Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico

Page created by Rose Buchanan
 
CONTINUE READING
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
AUM 2017
       CERN Gamma Irradiation Facility

Status of the GIF Facility
                                         Martin Jäkel
                                            EP-DT-DD
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
User Meeting       2017

                                      GIF @ EHN1
              Irradiation Bunker
                                                    Joint facility, operated by EN-EA and EP-DT
                                                    Unique place, combining a high energy muon
                                                    beam with a 14 TBq 137Cs gamma source
                                                    Designed for testing real size detectors, of up to
                                                    several m2, as well as a broad range of smaller
                                                    prototype detectors and electronic / optical
                                                    components.
                                                    100 m2 irradiation bunker with 2 independent
                                                    irradiation zones, separated attenuation
                                           N        systems
                                         Pl eut
                                           at rin
                                             fo o
                                               rm   All year operation from Cs-Irradiator
                           CMS ECAL
                                                    High energy Muon beam at H4 beam line
                                                    9 weeks dedicated shared beam in 2017
                            Service Area
                          (electronics, gas)        Central Control System, recording all relevant
Preparation Area                                    parameters and provides interlocks (e.g. for
                                                    wrong gas mixtures)
                                                    Wide range of available gases (+ custom gases)
                                                    in bunker & service zone
             e
            lin

                  Control Room
        am

                                                    > 25 different large setups scheduled for 2017,
       be

                              GIF++ @ EHN1
    4

                                                    with 16 setups requiring muon beam.
   H

                                                    (https://gif-irrad.web.cern.ch/gif-irrad/UserList.html)

                                                                                                              M.Jäkel (EP-DT)
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
User Meeting          2017

                       User Set-Ups for 2017
  Set-ups requesting beam or long term irradiation
ATL-MDT detector                                 ATL-RPC                                   CMS-GEM1
ATL-Phase-II system test                         ATL-BIS78-mod0                            CMS-GEM2
ATL-MM                                           BE-BI-BL BLM                              CMS-RPC1
ATL-NSW-MM-mod0                                  CMS-CSC1                                  CMS-RPC2
ATL-NSW-MM_resistive                             CMS-CSC2                                  CMS-RPC3
ATL-NSW-MM-prod                                  CMS-CSC3                                  EP-DT1
ATL-NSW-STGC-mod0                                CMS-DT-MB1                                EP-DT2

Wide range of setups,
ATL-NSW-STGC-prod       from realCMS-DT-bycells
                                  size LHC gas detectors (up toRE21_CBM
                                                                several m 2)
                                                                        (FAIR)
to small optical or electrical components
ATL-NSW-STGC-ELX                                               LHCb

   Description of each set-up available at https://gif-irrad.web.cern.ch/gif-irrad/UserList.html
               ATLAS

                       Phase II
                       ATLAS
                RPC

                                                                                                                   Muon Beam
                                                                  ATLAS

                                                                          ATLAS
                                                                           MDT

                                                                                  NSW-MM

                                                                                           RPC 1
                                                                   MM

                                                                                            CMS
                                                                                   ATLAS

                                                                                                       RPC 3
                                                                                                       CMS
                                                          GEM 1
                                  CSC2

                                         CSC1
                                  CMS

                                         CMS

                                                  GEM 2

                                                                                           (Week 1 & 2 combined)

                                    Setup during first beam time 2017                                               M.Jäkel (EP-DT)
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
User Meeting         2017

                            GIF EP TEAM 2017
  GIF Physics Coordinator

                              Overall GIF coordination.
                              Deputy to SPS Physics Coordinator for the GIF with authority
                              to optimise the user schedule for all modes (beam, stand
                              alone…), within the constrains of the SPS schedule.
              50%
                              Future development of the facility

GIF User Tech.Coordinator
                             Space management of the bunker & preparation zone
                             Supervises user installation, installation of cables &
                             electronics, rack space distribution, gas requests
                             Collects all requests for infrastructure enhancements,
              50%            helps with daily problems
          EXSO               Contact to EN services

                             One EXperimental Safety Officer (EXSO) for all
                             EP irradiation facilities
              10%
                                                                                      M.Jäkel (EP-DT)
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
User Meeting        2017

Some of 2017 Highlights
        Intense maintenance period completed in March
        Second cosmic trigger chamber installed
        Improved temperature & humidity control inside bunker
        + temperature stabilisation for gas system
        Improved central control system, new web page
        Upstream & Downstream XTDV installed
        Irradiation field markings
        New gas detection system installation
        Several new setups installed
        Material access door finalised, installation in November

                                                    (new Logo)

                                                        M.Jäkel (EP-DT)
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
User Meeting            2017

   Example Challenge :
EHN1 Extension for Neutrino Platform
               Large open areas in walls
               Open material doors due to constant delivery
               Upgraded EHN1 VAC planned for later this year
               Huge amount of dust from construction
                    18°

                     AC le
                    V   a b               Down to 11 degree in service area
                IF ot ate
              G n ns                       (should be above 18 degrees)
                p ly   e
             m        p
           s com
            i
              to
                16,4°

                          11°

                                Down to 16 degree inside bunker area
                                   (Should be stable 21 degree)
                                                                       M.Jäkel (EP-DT)
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
User Meeting       2017

                  Improved situation inside the bunker area
Bunker            by significantly reducing the air exchange
                  No remote control of GIF VAC, and zone of unit might
                  be inaccessible

                                Tend to protect against low temperature
Gas Area
                                Installation of manual heater needed
                                Floor is not air-tight (by design)
                                No temperature control inside tend
                                Requires manual CO2/ODH meter
                                Upgraded EHN1 VAC (operational ?)
                                We need to see if more expensive
                                solution is needed (e.g. barrack)
                                                                     M.Jäkel (EP-DT)
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
User Meeting           2017

                                           Some Ongoing Improvements
(see talk from Sylvan R.)

                            GIF Control System
                                                                                                      EP-DT-DI
                                 Improved archiving of all relevant data, publishing via DIP
                                 Retrievable via web interface, improved notification
                                 Calculation of irradiation dose based on the source status (on/off) and filter settings
                                 Irradiator status and filter setting available via hardware signal.
                                 Upgrade of the RADMON sensor readout to 12 sensors, including Berthold probes
                                 Inclusion of GAS system values, currently published separately
                                 Display in GIF control room, trend of significant values (PC finally arrived)

                                                                                                                Source

                                                                                                      Upstream Attenuation

                                                                                                                         M.Jäkel (EP-DT)
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
User Meeting         2017

                            Some Planned Improvements (2)
                        Installation of material access door (Nov. 2017)
(see talk from Nikos)

                                                                                    + EN-EA
                        Increased rack space in service area (+4 racks)
                        Additional power outlets in service area racks
                        Additional power outlets in “Roberto’s Corner”
                        Gas system improvements (e.g. new exhaust line)
                        New set of Scintillators to provide beam trigger for deflected beam (Goliath)
                        Improved irradiation field usage
                        Enlarged irradiation bunker to handle different rad.requirements (???)

                                                          power outlets

                                                                                              M.Jäkel (EP-DT)
Status of the GIF Facility - AUM 2017 - Martin Jäkel - CERN Indico
User Meeting         2017

Upcoming Christmas Periode 2017/2018
 We will try to keep the Irradiator operational (CMS-DT campaign)
 Access and gas supply needs to be clarified

Upcoming Maintenance Periode Mar. 2018
  Annual Maintenance of the Irradiator
  Opening of the roof (2 plates) / Modification of GIF top enclosure (!)
  Connection of Irradiator Control Rack to UPS (control part only)
  Installation of additional interlock key (while keeping control part active)
  Removal of all set-ups (as last year)
  Time for a field mapping campaign ?

                                                                            M.Jäkel (EP-DT)
User Meeting          2017

GIF Web Page

https://gif-irrad.web.cern.ch/gif-irrad/   M.Jäkel (EP-DT)
User Meeting   2017

                         GIF Web Page (2)

Plan to add : Rack space layout
                                              -> Your publications !!!
              Pipe usage (incl. history)      Largely missing, except contributions from Barbara

                                                                                            M.Jäkel (EP-DT)
User Meeting      2017

                      GIF Web Page (4)
                                                                 Upcoming :
                                                                Dedicated SIR
                                                                  training

REMINDER : It is your responsibility to ensure that you have all the need access
rights and PPE when entering the bunker. Especially when the Access System
can be bypassed (e.g material door open) !

                                                                                M.Jäkel (EP-DT)
User Meeting       2017

                                                          Safety Files under Finalisation
                      EHN1 ZONE PPE154 ‐ PPE172

                                                                                                                                         Safety File for Gas Alarm System under preparation.
                                                                                   SGDGA‐01761
                                                                              SGSIL‐
                                                       SGSIL‐00027
                                                                           00037‐00042
                                                                                          SGSIL‐
                                                                                       00039‐00044
                                                                                                              SGDGA‐01762
                                                                             SGDGA‐01760             SGDGA‐01759

                                                                                                                                         LEVEL 3 ALARM ! (Fire Brigade Intervention)
                                                                              SGDGA‐01765
                                                                            SGDGA‐01763         SGDGA‐01758
                                                                      SGDGA‐01764                                     SGSIL‐
                                                                                                                   00038‐00043

                                     SGDGA‐01732
                                                SGDGA‐01736                                                                              Basic rules are clear : You leave the zone of danger
                                                                                                                                         immediately, and go to an assembly point.
                   SGSIL‐00026
                                                                                               SGSIL‐
                                                                                            00036‐00041
                                     SGDGA‐01735                             SGSIL‐00034
                       SGDGA‐01733

                                                                     SGDGA‐01756
                                                                              SGDGA‐01757

                                         SGSIL‐00024

                                                                                 SGSIL‐00035

SIL‐00025
     SGDGA‐01734

                                                                                                                                         Procedure for Public Visits

                                                                                                                                         Only 3 guides (Federico, Giuseppe, Martin)
                                                                                                                                         Secondary guide from User Community
                                                                                                                                         Test visit done, recommendations form HSE
                                                                                                                                         received, need to be implemented and approved.

                                                                                                                                                                                      M.Jäkel (EP-DT)
User Meeting        2017

               GIF Web Page (5)

WebCam still picture available, updated once a day (01h00), CERN account
WebCam still picture archived - once per hour (xh00), for limited time

View from control room ?

                                                                         M.Jäkel (EP-DT)
User Meeting     2017

               Active IMPACT for GIF
https://impact.cern.ch/impact/secure/activities/accessPoint/YDALC02-PPE154

   CMS

                                                                     M.Jäkel (EP-DT)
User Meeting     2017

 Muon Beam       Cosmic Muon                  Muon Beam     Cosmic Muon

R&D               R&D + mass production tests               R&D for future projects
                                                                   GIFv3 ?
Operation until Run 3 :
      The GIF should be fully operational, with even increased user base
      Only ≈ 1 week per year of preventive maintenance for Cs source
      (from our schedule)
      Upcoming mass-production tests will increase the load on access
      system, transport and planning

Limitations during YETS & LS2 still under discussion
   e.g. cooling not available during YETS

               WE NEED TO KNOW YOUR NEEDS
                            (see late point on agenda)
                                                                          M.Jäkel (EP-DT)
User Meeting    2017

       Last but not least …

     Thank You !           (rescuing the Comic Sans font)

Colleagues from EP-DT and EN-EA

GIF User Community

RD51 Community for shared beam time

                                                            M.Jäkel (EP-DT)
User Meeting    2017

       Last but not least …

     Thank You !           (rescuing the Comic Sans font)

Colleagues from EP-DT and EN-EA

GIF User Community

RD51 Community for shared beam time

                                                            Adrian Fabich

                                                                   M.Jäkel (EP-DT)