Starbucks Architectural Design Renovation: 301 W Lake St
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Starbucks Architectural Design Renovation: 301 W Lake St Scheduled for review at March 16, 2021 Planning Commission Regular Meeting Summary: The City of Mt. Shasta received an Architectural Design Application for renovations to an existing fast food building on 301 W. Lake St. (APN 057-241-490) from Shastahoof, LLC (“Applicant”). The renovations would include a complete façade replacement, removal of outdoor refrigeration units and replacement with and outdoor eating area, and redesign of the drive-thru and parking area. Project Description: The Applicant proposes to renovate the existing fast food facility exterior and interior. The proposal would remove the exterior mounted refrigerators and freezers on the back of the building and refresh the exterior. This includes replacing the existing wood shakes with a standing seam metal roof and taking the hipped roof off the small architectural tower and replacing it with a flat roof. The façade would be redone with rock, neutral stucco, and horizontal wood paneling. The building will continue to have a rock wains coating around the building other than the wood tower. Pedestrian amenities will be improved by relocating the garbage enclosure and removing the propane tanks to create an outdoor area to the south of the building for customers to use. Much of the existing vegetation has not been well maintained for the past. The Applicant proposes to remove the existing liquid amber trees and replace them with flowering pears to better fit with changes the City has been making. The Public Works Director has agreed to the replacement of the liquid ambers and repairs to the sidewalk. Landscaping will be added against the north and west sides of the building to add a natural element against the building. The Applicant proposes to update the landscaping around the property and in the parking lot landscaping islands. The Applicant proposes to use plants that do well in the region and are non- invasive. This would include drought resistant ornamental grasses and shrubs. The goal will be to landscape around the patio in a manner to help create a buffer between the vehicles and the pedestrians. The hours of operation would be shorter than Taco Bell/Kentucky Fried Chicken, but employees may be onsite during off hours to prepare for shifts. The employees would be onsite 4:00 A.M. to 11:00 P.M. There will be approximately 25 employees that would be a mix of part- and full- time, with 3 to 6 on site during each shift. Though it is hard to estimate the number of daily customers due to Interstate 5, it is estimated that the location will have roughly 3,250 visits per week between the drive thru and store visits. Project Location:
The Project is located within the City of Mt. Shasta on the south side of West Lake Street, east of Black Bear Diner and a vacant commercial parcel, south/southeast of Pine Street and the Mt. Shasta Visitors Center, west of Union Pacific Railroad, and north of the Mt. Shasta Shopping Center in Section 6, Township 40 North, Range 4 West of the U.S. Geological Survey (USGS) City of Mount Shasta quadrangle. Latitude: 41° 20' 52.7" N; Longitude: 122° 20' 42.4" W. Assessor’s Parcel Number: 057-771-030
KEY NOT ES STARBUCKS SITE REGIONAL MAP STO R E # TB D SITE MAPS C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 VICINITY MAP SITE MAP STA R B U C K S D E S I G N I N T E N T PAC K AG E | 3
E X ISTING SITE PLAN STO R E # TB D LL DRAWINGS C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 4
11' - 3" KEY NOT ES 1 MONUMENT SIGN 5 r1 5' 2 STOREFRONT ENTRY DOOR r 25' - 0 - 0" " 3 ADA PARKING 4 MOP PARKING PROPOSED STARBUCK S SPACE STARBUCKS 5 DT WINDOW W/ AIR 2,060 SF CURTAIN 12' - 1 1/4" 2,060 SQ FT " 0" -0 r 25' - 2 0' 6 DIRECTIONAL SIGN r2 7 CLEARANCE BAR 15 8 THANK YOU/EXIT SIGN 14 9 DT WAYFINDING GRAPHIC ENTRY ARROW GREEN 2 13 10 DT WAYFINDING GRAPHIC EXIT ARROW WITH STRIPE 3 3 12 -WHITE 11 PRE MENU BOARD 4 4 4 4 4 12 DOS WITH CANOPY 13 5- PANEL MENU BOARD 8 14 TRASH ENCLOSURE BY LL 10 25' - 0" 11 15 BIKE LOOPS 16 NEW EASED ENTRY CURB 17 STOP SIGN 12' - 0" DT APPROACH DT EXIT ACCESSIBLE ROUTE TO PUBLIC WAY 7 6 9 17 1 STOP 1 r2 16 0' - 0" STO R E # TB D SITE PLAN C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 5 SITE PLAN
E X ISTING ELEVATIONS STO R E # TB D LL DRAWINGS C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 6
EXISTING EXTERIOR STO R E # TB D EXISTING C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 7
E X ISTING EXERIOR STO R E # TB D EXISTING C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 8
NEW WOOD CLADDING FINISH 60 IN SIREN LOGO DISK NEW METAL ROOF NEW STUCCO FINISH SW7043 WORDLY GRAY NEW WINDOWS NEW WALL SCONCES NEW STONE VENEER NEW PLANTER STO R E # TB D PERSPECTIVE C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 9
NEW METAL ROOF 18 IN WORDMARK 72 IN DRIVE THRU SIGNAGE NEW CANOPY NEW STUCCO FINISH SW7043 WORDLY GRAY NEW WINDOWS NEW STONE VENEER NEW PLANTERS NEW PATIO RAILING STO R E # TB D PERSPECTIVE C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 0
NEW METAL ROOF NEW STUCCO FINISH SW7043 WORDLY GRAY NEW STONE VENEER NEW BIKE LOOPS STO R E # TB D PERSPECTIVE C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 1
NEW WOOD CLADDING FINISH NEW METAL ROOF 60 IN SIREN LOGO DISK NEW CANOPY NEW STUCCO FINISH SW7043 WORDLY GRAY NEW STONE VENEER STO R E # TB D PERSPECTIVE C P N # 90 6 20 - 0 0 1 MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 2
KEY NOT ES 1 DEMO INTERIOR 2 ELECTRICAL PANELS TO REMAIN 3 DEMO LOWER AREA DEMO EXISTING TRASH 4 CAN 1 PROPANE 3 4 2 STO R E # TB D DEMO FLOOR PLAN C P N # 90 6 20 - 0 0 1 DEMOLITION FLOOR PLAN MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 6
KEY NOT ES 8 7 21 15 1 MERCH BAYS 5' - 0" 20 2 CONDIMENT CART 4 5 3 FRONT ENGINE 6 4' - 0" 4' - 0" 4 BACK ENGINE 13 5 UNDER COUNTER THAW 4' - 0" RACK 3' - 0" 12 4' - 1" 6 HAND SINK 3 9 7 1800 lb ICE MACHINE 11 3' - 8" 8 DRY STORAGE RACKS/ METROS - 3 10 9 3 COMP SINK + SANITIZER 2 1 10 2 DR REFIGERATOR 14 11 1 DR REFIGERATOR 3' - 6 1/2 18 " 12 2 DR FREEZER 13 PASTRY RACK 20 6 C omponent#5 ent#1 ent#2 ent#3 ent#4 14 MWS + IT RACK ABOVE 17 15 MOP SINK + WATER FILTRATION SYSTEM WATER HEATER (ABOVE) 19 16 ELECTRICAL PANELS 17 TRASH 18 WORK STATION C omponent#5 ent#1 ent#2 ent#3 ent#4 19 LOCKERS + PARTNER 16 CHECK IN STATION 20 DRY STORAGE 21 FUTURE 3RD MASTRENA SEAT ING 23 INTERIOR SEATS 9 CUSTOMER OCCASIONS STO R E # TB D FLOOR PLAN C P N # 90 6 20 - 0 0 1 PROPOSED FLOOR PLAN MT S H A STA DATE: 0 1 / 1 1 / 20 21 STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 7