User Meeting 2017 GIF @ EHN1 Irradiation Bunker Joint facility, operated by EN-EA and EP-DT Unique place, combining a high energy muon beam with a 14 TBq 137Cs gamma source Designed for testing real size detectors, of up to several m2, as well as a broad range of smaller prototype detectors and electronic / optical components. 100 m2 irradiation bunker with 2 independent irradiation zones, separated attenuation N systems Pl eut at rin fo o rm All year operation from Cs-Irradiator CMS ECAL High energy Muon beam at H4 beam line 9 weeks dedicated shared beam in 2017 Service Area (electronics, gas) Central Control System, recording all relevant Preparation Area parameters and provides interlocks (e.g. for wrong gas mixtures) Wide range of available gases (+ custom gases) in bunker & service zone e lin Control Room am > 25 different large setups scheduled for 2017, be GIF++ @ EHN1 4 with 16 setups requiring muon beam. H (https://gif-irrad.web.cern.ch/gif-irrad/UserList.html) M.Jäkel (EP-DT)
User Meeting 2017 User Set-Ups for 2017 Set-ups requesting beam or long term irradiation ATL-MDT detector ATL-RPC CMS-GEM1 ATL-Phase-II system test ATL-BIS78-mod0 CMS-GEM2 ATL-MM BE-BI-BL BLM CMS-RPC1 ATL-NSW-MM-mod0 CMS-CSC1 CMS-RPC2 ATL-NSW-MM_resistive CMS-CSC2 CMS-RPC3 ATL-NSW-MM-prod CMS-CSC3 EP-DT1 ATL-NSW-STGC-mod0 CMS-DT-MB1 EP-DT2 Wide range of setups, ATL-NSW-STGC-prod from realCMS-DT-bycells size LHC gas detectors (up toRE21_CBM several m 2) (FAIR) to small optical or electrical components ATL-NSW-STGC-ELX LHCb Description of each set-up available at https://gif-irrad.web.cern.ch/gif-irrad/UserList.html ATLAS Phase II ATLAS RPC Muon Beam ATLAS ATLAS MDT NSW-MM RPC 1 MM CMS ATLAS RPC 3 CMS GEM 1 CSC2 CSC1 CMS CMS GEM 2 (Week 1 & 2 combined) Setup during first beam time 2017 M.Jäkel (EP-DT)
User Meeting 2017 GIF EP TEAM 2017 GIF Physics Coordinator Overall GIF coordination. Deputy to SPS Physics Coordinator for the GIF with authority to optimise the user schedule for all modes (beam, stand alone…), within the constrains of the SPS schedule. 50% Future development of the facility GIF User Tech.Coordinator Space management of the bunker & preparation zone Supervises user installation, installation of cables & electronics, rack space distribution, gas requests Collects all requests for infrastructure enhancements, 50% helps with daily problems EXSO Contact to EN services One EXperimental Safety Officer (EXSO) for all EP irradiation facilities 10% M.Jäkel (EP-DT)
User Meeting 2017 Some of 2017 Highlights Intense maintenance period completed in March Second cosmic trigger chamber installed Improved temperature & humidity control inside bunker + temperature stabilisation for gas system Improved central control system, new web page Upstream & Downstream XTDV installed Irradiation field markings New gas detection system installation Several new setups installed Material access door finalised, installation in November (new Logo) M.Jäkel (EP-DT)
User Meeting 2017 Example Challenge : EHN1 Extension for Neutrino Platform Large open areas in walls Open material doors due to constant delivery Upgraded EHN1 VAC planned for later this year Huge amount of dust from construction 18° AC le V a b Down to 11 degree in service area IF ot ate G n ns (should be above 18 degrees) p ly e m p s com i to 16,4° 11° Down to 16 degree inside bunker area (Should be stable 21 degree) M.Jäkel (EP-DT)
User Meeting 2017 Improved situation inside the bunker area Bunker by significantly reducing the air exchange No remote control of GIF VAC, and zone of unit might be inaccessible Tend to protect against low temperature Gas Area Installation of manual heater needed Floor is not air-tight (by design) No temperature control inside tend Requires manual CO2/ODH meter Upgraded EHN1 VAC (operational ?) We need to see if more expensive solution is needed (e.g. barrack) M.Jäkel (EP-DT)
User Meeting 2017 Some Ongoing Improvements (see talk from Sylvan R.) GIF Control System EP-DT-DI Improved archiving of all relevant data, publishing via DIP Retrievable via web interface, improved notification Calculation of irradiation dose based on the source status (on/off) and filter settings Irradiator status and filter setting available via hardware signal. Upgrade of the RADMON sensor readout to 12 sensors, including Berthold probes Inclusion of GAS system values, currently published separately Display in GIF control room, trend of significant values (PC finally arrived) Source Upstream Attenuation M.Jäkel (EP-DT)
User Meeting 2017 Some Planned Improvements (2) Installation of material access door (Nov. 2017) (see talk from Nikos) + EN-EA Increased rack space in service area (+4 racks) Additional power outlets in service area racks Additional power outlets in “Roberto’s Corner” Gas system improvements (e.g. new exhaust line) New set of Scintillators to provide beam trigger for deflected beam (Goliath) Improved irradiation field usage Enlarged irradiation bunker to handle different rad.requirements (???) power outlets M.Jäkel (EP-DT)
User Meeting 2017 Upcoming Christmas Periode 2017/2018 We will try to keep the Irradiator operational (CMS-DT campaign) Access and gas supply needs to be clarified Upcoming Maintenance Periode Mar. 2018 Annual Maintenance of the Irradiator Opening of the roof (2 plates) / Modification of GIF top enclosure (!) Connection of Irradiator Control Rack to UPS (control part only) Installation of additional interlock key (while keeping control part active) Removal of all set-ups (as last year) Time for a field mapping campaign ? M.Jäkel (EP-DT)
User Meeting 2017 GIF Web Page https://gif-irrad.web.cern.ch/gif-irrad/ M.Jäkel (EP-DT)
User Meeting 2017 GIF Web Page (2) Plan to add : Rack space layout -> Your publications !!! Pipe usage (incl. history) Largely missing, except contributions from Barbara M.Jäkel (EP-DT)
User Meeting 2017 GIF Web Page (4) Upcoming : Dedicated SIR training REMINDER : It is your responsibility to ensure that you have all the need access rights and PPE when entering the bunker. Especially when the Access System can be bypassed (e.g material door open) ! M.Jäkel (EP-DT)
User Meeting 2017 Safety Files under Finalisation EHN1 ZONE PPE154 ‐ PPE172 Safety File for Gas Alarm System under preparation. SGDGA‐01761 SGSIL‐ SGSIL‐00027 00037‐00042 SGSIL‐ 00039‐00044 SGDGA‐01762 SGDGA‐01760 SGDGA‐01759 LEVEL 3 ALARM ! (Fire Brigade Intervention) SGDGA‐01765 SGDGA‐01763 SGDGA‐01758 SGDGA‐01764 SGSIL‐ 00038‐00043 SGDGA‐01732 SGDGA‐01736 Basic rules are clear : You leave the zone of danger immediately, and go to an assembly point. SGSIL‐00026 SGSIL‐ 00036‐00041 SGDGA‐01735 SGSIL‐00034 SGDGA‐01733 SGDGA‐01756 SGDGA‐01757 SGSIL‐00024 SGSIL‐00035 SIL‐00025 SGDGA‐01734 Procedure for Public Visits Only 3 guides (Federico, Giuseppe, Martin) Secondary guide from User Community Test visit done, recommendations form HSE received, need to be implemented and approved. M.Jäkel (EP-DT)
User Meeting 2017 GIF Web Page (5) WebCam still picture available, updated once a day (01h00), CERN account WebCam still picture archived - once per hour (xh00), for limited time View from control room ? M.Jäkel (EP-DT)
User Meeting 2017 Active IMPACT for GIF https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154 CMS M.Jäkel (EP-DT)
User Meeting 2017 Muon Beam Cosmic Muon Muon Beam Cosmic Muon R&D R&D + mass production tests R&D for future projects GIFv3 ? Operation until Run 3 : The GIF should be fully operational, with even increased user base Only ≈ 1 week per year of preventive maintenance for Cs source (from our schedule) Upcoming mass-production tests will increase the load on access system, transport and planning Limitations during YETS & LS2 still under discussion e.g. cooling not available during YETS WE NEED TO KNOW YOUR NEEDS (see late point on agenda) M.Jäkel (EP-DT)
User Meeting 2017 Last but not least … Thank You ! (rescuing the Comic Sans font) Colleagues from EP-DT and EN-EA GIF User Community RD51 Community for shared beam time M.Jäkel (EP-DT)
User Meeting 2017 Last but not least … Thank You ! (rescuing the Comic Sans font) Colleagues from EP-DT and EN-EA GIF User Community RD51 Community for shared beam time Adrian Fabich M.Jäkel (EP-DT)