Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
Ministry of Electricity and Renewable Energy

     sustainable Energy
       Deployment in
            Egypt
                           Eng. Ahmed Mohina
                 Undersecretary for Authorities follow up
                                           9/11/2017
Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
contents
Where we want to be ? .

Where are we now ? .

What is the gap ? .

What are we doing to be there ? .
2
Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
Sustainable Development Strategy: Egypt vision 2030
3
Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
Strategic vision for energy to 2030
An energy sector meeting national sustainable development
requirements and maximizing the efficient use of various resources
contributing to economic growth, competitiveness, achieving social
                                       A renewable
justice, and preserving the environment.
energy and efficient resource management
leader,and an innovative sector capable of forecasting and
adapting to local, regional, and international developments and
complying with SDGs.

                                     There is coherent among the
                                    strategic vision for energy 2030
                                             and UN SDGs.
   4
Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
Utilization of all available resources.

    Promoting utilization of renewable energy.

       Promoting electricity interconnection.

       Improving energy Efficiency through adopting Energy Efficiency
       strategies.

    Environment conservation by adopting necessary measures on the
    supply side.

Future planning to face the increasing demand.
Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
Energy Strategy until 2035
§ A new strategy of electricity Sector was updated in
  cooperation with EU in the framework of Energy
  Sector Policy Support Program (ESPSP) up to 2035 to
  ensure diversify of energy mix from all resources (Wind
  – Solar PV – Solar CSP - Coal – Nuclear – oil & gas).
§ In this strategy, all energy scenarios in Egypt has been
  studied by focusing on renewable energies and Energy
  Efficiency.
Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
Energy Strategy until 2035
§ In 18/10/2016 The supreme council chose the optimal scenario
  for Egypt.
§ Now we are updating the strategy according to the new
  variables such as fuel prices, floating exchange rate and
  decaying of new technologies cost. A new optimal scenario
  achieves the required energy balance including 42% Renewable
  Energy share till 2035, taking into consideration energy
  efficiency measures with the target of 18 %.
Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
Electricity production by plant type in the
Updated Optimal Scenario until 2035
Sustainable Energy Deployment in Egypt - Eng. Ahmed Mohina Undersecretary for Authorities follow up
2017

Installed Capacity (MW)              45192

Max Load (MW)                        30800

No. of Consumers (million)           32.8

Electricity Share per Capita (kwh)   1950
Ministry of Electricity &
                                     Renewable Energy

 New and
Renewable        Hydro Power       Egyptian Electricity        Nuclear       Atomic          Nuclear
 Energy         Plants Executive                             Power Plants    Energy         Materials
                   Authority       Holding Company            Authority     Authority       Authority
Authority

            Electricity                                                        Distribution
            Generation                Egyptian Electricity                     Companies
            Companies                    Transmission
                                          Company                                North Cairo
            Cairo
                                                                                 South Cairo
       East Delta                                                                 Alexandria

      Middle Delta                                                                El Beheira

                                                                                  North Delta
       West Delta
                                                                                  South Delta
      Upper Egypt
                                                                                        Canal
  Hydro Power Plants
                                                                                  Mid. Egypt

                                                                                 Upper Egypt
Activities in RE Fields
  (Hydro – Wind - Solar)

Hydro      Wind        Solar
Energy    Energy      Energy
Installed capacity from hydro is 2843 MW
Hydro power represents 7 % from the generated electrical energy.

   Currently, Assuit Hydro Power Project with 32 MW is under
    implementation and it is planned to be operated by 2018
It’s planned to establish pumping & storage plant up to 2400 MW in
                 Attaqa - Suez to be operated by 2022
A study has been conducted to choose the most suitable locations for
                    Pumping & Storage plants.
High Resources Wind Atlas of Egypt
        1996, 2003 & 2005
                    Average wind speed
                    reaches: 10.5 m/sec at
                    50 m height.

                    Average wind speed
                    reaches: 7.5 m/s at 80
                    m height.

                    Potential Capacities:
                    More than 30000 MW
                    Produced Power
 16
Installed Wind Farms

Installed capacity : 750 MW

Generated Energy 12.6 Billion KWh
       fuel savings 2.7 mteo
  CO2 reductions 6.8 million ton
High Resources Solar Atlas of Egypt
Direct solar radiation
ranging: 2000 – 3200
kWh/m2/year

 Sun shine duration:
 9-11 h/day

 Potential Capacities:
 More than 50000 MW
 Produced Power
Solar Thermal Electricity
             Generation

140 MW Solar thermal
 power plant at kuraymat
§The 1st CSP plant is 140
 MW including solar field
 of 20 MW
§The     project     started
 operation commercially in
 July 2011.
Solar Photovoltaic Systems

The Total Installed   The Cabinet has     the Governorates
   Capacity of PV
                      approved decree        Council has
  Systems is more
                        to disseminate       approved to
 than 80 MW for        the use of PV in    utilize the Solar
different purposes
                             1000          Energy in streets
   (remote areas,
   governmental         governmental          and public
   buildings, ….).         building.      buildings lighting.
Evolution of Legislation
March       •   Amendment the name of ministry of Electricity & Energy to be
2014            Ministry of Electricity and Renewable Energy.
July 2014   •   A tariff reform program was adopted and announces for eight years
                up to 2022. Consequently, the price of the electricity generated from
                renewable energy will be increased annually with the same rate.
            •   Renewable energy will benefit from it, as the right price signal is
                becoming available.
Sep. 2014 •     The Cabinet has approved the Feed-in Tariff system for electricity
                projects produced from RE resources (PV & wind).
Oct. 2014 •     A presidential decree has issued to modify (NREA) establishment law
                to allow it to establish companies by itself or in partnership with the
                Private sector to implement, operate and maintain RE project.
Dec. 2014 •     RE law was issued to encourage generating the electricity from
                renewable energy sources through 4 development schemes.
Sep.        •   A new phase of the Feed-in Tariff system for
                                                          23 PV & wind farm has

2016            been announced to be applied by 28/10/2016.
The Egyptian Government role in supporting
the renewable energy includes:

v Land allocation and permits, (7650 km2 are already
  allocated)
v Availability of the related information,
v Long-term PPA,
v Governmental guarantees,
v Custom duties are 2%.
v The investors will enjoy benefiting from carbon credits.
v Environmental Impact Assessment studies and others.
Land assigned for renewable
      energy, projects
Renewable Energy Development Schemes
                   RE Development Mechanisms

                             Competitive               FiT
                               Biding              since 2014
                                                   (4300 MW)

   New& Renewable
 Energy Authority (NERA)
                                           Transmission company
(EPC contracts) since 1999                    (BOO) since 2009
       (3259 MW)                                 (1250 MW)

                      Total capacity 8809 MW
 27
Feed-in Tariff
§ In Sep. 2014, The Cabinet has approved the Feed-in Tariff
  system for PV & wind farm with capacity less than 50 M.W.
§ the Regulatory Agency (Egypt ERA) has finalized the
  regulation rules.
§ FIT aims installing of 2300 MW (PV) (2000 M.W. by
  investors + 300 M.W. for residential rooftop) and 2000
  MW (wind).
§ A central unit for FIT(On stop Shop) has been established
  to provide the necessary support for the investors.
Feed-in Tariff
 1st Phase :
§ FIT Unit received about 175 offers with about 10500 MW
  PV and about 3200 MW wind.
§ .9 Companies have submitted their offers in PV .
§ 3 Companies had been qualified to implement 3 x 50 MW
 PV projects at Benban area.
§ 1st Project will start generating electricity on 15 November,
 2017.
Feed-in Tariff
 2 Phase :
§ In Sep. 2016, A new phase of the Feed-in Tariff system for
  PV & wind farm has been announced to be applied by
  28/10/2016.
§ The financial closure of the project was in October 2017.
§ By the end of October 2017, 30 Power Purchase Agreement
  (PPA) was signed with total capacity of 1365 megawatts
  Solar project in addition to signing an agreements with two
  companies in a private land allocation with total capacity
  100 megawatts.
Plant Installed
                        Finance          FiT / kwhr
    Capacity

   Residential            -----          102.88 pt.

 Non Residential
                          -----          108.58 pt.
Less than 500 KW

500 KW – 20 MW                           7.88 $ cent
                   70% Foreign finance
                    30% Local finance
20 MW – 50 MW                            8.40 $ cent

           Contract Period : 25 years
FiT                                  FiT
     Operational Hours                    Operational Hours   $ cent / kwhr
                         $ cent / kwhr

           2500              7.96               4100              4.85
           2600              7.65               4200              4.74
           2700              7.37               4300              4.63
           2800              7.11               4400              4.52
           2900              6.86               4500              4.42
           3000              6.63               4600              4.33
           3100              6.42               4700              4.23
           3200              6.22               4800              4.15
           3300              6.03               4900              4.06
           3400              5.85              ≥ 5000             4.00
           3500              5.69
           3600              5.53
           3700              5.38        Contract Period : 20 years
           3800              5.24
           3900              5.10
           4000              4.97          60% Foreign finance
                                            40% Local finance
32
Feed-in Tariff
The total capacity of contracted
 (PV) projects through FIT
program is 1615 megawatts.
BOO Projects
q Egypt announced 250 MW wind energy project, In Build
Own Operate, BOO, scheme which attracted more than 30
international consortiums.
q Based on FIT experience we got an excellent price, US$
3.82 Cent per kWh, flat rate 20 years.
q The PPA has been signed with the winning consortium
of Toyota Anji and Orascom on 31/10/2017.
Environmental Impacts

vThe expected electricity generation is
around    49   TWh/year     by   2022/2023
(including hydro) .
v Fuel Saving about 9.7 million TOE/year .
v CO2 emission reduction 25.3 million
TCO2/year
 36
Energy Efficiency
ENERGY EFFICIENCY IMPROVEMENT
On the Supply Side:

§   Optimizing the share of the combined cycle power plants.
§   Usage of super critical steam technology.
§   Conversion of old thermal power plants to work in dual firing
    system.
§   Improve power plants efficiency and rehabilitation and renewal of
    transmission and distribution networks to reduce fuel consumption
    and electrical losses .
§   Modernization of the transmission network to be converted into
    smart grid.
ENERGY EFFICIENCY IMPROVEMENT
On the demand side:
In the residential sector
vAround 12 million CFL lamps were distributed with half
 price and 18 months guarantee.
v Another initiative for distribution 13 millions LED lamps
 has been announced (until now, more than 11 millions
 LED lamp have been distributed).
In street lighting sector:
vCurrently, a new project has been set to replace 3.9 million
 lamps with more efficient ones.(1.4 have been replaced)
Other programs:
 § Energy conservation measures (mainly efficient
   lighting and power factor correction) in many
   administrative buildings.
 § Labeling     and    standards
   program for home appliances.

 § Energy efficiency codes for
   residential, commercial and
   public buildings.               Energy label for refrigerator
Egypt is a Hub for Electrical Interconnection

                                                              Turkey
          Spain              Europe
                                                                       Eastern Arab
                                                                        countries

                                                                                Iraq
                             Tunisia                    Lebanon Syria
    Morocco       Algeria
                                                    450 MW Jordan
                                  Libya
         Western Arab countries
                                       120 MW EGYPT            3000 MW       Gulf Arab
                                                                             Countries Kuwait
                                          200 MW      2000 MW                Saudi
                                                                             Arabia      Bahrain
                                                    Sudan
                                               3200 MW                     Emirates      Qatar
                                                        Ethiopia

                                          African Countries                     Oman
     In operation
     Under preparation
Local Manufacturing
MOERE established a localization program for Design , Installation and
manufacture of Components of electrical equipment . The following are now
achieved:

§ 100% of the Transmission Networks up to 220 kV
  and all Distribution Network components.
§ 42 % of power plants components.
§ 30% of the wind energy equipment (70% at the end of 2020).
§ The local share in the 1st solar thermal power plant
    project is 50%.
Local Manufacturing
§ It's planned to reach 100% of PV components.
§ The ministry of military production is planning to establish a factory a
  full chain to produce PV cells in Egypt using white sand available in
  Egypt
§ Egypt has signed an MoU between NREA and Siemens during the
  Egyptian economic conference (March 2015) to build 2000 M.W. wind
  farms with EPC+F Scheme, in addition to establish a wind turbine
  blades factory with annual capacity of 340 M.W. we have received two
  offers from Vestas and General Electric with the same approach.
§ There are several opportunities for the private sector to participate in
  the local manufacture such as: led lamps, dry transformers, electronic
  meters, DC networks, smart grids, wind turbines, CSP, solar heaters.
Cooperation between
                 Egypt and EBRD
•   Provide 165 million dollar to converge el shabab from gas turbin to
    combine cycle (under implementation now with 94% ) .

•   Provide   25 million dollar to converge west damiatta from gas turbin
    to combine cycle (under implementation now with 95% ) .

•   Development of Strategic Environmental and Social Impact
    Assessment (SESA), Ornithological Investigation for an Area of 2200
    km2 East Of Nile and land demarcation (on going). To establish wind
    and solar projects.

•   Strategic Environmental and Social Impact Assessment for an Area of
    37.5 km2 at Benban (done) To establish solar PV projects.
Cooperation between
         Egypt and EBRD

 EBRD support EGYPT strongly to implement

the FIT program by providing more than    1 billion
dollar in cooperation with Green climate fund
(GCF)(154 million us dollar for private sector to
construct around 750 MW in benban .
Cooperation between
             Egypt and EBRD

PROPOSED FIELDS FOR COOPORATION :

§ Creation of Energy efficiency market .

§ Smart meters and smart grid .

§ Reinforcement of transmition and distribution grids

§ Development of geothermal energy .

§ Pumping and storage .
Thank you
for your attention