TENANT DESIGN MANUAL UPDATED JUNE 2015 - Simon Property Group
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
PROJECT OVERVIEW In the heart of Las Vegas sits The Forum Shops at Caesars. Situated at the midpoint of “The Strip,” (Las Vegas Blvd.), The Forum Shops has convenient access from every major hotel and casino in town, and welcomes millions of visitors and shoppers from all 50 states and around the globe. 2
PROJECT OVERVIEW Fashioned after the architecture of one of the most famous civilizations in the world, The Forum Shops at Caesars offers expansive cobbled avenues under an ever changing sky, one of a kind statues and fountains and a majestic spiral escalator, all presided over by Roman Gods and Goddesses. “The Shopping Wonder of the World” boasts 145 luxury and specialty retail stores and boutiques as well as 15 of the best restaurants in town. 3
TENANT INFORMATION PACKAGE • The Tenant Information Package (TIP) is intended to provide you with the project’s design and construction criteria and consists of several parts: COMPONENT DESCRIPTION Will provide a comprehensive list of topics to help TIP Index locate information Tenant Design Provide mall specific architectural, sign and Manual engineering design criteria Kiosk Design Manual Outline submission requirements and will provide Architectural Criteria necessary guidelines to design your store. MEP/FP Criteria (same as Architectural Criteria) Bulletins 5
TENANT INFORMATION PACKAGE • The Tenant Information Package can be accessed from Simon’s website – simon.com. » Select the business header, search for the property name, click on the Tenant Info Package link on the right side of the page. » If you have any difficulties working with the website, please contact your Tenant Coordinator. *For questions regarding the Landlord’s design and construction requirements, please contact your Tenant Coordinator or call 317-636-1600 and ask for Tenant Coordination. 6
MALL BUILDING DATA • Occupancy/ Use: Mercantile • Construction Classification: Type I • Building Levels: Phase I/II: One (1) Level Phase III: Three (3) Retail Levels + Basement • Sprinkler System: Fully Sprinkled 7
PHASE PLAN USE THIS PLAN AS A GUIDE TO THE BUILDING STOREFRONT SIGN MODELS ON THE PAGES THAT FOLLOW. 8
STOREFRONT ELEVATIONS – PHASE I & II: Inside The Forum Shops, visitors encounter a visual, sensory and aesthetic experience as they make their way along the streets and alleyways of tasteful boutiques and restaurants. Dramatic views and entertainment occur intermittently in the piazzas and under the rotundas, all in close proximity to the understated storefronts with their doors and windows designed to reflect and respect the early Roman architectural themes and motif of Classical design. 9
STOREFRONT ELEVATIONS – PHASE I & II Designers are required to provide designs which enhance the streetscapes of The Forum Shops. Bases, entrance vestibules, display windows with raised platforms and hardware indicative of traditional street level retail shall be used in combination to create a complementary transition between the various vias and piazzas of The Forum Shops. While the Landlord will allow Tenants to maintain their identity through graphics, logos and signing, each storefront will be reviewed and approved based upon its complement to The Forum Shops overall design aesthetic. 10
STOREFRONT ELEVATIONS- PHASE I & II In Phase I and II of The Forum Shops, Tenant storefront heights vary and shall be field verified by each individual Tenant. Tenants are responsible for designing, fabricating and installing their storefront design within the confines of the Tenant opening. Landlord finishes shall not be altered. Faux marble columns (the neutral piers) vary in size between Tenant spaces and shall be field verified. 11
STOREFRONT ELEVATIONS – PHASE I & II Direct and ambient light shall not be allowed Special consideration must be made to the to form shadows on the vaulted ceilings of lighted storefront graphics and lighting in the common area. Up lighting of Tenant relationship to the sky lighting feature in storefronts is strictly prohibited. Phase I and II of the Forum Shops and relative low light levels. 12
STOREFRONT ELEVATIONS – PHASE II ROTUNDA All Tenant lighting, including signs and display The type, intensity and color of lighting used in the window lights, in the areas which abut the store and in conjunction with the graphics shall be entertainment rotunda in Phase II shall be counterpoised with the reverential atmosphere of the controlled for the first (15) fifteen feet by Great Hall of Atlantis in the entertainment rotunda. independent timed controls. The lights shall de- illuminate during the duration of the show. 13
STOREFRONT ELEVATIONS – PHASE III In Phase III of The Forum Shops, Tenant’s storefronts are 16’-0” A.F.F. Storefronts are separated by a ¾” black metal reveal. 14
EAST ELEVATIONS – PHASE III Restaurant common area seating / knee wall to be brought inside the Tenant space each evening at mall closing for common area cleaning. 15
NEUTRAL PIER DETAIL – PHASE III 16
STOREFRONT SIGNS, AWNINGS AND CANOPIES 17
You can also read