THE NEXT BIG THING: HAVELSAN'S SIMULATORS ARE ATTRACTING THE WORLD'S ATTENTION
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
AN INTERVIEW WITH MR. SERDAR DEMİREL – DEPUTY UNDERSECRETARY FOR DEFENSE INDUSTRIES VOLUME 11 ISSUE 73 YEAR 2017 ISSN 1306 5998 THE NEXT BIG THING: HAVELSAN’S SIMULATORS ARE ATTRACTING THE WORLD’S ATTENTION SSM RELEASES 2016 ANNUAL ACTIVITY REPORT OTOKAR’S OUTSTANDING ACHIEVEMENT IN THE UAE STM CYBER FUSION CENTER INTERCEPTING CYBER THREATS TURKISH DEFENSE POWERHOUSES FNSS AND SSM TEAM UP FOR LOCAL DESIGN AND PRODUCTION TO ZAHA PROGRAM
VOLUME: 11 ISSUE: 73 YEAR: 2017 ISSN 1306 5998 Publisher Hatice Ayşe Akalın Publisher & Editor in Chief Ayşe EVERS 6 a.akalin@defence-turkey.com Managing Editor Cem AKALIN cem.akalin@defence-turkey.com Administrative Coordinator Yeşim BİLGİNOĞLU YÖRÜK y.bilginoglu@defence-turkey.com International Relations Director Şebnem AKALIN sebnem.akalin@defence-turkey.com SME’s Advertisement Director Yasemin BOLAT YILDIZ yasemin.yildiz@defence-turkey.com Translation 26 Tanyel AKMAN info@defence-turkey.com Editing Mona YÜKSELTÜRK Robert EVERS Graphics & Design Gülsemin BOLAT Görkem ELMAS info@defence-turkey.com Photographer Sinan Niyazi KUTSAL Advisory Board (R) Major General Fahir ALTAN (R) Navy Captain Zafer BETONER Prof Dr. Nafiz ALEMDAROĞLU 42 Cem KOÇ Asst. Prof. Dr. Altan ÖZKİL Kaya YAZGAN Philipp REUTER Ali KALIPÇI Zeynep KAREL İMGE Co. Sancak Mah. 596 Sok. 59/7 Çankaya Ankara / Turkey DEFENCE TURKEY Administrative Office 51 Sancak Mah. 596 Sok. 59/7 Çankaya Ankara / Turkey Tel: +90 (312) 447 1320 info@defenceturkey.com www.defenceturkey.com Printing Görsel Grup Basim Tanitim Tasarim Matbaacilik Kağ.Kirt.San.İç Ve Diş Ti̇ c. Ltd.Şti İstanbul Caddesi̇ İstanbul Çarşisi Kat: 2 No : 48 / 64 İski̇ tler - Ankara Tel: 0 312 256 11 88 Fax: 0 312 256 18 88 Info@gorselbasim.com.tr www.gorselbasim.com Basım Tarihi Şubat - Mart 2017 Yayın Türü 58 Süreli İMGE Co. © All rights reserved. No part of publication may be reproduced by any means without written permission.
ISSUE 73/2017 3 DEFENCE TURKEY 6 Resolute Commitment with a Common Purpose - 72 STM Published Cyber Threat Report Promoting Turkey’s National Interest with Long Term and Strategic Defense Industry Plans 73 Turkish Land Forces Inventory Fortified with Cobra- II 26 SSM Releases 2016 Annual Activity Report 74 Defense Industry Teknokent Companies Coalesce at 32 Otokar’s World-Class Status Reinforced with ‘Al the TSSK 4th Project Market Jasoor’ - The Gulf Region’s RABDAN 8x8 – A Colossal Deal Brimming with New Market Opportunities 78 Turkish Industry Determined to Stay Competitive OSSA 4th Ordinary General Assembly Convened 36 2016 TOBB Defense Industry Council Assembly Meeting Convened in Ankara 81 Havelsan Develops Unique Products in Cyber Security 42 The Next Big Thing: Havelsan’s Simulators are Attracting the World’s Attention 82 Change Itself is an Opportunity to Bring new Actors together – An Interview with ATC’s President Howard 51 STM Cyber Fusion Center Intercepting Cyber Beasey Threats 85 Harp ArGe Electromagnetic Anti-Drone System 53 Turkish Defense Powerhouses FNSS and SSM Team Exported to Azerbaijan up for Local Design and Production to ZAHA Program 86 New Chairman on Aselsan Board of Directors 54 Meteksan Defense Surfacing on the Global Stage with its Damage Control Simulator – Securing a Sale to 86 Havelsan Ordinary General Meeting Concluded the Republic of Korea Navy 87 A New Chairman of the TAI Board of Directors and 55 High Tech Mast Systems Set for Mass Production in New Members Appointed 2017 87 Changing of Hands - Selex ES Turkey Changes 56 Austal -The Australian Shipbuilder with a Proud Management History of Success in Turkey, Positioned for Future Opportunities 87 New Appointment to AYESAŞ and Vestel Defense Companies 58 Submarine Rescue Ship MOSHIP TCG “Alemdar” 88 CTech Introducing its Products and Technologies at Delivered to Turkish Navy Winter Drill 2017 60 Turboshaft Engine Development Project Contract 88 TAI Awarded Invention Award at the Istanbul Signed Between TEI and SSM International Invention Fair 60 BAE Systems Signs Heads of Agreement for a Future 89 Teknopark Istanbul - The 3rd Golden Cube Award Contract with TAI for TF-X Program Ceremony 61 Nurol Makina’s First Export to North Africa – 89 Ares Shipyard Stride Out in Maritime Industry Successful Ejder Yalçın Vehicle Gains Attention in New Markets 90 12th Round of Pakistan-Turkey High Level Military Dialogue Group Meeting Held in Pakistan 61 Splendid Match worth Millions - TAI and Sikorsky Aircraft 90 Lockheed Martin Introduces Paragon Direct Attack Munition 62 Inauguration of Shooting Range and Test Center 63 The Countdown for Hürkuş-C to Begin Combatant 91 Ambitions Soar as Young Ladies from Area High Schools Participate in TEI’s Women of Aviation Tasks Worldwide Week 64 IDEX 2017 – Dominant Middle East Defense Fair 92 Rolls-Royce Announces Investment in Research & 65 Otokar is now Closer to its Users in the Gulf Region Development for Ship Intelligence 66 Sarsılmaz Ramp Up MPT-76 Modern Infantry Rifle 93 Lockheed Martin to Deliver World Record-Setting 60kW Laser to U.S. Army 66 Aselsan and STM - Contract Inked for an Electronic Warfare System 93 Raytheon Awarded Contract to Provide the Qatar with Early Warning Radar System 66 Two More Successful Deliveries to Qatar MoI 94 Honeywell Forecasts 3,900 to 4,400 Global 67 Sikorsky Transfers S-70i Helicopter to Aselsan for Helicopter Deliveries Over Next Five Years Turkish Utility Helicopter Program Development 95 F-35 Successfully Conducts First Firings of MBDA’s 68 Significant Progress Achieved in the Emergency ASRAAM Physical Security System Project at the Turkey – Syria Border 96 SpaceDataHighway to Reach Asia-Pacific 69 Full Steam Ahead – “Korkut” Serial Production 96 Leonardo-Finmeccanica: Successful first Flight for Commences the new Aermacchi M-345 70 Power Pack Development Contract Terminated
ISSUE 73/2017 5 TF-X Program Gaining Momentum Ayşe Evers Publisher & Editor in Chief The final decision on selecting a partner was reached within the context of the TF-X program and the contract was signed with BAE Systems. The project setup was built on the philosophy of developing the TF-X aircraft by utilizing BAE’s existing technologies (Background IP) as well and through the collaborative activities of BAE and Turkish engineers based on the domestic joint responsibilities principle. In accordance with the project model, a design organization will be established within TAI’s premises and BAE will conduct the leadership of certain design groups and TAI will be the leader of some other groups. G2G level negotiations between Turkey and the UK played an important role. In this way, the establishment of cooperation at a strategic level through the Exchange of Letters method between both countries at the Defense Ministry level was planned in order to facilitate project activities throughout the project; priorities such as obtaining export licenses and accelerating technology sharing and the obtaining of export licenses. Thus, the risks that may arise as part of the project will be minimized with the support provided by the British governmental authorities and at the same time the infrastructure and facilities. Engine selection is an issue for the next phase. It is stated that regarding the selection of the off-the-shelf engines and indigenous engines, Turkey requires a hybrid solution and many existing off-the-shelf products are not fully capable of ensuring the performance that Turkey desires. It is mentioned that the solution will be jointly developed by Turkish industry and the engine company then it will be submitted to the Undersecretariat for Defense Industries for approval. Within the concept of the TF-X program a significant number of human resources will be required for the following phases. In this respect, with the launch of the project’s design stage, numerous engineers from BAE Systems who are experienced in the design of fighter jets will be coming to Ankara and collaborating with the experienced engineers at TAI. Within the framework of our cooperation with BAE Systems, providing “on the job training” to Turkish engineers is planned as well. In this context, with the launch of the project, numerous TAI engineers will be simultaneously assigned at the facilities of BAE Systems (without being limited only to T-FX) for on the job training purposes and will be performing tasks and gaining experience there. Within the scope of this project, studies are being carried out on determining which requirements would be covered by the available sub systems or off-the-shelf commercial products by projections on technologies which are to be utilized in the 2030s. The in-depth analysis will be made within this context regarding which technologies should be adopted indigenously as Turkey’s main objective is to put forth an Indigenous Fighter Jet designed fully in accordance with the requirements of the Turkish Air Forces. Enjoy this issue..
DEFENCE TURKEY 6 ISSUE 73/2017 Resolute Commitment with a Common Purpose - Promoting Turkey’s National Interest with Long Term and Strategic Defense Industry Plans In this exclusive interview, Deputy Undersecretary for Defense Industries Mr. Serdar Demirel shares in depth insight into the impressive and growing list of Defense Industry products coming out of Turkey. © Defence Turkey
ISSUE 73/2017 7 DEFENCE TURKEY Defence Turkey: Mr. Serdar Demirel first of all we would like to thank you for your time. There have been some changes in the responsibilities and organizational structure of the Deputy Undersecretary for Defense Industries in the recent period. Within this context, could you please inform us on the new structure? Due to the accelerated work pace and increased responsibilities of the Undersecretariat for Defense Industries within the previous year, making several changes became inevitable. The fifth Deputy © Defence Turkey Undersecretary was appointed last summer in order to balance the workload between the Deputy Eagle aircrafts (the initial deliveries of the Command Control Aircrafts Undersecretaries. Within this context, which were made before 2016) were Logistical Support Project, and the Land Platforms Department and accomplished within 2016. Electronic Warfare, Test and Department of Helicopters, where I Within the scope of the auxiliary Training Field (EHTES) Logistical was assigned previously as a Deputy ships program executed by our Support Project were signed Undersecretary separated and Undersecretariat in line with the by the Department of Logistics Deputy Undersecretariat incorporate requirement of the Naval Forces under the auspices of our Deputy in the Department of Unmanned and Command and as part of the Undersecretariat. Presently the Smart Systems and Department of Submarine Rescue Mother Ship activities regarding the Long Horizon Logistics. In this way, our Deputy Project (MOSHIP), the test activities Logistical Support Project, Coast Undersecretariat now collaborates were completed and as you know Guard Boats’ Stabilized Machine mostly with the Air and Naval Forces the vessel’s acceptance was Gun Platform (STAMP) Systems and Coast Guard Commands and the made on 28 January 2017 with a Logistical Support Project, Project for Departments of Land Platforms and commissioning under the name Acquiring Depot Level Maintenance Helicopters which used to generally ‘TCG Alemdar’. Capability for the PT6 Series cooperate with the Land Forces and In addition, within 2016, as part Engines, Project for Acquiring the Gendarmerie General Command are of the New Type Patrol Boat Project, Depot Level Maintenance Capability now under the auspices of another the Final Delivery of the 16th Boat for the Airborne Early Warning and Deputy Undersecretariat. (the last boat) was completed. Control Aircraft, Kornet-E Anti- Defence Tu r k e y : The Within the scope of the 25–Tons tank Weapon System Logistical Departments of Fixed-Wing Coast Guard Boat Project, the initial Support Project, 2nd Lot Tactical Platforms, Naval Platforms, and acceptance of the 17th Boat (last UAV (MALE) Direct Procurement Unmanned-Smart Systems and boat) was accomplished and the Program–GÖZCÜ Logistical Support Logistics are executing critical Final Acceptance of the 13th – 16th Project, New Generation Basic system and platform projects Boats were accomplished. Finally, Trainer Aircraft Hürkuş-B Logistical under your responsibility. In this within the framework of the SAR 33 Support Project, Bora Logistical regard, could you please evaluate Boat’s Modernization Project, the Support Project, Emergency the latest status of the product- Final Acceptance of all boats (five Manned Reconnaissance Aircraft platform deliveries, programs in boats in total) were completed. Logistical Support Project are being the serial production stage and the The Unmanned Air Vehicle conducted. development programs conducted systems developed as part of the As the expert in the areas of in 2016? Bayraktar TB2 Tactical Unmanned effective life cycle and logistics Within the scope of the Erciyes Air Vehicle Development Project management, our Department of Project, in which the avionic were initially delivered to the Land Logistics is providing the necessary systems of the C-130 aircrafts in the Forces Command and in 2016 support to the Turkish Main Battle Air Forces Command’s inventory they were delivered to the Security Tank (Altay) Project, Indigenous were modernized, the tests on General Directorate. Helicopter Development Project, one prototype were successfully The acceptance tests of the KARAOK Short Range man portable completed and its delivery was unmanned air vehicle system in Anti-Tank Missile Project, Anti-Tank accomplished in December operative class ANKA developed Vehicle (STA) Project, AKYA Project 2016. Upon the completion of within the scope of the Indigenous phase-2 and Early Warning and the prototype stage, the serial Turkish Unmanned Air Vehicle Radar Systems Phase-1 Projects. modernization activities of the (MALE-Class) Development Project Defence Turkey: Which aircrafts were initiated. Moreover, was also completed successfully. system and product deliveries the final deliveries of the Peace The contracts regarding are planned for 2017 by the
DEFENCE TURKEY 8 ISSUE 73/2017 Departments of Fixed-Wing, Naval to designing its own frigate. Development activities and Platforms, Smart and Unmanned The deliveries of 2 vessels as deliveries are progressing for Systems operating under your part of the Landing Ship Tank (LST) diversified requirements of the responsibility? Also, in which - Amphibious Ship Project, the first Turkish Armed Forces for the smaller areas will new procurements and of the 2 ships as part of the Logistical class of UAV programs. new projects be initiated? Support Ship Project are expected Defence Turkey: You always We plan to realize 2 deliveries in to be delivered to the Naval Forces mention that life cycle costs and 2017 as part of the A400M program. Command in 2017. As part of the management should be more The activities for the acceptance 25-Ton Coast Guard Boat Project, effectively implemented in the tests of the first delivery are about the Final Acceptance of the 17th defense systems programs, at to be launched. Moreover, within Boat (the last one) is planned to be the same time claiming that the the scope of the Erciyes Project completed in March. Performance Based Logistics the serial modernization of the Within the scope of the Rescue applications should become more aircrafts and their delivery to the Air and Towing Vessel Project (KURYED) widespread. To this end, within the Forces Command are planned to be being carried out for the Naval preparatory stage, which type of initiated. Forces Command and the Seismic a model is in discussion to guide, On the other hand, I am delighted Research Vessel Project for fulfilling support and encourage the sector to announce to Defence Turkey the requirements of the General in line with the Logistics Road readers that the first armed test Directorate of Mineral Research and Map? Could you please share the flights and launching test of the Exploration, the Harbor and Sea current status with us; its pros prototype of Hürkuş-C, which is Acceptance Tests of the vessels are and cons as well as the ideal the Hürkuş Training Aircraft’s armed ongoing. In this context, delivery of structure? close air support configuration, will the 2 vessels as part of KURYED As the Undersecretariat, our be initiated in April. and Seismic Research Vessel to main approach regarding logistics As you may recall from previous the Naval Forces are expected to is maintaining the support of the years, Baykar TB2 Unmanned Air be commissioned in the first half weapon system in the inventory Vehicle’s entry into the inventory, of 2017. Additionally, we aim to through effective and optimum cost in pursuit of its armed version was finalize the evaluations of the bidding and integrating this into the design rapidly designed, integrated and put regarding the Research Vessel and of the weapon system, thus enabling into service. Based on this, I would Fleet Replenishment Ship Project in the user’s focus on its primary like to underline that the design of 2017 and submit them to the Defense tasks. To this end, we attach great new weapon systems and their entry Industry Executive Committee. The importance to the identification of into inventory require great effort deliveries in respect to the Bayraktar the logistical supportability criteria and patience. Then again, following TB2 Tactical UAV (Pist) Development even from the design stage in order the launch of the first product and Project will proceed throughout the to provide input to the design. As the acquisition of the capability, the year as well. commonly known, the principle of derived products can be rapidly Within the scope of the Mini Performance Based Logistics (PDL) designed and manufactured. In this UAV Project, which is one of our first is to enhance the reliability of the context, I expect that we will see novel unmanned air vehicle systems, system by committing to the user many new and improved products previously entered into the inventory a certain level of combat readiness based on the capabilities acquired of the Land Forces Command and of the weapon system. At this very through the Altay Main Battle Tank new deliveries are planned to be point, we are exerting efforts toward and Indigenous Helicopter programs. accomplished within 2017. the development of the ‘indigenous In respect to MILGEM Corvette, quite Within the scope of the ANKA product support strategies’ some time has passed since the first serial production projects, based which are capable of utilizing the delivery but with the involvement of on the capabilities gained through manufacturer’s knowledge of the the private shipyards in the process the Indigenous Turkish Unmanned system, comprising of the PDL I am confident that soon we will be Air Vehicle (MALE) Development approach as well as the existing able to announce achievements in Project, the air vehicles equipped facilities and capabilities in the export activities. However, it is an with various payloads and the related military factories and our shipyards. undeniable fact that the experience ground systems will be delivered Surely, our Undersecretariat’s role gained in maritime fields are utilized within 2017. here mostly consists of the inclusion
ISSUE 73/2017 9 DEFENCE TURKEY
DEFENCE TURKEY 10 ISSUE 73/2017 of the system’s supportability to its design and the development of © Defence Turkey contract models in which the system designers / manufacturers will also be in charge of the logistical support of the system. While developing product support strategies, we aim to build a close coordination between the industry, procurement authority and end users, and set up models that analyze feedback from application in the field, breakdown or error frequencies and any other types of data analyses within this process. C o n s e q u e n t l y, our Undersecretariat works in close collaboration with both the industry and end users as well as the research institutions and is continuing ‘original product support strategies’ Models, either implemented or preparations for the Life Cycle and we are striving to utilize a planned to be implemented, by our Management Conference which logistical support approach designed Undersecretariat are as follows: is planned to be held this May and to combine the capacities of the ›› Industry’s planning towards the which all the related shareholders will public and private sectors allowing supportability of products after the attend. The most important output all the stakeholders to focus on guarantee period and being active in of this Conference is to establish a their own capabilities to achieve the area of logistical support, rather Life Cycle Management Platform in performance targets identified in line than just focusing on the production which all shareholders will participate with a long term product support and delivery, and execute workshops in certain strategy encompassing all phases ›› Regarding the development areas and thus create a working of the project life cycle. projects, transfer of the procurement environment for the activities of The main objective of the authority’s criteria to design in a way this platform and joint actions of Logistical Support Models, also that includes the supportability criteria the shareholders in line with the bearing in mind today’s operations, and building the optimal model by determined targets. I believe that is to provide the availability of the benefiting from the experiences the participation in this conference products and systems in a cost- acquired through similar projects, and platform will be useful in respect effective manner and in line with the ›› Maintaining long term relations to reaching a better understanding performance criteria. PDL’s main -bearing in mind their effect on the of our Undersecretariat’s logistical objective is to maintain readiness. costs- with the subcontractors within support approach and for the Undoubtedly, our companies the supply chain, exchange of ideas with the are expected to establish effective ›› Maintaining the coordination between shareholders directly related with the supply chains, and while developing the manufacturer and the system subject. The essential outcome of the product support strategies, it after the guarantee period, making Conference and the Platform is the is necessary to establish close long term logistical support contracts adoption of decisions concerning the coordination with the industry, the that will enable the execution of the implementation and their realization requirements of authorities and maintenance of the systems in an by all relevant shareholders, our the end users, analyzing data such affordable manner with the desired Undersecretariat being first and as the frequency of failures as well level of performance, foremost. as other valuable feedback and ›› Of course, finally, our companies need Defence Turkey: The information from the field. Within to take an active role in the field of Performance Based Logistics this process will focus on activities logistic support, by taking into account issue has been on the agenda of for developing new technology and the achievements attained thus far, in the Undersecretariat for a long new capabilities. order to further the sustainability of while and we know it is being Defense companies in United our defense industry. implemented in certain successful States, UK and similar countries Defence Turkey: Could you pilot studies under your guidance. don’t position themselves as please inform us on the recent Taking into account worldwide merely system manufacturers, status of the ongoing Hürkuş-B best practices, with the increasing these corporations are eager to be serial production program, A400M popularity of this model, which involved in the logistical support program, retrofit activities of the contributions will it provide to the service required by the system as Peace Eagle Aircrafts, Avionic Turkish Defense Industry together well. Modernization of the C-130E/B with the sub-industry, SMEs, Main Amongst our primary goals within (Erciyes) and Meltem-3 programs Contractors and all supply chains? the scope of the PDL approach and conducted by your Deputy Performance Based Logistics other effective Logistical Support Undersecretariat? (PDL) can be defined as the use of
ISSUE 73/2017 11 DEFENCE TURKEY
DEFENCE TURKEY 12 ISSUE 73/2017 As known, the serial production activities of the A400M Transportation Aircraft are proceeding. In respect to the Peace Eagle Project, the delivery of the Airborne Early Warning and Control Aircrafts were accomplished and currently our aircrafts are effectively performing their tasks. Within the scope of the Erciyes Project, comprising the upgrade of the avionic systems of our C-130 aircrafts, as I mentioned previously, the prototype development phase has already been completed and modernization activities of the of the contract signed with BAE that was signed on 28 January 2017. aircrafts are ongoing. Systems, on the business model of The parties agreed on conducting As part of the Meltem-3 Maritime TAI and BAE Systems companies the following contract negotiations Patrol Aircraft with Sea Surveillance and the structure to be built? within the framework of the articles Capability Project, the structural When establishing the project of this agreement. It seems that modifications of the first aircraft and model, our 5th Generation Aircraft the two parties will soon agree ground tests were accomplished at Technologic Readiness Level, upon the entire terms concerning TAI’s facilities and it was dispatched qualified labor forces, projected the cooperation agreement. With to Torino/Italy in July 2016 for the schedule, Test and Measurement, the signing of the Cooperation certification tests. The project Production and Infrastructure Agreement, BAE Systems will be activities are proceeding. Requirements, etc. and the output assigned as the YIF within the TF-X Within the scope of the Hürkuş capacity required for this type of Project. Project, initiated in 2006 by our system’s cost-efficient inclusion The project setup was built on the Undersecretariat for fulfilling the in the inventory were evaluated. philosophy of developing the TF-X requirements of the Turkish Armed As a result of the analysis, the aircraft by utilizing the YIF’s existing Forces, the maiden flight was human resources and cost for the technologies (Background IP) as accomplished in August 2013 and development of the aforementioned well and through the collaborative the final phase of the project, The complex system were taken into activities of the YIF and Turkish Type Certificate was granted to the consideration and it was concluded engineers based on the domestic Hürkuş-A Trainer Aircraft in July that the project would not be cost- joint responsibilities principle. 2016 by the European Civil Aviation effective if it considered only the In accordance with the project Authority (EASA). In respect to the requirements of Turkey. model, a design organization will be New Generation Trainer Aircraft In this context, the needed established within TAI’s premises and (Hürkuş-B) Project, launched in to collaborate with a Foreign the YIF will conduct the leadership December 2013 for comprising Cooperation Partner (YIF) that has of certain design groups and TAI will Turkish Air Forces Command’s combatant fighter design experience be the leader of some other groups. requirements for 15 new generation and which can readily access new We plan for the participation of trainer aircrafts, the structural alternative export markets. Various employees of both companies to all integration of 5 aircrafts was companies submitted bids to the be a part of all design groups, a joint accomplished and the assembly of tender launched for the selection approach regarding project activities, the 6th aircraft is underway as part of the YIF and upon review of the within the framework of collaboration of mass production. According to the evaluations, BAE Systems was to accomplish a successful design program schedule, the maiden flight selected as the preliminary YIF process. is scheduled for December 2017. candidate. On the other hand, we initiated The first delivery is expected to be Immediately afterwards, the intergovernmental negotiations completed in June 2018 and the final activities known as the “Pre-Contract between the Turkish and British delivery will be accomplished, a year Study” (PCS) were conducted with Government. In this way, the later, in June 2019. BAE Systems and in addition to establishment of cooperation at a Defence Turkey: Mr. Demirel, contract negotiations, joint activities strategic level through the Exchange the final decision on selecting a concerning engine selection, of Letters method between both partner was reached within the review of the conceptual design, countries at the Defense Ministry context of the TF-X program and infrastructures, etc. were carried out level was planned in order to facilitate the contract was signed with the with joint working groups. As a result project activities throughout the British company BAE Systems. of these studies, the main principles project; priorities such as obtaining In this respect, previously the in relation to the cooperation to be export licenses and accelerating main contractor contract for the built between TAI and BAE Systems technology sharing and the obtaining preliminary design phase was companies were identified through of export licenses. Thus, the risks signed with TAI in August. Could the “Heads of Agreement” document that may arise as part of the project you please inform us on the details
ISSUE 73/2017 13 DEFENCE TURKEY
DEFENCE TURKEY 14 ISSUE 73/2017 will be minimized with the support engine’s performance to the desired domestic resources and through provided by the British governmental level by using the development ‘reverse brain drain.’ authorities and at the same time the margins of the selected engine and Within the framework of our infrastructure and facilities owned executing serial manufacturing with cooperation with BAE Systems, by the British government will be this engine. providing “on the job training” to available for our utilization. ›› Long Term: Designing more improved Turkish engineers is planned as well. Defence Turkey: Within the engines compatible with the In this context, with the launch of scope of the TF-X program, the interface and sizes with the serial the project, numerous TAI engineers decision was made for the twin- production engines and conducting will be simultaneously assigned engine platform design. Apart from improvements with these new at the facilities of BAE Systems the design solution and platform engines in the half-life modernization (without being limited only to T-FX) performance, to what extent of the aircrafts. for on the job training purposes will the model’s availability for Surely, as I emphasized and will be performing tasks and improvement, cost components previously, these are my own gaining experience there. These and technological gains be in intellectual assumptions. The setup staff will be returning to TAI in the contributing to the development of the project may be different than following phases of the project and of an indigenous engine? What my projection. The original solutions the experiences they gained will be are your comments? for this issue, which may be different utilized in the project. As you also recognize, there from the forecast, are developed Moreover, within the scope of are numerous key factors such as by a business model and related the Exchange of Letters which will technical, financial and strategic cost-effectiveness and analysis are be realized between the Turkish ones, that have an impact on the presented to the Undersecretariat. and British Government, a benefit selection of the company. We are Defence Turkey: A significant is anticipated from the graduate evaluating alternative solutions number of human resources and post graduate programs at the by taking these aspects into will be required for the following British Universities. The technology consideration. To me, the most phases of the TF-X program. To transfer gained through this process, important criteria is the added value this end, what will be the plan the convenience provided by the they will be contributing to the fruitful for creating a team composed itinerary and the technological accomplishment of all these plans of internationally experienced, cooperation between the two and the TF-X program which we seasoned lead engineers, countries within the context of this expect to become the locomotive administrative and technical staff project are planned to be increased of our defense industry in respect to with technical know-how and to the highest level. aviation. experience who will be able to In addition to the fighter jet Regarding the selection of the devote themselves to the project? design, this project requires the off-the-shelf engines and indigenous At this stage, what kind of a role development of various advanced engines, we actually require a hybrid will the Undersecretariat be technology sub-systems. The solution. As you may also appreciate, playing as well as which roles will readiness of similar regulations is the design of a complex platform TAI and BAE Systems have as the planned to be conducted by our such as that of a fighter jet is already main contractors? related companies and if necessary a very challenging task. Conducting As a result of the activities the Joint venture company they will this design for a “tailor made engine”, conducted throughout both the be interoperable with as well as the features and behaviors of which conceptual design of the project between the governments. are not finalized, makes the process and the pre-contractual activities Defence Turkey: BAE Systems even more complicated. On the other executed with the BAE Systems, is a capable of developing and hand, when we analyze the features a need for human resources with manufacturing the Eurofighter of the aircraft that we plan to design, both quality and quantity aspects and the company has significant we come across a different picture; emerged. In order to fulfill this experience in this area. Regarding many existing off-the-shelf products requirement, studies are being the design phase of the program, are not fully capable of ensuring the conducted regarding domestic and is there any solution model on the performance that we desire. Without international human resources for table containing the utilization of a doubt, the solution will be jointly this type of project, meanwhile the off-the-shelf subsystems formerly developed by our industry and the know-how and experience of the utilized in the Eurofighter, and the company that we cooperate with staff already employed at the project critical technologies such as AESA and then it will be submitted to are being enhanced through training. Radar, EW system, communication the Undersecretariat for Defense In this respect, with the launch of system and indigenous weapon Industries for approval. the project’s design stage, numerous integration, etc. that would be Then again, if we are to make an engineers of BAE Systems who are developed by Turkey, and hence intellectual estimation, I think there experienced in the design of fighter Turkey would only focus on critical may be a three-staged plan which is jets will be coming to Ankara and technologies? as follows: collaborating with our experienced Undoubtedly, one of the most ›› Short Term: Initiating the design engineers at TAI. On the other hand, prominent contributions to the TF-X activities by selecting an existing we received unconfirmed news that provided by BAE Systems would engine. TAI will be pursuing a concentrated be the company’s know-how and ›› Medium Term: Increasing the selected “brain hunt” process from the competency in the development of
ISSUE 73/2017 15 DEFENCE TURKEY
DEFENCE TURKEY 16 ISSUE 73/2017 fighter jets and related sub systems. Within the scope of this project, © Defence Turkey our studies are being carried out on determining which requirements would be covered by the available subsystems or off-the-shelf commercial products by projections on technologies which are to be utilized in 2030s. The in-depth analysis will be made within this context regarding which technologies should be adopted indigenously; the export restrictions that may emerge, risks, cooperation opportunities, technological readiness level and capabilities of our country’s defense industry and decisions on procurement or development will be made accordingly. The model you mentioned is not Under the current situation, United States and partner actually the model we projected. resolution on the procurement countries including Turkey were Our main objective is to put forth an consisting of 2020, 2021 and 2022 complaining about the unit price Indigenous Fighter Jet designed fully delivery terms, which was named of the aircrafts for a long while. in accordance with the requirements the “Block Buy” was made at The reduction of unit price has a of the Turkish Air Forces, instead of the Defense Industry Executive close link with the learning curves manufacturing a domestic improved Committee’s meeting on 28 October in addition to the increase in the version of an already existing 2016. With the adopted committee amount of orders and ramp-up of Combat Aircraft. Within this frame, decisions, the number of aircrafts production. Thanks to this approach, the off-the-shelf systems that are decided upon for procurement within referred to as the “Block Buy” by the considered compatible with our the scope of the project reached up JSF Program Office, a considerable combat aircraft and that do not to 30 Aircrafts. amount of increase in aircraft create foreign dependency regarding Our first two aircrafts, to be orders is expected, in addition to the required sub systems may be received in 2018, will be dispatched a reduction in costs. Currently the utilized either directly or with minor to Luke Air Base for Pilot Training. amount of savings achieved with modifications. Still, in cases where The United States will hand over the Block Buy are surveyed by the indigenous design is essential, most the first two aircraft to Turkey within Program Office, yet the decreasing certainly we would work on the 2019. costs were, actually, the figures we similar development models with our The activities concerning projected with our partners through defense industry companies. the integration of the indigenous analysis and scheduled cost at the Defence Turkey: Could you munitions, which we consider onset of the program. As a matter please inform us on the number important such as the SOM-J of fact, the aircraft procurement of orders Turkey has given so far and HGK to the F-35 platform, are projections were made based on within the scope of the F-35 JSF continuing. If the program schedule these assumptions as well. program, the delivery schedule proceeds on track, we will be enable Furthermore, we are pleased of these orders and on block to launch both munitions from our to see that the ambitious price configurations? Additionally, what aircrafts in 2022. reduction predictions, that we made kind of a schedule do we have Defence Turkey: As the partner years ago, have come to pass. We ahead concerning the integration country, Turkey has a commitment are a program management success of the unique munitions such as of 100 orders within the framework story, an achievement by the 9 the Stand-off Missile (SOM-J) and of the JSF program. The unit cost program partner countries. Guidance Kit (HGK) to the F-35s trend is expected to decline with Defence Turkey: Mr. Demirel, that will be included in the Turkish the gathering of bulk orders given what would you like to say Air Forces’ inventory and their particularly by partner countries regarding the financial volume of certification? in the upcoming period. Most the programs conducted by the At the Defense Industry Executive recently, in February, Lockheed Naval Platforms Department as of Committee’s (SSIK) meeting held Martin went through a serious 2016? For a while, especially due on 06 May 2014, a resolution for overhaul with US orders, and to the slump in oil prices in the putting orders for the first two F-35A for the first time the F-35’s unit world conjuncture in the Military JSF was made and then on SSIK’s price went below $ 100 million. Vessel Construction sector, there meeting on 07 January 2015 an order In this context, how will these is an economic contraction and for additional 4 JSF was decided developments impact Turkey’s the share is shrinking. Assessing upon. The first F-35 JSFs with Block- orders and the requested the current status and the future 3F configuration are planned to be configurations in the near future? of the Local Military Vessels taken over in 2018.
ISSUE 73/2017 17 DEFENCE TURKEY
DEFENCE TURKEY 18 ISSUE 73/2017 programs together, how do you we cater to all surface military Construction Industry but it is regard the sustainability of the ship requirements either in steel, constantly underlined that acting sector? What would you like to aluminum or composite structure within a consortium is of essence say on the support and incentives through our local resources. At this for them to become a global made to this end? stage, the budgetary size of our brand. How will we establish a As a developing country, we military ship construction projects sustainable and powerful structure are confronting various problems is approximately $ 5.5 Billion. This both in domestic programs and such as terrorism and the conflicts budgetary size will increase with in foreign countries? Which do in the Middle East in addition to the the projects we will be initiating you think the correct setup is for economic recession globally and in the years ahead. Surely, these success? in our country. There has been an figures encompass all prices of the As a result of the projects economic recession in the Military propulsion, weapon and electronic conducted by our Undersecretariat Ship Construction Industry but we systems of a given vessel as well. in recent years, the contracts may still claim that 2016 has not been From this perspective, even if that have been signed, the unfavorable for the military vessel the figure now seems quite high, accomplished deliveries and the industry as a whole. Then again, as the share of the military vessel new tenders launched, the private a result of the negative conditions in construction sector’s remains sector shipyards acquired the the world, there has been a tendency below this figure. Therefore, I regard know-how and experience enabling towards maintenance and repair and the continuity of the increasing them to conduct military ship military vessel manufacturing in the export activities as essential for design, construction, outfitting and Turkish Vessel Construction Industry. the sustainability of our sector. We integration, test trials, guarantee, The Turkish Ship Construction will continue to provide support to integrated logistical support and risk Industry managed to maintain its our companies for export activities. management. existence even in the unfavorable However, in order to conduct export Turkey took its place amongst conditions that we have been activities, a sound infrastructure, the countries having a say in a enduring since 2010 and continued technological know-how and a field as it is capable of conducting its development. Taking a look at qualified labor force are essential. I the design of the ships through its our own particular examples, many believe that the sector has a critical own resources and engineering of our military ship construction role in improving itself as well. acquirements. Our companies in projects’ initial delivery and final As a result, we have confidence the military ship construction sector delivery were accomplished in 2016 in the capabilities of our private have been developing themselves and the construction of our naval sector. We support all types of setups and becoming more robust with platforms such as LST, KURYED, and activities of our private sector each project. Up to 2002, mostly MOSHIP, Logistical Support Ship which gains strength. As long as the package projects were realized and LHD continue in 2017. The our sector enhances its capabilities, in which the design, integration and preparations for new tenders for and reinforces the qualifications equipment support were supplied the Defense Industry are being of its staff and infrastructure, the from abroad, but at the level we have conducted and with the finalization trust of both the Naval/Coast reached, our sector is now capable of these tenders, a significant Guard Command Forces and our of designing and building almost amount of contribution and labor trust in our sector will increase. all types of surface military ships will be provided to the sector in the Taking into consideration the level ranging from corvette-class warship upcoming period. we have reached in the military to landing ships, patrol boats and Despite the decline observed ship construction industry and the other auxiliary vessels in our country. in the rate of defense expenditures existing and potential projects, with However, it is known that the nowadays, the perception of threats the effective utilization of resources sector’s sustainability could not and requirements are changing and investments, the specialization be feasible merely through the and technological development of the shipyards and the philosophy procurement of Turkish Naval is gradually accelerating. The of “building our own ships at our own Platforms Programs. For this reason, efficient utilization of resources shipyards” regarding the products we attach great importance toward and the sustainability of developed with high export potential, the export activities. We are bearing the capabilities stand out in this design and manufacturing in Turkey export initiatives of our companies process and we are monitoring are our main goal, and supporting at all times. Occasionally several the fusing of components such as and paving the way for the sector companies place a bid for the same design, production, engineering are now amongst our main tasks. client or tender within the scope of and financing based on horizontal Moreover, the establishment of our export activities. This is the case and vertical integration; success export potential which we support that defies an easy explanation to in foreign markets is the objective by bringing successful domestic the clients. In order to prevent this instead of competition within the products to the world market plays predicament, we lean towards and domestic market. a significant role in the sustainability encourage consortium models in Today, I would like to express of the sector. which our companies will be able with pleasure in consequence of Defence Turkey: Many of to amalgamate their capabilities the strategies that we have been our shipyards active in building regarding the military ship sector in pursing over the last fifteen years. naval platforms have significant an integrated manner allowing them We have reached a level at which capabilities in the Military Ship to feature their strengths.
ISSUE 73/2017 19 DEFENCE TURKEY
DEFENCE TURKEY 20 ISSUE 73/2017 When we also analyze the cases defense in the region that they exist. facilities of the military shipyards, dominating the market in respect to On a global scale, it is understood we have a favorable attitude, yet military ship construction, we come that similar platforms are extremely instead of being insistent in this across the utilization of the acquired great programs on which detailed respect, I believe that the industry’s infrastructure and capacities as work is conducted in respect to presentation of its own solutions a whole, creating national brands design, manufacturing and finance. would be healthier and more and giving priority to competition Certainly, at this point, another key permanent. in exports. These national brands factor that needs to be recalled is the Defence Turkey: Could you contain various standardized achievement of a joint operation in please inform us on the latest shipyards that are specialized an efficient manner with other land, status of the MILGEM- I Class in different vessel types and are naval and air military units in the Frigate (MILGEM 5-8), New Type capable of functioning as a whole. inventory, ensuring interoperability Submarine, Fast Intervention In most parts of the export market, in respect to regional air defense. Boat Projects, Turkish Type Fast competition is seen among these Rather than an individual project, Patrol Boat, Landing Helicopter national brands and companies the TF-2000 Anti Air Warfare Frigate Dock (LHD), Off-Shore Tugboat, about to access the market are is a program requiring the realization Amphibious Ship (LST) programs? confronting these strong rivals. From of many disciplines through long Regarding the procurement of this perspective, the Turkish military term and strategic plans in line with a the fifth, sixth, seventh and eighth ship construction industry must use common purpose. Within this scope, ships of our MILGEM Project, we its infrastructure and capabilities various indigenous projects such issued our Call for Proposals in the jointly in order to be able to compete as the Multifunction Phased Array second half of 2016. Our activities in capacity and financial aspects. Radar System (CAFRAD), Surface- for the evaluation of the proposals The precondition of this process, I to-Surface Guided munition, unique of the bidders are proceeding. We believe, is the specialization of the torpedo, adaptation of combat aim to finalize the tender process shipyards which will be selected and management system have been as soon as possible and submit the accomplishment of integration initiated prior to the construction of the project to the Defense Industry between the shipyards to a certain the main platform and they are being Executive Committee. extent. executed in line with their schedules. Regarding the New Type As we recently witnessed at Taking into consideration the Submarine Project, we initiated the the IDEX Defense Fair in the United projects I previously mentioned, construction of the first submarine Arab Emirates, our local private regarding the subsystems towards in the last quarter of 2015 and shipyards assigned to the military the design and construction of the the construction of the second ship construction projects have TF-2000 platform and bearing in one began in the first half of already gathered voluntarily and mind the feasibility study prepared 2016. Currently the pressure hull formed a consortium. When we earlier, we have reached the final construction of the submarines also take a look at the examples in stage of our activities for determining is being carried out at the Gölcük the world, export is indispensable the most optimal project model in Shipyard Command and the factory for a sustainable industry. To this financial and technical aspects, acceptance tests of the sub-systems end, branding and acting unitedly as well as the schedule. We aim which will exist on-board are being is quintessential, a crystal-clear for maximum benefit from the run as well. Our efforts continue with fact. Therefore, they key factor of engineering infrastructure in our navy an intensive pace toward gaining this sustainability and success in exports and from our shipyards as well as important project into the inventory is our country’s private sector the main system suppliers that have every other year starting from shipyards acting as a joint force both been assigned in many military ship 2021; a project in which many of in projects at home and abroad. construction projects up until today. our domestic companies assumed Defence Turkey: Dear Mr. On the other hand, both critical tasks. Demirel, in which direction are concerning the issues in respect to Within the scope of the Landing the design activities proceeding the gathering of our private sector Helicopter Dock (LHD) Project, the and the activities related with the shipyards and the utilization of the construction of the hull has been following stage within the scope of the TF-2000 program, which © Turkish Navy Commander has been on Turkey’s agenda for a long time? Is the implementation of a consortium model in which military and private shipyards work together foreseen in this program just as in the I-Class Frigate program? Could you please evaluate the setup here? The naval platforms having Anti- Air Warfare capability are amongst the primary military forces used for regional defense that plays a key role in the accomplishment of the air F-512 “Büyükada”
ISSUE 73/2017 21 DEFENCE TURKEY
DEFENCE TURKEY 22 ISSUE 73/2017 of the National Police, when will © Defence Turkey the contract be signed with TAI? Could you inform us on the latest status of the project? The ANKA-S system, which is an operative UAV System with a long endurance capacity at medium altitude, will be utilized by the Air Forces Command. In the current situation, inventories of the Air Forces of many countries in the world have operative class UAV systems. The system deliveries are planned to be accomplished in 2017 and 2018 in line with the ANKA-S Project schedule. Moreover, the initiated and the activities for the Unmanned and Smart Systems Operative UAV system requirement revision of the design in line with Department, could you share of the Security General Directorate the requirements and contract with us the recent status of the is expected to be fulfilled with the execution are proceeding. Tactical Class UAV procurement Operative UAV System Procurement As part of the Amphibious Ship programs of the Security General Project that is planned to be signed (LST), completion of the initial Directorate, Gendarmerie General with TAI in the near future. acceptance activities of the 2 ships Command and Land Forces Defence Turkey: In addition to and their delivery to the Naval Command? the procurement and development Forces Command is planned to take With the Tactical Class UAV of Unmanned Air Vehicles, the place in 2017. Systems included in the inventories Bomb Disposal Robot Project, Within the scope of the Fast of Security General Directorate development activities of which Patrol Boat Project, the proposal Gendarmerie General Command are carried out by Aselsan, is evaluation has been completed and Land Forces Command, again being conducted under the and readiness studies concerning target acquisition and directing the responsibility of your Unmanned the submittal of the project to maneuvers and firing are being run and Smart Systems Department. the Defense Industry Executive with the payloads, additionally these The delivery of the first systems Committee continue. systems are capable of engaging was planned to take place in Concerning the Turkish Type Fast and destroying the targets with 2018. Yet, there is an immediate Patrol Boat, Final Report on Request instant visualization as well as requirement of the Security for Information prepared as a result the limited ammunition capability. General Directorate, so is it of the activities conducted by our Various countries across the world possible to hasten the timeline Undersecretariat was submitted procure these Tactical UAV Systems and make the first party delivery to the Turkish General Staff and and assign them to diverse tasks. in 2017? Could you please the Naval Forces Command. The Delivery of the TB2 systems, elaborate on the recent status of activities are being executed by manufactured by Baykar Makine the activities conducted to this the Naval Forces Command in line A.Ş., to various users as part of end? with the points presented in the the Tactical Class UAV Projects The deliveries of the Light Final Report. Our Undersecretariat executed by our Undersecretariat is Armored Vehicles within the will launch the readiness for the ongoing. The delivered UAV systems scope of the project were made tender when these activities are are providing services with a high in December 2015 and January accomplished. readiness rate. Our assessments 2016, eight months prior to the In respect to the Multi-Purpose for enabling the utilization of project schedule since there was Off-Shore Tugboat Project, the the aforementioned systems in an emergency for the systems. tender has been launched and commercial areas are in progress Currently, the qualification tests the proposals are expected to be and we believe that the unmanned of the manufactured prototypes received by the end of April. We plan air vehicles technology, providing are also being run earlier than the to complete the evaluation of the worldwide high rate of utilization delivery period. As a result of our proposals in 2017. Within the scope opportunities, will be significantly negotiations with Aselsan, we of the auxiliary vessels, we recently demanded in the commercial sector reached an agreement on both initiated our activities for launching as well. increasing the amount of the party a tender for the Shore/Harbor Tug Defence Turkey: What is the deliveries of the Bomb Disposal Project. We aim to issue the Call for project schedule envisioned for Robot and on the accomplishment Proposals for this project in 2017. the system deliveries within the of the deliveries before the delivery Defence Turkey: Within the scope of the Anka-S program? period according to the project scope of the programs conducted In addition, considering the Anka schedule in order to fulfil the under the auspices of your Block-B procurement activities emergency of the Security General Directorate.
You can also read