The latest eco products Cleaning and gardening equipment AirCon and cooling solutions

Page created by Terrance Cruz
 
CONTINUE READING
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
Spring/Summer
                                                         2021 Edition

Browse our most sought-after seasonal
hires, everything you need for a
busy Spring and Summer

Inside this issue

The latest eco products
Cleaning and gardening
equipment
AirCon and cooling
solutions
And much more…

                                                          trust us to deliver

                                        speedyservices.com /spring-summer
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
Welcome                                                                                                                                          Contents

                                                                                                                                            08
                                                                                trust us to deliver

Keeping you informed about                                                                                     Expertly equipped                 About Speedy          4
                                                                                                               for every step
what’s new at Speedy.                                                                                          As the UK’s leading tools,        Speedy in the news     6
                                                                                                               equipment and plant hire
Speedy will make sure that                                                                                     company, we are equipped          Energise and our
you are always equipped                                                                                        to support your business          eco product range      8
for business; reducing risks,                                                                                  on every project.
                                                                                                                                                 Cooling19
managing costs and ensuring                                                                                    Hire or buy
compliance allowing you the                                                                                    Products can be hired             Access                22
time and focus to do what you                                                                                  or purchased – choose
                                                                                                               from our wide range of            Powered Access        25
do best.                                                                                                       over 3,000 product lines
So whether you are looking to hire or buy                                                                      for hire and 8,000 to             Training27
                                                                                                               purchase. In addition we
equipment, update your training or need
                                                                                                               can supply non-standard           Comms                 30
help in an emergency, make Speedy your
                                                                                                               items, which we source
first contact.                                                                                                 directly from our                 Fencing, Barrier and
                                                                                                               network of quality                Temporary Flooring    31
                                                                                                               approved partners.
                                                                                                                                                 Concreting33
                                                                                                               4 hour delivery

                                                                                                                                            22
                                                                                                               nationwide on over                Dust                  36
                                                                                                               350 popular products
                                                                                                               We can deliver over 350 of        Cleaning38
                                                                                                               our most popular products
                                                                                                               direct to you within 4            Landscaping
                                                                                                               hours – nationwide,               & Gardening           42
                                                                                                               when you order by 3pm.
                                                                                                               Guaranteed, or get 1 week         Pipework and
                                                                                                               free hire.                        Engineering           44
                                                                                                               Look out for the
                                                                                                                                                 Survey                46
                                                                                                               following icon
                                                                                                               throughout equip,
                                                                                                                                                 Power & Air           49
                                                                                                               online and on the

                                                                                                                                            42
                                                                                                               Speedy app.
                                                                                                                                                 Lifting and
                                                                                                                                                 Lloyds British        52
                                                                                   Important information:
                                                   Measurements are approximate. Errors and Omissions
                                             Excluded. Calls may be recorded for training purposes. Full                                         Find your nearest
                                                                                                                                                                        54
                                               terms and conditions are shown online. All images are for
                                            illustration purposes only. Not all products and services are                                        service centre
                                                 available in all locations – check availability in advance.
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
04                                                                      Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                                      05

About Speedy                                                                                                                                                                                                 trust us to deliver

Hire                                                Buy                                                     Test                                                           Train
At Speedy, we’re making your life easier with       We are your partner for the purchase of products,       We offer over 200 years’ experience in testing,                We offer industry-leading, award-winning training
an industry-leading hire range and nationwide       tools and accessories. Quality products from            inspection and certification services delivered                that helps thousands of our customers work more
availability. We can support you with all of        market leading brands.                                  through Lloyds British.                                        effectively and safely than ever before.
your project needs, wherever you are working.
                                                    Our extensive range of products available to            Our expertise covers a wealth of disciplines                   Our core training covers the following courses
Our huge industry-leading hire range includes:      purchase:                                               including but not limited to:                                  including but not limited to:

 Low level access          Communications          Abrasives                   Nails, screws and         Testing inspection and     Design, manufacturing             Access training              Site and traffic
 Powered access            Survey                  Burning and welding          fixings                    certification                and refurbishment                Confined space training        management training
 Compressors,              Plant                   Adhesives, sealants and     Lifting equipment         Crane services             Training services                 Dust management and          Tools and survey
  generators and pumps      Lifting                  coatings                    Packaging supplies        Design and                 Specialist testing                    awareness training          training
 Tools                     Safety equipment and    Catering and janitorial     Power tools                manufacture                  services                         Lifting training             Professional services
 Heating, ventilation        atex                   Cutting and drilling        PPE                       Height safety                                                 Plant training               NVQs
  and cooling               Pipework and            Hand tools and              Oils, gases and fluids    Lifting and safety                                            Safety equipment, first      Apprenticeships
 Lighting                    engineering             specialist hand tools       Rail                       equipment sales                                                   aid and fire
 Site and traffic          Rail                    Equipment sales             Signage
  management                                         Electrical equipment        Survey equipment

Key Features                                        Key Features                                            Key Features                                                   Key Features

                                                             8,000 core products. 36,000 products                    Pressure testing facilities to carry out                          Nationwide audited
          Over 2,000 product lines
                                                             in our extended range                                   pressure tests up to 30,000 psi                                   training locations

          Latest innovations and the most                    Essential hire accessories                              Testing and inspection including                                  Flexible delivery: on- or off-site; and
          sustainable solutions                              held nationally                                         structural testing, proof load                                    now in e-learning format as well

          Full nationwide coverage                           Delivered by us. We offer the most                      Height safety testing, certification and                          Bespoke training design
          with over 200 locations                            complete supply service in the UK                       installation                                                      and development

          4 hour nationwide delivery on 350+                 Bespoke to you. We understand that                      Examination of equipment covering                                 Over 200 ‘off the shelf’ accredited
          of our most popular products                       no two companies are the same                           LOLER, PSSR, COSHH, PUWER                                         and certificated courses

          Specialist plant and equipment hire                Central Distribution warehouse                          Crane services including installation,                            Our delegates are 95% satisfied
          through our Partnered Services                     and over 200 locations                                  repairs and breakdown                                             with our training courses
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
06                                                                          Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                                 07

Speedy in the News                                                                                              New Speedy centre set to support South
                                                                                                                Yorks’ construction and rail businesses
                                                                                                                                                                                                  Speedy’s Chief
                                                                                                                                                                                                  Operating Officer
                                                                                                                                                                                                  joins industry’s
                                                                                                                Speedy has launched a new regional service centre in Doncaster to
                                                                                                                support construction and rail engineering firms across the region.                top construction
                                                                                                                                                                                                  sustainability board
B&Q and Speedy trial
                                                                                                                The new 15,000 sq ft centre on Sandall Stones Road, Kirk Sandall,
                                                                                                                is four times the size of its previous site on Kelham Street, and the             Speedy’s chief operating

new outlets
                                                                                                                business is expecting to take on new staff as it continues to expand              officer Dan Evans has joined
                                                                                                                its service offering locally.                                                     the Supply Chain Sustainability
B&Q, the UK’s leading home improvement retailer, and                                                            Read more                                                                        School board as the organisation
Speedy, the UK’s leading provider of tools and equipment hire,                                                                                                                                    ramps-up its focus on helping the
announce the extension of a trial of new tool and equipment                                                                                                                                       industry meet the challenging
hire outlets within B&Q.                                                                                                                                                                          sustainability targets set out by
                                                                      Speedy Powered
The concessions, typically about 90sqm in size, give B&Q retail                                                 Speedy ramps                   Speedy                                             the UK Construction Strategy
                                                                      Access invest £2m in                                                                                                        2025.
and trade customers the option to hire tools and equipment                                                      up operations                  fuels a more
                                                                      low emission fleet
from Speedy as part of their B&Q shopping trip.
                                                                                                                in Swindon                     sustainable                                        Read more 
                                                                      Speedy Powered Access, has
Read more                                                                                                      to support                     future with
                                                                      expanded its fleet of low emission                                                                            Speedy makes £1.5m
                                                                                                                region’s                       £5 million power
                                                                      equipment with a £2m investment                                                                               investment in new hoist
                                                                                                                business                       investment
                                                                      in 50 new hybrid boom lifts to help
                                                                                                                                                                                    division and lifting products
                                                                      customers reduce pollution and            Speedy has launched            Speedy has invested
                                                                                                                                                                                    Speedy has made an initial £1.5M investment
                                                                      meet carbon targets.                      a new Regional Service         £5 million in generators,
                                                                                                                                                                                    to launch a new specialist hoisting division.
                                                                      The hybrid system used by the new         Centre in Swindon to           biofuels and mobile
                                                                                                                expand the specialist          fuel stations to support             Its first dedicated hoisting depot is based at
                                                                      boom lifts, manufactured by Milton
                                                                                                                construction hire              customers in reducing                a new 52,000 ft² hub in Birmingham that will
                                                                      Keynes access specialist Niftylift,
                                                                                                                services it provides to        on-site carbon emissions.            provide customers with access to the UK’s
                                                                      allows power to be automatically
                                                                                                                businesses across the                                               largest range of GEDA hoisting equipment to
                                                                      drawn from both the diesel engine                                        The business has added
                                                                                                                region.                                                             hire on a Nationwide basis, offering working
                                                                      and the electric battery pack.                                           over 200 new generators
                                                                                                                                                                                    load ranges of 200kg to 2 tonnes.
                                                                      Read more                                The new 8,500 sq ft            ranging from 20kva
                                                                                                                centre at Kembrey              up to 500kva to create               Read more 

                                     Speedy first to market with new battery                                    Place, Kembrey Street,         a 2,500-strong fleet
                                                                                                                will double the size of        which is compatible with
                                     powered lighting launch
                                                                                                                its previous depot on          Hydrotreated Vegetable
                                     Speedy is set to become the first hire provider to launch a new line of    Cheney Manor Industrial        Oil (HVO) fuel. Customers
                                     high-performance battery powered lighting towers, the first of their       Estate and the business        who choose to operate
                                     type in the UK, which will help contractors reduce on-site emissions and   expects to grow the            their equipment with
                                     make significant savings in fuel costs.                                    site’s workforce as it         HVO fuel have the
                                     The UK’s leading tool and equipment hire provider has invested in 300      continues to expand its        opportunity to reduce
                                     MX Fuel Tower Lights, manufactured by Milwaukee, following successful      service offering.              emissions by up to 90%
                                     trials with national customers including Balfour Beatty.                   Read more                     compared to using diesel.
                                     Read more                                                                                                Read more 
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
08                                                                      Equip Spring/Summer 2021 Edition

Energise and our
Eco Product Range
We can supply a range of products that help to minimise the impact
on the environment.

In the last year:
• We expanded our              • Our Powered Access         Check out ECO product
  ECO product range,             business made a            range here and throughout
  classified as our              multi-million-pound        the guide, just look out for
  products that provide an       investment in hybrid       the following icons.
  environmental benefits,        boom lifts, which can
  to approximately 20% of        run for a full day on
  our itemised equipment         a single charge in
  fleet, providing our           electric-only mode.
  customers with latest        • Our Chief Operating
  innovative solutions.          Officer, Dan Evans,
• We made a £2.8                 joined the Supply
  million investment in          Chain Sustainability
  our lighting fleet to          School board as
  boost our low emission         the organisation
  offering, which now            ramps-up its focus on
  includes 50 solar              helping the industry
  powered lighting towers.       meet its challenging
• HVO fuel became our            sustainability targets.
  standard low emission        • We won the Hire
  fuel. For every 500 litres     Award of Excellence
  used, one tonne of CO2         (HAE) for sustainability
  is saved compared to           for the second
  fossil fuels.                  consecutive year.
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
10                                                               Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                         11

 Cordless Technology                                                                                  Milwaukee                                                                 Milwaukee
                                                                                                      M18 Cordless                                                              Cordless
                                                                                                      Reciprocating Saw                                                         Angle Grinder
 We are proud to stock       Milwaukee HD                                                             15/0476                                                                   13/0186
 a full range of cordless    Cordless
 power tools from            Hammer Drill
 leading manufacturers                                                                                                                        Hilti TE 6-A36-AVR
                             10/0354                                                                  18V cordless reciprocating saw                                            115mm cordless angle grinder
 including Hilti, Makita
                                                                                                      is designed for cutting metal,
                                                                                                                                              Rotary Hammer                     is designed to use abrasive discs
 and Milwaukee.                                                                                                                               11/0140
                                                                                                      wood, pruning and composite                                               for cutting or grinding metal and
 In partnership                                                                                       materials. The saw is equipped                                            stone or a diamond blade for
                             18V cordless combi drill designed for
 with Milwaukee,                                                                                      with high cutting efficiency                                              cutting masonry and concrete.
                             hammer drilling, drilling and screwing which
 we introduced the                                                                                    while ensuring low vibration.
                             can be used on construction materials such                                                                       36V cordless rotary hammer
 innovative red lithium-                                                                                                                                                           ORDER
                             as concrete, brick, wood and metal.                                                                              drill designed for drilling,       ONLINE NOW
 ion battery technology                                                                                  ORDER
                                                                                                       ONLINE NOW
                                                                                                                                              hammer drilling and chiselling.     £30.00
 into our cordless range,                                                                                                                                                         PER WEEK
                                ORDER                                                                   £33.00                                Ideally suited for building and
 ensuring the equipment       ONLINE NOW                                                                PER WEEK                              construction environments.
 we supply is as efficient     £30.00
                               PER WEEK
 and environmentally
                                                                                                                                                  ORDER
 friendly as possible.                                                                                                                          ONLINE NOW
                                                                                                                                                 £40.00
 Progressing from                                                                                                                                PER WEEK
 this, we continue to
 invest in suppliers
 who have innovated
 with sustainable
                                                                                                      Introducing the
                                                                                                      NEW MX Fuel Lighting Tower
 and efficient
 cordless technology
 throughout all our
 product categories,                                                                                                                          by the trades, without the        • 27,000 lumens of task or
 further strengthening                                                                                                                        hazards associated with             area lighting
 our commitment to                                                                                                                            emissions, noise, vibration,      • Zero noise and zero
 sustainable product                                                                                  A new way to light                      and the frustrations of petrol      emissions
 development.                                                                                         your site.                              maintenance. Additionally         • Versatile 3m high tower light
                                                                                                      The first product from the              eliminating tripping breakers,      for indoor and outdoor use
                                                                                                      ground- breaking MX FUEL™               voltage drops and trip hazards.   • Withstands up to 55 km/h of
  Click on                                                                                            cordless system revolutionises          Each solution on the MX FUEL™       wind
any product
Add it to your basket
                                                                                                      the lighting equipment market.          system goes beyond the            With the MX Fuel system you
  and hire today
                                                                                                      The new system delivers                 limitations of petrol and AC,     are one step closer to a greener,
        online!
                                                                                                      the performance, run time               operating on one completely       safer and more productive
                                                                                                      and durability demanded                 compatible battery system.        jobsite.
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
Order via the App or online at speedyservices.com /spring-summer                                      13

Makita DHP482 18V Cordless                                                  Dust Extraction
Combi Driver                                                                Unit - DC2800C/
10/0355                                                                     DC2900C
                                                                            13/0141

                                                                            The DC 2900 is suitable
                                                                            for vacuum cleaning and
18V Cordless combi drill
                                                                            source extraction from
designed for hammer
                                                                            handheld power tools (with
drilling, drilling and
                                                                            up to 5” suction casings)
screwing which can be
                                                                            and small table saws.
used on construction
materials such as concrete,
                                                                                ORDER
brick, wood and metal.                                                        ONLINE NOW
                                                                              £70.00
                                                                               PER WEEK
   ORDER
 ONLINE NOW
  £30.00
  PER WEEK
                                                                    Milwaukee M18 3 Head
                                                                    Led Battery Stand Light
                                                                    22/0049

Cut Off Saw - 2 Stroke -                                            This cordless light has multiple uses
300mm                                                               such as work light and an area light
                                                                    which makes this very
15/0230
                                                                    adaptable to the
                                                                    work environment,
                                                                    such as in
Compact and robust                                                  construction and
with extremely low                                                  industrial areas.
vibration levels (3.9m/s²)
the STIHL TS410 Petrol Masonry                                         ORDER
                                                                     ONLINE NOW
Cut Saw has built in performance
                                              ORDER                   £29.00
and durability as standard for              ONLINE NOW                PER WEEK
cutting through stone, concrete,             £25.00
                                             PER WEEK
brickwork and masonry materials.
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
14                                                                Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                              15

Cutting Station                                                                                       12m Bi Fuel Artic                       Solar Welfare and Accommodation
15/0259                                                                                               Boom Narrow                             We have access to the widest range of temporary accommodation
                                                                                                      77/1314                                 and welfare facilities on the market, providing an unlimited range
                                                                                                                                              of self-powered, self-sufficient mobile welfare buildings, ideal for

A multi-purpose, cutting, mobile                                          Electric                                                            remote sites where there is no electricity, water or drains.

workstation that eliminates the                                           Compact                     The compact 12.2m Nifty                 Ranging from instant start welfare and the Snoozepod to Solar Loos
need for a separate cutting room                                          Excavator                   HR12NDE with both battery               we have a full range sustainable options which help to reduce fuel
and is essential for safely cutting                                                                   and diesel power is the UK’s            consumption, CO2 and noise emissions.
                                                                          The new 19c-1e gives
lengths, such as conduit, timber,                                         you the freedom             most popular indoor/outdoor
cable tray and pipe.                                                      to work anywhere,           self-propelled boom. Just                    CALL PARTNERED
                                                                                                      1.5m wide and under                           SERVICES ON
                                                                          anytime with quick
   ORDER                                                                                              3000kg the machine is easy
                                                                                                                                                0345 600 3546
 ONLINE NOW
                                                                          charging and enough                                                      TO ORDER TODAY
      £95.00                                                              battery life to let you     to transport between sites.
      PER WEEK
                                      1100 Litre Washer                   work for a full day on
                                                                          a single charge. With 3
                                      Bowser - Towable
                                                                          charging options, you
Vortex Rotary                         27/0070                             can get to work when
Atomiser Mobile                                                           and where it suits you.
C/W Generator
13/0168                               When electric and                        CALL PARTNERED
                                                                                SERVICES ON
                                      water mains supply is                 0345 600 3546
                                      unavailable, the washer                 TO ORDER TODAY

110v mobile solution to localised     bowser solves your                                                                                      Mi-Tower
odour & dust issues. It can be set    problem. Fitted with
                                                                                                                                              26/3523
to produce a variety of different     electric start, diesel
droplet sizes allowing it to be       pressure washer 3000 psi
adjusted to suit each individual      cold water is fed straight
need, achieving the optimal droplet   from the bowser tank.                                                                                   MI TOWER is the world’s first one-man,
size to tackle the specific issue.                                                                                                            quick assembly access tower, making
                                         ORDER                                                                                                scaffolding access available to the
                                       ONLINE NOW
                                                                                                                                              individual. The unique design allows
   ORDER                               £250.00
 ONLINE NOW                             PER WEEK                                                                                              a single worker to erect the sturdy
  £372.35                                                                                                                                     scaffold tower in under 10 minutes
      PER WEEK

                                                                                                                                                  ORDER
                                                                                                                                                ONLINE NOW
                                                                                                                                                £120.00
                                                                                                                                                 PER WEEK
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
16                                                              Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                               17

                                                                                                                                                                                                         Click on
Pop Up Push10 Pro                                        60 kVA Generator                           Sound Barrier                                PS1000 X Scanner                                      any product

5m Working Height                                        415/3/50                                   08/0858                                      with Monitor
Platform                                                 41/0060                                                                                 24/0073
26/2984
                                                                                                    Quick to install, easy to transport
                                                                                                                                                                                         ECAT4+
                                                         60kVA generator engineered for use         and re-useable – our Speedy                  The Hilti PS 1000 X-Scan system
                                                                                                                                                                                         Detector with
The Pro IQ push around lift is designed                  in a variety of applications where         Barriers are the ideal solution to           detects reinforcing bars, pre- and      Strike Dept
                                                         temporary power is required.               your on-site noise reduction issues.         post-tensioned tendons, metal           24/5355
to provide the safest access solution
                                                                                                    Perfect for sites located close              pipes, plastic pipes, electric cables
for working at height. This push around
                                                                                                    to residential areas, our Speedy             and glass-fibre cables in minutes –
lift has been designed specifically for
                                                                                                    Barriers can be mounted next to              even over large concrete areas.
low-level access and can withstand the                                                                                                                                                   The ECAT4+ cable
                                                                                                    each other to create an effective
demands of everyday use on site while                                                                                                                                                    locator is engineered
                                                                                                    barrier system which reduces noise               ORDER
offering enhanced safety features.                                                                                                                                                       to deliver precision for
                                                                                                    and is weather resistant, so can be            ONLINE NOW

                                                                                                    used all year round.
                                                                                                                                                  £1388.75                               damage prevention
                                                                                                                                                    PER WEEK
                                                                                                                                                                                         when locating buried
                                                                                                                                                                                         cables and pipes.
                                                                                                       ORDER
                                                                                                     ONLINE NOW
                                                                                                      £20.00                                                                                ORDER
                                                                                                      PER WEEK                                                                            ONLINE NOW
                                                                                                                                                                                           £80.00
                                                                                                                                                                                           PER WEEK

                                          Plant Oil Spill Guard – Large
                                          08/1715

      Retro fit and low
        carbon NVQs                       The Plant Nappy is a practical solution to current
                                          spill prevention products, allowing fuels and oils to
             available                    be absorbed into the base and contain the spillage                                                     GS18 T LTE Unlimited
               • Cavity Wall Insulation   whilst allowing clean water to escape.                                                                 GNSS SmartAntenna
              • Cladding Occupations                                                                                                             24/4567
                 • Cold Roof Insulation      ORDER
                                           ONLINE NOW
            • External Wall Insulation
                                            £35.00
           • Fenestration Installation      PER WEEK
                                                                                                                                                 The Leica GS18 T-GNSS RTK Rover
                                                                                                                                                 system is designed with Global
                                                                                                                                                 Navigation Satellite System (GNSS)
                   0330 088 9671                                                                                                                 and Real-Time Kinematic (RTK),
      enquiries@geason.co.uk                                                                                                                     this system enables surveyors to
                                                                                                                                                 capture accurate positioning data.
The latest eco products Cleaning and gardening equipment AirCon and cooling solutions
18                                                                           Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                              19

New fPod® Elite and Fuel Management
Our new fPod® Elite is an MID approved fuel station,
                                                                                                                 Cooling
a single refuelling point for your site that services                                                            Speedy can provide a complete range of cooling solutions for every
every fuel user and contractor. It will help to reduce                                                           working environment.
vehicle movements and fuel containers on site, with
environmental, safety and cost benefits for all users.
Plus an additional feature of the fPod® Elite is that it
allows direct billing of all subcontractors.
                                                                                                                 240V Turbo Fan                                                      Evaporative
                                                                                                                 20/0020                                                             Cooler – Large
With a fuel management system installed, we can
                                                                                                                                                                                     20/0039
ensure deliveries are made only when you need
them and guarantee that you never run out of fuel.
                                                                                                                 500mm Industrial cooling fan is
                                                                                                                 ideal for increasing ventilation and
                                                      New HVO Fuel
                                                                                                                                                                                     Hugely powerful air
                                                                                                                 air circulation designed for use in                                 conditioning system with

                                                      now available
                                                                                                                 industrial, commercial, retail and                                  the power to cool a 50m²
                                                                                                                 leisure facilities.                                                 room. Ideal for shops, pubs,
                                                                                                                                                                                     clubs, workshops, and other
                                                      HVO stands for Hydrotreated Vegetable Oil, a form             ORDER                                                            indoor areas.
                                                                                                                  ONLINE NOW
                                                      of renewable diesel that has been produced from
                                                                                                                   £60.00                               110V Turbo Fan
                                                      vegetable fats and oils. Unlike regular biodiesel,           PER WEEK                                                             ORDER
                                                                                                                                                        20/0018                       ONLINE NOW
                                                      hydrogen is used as a catalyst in the creation
                                                                                                                                                                                       £80.00
                                                      process instead of methanol.                                                                                                      PER WEEK

                                                      Key Facts
                                                      • Up to 90% reduction in harmful emissions
                                                      • All deliveries are carbon offset – at no extra cost
                                                        to you                                                   Evaporative Cooler -
                                                      • Safer Handling, reduced emissions and cleaner            Medium
                                                        burning                                                  20/0038
                                                      • Simply top up your existing stock and go
                                                                                                                 240v Evaporative Cooler uses the
                                                      HVO fuel provided by Speedy is our standard low            ‘evaporation reduces heat’ principle.
                                                      emission fuel, it is the only HVO fuel approved            Not only can it reduce heat but
                                                      for use in Speedy equipment. It has been widely            also can filter dust from the air and
                                                      adopted in the UK as a drop-in diesel replacement          improves the air quality. Can be used
                                                      by: centrally fuelled fleets both on-road, off-road,       in gyms and shops.
                                                      marine, and in back-up power applications where
                                                      it helps to meet the new MCPD requirements.                   ORDER
                                                                                                                  ONLINE NOW
                                                                                                                   £42.75
                                                                                                                   PER WEEK
Order via the App or online at speedyservices.com /spring-summer                                        21

Air Conditioner - Small
                                                                                 Industrial
20/0031
                                                                                 Units
This portable air conditioner is
                                                                                 Air Conditioners
designed with a cooling capacity
of 9,000 BTU. Ideal for use in small                                             A range of cooling
                                                                      ORDER      solutions ideal for
offices, shops, in the home and                                     ONLINE NOW
offers a reliable solution to internal                              £32.62       offices, server rooms
                                                                     PER WEEK    and for factory and
cooling.
                                                                                 event cooling hire.
                                                                                 • Portable air
Air Conditioner
                                                                                   conditioners
- Medium                          ORDER
                                ONLINE NOW                                       • Split air
20/0032                          £90.00                                            conditioners
                                 PER WEEK
                                                                                 • Mono-block/
                                                                                   exhaust tube units
A compact and convenient portable air
                                                                                 • Evaporative coolers
conditioning unit, ideal for creating a pleasant
                                                                                 Chillers
working environment in offices, computer
rooms, conference rooms and other domestic                                       A range of chillers
and commercial spaces. They are designed                                         for simple comfort
with automatic thermostat controls, easy to                                      cooling through to
operate temperature and fan controls.                                            emergency support
                                                                                 for temperature
                                                                                 critical areas and
Air Conditioner                                                                  manufacturing
- Heavy Duty                                                                     processes.

20/0034                                                                          • Chillers
                                                                                 • Heat pump chillers
                                                                                 • Air handlers
240v Portable Air Conditioner tough, reliable                                    • Fan coils for
with castors for easy manoeuvrability.                                             cooling
Versatile air conditioning unit ideal for
                                                                                 • Low temperature
factories, studios, industrial use, laboratories,
                                                                                  air handlers
workshops, and perhaps the most popular
use of this very adaptable air con unit is in
server room cooling applications.                                                   CALL PARTNERED
                                                                                     SERVICES ON
   ORDER                                                                          0345 600 3546
 ONLINE NOW                                                                         TO ORDER TODAY
 £150.00
   PER WEEK
22                                                                                      Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                          23

                                                                                                                            Access
                                                                                                                                                                                                                               Click on
                                                                                                                                                                                                                             any product

      Sales
      Prefer to purchase your                            We can deliver training
                                                                                                                            From ladders and scaffold towers to steps and platforms, you can
      cooling solution then see                            nationally PLUS fully                                            hire a wide range of access equipment with Speedy online.
                                                            funded NVQs can be
      a sample of our offering                          achieved if eligible in the

      below.
                                                                     below areas:
                                                                                                                            PopUp                           BS8620                       BoSS Narrow              Quick-Step
                                                                    • Black Country                                         Mi-Tower                        Podium Step                  1.8m Tower               200 Access
                                                                             • Derby
      Desk Fan 12” 240v                                       • Greater Cambridge
                                                                                                                            Quick                           1.5m                         5.3m Handrail            Platform
      B020020025A-s                                        • Greater Peterborough                                           Assembly                        26/3073                      Height                   1.96m
                                                                      • Nottingham
      12” desk fan is designed for                           • Swindon & Wiltshire                                          Access Tower                                                 N18053                   26/0009
      circulating air using                                       • Worcestershire                                          Platform                                                     Designed to be
      the oscillation                                                                                                       26/3523                         The Lyte Ladder              used in narrow and
      and tilt                                                                                                                                              LYTEPOD15X is                awkward locations, all   Easy to operate and
      functions.                                                                                                                                            a superb quality             towers are supplied      maintain with no
                                                                                                                                                            anti-surf podium.            with full instructions   batteries, electrics or
                                                                                                                            MI TOWER is the world’s
                                                                                                                                                            Ultra-stable design          for safe erection.       pumps, the Quick Step
                                                                                                                            first one-man, quick
                                                                                                                                                            complies fully                                        is extremely efficient
                                                                                                                            assembly access tower,
                                                                                                                                                            with the latest BS                                    and downtime
                                                                                                                            making scaffolding
                                                                                                                                                            8620 standard for
                                                                                              Pop Up Pro 10                 access available to the
                                                                                                                                                            podiums.
                                                                                                                                                                                                                  is reduced to an
      Pedestal Fan 400m                                                                       IQ 3m Platform                individual. The unique                                                                absolute minimum.

      3 Speed 240v                                                                            Push Around                   design allows a single
                                                                                                                                                                ORDER                                                ORDER
                                                                                                                            worker to erect the
                                                                                              Scissor Lift
      B020020030A-s                                                                                                                                           ONLINE NOW                                           ONLINE NOW
                                                                                                                            sturdy scaffold tower in           £55.00                                               £60.00
      16” pedestal fan is designed                                                            26/2984                                                          PER WEEK                                             PER WEEK
                                                                                                                            under 10 minutes.
      for circulating air using the
      oscillation and tilt functions.
                                                                                                                               ORDER
                                                                                                                             ONLINE NOW
      Elite AC1600E Air                                                                       The Pro IQ push around         £120.00
                                                                                                                              PER WEEK
      Conditioner 16000                                                                       lift is designed to provide
                                                                                              the safest access solution
      BTU 240v 37Kg
                                                                                              for working at height.
      B020010040A-s                                                                           This push around lift
      240v Portable Air Conditioner,                                                          has been designed
      compact with castors for easy           We are here to support you with
                                        1 Longwall Avenue Meadows, Nottingham, NG2 1NA        specifically for low-level
      manoeuvrability. Designed with          your professional development.                  access and can withstand
      automatic thermostat controls,            If you’d like to find out more                the demands of everyday
                                                  please call 0330 088 9671
      easy to operate temperature and                       or email                          use on site while offering
      fan controls.                                enquiries@geason.co.uk                     enhanced safety features.
Order via the App or online at speedyservices.com /spring-summer                                         25

Powered Access
Speedy Powered Access is one of the UK’s largest providers of
specialist powered access equipment, training and services.

Hire                                Niftylift HR21 Hybrid Boom
                                    The HR21s are fuel efficient, economically friendly and will lift 2
We offer a wide range
                                    persons and their tools to a working height of 20.8m or a working
of equipment for
                                    outreach of 13m.
both short and long
term requirements,
all available from
our specialist service
centres which are
spread across the UK.

Skyjack SJ6832RT
9.75m Scissor Lift
Diesel 454Kg SWL
Skyjack rough terrain scissor              Skyjack Sj3219 7.8m
lifts boast impressive platform            (19ft) Scissor Lift
capacities and industry-leading            227kg Capacity
gradeability (up to 50%).
                                           Skyjacks electrically powered DC
                                           scissor lifts offer a quiet, compact and
                                           versatile package with zero emissions,
                                           and are capable of manoeuvring in
                                           confined indoor and outdoor job sites
                                           and are suitable for a wide range
                                           of construction, maintenance, and
                                           industrial applications.
26                                                                    Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer               27

Genie Z-45 FE
The Genie® Z®-45 FE hybrid
articulating boom lift is the
                                Training
                                Getting trained with Speedy
                                                                       Servicing
                                                                       If you own your own platform
                                                                                                          Training
ideal, environment-friendly
                                Powered Access couldn’t be easier!     then why not let Speedy            We offer industry-leading, award-winning training that helps thousands of our
                                                                       Powered Access thoroughly          customers work more effectively and safely than ever before.
solution for increased          When you enrol on an IPAF, PASMA,
                                                                       look after your examinations
efficiency and low cost of      or any other training course, you
                                                                       and servicing requirements.
operation. In ‘all-electric’    can be sure that you and your staff                                       Our training company Geason             Key Features
mode it offers a full work      will be trained to a high level of     It is a legal requirement,         - A Speedy business brings
day of emissions-free run       competence. Our professional,          under the Lifting Operation        together 15 years of industry-                   Nationwide audited
time on a single battery        highly qualified instructors conduct   Lifting Equipment Regulations      leading experience, to offer                     training locations
charge. In ‘hybrid’ mode, it    and supervise all training courses     that a Competent Approved          customers an end-to-end
offers one week of run time     and guarantee a successful and         Person inspects your platform      training solution.                               Bespoke training design
with a single tank of diesel.   unique learning experience.            every six months. All of our                                                        and development
                                                                                                          We have now combined our
                                                                       inspection engineers are           extensive range of safety and
                                Training can be undertaken on site                                                                                         Flexible delivery: on- or
                                                                       Powered Access specialists         skills courses with a wide                       off-site; and now in
                                or at one of our 11 Speedy Powered
                                                                       qualified to IPAF CAP standards.   variety of apprenticeships,                      e-learning format as
                                Access’ facilities across the UK.
                                                                                                          NVQs and professional skills                     well
                                                                       Having your platform regularly
                                Call the team on: 01924 908457
                                                                       serviced will improve machine      training. This equips our learners               Over 200 ‘off the
                                or email training@
                                                                       reliability and increase           with nationally recognised                       shelf’ accredited and
                                speedypoweredaccess.com
                                                                       productivity.                      qualifications and transferable                  certificated courses
                                for more information.
                                                                                                          skills, allowing them to work                    Our delegates are
                                                                       You will be notified of
                                                                                                          more effectively and safely                      95% satisfied with our
                                                                       excessive wear before it
                                                                                                          than ever before. Whether                        training courses
                                                                       becomes a major problem,
                                                                                                          you are focused on a specific
                                                                       reducing the risk of breakdown
                                                                                                          field, a more general approach
                                                                       and cost of repair. Regular
                                                                                                          in construction, or gaining/
                                                                       servicing also extends the
                                                                                                          upgrading a CSCS card, we are
                                                                       life of the equipment and
                                                                                                          here to help.
                                                                       improves overall operation.

Haulotte Star10
10m Mast Lift
200kgcap C/W
3m Outreach
The agile Star10 lifting
mast has been built
with the ability to work
in tight confined
spaces in mind.                                                  Get in touch:
                                                                 0345 602 6060
                                                                 info@speedypoweredaccess.com
                                                                 speedypoweredaccess.com
28                                                                         Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                                    29

How we work                                                                                                    NVQs                                         Apprenticeships
We work in partnership with our                                                                                Construction                                 Construction
customers to create a tailored                                                                                                                              • Level 1 Certificate in
solution designed around the                                                                                                                                  construction skills          Whether you’re
needs of their business and the
                                                                                                                                                            • Level 2 Bricklayer            a construction
capability of their workforce.
                                                                                                                 • Level 2 Fenestration                     • Level 2 Property             worker wanting
We listen, evaluate your current
situation and offer bespoke                                                                                      •	Level 2 Insulation and
                                                                                                                                                              maintenance operative              to elevate
programmes by listening                                                                                             building treatments - cavity            • Level 2 Hire controller       your skills and
carefully to your specific                                                                                          wall, loft insulation (cold               (plant, tools & equipment)
                                                                                                                                                                                             upgrade your
requirements and only then we                                                                                       roof), external wall (boarder/          • Level 4 Construction site
                                                                                                                                                                                                CSCS card,
start to work with you to design                                                                                    finisher)                                 supervisor
the solution.
                                                                                                                                                                                             or a business
                                                                                                                 • Level 2 specialised cladding             Professional services
We use our expertise,
                                                                                                                                                                                           owner wanting
                                                                                                                                                            • Level 2 and 3 Customer
experience, skills and resources     • Provide advice on the              • Safety equipment, first aid                                                       service
                                                                                                                                                                                            to upskill your
to provide high quality skills         use of the supply chain’s            and fire.                          • Level 2 Curtain wall installation
                                                                                                                                                            • Level 3 Business             employees, our
development and training, while        Apprenticeship Levy Funds          • Site and traffic management        • Level 2 Interior systems - dry
                                                                                                                                                              administrator                   100% funded
we ensure and maintain high            for the skills development                                                lining fixing/finishing
standards.                             programme.
                                                                            training.
                                                                                                                                                            • Level 3 Team leader/           NVQ Training
                                                                                                               • Level 2 Passive fire protection
We monitor, and provide              • CITB Approved Training
                                                                          • Tools and survey                                                                  supervisor                        is for you if
                                                                            trainingavailable are              • Level 2 General construction
robust, rigorous and continuous        Organisation (ATO) for all grant     submitted in a timely manner         operations (GCO)
                                                                                                                                                            • Level 4 Sales executive            you live in
quality assurance that includes        streams. We can help with            and recorded.                      • Level 2 Plastering
                                                                                                                                                            • Level 5 Operations/             the following
management reporting and               grant administration if desired.
                                                                                                               • Level 2 Decorative occupations
                                                                                                                                                               departmental manager
                                                                                                                                                                                                     areas*:
analysis, regular learner surveys,   • Provide advice, guidance or
feedback and review sessions.          full management of CITB grant                  Have you                   (painting)                                                                                       • Black Country
                                       claims to ensure any available                thought of                • Level 2 Thermal insulation fit                                                                          • Derby
                                                                                                                 protection
Grants and Funding                     are submitted in a timely                   taking on an                                                                                                         • Greater Cambridge
Our expert team can help with
                                       manner and recorded.
                                                                                   apprentice?                 • Level 2 Trowel occupations
                                                                                                                                                                                                   • Greater Peterborough
all of the following:                                                                                          • Level 3 Occupational work
                                                                                  Now you can claim up                                                                                                             • Nottingham
• Advice on new and existing         Short duration                               to £4,000 in incentive
                                                                                                                 supervision
                                                                                                                                                                                                     • Swindon & Wiltshire
  funding streams both on            courses                                   payments in line with the       • Level 4 Construction site
                                                                                                                 supervision                                                                                  • Worcestershire
  a regional and national            • Access training (IPAF and               new government scheme.
  level – including the new            PASMA)                                                                  Professional services
  Apprenticeship Incentive                                                                  Get in touch:                                                                                                           Get in touch:
                                     • Confined space training                                                 • Level 3 Social media for business
                                                                            enquiries@geason.co.uk                                                                                         enquiries@geason.co.uk
  Programme that was brought
                                     • Dust management and                            0330 088 9671            • Level 2 IT users                                                                    0330 088 9671
  in to help businesses and the
                                       awareness training                      geasontraining.co.uk            • Level 2 Business and                                                         geasontraining.co.uk
  economy recover from the
  impact of the coronavirus          • Lifting training                                                          administration                                                            *
                                                                                                                                                                                            Subject to
                                                                                                                                                                                           eligibility criteria
  (COVID-19) pandemic.               • Plant training                                                          • Level 2 Team leading
30                                                                         Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                          31

Comms                                                                                                          Fencing, Barrier and
Here at Speedy, we have a selection of high-quality radios, repeaters
and communication systems available to book and hire today.                                                    Temporary Flooring
                                                                                                               Secure the site and keep both workers and members of the public
Rapid Site 3G/4G                      Motorola ATEX                       Motorola DP4400e                     safe with temporary fencing on hire from Speedy.
Solution                              Digital Radio                       Digital Handheld
34/1155                               34/1225                             Radio                                Sound
Our Rapid Site 3G/4G system           2 way radio, available in           34/1087                              Management
uses the mobile 3G and 4G             UHF and VHF frequency               The DP4000e Series is designed       Acoustic
networks to link to the internet.     bands. The DP4401 is easy           for the skilled professional who     Barrier
It can be used wherever there         to use and features up to           refuses to compromise. With          08/0858
is sufficient mobile coverage         32 channel capacity, five           high-performance integrated
                                                                                                               Quick to install, easy
and can be installed quickly          programmable buttons                voice and data, and
                                                                                                               to transport and re-
and easily to get your site           and a dedicated                     advanced features for
                                                                                                               useable – our Speedy
connected from day one.               emergency button.                   efficient operation, these
                                                                                                               Barriers are the ideal
• Quick, cost effective internet                                          next-generation radios
                                                                                                               solution to your on-site
   for all sizes and types of sites                                       deliver complete
                                                                                                               noise reduction issues.
• User access quantity                                                    connectivity to
  expandable to suit                                                      your organisation.
                                                                                                                  ORDER
• Wireless enabled networks                                                                                     ONLINE NOW                                                         Fence Panel
  with expandable hardware                                                                                       £20.00
  connection ports
                                                                                                                 PER WEEK                                                          Heavy Duty
• Supports minimum of 2 VoIP                                                                                                                                                       Round Top Anti-
  phones                                                                                                       Ground Protection                                                   Climb 3.5m
• Site survey to assess                                                                                        8x 4 Panel                                                          x 2.0m x 40mm
  3G/4Gcoverage and user                                                                                                                                                           08/0450
  connection requirements             Athena Lighter                                                           01/0088
                                                                                                               The product offers temporary
                                      34/1191
                                                                                                               access and ground protection for
                                      The Athena Lighter System is a                                                                                                               These robust fence panels
                                                                                                               moving / accessing operating plant
                                      variant that has been adapted to                                                                                                             make an ideal choice
                                                                                                               equipment, pathways, temporary
                                      customer requirements,                                                                                                                       for construction sites,
                                                                                                               roadways and walkways over soft
                                      featuring a milled left ear                                                                                                                  properties and events.
                                                                                                               or sensitive ground.
                                      dome that is hollow.
                                      By doing this the user is
                                                                                                                  ORDER                                                               ORDER
                                      able to hear their surroundings,    communications via back-to-           ONLINE NOW                                                          ONLINE NOW
                                      promoting situational and spatial   back radio and fist mic to be          £15.00                                                               £4.10
                                                                                                                 PER WEEK                                                            PER WEEK
                                      awareness while on site allowing    heard clearly.
32                                                                 Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                               33

                                                                                                                                                                                               Click on

                                                                                                       Concreting
                                                                                                                                                                                             any product
Grass Mats
01/0535
The pedestrian mat is designed as easy to lay
flooring that features integral interlocking lips to
enable smooth joins without trip hazards. Ideally                                                      We’ve got a great choice of cement mixers, power floats, paddle
suited for a wide range of applications including                                                      mixing drills and screeding, available to hire online now.
marquee flooring, footpaths, construction site
walkways, factory and warehouse flooring,
equestrian and livestock flooring.
                                                                                  HO
                                                                                     UR                Vibrating High
                                                                                                       Frequency
                                                                                       TEED

                                                                              4
   ORDER
 ONLINE NOW
      £3.29                                                                  U A R
                                                                            G DE E A N                 Poker

                                                                                          RY
      PER WEEK
                                                                                     LIV               57mm
                                                                                                       18/0444

                                                         Tool hire
                                                       delivered as
                                                                                                       Internal vibrator 58mm high
                                                                                                       frequency electronic poker
                                                                                                       designed for settling concrete by

Maxitrack Panel
                                                        Speedy as                                      releasing trapped air and water used in
                                                                                                       the toughest site conditions.

01/0096
The Maxi Track is designed as a heavy-duty
                                                        possible!                                         ORDER
                                                                                                        ONLINE NOW
                                                                                                        £120.00
trackway system. The mats are strong with                                                                PER WEEK

overlapping flanges providing maximum                    Hire for guaranteed
support and mud suppression.                             4 hour delivery on                                                                                                Floor Planer/
                                                                                                                                                                           Scarifier – 110v
                                                       350 top products, or get
   ORDER                                                                                                                                                                   18/0320
 ONLINE NOW                                               a week FREE hire!
      £17.98
      PER WEEK                                                                                         Roller Striker
                                                             #CapitalCommitment                        18/0400                                                             This scarifier is perfect for
                                                                                                       Hydraulic Drive Unit to be                                          general surface prep and
                                                                                                       used in conjunction with                                            coating removal on small
                                                                                                       tubes from 3.66m to 7.92m.                                          and medium size jobs.

                                                                                                          ORDER                                                               ORDER
                                                            Order via the App or online at              ONLINE NOW                                                          ONLINE NOW
                                                       speedyservices.com/capital-commitment            £299.20                                                             £175.00
                                                                                                         PER WEEK                                                            PER WEEK
Order via the App or online at speedyservices.com /spring-summer                                           35

4/3 Mixer Petrol                                                                     5/3½ Mixer
03/0060                                                                              Diesel
                                                                                     03/0090

Built for site durability,
these are quality,                                                                   Site diesel mixer
portable mixers for                                                                  for large batches of
all small to medium                                                                  concrete and mortar.
building projects. The
number one choice for                                                                   ORDER
mixers worldwide.                                                                     ONLINE NOW
                                                                                       £80.00
                                                                                        PER WEEK
   ORDER
 ONLINE NOW
  £20.00
   PER WEEK

4/3 Mixer 110v
03/0040

                                                                    Power Float - 900mm (36’’)
                                                                    18/0380
                                                      ORDER
                                                    ONLINE NOW
                                                    £100.00
                                                     PER WEEK       Designed to provide contractors with
                                                                    the features and performance they need.
                                                                    These machines are used for long periods
                                                                    so the Pro Trowel gives improved operator
                                                                    comfort and easy control. Smooth running
                                                                    helps achieve a high quality finish.
36                                                                   Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                       37

Dust
                                                                                                         Air Cube - Dust                              Vortex Rotary                         Dust Extraction
                                                                                                         Extractor                                    Atomiser Mobile                       Unit -
                                                                                                         20/0026                                      c/w Generator                         DC2800C/
Remove dust and dirt with Speedy’s range of dust control and extraction units.                                                                        13/0168                               DC2900C
                                                                                                                                                                                            13/0141
                                                                                                         110v air cleaner is designed for
                                                                                                         cleaning the air in a workplace              110v mobile solution to localised
Dust Extraction Unit                                                                                     by circulating the air through a             odour & dust issues. The Rotary       The DC 2900 is suitable
13/0144                                                                                                  pre-filter and a HEPA filter.
                                                                                    Dust is not just a                                                Atomiser is a powerful system,        for vacuum cleaning
                                                                           nuisance; it can seriously                                                 using rotary centrifugal energy to    and source extraction
                                                                                                            ORDER                                     force liquid into a finely atomised
                                                                               damage your health         ONLINE NOW                                                                        from handheld power
The Hilti wet/dry dust                                                          and some types can         £55.00                                     mist, which is projected forward      tools (with up to 5”
extraction unit can be used in                                                                             PER WEEK                                   by a fan at the back of the unit.
                                                                               eventually even kill.                                                                                        suction casings) and
conjunction with Hilti products                                                Regularly breathing                                                                                          small table saws.
such as grinders, cutters, drills                                                                                                                        ORDER
                                                                            dusts, especially those                                                    ONLINE NOW
and diamond coring.                                                         from construction and                                                      £372.35                                 ORDER
                                                                                                                                                         PER WEEK                            ONLINE NOW
                                                                              asbestos, over a long                                                                                           £70.00
   ORDER                                                                         time can therefore                                                                                           PER WEEK
 ONLINE NOW
  £62.00                                                                        cause life-changing
      PER WEEK                                                                       lung diseases.

                                                                                                         Dust Extraction Unit
                                                                                                         - DC1800
                             Dust Extraction Unit -
                                                                                                         13/0143
                             Tromb C 110V ECO
                             13/0142

                                                                                                         The DC 1800 eco is small,
                                                                                                         lightweight and ideal for those
                             110v dust extraction unit is designed                                       that need a highly portable
                             to manage the requirements for a clean                                      machine that is powerful
                             and healthy working environment.                                            enough for source extraction.

                                ORDER                                                                       ORDER
                              ONLINE NOW                                                                  ONLINE NOW
                               £110.00                                                                     £60.00
                                PER WEEK                                                                   PER WEEK
38                                                           Equip Spring/Summer 2021 Edition

Cleaning
Blast through tough dirt with our range of cleaning equipment for hire.

M Class Dry
Vac - 110v Single
Motor- Mv570
21/0354

The MV570 is a 23 litre
capacity machine, suitable
for all light or medium
hazard applications.

   ORDER
 ONLINE NOW
  £60.00
      PER WEEK

                             Pressure Washer
                             Industrial Cold 110v
                             21/0230

                             Ideal for the rigours of daily
                             cleaning in trade, automotive
                             and agricultural use or
                             professionals on the move.

                                ORDER
   Click on                   ONLINE NOW
 any product
                               £75.00
                               PER WEEK
40                                                              Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                        41

Pressure Washer
Diesel 3000psi
                                                               Sales                                Karcher HD 7/12-4 M                                                      Bosch Universal
21/0200                                                                                             Cold Water Pressure                                                      Hedgecut 50 240v
                                                               A wide range of                      Washer - 240v                                                            Hedgecutter
                                                               equipment to purchase                B021090056A-s                                                            B005010046A-s
Hilta high performance                                         for indoor and outdoor               • Easy Lock system
3000psi pressure washer runs                                   improvements.                                                                        Bosch                    • Multi-position front handle
                                                                                                    • Accessory storage                                                        and ergonomic rear handle
from a low noise Yanmar diesel                                                                                                                      Easygrasscut             • Blade-tip protector
engine. Fitted with a 12m high                                                                                                                      23 240v Grass
pressure hose lance and gun the   Twin Motor Wet               Karcher Expert One                   110v Option                                     Trimmer
pressure washer can be used
                                  & Dry Vacuum                 Pressure Washer -                    B021090057A-s                                   B005010044A-s
in conjunction with a cleaning
                                  Cleaner 110v                 240v                                                                                 • Semi-auto
chemical with a maximum
pressure of 3000psi or 200 bar.   Red Drum                     B021090005A-s                                                                          spool feed
                                                                                                                                                    • Adjustable
                                  21/0380                      • Easy Lock system                                                                                            EasyHedgeCut
                                                               • Easy press trigger                                                                   handle
   ORDER
 ONLINE NOW
                                  The CVD900 is a
                                                                                                                                                    • Protection
                                                                                                                                                                             45-16 NEW
                                                                 gun
 £150.00                          powerful combi vacuum,
                                                                                                                                                      guard                  B005010045A-s
      PER WEEK                    ideal for use in a variety   • 10m High
                                  of situations with high        Pressure Hose                                                                                               • Ergonomic handling for
                                  efficiency dual washable                                                                                                                     comfort
Portable Water Butt                                                                                                                                                          • Blade-tip protector
                                  filter systems enabling
Poly Trolley                      wet or dry pick-up                                                                                                                         • Two handles each with
21/0125                           without the need to          110v Option                                                                                                     a blade control switch
                                  change filters.              - No plug supplied
                                                               B021090010A-s
                                     ORDER
Poly Trolley Washer Bowsers        ONLINE NOW
are an efficient solution for       £74.00
                                    PER WEEK
onsite water storage, equipment
cleaning, and dust suppression.
                                                               Bosch
   ORDER
 ONLINE NOW
                                                               Glassvac
  £90.00                                                       Solo Cordless                                    Bosch IXO 6                                             Bosch Universal
      PER WEEK
                                                               Window                                           Screwdriver                                             Chain 35 240v
                                                               Cleaner                                          C/W 10 Bit Set                                          Chainsaw
                                                               C0810019A-s                                      C47190006A-s                                            B015030016A-s
                                                               Compact design for                               Compact and lightweight with a soft                     • Concentric SDS system for
                                                               easier handling, even                            grip zone for comfortable handling                        tool-free, easy chain tensioning
                                                               in confined spaces                               ideal for DIY use                                         and replacement
42                                                Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                43

Landscaping &
                                                                                      Hand Held Blower
                                                                                      4 Stroke
                                                                                                                                         Sales
Gardening
                                                                                      05/0130
                                                                                      Powerful and well-balanced                         If the lawn is in need of a trim, we have
                                                                                      handheld blower for clearing leaves                the full range of Bosch mowers available
                                                                                      and garden debris. Compact and                     to purchase.
                                                                                      lightweight machine with slim body
Choose from our selection of landscape gardening                        Click on
                                                                      any product     for comfortable handling.                          Bosch Rotak              Bosch
equipment to aid you on the job.
                                                                                                                                         32R 240v Rotary          Citymower18
                                                                                         ORDER
                                                                                       ONLINE NOW                                        Lawnmower                Cordless
                                                                                        £54.45                                           B005010041A-s            18v Rotary
Hedge Trimmer - 2 Stroke                                                                PER WEEK
                                                                                                                                         • Cutting Width:         Lawnmower
05/0145
                                                                                                                                           320mm                  B005010043A-s
                                                                                                                                                                  • 3-step cutting

A well-balanced and rugged double                    Brush Cutter -                                                                                                 height
                                                                                                                                                                  • ErgoFlex handles
cutting edge petrol hedge trimmer. Ideal             Contractor c/w                                                                                               • Lightweight
for commercial and domestic use.                     Harness                                                                                                        and easy to
                                                     05/0030                                                                                                        manoeuvre
   ORDER
 ONLINE NOW                                                                           Turf Lifter – Petrol
  £50.00                                                                              05/0378
      PER WEEK
                                                     Husqvarna Brushcutter            The Camon TC07 Turf Cutter is                      34R 240v
                                                     for cutting down weeds,          a highly effective self-propelled
                                                                                                                                         B005010042A-s
                                                     undergrowth and long             machine that will cut a 30cm
Hedge Trimmer - Long Reach                           grass. These machines are        (12”) wide strip of turf cleanly,                  • Cutting Width: 340mm
05/0159                                              highly portable, giving          quickly and effortlessly.
                                                     access to awkward areas
                                                     with minimum effort.                                                                Bosch Universal
                                                                                                                                         Rotak 550 240v
Stihl long-reach hedge trimmer for work
on high hedges and close to the ground.
                                                         ORDER
                                                       ONLINE NOW
                                                                                                                                         Rotary Lawnmower
Lightweight, manoeuvrable                              £60.00                                                                            B005010048A-s
                                                        PER WEEK
and adjustable by 145°.                                                                                                                  • 6 cutting heights
                                                                                                                                         • Lightweight and easy
   ORDER                                                                                                                                   to manoeuvre
 ONLINE NOW
  £60.00                                                                                                                                 • Foldable grass
      PER WEEK                                                                                                                             box
44                                                         Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                        45

Pipework and                                                                                   Junction Splitter
                                                                                               Box – 4 way

Engineering
                                                                                               16/0040

                                                                                               Splitter Boxes allow a single
At Speedy, you’ll find a pipework and engineering tool hire service                            power source to be split and                                        DOWNLOAD
to ensure you have the best tools for the task at hand.                                        distributed through various
                                                                                                                                                                     THE
                                                                                                                                                                    SPEEDY
                                                                                               outlets; made for site use.

20kVA Site               ArcGen 330CC/CV Welder
                                                                                                  ORDER
                                                                                                ONLINE NOW
                                                                                                                                                                     APP
Transformer              Generator Diesel 300A                                                   £15.00
                                                                                                 PER WEEK
                                                                                                                                                                    TODAY!
42/0520                  04/0137
20kVA transformer        The ArcGen Weldmaker 330CC/CV
415v - 110v.             is a super silent mobile 300amp
                         current diesel driven welder
                         generator with constant voltage
                         selection for welding up to
                         6mm electrodes.

                                                                                               Site Chest
                                                                                                                                           > Order online by browsing 1000’s of hire or buy products
                                                                                               B008180010A-s
                                                                                                                                           > Create shortlists of your favourite products
                                                                                               Heavy duty steel storage vault
                                                                                                                                           > Off-hire in a few simple clicks
                                                                                               - ideal for securing tools &
                         Kemppi LT250 Mastertig                                                bigger equipment on site.                   > View your bespoke pricing

                         Unit 12.6Kg                                                                                                       > Find your nearest depot
                                                                                                    BUY                                    > Track deliveries and collections
                         04/0212                                                                ONLINE NOW
                         MasterTig LT 250 is a                                                  £597.84                                    > Open 24/7, evenings and weekends
                                                                                                   EX VAT
                         high-quality DC TIG and                                                                                           > Checkout as Guest available for sales items
                         MMA welding source for
                         industrial applications.

                                                                                                                                           MAKE THE SWITCH TO SPEEDY DIGITAL TODAY
                            ORDER
                          ONLINE NOW                                                                                                       SAVE TIME, DO MORE AND TAKE CONTROL
                           £140.25
                            PER WEEK
                                                                                                                                                 DOWNLOAD                  REGISTER ONLINE
                                                                                                                                                 THE APP                   SPEEDYSERVICES.COM
46                                                             Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                             47

Survey
                                                                                                   GCAT4+ Precision                                          ECAT4+ Detector
                                                                                                   Cable Locator                                             with Strike Depth
                                                                                                   24/5069                                                   and Datalog
                                                                                                                                                             24/5355
Carry out any surveying operation with accuracy and high levels of
precision with our survey equipment hire range.
                                                                                                   The GCAT4+ cable locator
                                                                                                   is engineered to deliver                                  The ECAT4+ cable locator is
                                                                                                   precision for damage                                      engineered to deliver precision
Thermo                     Exterior Laser                                                          prevention when locating                                  for damage prevention when
Imaging                    24/0239
                                                                                                   buried cables and pipes.                                  locating buried cables and pipes.
Camera
                                                                                                      ORDER                                                      ORDER
24/3935                                                                                             ONLINE NOW                                                 ONLINE NOW
                           The Leica Rugby 620 is
                                                                                                     £80.00                                                     £80.00
                                                                                                     PER WEEK                                                   PER WEEK
                           one of the toughest
                           construction lasers on site.
Compact thermal
imaging camera
                              ORDER
                                                                                                   Genny4 Signal                                 Hilti PS300 Ferroscan
for applications in         ONLINE NOW                                                             Generator                                     Detection System
construction, electrical    £100.00
engineering and              PER WEEK                                                              24/5365                                       1.95Kg
mechanical engineering.                                                                                                                          24/0074

                           Leica Ts16 5’ Robotic                                                                                                 The Hilti PS 300 is a concrete

                           Total Station                                                           The Radio Detection 10/Genny4                 detector for rebar location, depth
                                                                                                   signal generator is designed                  measurement and size estimation
                           24/0587
                                                                                                   for tracing utilities through                 in structural analysis.
                                                                                                   underground infrastructure.

                           The TS16P is the world’s first                                             ORDER
                                                                                                    ONLINE NOW
                           self-learning total station,
                                                                                                     £50.00
                           automatically adjusting to any                                            PER WEEK
                           environmental condition, locks
                           onto your, and only your, target,
                           regardless of how challenging the
                           task or distractions in the field.                                                                                                 Cable Avoidance
                              ORDER
                            ONLINE NOW
                                                                                                                                                             Training available
                            £657.80
                             PER WEEK

                                                                                                                                                        trainingenquiries@speedyservices.com
48                                                                         Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                             49

                                                                                                               Power & Air
Have you thought about taking on                                                                                                                                                                                     Click on

apprentices?
                                                                                                                                                                                                                   any product

                                                                                                               From small generators to small air compressors, ensure
                                                                                                               every task is completed to the highest standard.
The benefits of apprenticeships       The new incentive is only
                                                                           Age       Incentive from
are becoming increasingly             available for apprentices placed               1st April 2021
obvious to employers across           on courses between 1st April         16-18     £4,000                    20 KVA Generator
the UK.                               2021 and 30th September 2021.                  (£1,000* + £3,000)
                                                                                                               415/3/50                                            Generator
Once viewed as purely trade-          Speedy offers industry-leading       19-24     £3,000
                                                                                                               41/0020
                                                                                                                                                                   Petrol
focused, non-academic career          training, through our training       25+       £3,000                                                                        2.4KVA
routes, apprenticeships allow         company Geason - A Speedy                                                                                                    14/0120
businesses to develop a highly        business:
skilled workforce - no matter the                                         Professional services                Packaged in durable, weatherproof
                                      Construction
industry. Whether you wish to                                                                                  canopies. Simple generator control
                                      • Level 2 Bricklayer                • Level 2 & 3 Customer Service
take on new employees, or upskill                                                                              and instrumentation. Industry                       2.9kVA single voltage
                                      • Level 2 Property Maintenance      • Level 3 Business Administrator     leading earth leakage and protection                generator is designed as a
existing staff, apprenticeships
are one of the best ways to             Operative                         • Level 3 Team Leader/               systems. Comprehensive pre-delivery,                portable electrical power            ORDER
                                                                            Supervisor                         safety and load testing regime. Dual                source. Ideally suited for         ONLINE NOW
acquire motivated and qualified       • Level 2 Hire Controller (plant,
                                                                                                               frequency (50Hz and 60Hz).                          tradesman, building and             £30.00
professionals in your business.         tools & equipment)                • Level 4 Sales Executive                                                                                                     PER WEEK
                                                                                                                                                                   construction environments.
                                      • Level 4 Construction Site         • Level 5 Operations/
Apprenticeship                          Supervisor                          Departmental Manager
Incentives for
Employers
To help businesses recover from         Employers now can claim up
the impact of the coronavirus
(COVID-19) pandemic,                    to £4,000 per apprentice from
employers now can claim up to
£4,000 per apprentice from the
                                        the government                                                                                                             400/125 Diesel
government.                                                                                                                                                        Compressor
                                                                                                                                                                   43/0130
                                                                                                               60 KVA                  100 KVA
                                                                                                               Generator               Generator
                                                                                                               41/0060                 41/0100                     The “Dual Mode” offers a “two in one” solution, more
                                      Get in touch to learn more enquiries@geason.co.uk                                                                            operational flexibility as both pressure and flow can change.
                                      www.geasontraining.co.uk                                                                                                     By pushing the button on the key pad, the operator can switch
                                                                                                                                                                   between “LO” (low pressure mode: rated pressure 7bar / free
*
 £1,000 payment provided for new
apprentices aged 16 to 18 and those                                                                                                                                air delivery 12m³/min) and “HI” (high pressure mode: rated
under 25 with an Education, Health
and Care Plan.
                                                                                                                                                                   pressure 10.3bar / free air delivery 10.6m³/min).
50                                                                   Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                            51

Lifting
                                                                                                         Bumpa Hoist                         6.26m Full Electric Telehander
                                                                                                         Petrol
                                                                                                         71/5200
                                                                                                         BUMPA’S capacity to clear           The fact that it has zero CO2 emissions allows for it to be used even in
Book and hire lifting equipment including material lifts, hoists, winches and more online.
                                                                                                         a pallet of concrete blocks         closed environments, such as warehouses, logistics areas and agricultural
                                                                                                         in under 1 minute or 1000           activities, improving the level of comfort and safety in the workplace. The
                                                                                                         tiles in 25 minutes from            low noise level allows for it to be used in workplaces and environments
Pallet Truck Semi                                   Material Lift                ORDER                   single to storey lift and           where the use of combustion engines is not recommended.
Electric                                            Genie SLA10                ONLINE NOW
                                                                                                         makes it a must for every
                                                                                £147.00                                                      • Battery Life Of 6-8 Hours             •   Zero Emissions
71/5715                                             71/5000                      PER WEEK                roofer and builder.                   (With 300ah or 400ah Battery)         •   100% Electric Lithium
                                                                                                                                             • Reduced Noise                         •   Battery Powered
                                                                                                                          ORDER              • Green Technology                      •   Optional Fast Charger
                                                                                                                        ONLINE NOW
Excellent tools for lifting and                     Material Lift will enhance worksite                                  £115.50
                                                                                                                          PER WEEK
carrying loads on pallets or                        productivity with highly portable solutions                                                  CALL PARTNERED
                                                                                                                                                  SERVICES ON
size-standardised containers,                       for a wide variety of lifting applications.
                                                                                                                                               0345 600 3546
thanks to their light weight,                                                                                                                    TO ORDER TODAY
smooth movement and
manoeuvrability, all models
are an ideal working tool for
use on smooth floors and
other kinds of surfaces.
                                                                                                         Ladder Hoist -
   ORDER
 ONLINE NOW
                                  Skoots SK2000 Moving                                                   110V
  £50.00
      PER WEEK                    System                                                                 71/5300
                                                                                                         A versatile single mast
                                  71/6070
                                                                                                         rack and pinion transport
                                                                                                         platform.

                                  Economic, simple, manoeuvrable and
                                                                                                                                                                                         Safe use of
                                                                                                            ORDER
                                  safe Skoots is simple to operate and                                    ONLINE NOW
                                                                                                          £173.25
                                                                                                                                                                                         small tools
                                  requires minimal training. Secure the                                    PER WEEK
                                  load to the eyebolts fitted to the Skoots
                                  frame using both straps supplied.                                                                                                                        training
                                     ORDER
                                   ONLINE NOW
                                                                                                                                                                                            course
                                   £220.00
                                    PER WEEK

                                                                                                                                                              trainingenquiries@speedyservices.com
52                                                                             Equip Spring/Summer 2021 Edition   Order via the App or online at speedyservices.com /spring-summer                                               53

6 Overhead Crane Safety Tips to                                                                                    Want to talk about                                                          6. Modernise your

Protect your Workers
                                                                                                                   modernising your                                                            overhead cranes
                                                                                                                   equipment?                                                                  Technology is always working to
                                                                                                                   Speak to us today.                                                          improve overhead crane safety.
Overhead cranes are an indispensable part of            approach to safety has to be applied across the                                                                                        Retrofitting older equipment
many industries, used to lift heavy objects which       board to mitigate equipment downtime and,                                                                                              with newer safety features is an
workers couldn’t safely handle manually. Cranes,        potential injury to users.                                                                                                             effective way to improve crane
                                                                                                                                                                                               safety across your site.
like most industrial equipment, can pose a risk to      Our crane experts have highlighted the top 6 tips          4. Train your                           5. Preventative
users. This risk is exacerbated if the equipment is                                                                                                                                            Over time, electrical control
                                                        which all businesses operating an overhead crane           operators                               maintenance
used incorrectly or poorly maintained.                  should be following:                                                                                                                   systems and certain mechanical
                                                                                                                   The majority of crane accidents         In combination with mandatory       parts can become compromised,
Crane safety has to be at the top of anyone’s
                                                                                                                   are caused by human error. Be           thorough examinations,              especially as stricter rules and
mind who uses an overhead crane. A proactive
                                                                                                                   it incorrect use of the cranes or       you must undertake regular          regulations come into force.
                                                                                                                   even just inefficient use. These        preventative maintenance.
                                                                                     3. Treat the                                                                                              Upgrading systems in your crane
                                                                                                                   things often lead to crane safety       As we mentioned at the              not only improves reliability
                                                                                     crane with                    issues, premature wear and,             start of the blog, a proactive      and safety, it likely increases
                                                                                     respect                       ultimately, costly downtime.            approach to crane safety is         the availability of parts should
                                                                                     A crane is not a toy so       To provide optimal safety               vital to minimising risk to your    you need to undertake more
                                                                                     don’t treat it as one.        conditions, crane operators             workers. A vigorous preventative    comprehensive repairs.
                                                                                     Accidents can happen          should be trained thoroughly            maintenance programme can
                                                                                                                                                                                               Improved LED lighting can
                                                                                     and can sometimes be          on the tools they use. Operators        drastically reduce the likelihood
                                                                                                                                                                                               increase visibility whilst at the
                                                                                     deadly. Overhead crane        should also have a detailed             of equipment failure and injury
                                                                                                                                                                                               same time lowering power
                                                                                     safety must be taken          understanding of safe rigging           to workers.
                                                                                                                                                                                               consumption. LED lighting also
                                                                                     seriously.                    techniques, load control (i.e. be       There’s no one-size-fits-all        has the added benefit of being
                                                                                                                   able to anticipate and control          approach to preventative            more focused which should
                                                                                     1 Ensure the route you        load swing should it arise) and         maintenance. The rollout of any     limit glare and minimise any
                                                                                       take with the load is       be able to recognise potential          such programme should fit your      chance of your operators being
                                                                                       clear of personnel          hazards at all times.                   work schedule - minimising          intermittently blinded.
                                                                                                                   Investing in the training of your       disruption - and your equipment.
1. Robust daily (& pre-                           2. Visibility                      2 Do not get distracted
                                                                                                                   crane operations staff is vital to      Preventative maintenance will
                                                                                                                                                                                               Another potential modernisation
                                                                                       while operating the                                                                                     which can increase overhead
operational) checks regime                        Clear visibility of your load                                    maintaining safety on site and          save you money and distress in
                                                                                       crane                                                                                                   crane safety is the addition of
The first thing to implement - if you’re          at all times and clear sight-                                    ensuring that you’re limiting           the long-term.
                                                                                     3 Never swing the load                                                                                    radio controls for the crane.
not already doing so - is a thorough daily        lines are vitally important.                                     crane downtime as much as               Speak to one of our experts         Remote/radio controllers give
checklist to inspect the equipment.               Double-check that you              4 Never exceed the            possible. The correct training of       about how Lloyds British            your operators increased freedom
                                                  always have a clear line             lifting capacity of         employees saves you money in            could build a preventative
From the floor, you should run through a                                                                                                                                                       as they’re no longer shackled
                                                  of sight of the load. This is        the crane or attached       the long-run.                           maintenance package that
series of visual checks to assess the state                                                                                                                                                    to pendant control cables.
                                                  especially true when using           lifting equipment                                                   works for you.
of the equipment. Checking at the start of                                                                         If you’d like to consider further                                           Your operators can distance
                                                  remote controls.                   And… perhaps more than
each shift allows you to identify issues very                                                                      training for your team. Lloyds                                              themselves from the load to
early and - hopefully - long before they          Make sure that there are           anything else                 British offers substantial crane                                            better position themselves in
turn into a true danger to your workers.          no obstacles on the floor -        5 Never move loads            operator training and safe                                                  a safer location, better able to
Crane safety begins with your daily checks.       human or otherwise!                  over people                 slinging techniques.                                                        identify hazards and react quicker.
You can also read