM-5
                                                                Revision                                               8.00
                                Supplier Quality Management:
                                                                Effective Date                                    18/07/2013
                           List of Tender Returnables Documents
                                                                              Specifi
                                                                              cation                                  QM 58

                 Category 3: Quality Requirements               Deliverables to be evaluated indicator = 1            Weights

             SECTION A : Quality Management System Requirements ISO 9001:2008
             Objective evidence of documented QMS that is not certified but complies with ISO9001
                                                                                                             Apply (Yes=1)
             A.1 Quality Management System (QMS) Manual - based on ISO 9001:2008 framework                        1
             A.2 Copy of Quality Policy signed by top management.                                                 1
             A.3 Procedure for Control of Documents                                                               1
                                                                                                                                25%
             A.4 Procedure for Control of Records                                                                 1
             A.5 Internal Audits Procedure – Not audit checklist or Audit report                                  1
             A.6 Procedures for Control of Nonconforming Product                                                  1
             A.7 Corrective Action Procedure                                                                      1
             A.8 Preventive Action Procedure.                                                                     1
                                                    Sub-Section A Score Option 2                                  8
             SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref QM-58 or 240-51544462)
                                                                                                             Apply (Yes=1)

             B.1 Copy of appointment letter & CV/ resume of a Quality Representative for the project (
             Quality training recommended)                                                                        1
             B.2 Signed project Organogram with names and or functions / responsibilities                         1
             B.3 Copy of procedure for control of suppliers & subcontractors                                      1             25%
             B.4 Copy of Customer satisfaction surveys- 2 clients minimum( Reference letter from
             previous clients)                                                                                    1
             B.5 Historical Information (list) of similar work performed < 2yrs- (sow /date/reference);
             detailed reference letter from previous employers                                                    1
                                                       Section B Score                                            5
2018/10/02                                                                                                                            4
Quality requirements Cont’d

                 SECTION C : Contract Quality Plan Requirements (Ref QM-58 and 240-109253698)
             Contract Quality Plan as per Scope of Works (Ref ISO 10005)
                                                                                                                 20%
             NB!!!! draft Contract/Project Quality Plan has important QA deliverables Apply
                                             Section C Score                                           0

               SECTION D : Quality Control Plan Requirements (Ref QM-58 Annexure I or 240-51544462)
             QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref ISO 10005 / 35-59 / 39-71)
                    NB!!!! draft QCP/ITP (jobcards) haves important QC deliverables                 Apply
             Simulated QCP required for tender evaluation                                              1         20%
                                           Section D Score                                             1

                   SECTION E : User defined additional Requirements & miscellaneous (Ref QM-58)
             Customer specific requirements & other standards and required can be listed and evaluated
                                                                                                  Apply
             E.1 Form A is completed and signed.                                                       1         10%
                                            Section E Score                                            1

2018/10/02                                                                                                             5
NEC3- ECSC - C3.1 Description of Works (for
    completing the CQP template)
1

            Open this document for Works Information

    2018/10/02                                         6
Detailed SCOPE of Work- keywords

• Scope 1 Meter Audits

• Audit and Capture Field Data, Perform meter accuracy test, Observe and Capture
  Remarks using own Handheld Unit (Rural)

•     Auditing of the rural installation (exclude testing) Digital meter

•     Replacement of the 5Amp meters

• Auditing and testing SPU meters

•      Change-out of Single phase meter due to Faulty / Tampered. (Rural); Change-out
    of 2 x Single Phase meter due to Faulty / Tampered. (Rural); Change-out of 3 x
    Single Phase meter due to Faulty / Tampered. (Rural); Change-out of 3 x 5 AMP
    meters due to Faulty / Tampered and convert to single Polyphase meter (160A).
    (Rural); Take a photo on an SPU meter when required by PM; Change-out up to
    50kva - Polyphase meter 125amp due to Faulty / Tampered. (Rural); Change-out of
    Single Polyphase meter 160 amp due to Faulty / Tampered. (Rural); Change-out of 3
    x Single Phase meters and convert to Polyphase meter due to Faulty / Tampered.
    (Rural); Audit and Capture Field Data, Perform meter accuracy test per meter,
    Observe and Capture Remarks using own Handheld Unit (Urban Rate)
     2018/10/02                                                                    7
SOW Continued

• Change-out of 3 x Single Phase meters and convert to Polyphase meter due to Faulty /
  Tampered. (Rural)

•     Audit and Capture Field Data, Perform meter accuracy test per meter, Observe and Capture
    Remarks using own Handheld Unit (Urban Rate)

•     Change-out/ of Single phase meter due to Faulty / Tampered. (Urban)

•     Collect & Submit MV Pole numbers with photos If instructed by PM

•     Auditing, testing of meter and Capturing Field Data Using Own Handheld Units (PPU single
    and three phase)

•     Disconnect All Bypassed/Tampered/Illegal connection and Issue Tamper Fine (PPU)

•     Seal Meters under the Following conditions: All unsealed meters ; All replaced Faulty meters

•     Reconnecting If Instructed by Project Manager (PPU Rural/ Urban); Collect & Submit MV
    Pole numbers with photos; Lock the pole top Boxes with an Eskom lock when requested by
    PM; Punch in the key change token on a PPU meter on request by PM

      2018/10/02                                                                               8
Scope 2 Meter Moves , Change Outs and Upgrades

• HOUSE CONNECTION

•     Overhead Connection

•     Underground Connection

•           SHACK POLES (Incl. Excavation)

•     4&5m Wood Shack Pole

•     7m Wood Shack Pole; 9m shack pole (including excavation); Extra over for hard
    holes 4 & 5m; Extra over for hard holes 7m; Extra over for hard holes 9m

•     SUNDRY ITEMS- Trenching for cable: Soft; Trenching for cable: Rock; Pole top
    box installation; Store and site office (fixit) 0-200; 63A Morsdorf Breaker; Change
    Faulty meter; Installation of external ECU Box

     2018/10/02                                                                           9
SPU & LPU CONNECTIONS

•     Meter box single phase installation including cable above ground level

•     Meter box three phase 25 to 100kVA installation including cable above
    ground level

•     Poly phase meter box 200kVA installation including cable above
    ground level .

•     Lay cables including terminations; Cables laid in ground 16 x 2;
    Cables laid in ground 25 x 4; Cables laid in ground 35 x 4; Cables laid in
    ground 70 x 4; Cables laid in ground 120 x 4; Cables laid in ground 240
    x 4; Excavate in soft material for trench (600mm) incl. backfilling

• HOUSE CONNECTION- Overhead Connection; Underground
  Connection

•     SHACK POLES- 4&5m Wood Shack Pole; 7m Wood Shack Pole

•     SUNDRY ITEMS- Pole top box; 63A Morsdorf Breaker; Faulty meter
    2018/10/02                                                                   10
Common mistakes made by tenderers on
 Quality submissions
1. Section A

    1. Quality manual structure layout not aligned to latest Standard (2008 or
       2015);

    2. QMS Procedures incomplete and do no comply with particular ISO clause
       elements; Do not copy and paste the ISO standard- inteprete and
       customise to your business; address all elements of the procedure as
       per clause requirements

    3. Quality policy not signed or not submitted; or does not comply with clause
       ISO 9001:2008 -5.3 ( it’s a controlled document must have ref number;
       revision; authorization date);

    4. For Option1- ISO certification scope must be relevant; valid by tender
       closing date;

  2018/10/02                                                                        11
Common errors when evaluating- cont’d

Section B

   1.     QMR appointment letter or and CV not submitted; QMR to attend training on
          QM in the first 12 months after contract award (contract condition)

   2.     Organogram has no names and signed nor on letterhead- must be a
          controlled document;

   3.     Supplier Management procedure not aligned to Clause 8.4 of ISO 9001:2015

   4.     Satisfaction surveys not completed by clients; Name of clients- name of
          project/service- stamp/signature missing; Submit CS survey templates- rather
          submit reference letter ( name of client- project/service-date); Reference letter
          from previous clients;

   5.     History of similar work not detailed- does not indicate client- client contact
          details- SOW provided; ( Project Completion letters; Reference letters fro
          previous employer accepted)

   2018/10/02                                                                              12
Common errors when evaluating- cont’d
Section C
   1. CQP sow not described as in the NEC; project organogram does not include roles and
      responsibilities of organogram functions in respect of SOW;

   2. Does not add the out-sourced SOW functions/activities; and other CQP ;elements;

Section D
   1. ITP/QCP template not used;

   2. If used, sow specific task order is not used (eg; design instead of installation;
      construction instead of design – Use a previousTender SOW Task order);

   3. Quality inspection checksheet is accepted for a while but get used to completing an ITP;
      Implement ITPs and ask for signatures as they are a requirement for Category 2
      Contracts;

Section E
   1. Incorrect Form A- old Forms;

   2. Form A neither completed not signed and incorrectly marked Form submitted.
   2018/10/02                                                                              13
2018/10/02   14
2018/10/02   15
When completing CQP & ITP/QCP

• Complete the scope of work as described on the NEC- ECSC Works
  Information ;

• complete other information as indicated in the Index, some requirements
  are not applicable. If any section on CQP not applicable indicate so and
  reason why.

  2018/10/02                                                             16