Starbucks Architectural Design Renovation: 301 W Lake St
Starbucks Architectural Design Renovation: 301 W Lake St
        Scheduled for review at March 16, 2021 Planning Commission Regular Meeting
Summary:

The City of Mt. Shasta received an Architectural Design Application for renovations to an existing
fast food building on 301 W. Lake St. (APN 057-241-490) from Shastahoof, LLC (“Applicant”).
The renovations would include a complete façade replacement, removal of outdoor refrigeration
units and replacement with and outdoor eating area, and redesign of the drive-thru and parking
area.

Project Description:

The Applicant proposes to renovate the existing fast food facility exterior and interior. The
proposal would remove the exterior mounted refrigerators and freezers on the back of the
building and refresh the exterior. This includes replacing the existing wood shakes with a standing
seam metal roof and taking the hipped roof off the small architectural tower and replacing it with
a flat roof. The façade would be redone with rock, neutral stucco, and horizontal wood paneling.
The building will continue to have a rock wains coating around the building other than the wood
tower. Pedestrian amenities will be improved by relocating the garbage enclosure and removing
the propane tanks to create an outdoor area to the south of the building for customers to use.

Much of the existing vegetation has not been well maintained for the past. The Applicant
proposes to remove the existing liquid amber trees and replace them with flowering pears to
better fit with changes the City has been making. The Public Works Director has agreed to the
replacement of the liquid ambers and repairs to the sidewalk. Landscaping will be added against
the north and west sides of the building to add a natural element against the building. The
Applicant proposes to update the landscaping around the property and in the parking lot
landscaping islands. The Applicant proposes to use plants that do well in the region and are non-
invasive. This would include drought resistant ornamental grasses and shrubs. The goal will be
to landscape around the patio in a manner to help create a buffer between the vehicles and the
pedestrians.

The hours of operation would be shorter than Taco Bell/Kentucky Fried Chicken, but employees
may be onsite during off hours to prepare for shifts. The employees would be onsite 4:00 A.M.
to 11:00 P.M. There will be approximately 25 employees that would be a mix of part- and full-
time, with 3 to 6 on site during each shift. Though it is hard to estimate the number of daily
customers due to Interstate 5, it is estimated that the location will have roughly 3,250 visits per
week between the drive thru and store visits.

Project Location:
Starbucks Architectural Design Renovation: 301 W Lake St
The Project is located within the City of Mt. Shasta on the south side of West Lake Street, east
of Black Bear Diner and a vacant commercial parcel, south/southeast of Pine Street and the Mt.
Shasta Visitors Center, west of Union Pacific Railroad, and north of the Mt. Shasta Shopping
Center in Section 6, Township 40 North, Range 4 West of the U.S. Geological Survey (USGS)
City of Mount Shasta quadrangle. Latitude: 41° 20' 52.7" N; Longitude: 122° 20' 42.4" W.

Assessor’s Parcel Number: 057-771-030
Starbucks Architectural Design Renovation: 301 W Lake St
KEY NOT ES

         STARBUCKS SITE

                                          REGIONAL MAP

                STO R E # TB D
 SITE MAPS
                C P N # 90 6 20 - 0 0 1
 MT S H A STA
                DATE: 0 1 / 1 1 / 20 21
                                          VICINITY MAP   SITE MAP
                                                                    STA R B U C K S D E S I G N I N T E N T PAC K AG E | 3
Starbucks Architectural Design Renovation: 301 W Lake St
E X ISTING SITE PLAN
                  STO R E # TB D
LL DRAWINGS
                  C P N # 90 6 20 - 0 0 1
   MT S H A STA
                  DATE: 0 1 / 1 1 / 20 21                          STA R B U C K S D E S I G N I N T E N T PAC K AG E | 4
Starbucks Architectural Design Renovation: 301 W Lake St
11' - 3"
KEY NOT ES
1    MONUMENT SIGN                                                                                            5
                                                                                 r1
                                                                                      5'
2 STOREFRONT ENTRY DOOR                                             r 25' - 0            -   0"
                                                                             "
3 ADA PARKING
4 MOP PARKING
                                                                                                           PROPOSED
                                                                                                        STARBUCK S SPACE
                                                                                                         STARBUCKS
5 DT WINDOW W/ AIR                                                                                          2,060 SF
  CURTAIN                                               12' - 1 1/4"                                    2,060 SQ FT                                                    "           0"
                                                                                                                                                                     -0    r 25' -
                                                                                 2                                                                              0'
6 DIRECTIONAL SIGN                                                                                                                                            r2
7 CLEARANCE BAR
                                                                                                                                   15
8 THANK YOU/EXIT SIGN                                                                                                                                   14
9 DT WAYFINDING GRAPHIC
  ENTRY ARROW GREEN
                                                                                                               2                                                      13
10   DT WAYFINDING GRAPHIC
     EXIT ARROW WITH STRIPE                                                                                                        3           3                      12
     -WHITE
11   PRE MENU BOARD
                                                                                                          4       4   4    4   4
12   DOS WITH CANOPY
13   5- PANEL MENU BOARD
                                                                                        8
14   TRASH ENCLOSURE BY LL
                                                                    10                                                                             25' - 0"                11
15   BIKE LOOPS
16   NEW EASED ENTRY CURB
17   STOP SIGN
                                                                                                                                                                                   12' - 0"
               DT APPROACH

               DT EXIT
                ACCESSIBLE
                ROUTE TO
                PUBLIC WAY
                                                                                                                                                                           7
                                                                                                                                                                           6
                                                                                                                                                                                        9

                                                                                                                                           17

1
                                                                                                                                        STOP
                                               1

                                                   r2          16
                                                        0'
                                                           -   0"
                    STO R E # TB D
     SITE PLAN
                    C P N # 90 6 20 - 0 0 1
     MT S H A STA
                    DATE: 0 1 / 1 1 / 20 21                                                                                                                                                   STA R B U C K S D E S I G N I N T E N T PAC K AG E | 5

                                              SITE PLAN
Starbucks Architectural Design Renovation: 301 W Lake St
E X ISTING ELEVATIONS
                  STO R E # TB D
LL DRAWINGS
                  C P N # 90 6 20 - 0 0 1
   MT S H A STA
                  DATE: 0 1 / 1 1 / 20 21                           STA R B U C K S D E S I G N I N T E N T PAC K AG E | 6
Starbucks Architectural Design Renovation: 301 W Lake St
EXISTING EXTERIOR
               STO R E # TB D
EXISTING
               C P N # 90 6 20 - 0 0 1
MT S H A STA
               DATE: 0 1 / 1 1 / 20 21                       STA R B U C K S D E S I G N I N T E N T PAC K AG E | 7
Starbucks Architectural Design Renovation: 301 W Lake St
E X ISTING EXERIOR
               STO R E # TB D
EXISTING
               C P N # 90 6 20 - 0 0 1
MT S H A STA
               DATE: 0 1 / 1 1 / 20 21                        STA R B U C K S D E S I G N I N T E N T PAC K AG E | 8
Starbucks Architectural Design Renovation: 301 W Lake St
NEW WOOD
          CLADDING FINISH
    60 IN SIREN LOGO DISK

          NEW METAL ROOF

      NEW STUCCO FINISH
    SW7043 WORDLY GRAY

             NEW WINDOWS

       NEW WALL SCONCES

        NEW STONE VENEER

                 NEW PLANTER

                 STO R E # TB D
PERSPECTIVE
                 C P N # 90 6 20 - 0 0 1
  MT S H A STA
                 DATE: 0 1 / 1 1 / 20 21   STA R B U C K S D E S I G N I N T E N T PAC K AG E | 9
Starbucks Architectural Design Renovation: 301 W Lake St
NEW METAL ROOF
            18 IN WORDMARK
  72 IN DRIVE THRU SIGNAGE

                 NEW CANOPY
        NEW STUCCO FINISH
      SW7043 WORDLY GRAY

            NEW       WINDOWS

         NEW STONE VENEER
            NEW PLANTERS

        NEW PATIO RAILING

                 STO R E # TB D
PERSPECTIVE
                 C P N # 90 6 20 - 0 0 1
  MT S H A STA
                 DATE: 0 1 / 1 1 / 20 21   STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 0
NEW METAL ROOF

        NEW STUCCO FINISH
      SW7043 WORDLY GRAY

         NEW STONE VENEER

            NEW BIKE LOOPS

                 STO R E # TB D
PERSPECTIVE
                 C P N # 90 6 20 - 0 0 1
  MT S H A STA
                 DATE: 0 1 / 1 1 / 20 21   STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 1
NEW WOOD
            CLADDING FINISH

            NEW METAL ROOF

     60 IN SIREN LOGO DISK

                 NEW CANOPY

       NEW STUCCO FINISH
     SW7043 WORDLY GRAY

         NEW STONE VENEER

                 STO R E # TB D
PERSPECTIVE
                 C P N # 90 6 20 - 0 0 1
  MT S H A STA
                 DATE: 0 1 / 1 1 / 20 21   STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 2
KEY NOT ES
      1 DEMO INTERIOR
      2 ELECTRICAL PANELS TO
        REMAIN

     3 DEMO LOWER AREA

           DEMO EXISTING TRASH
      4
           CAN

                                                                           1
                                                                                                            PROPANE
                                                                                   3

                                                                                                               4

                                                                               2

                         STO R E # TB D
DEMO FLOOR PLAN
                         C P N # 90 6 20 - 0 0 1
                                                   DEMOLITION FLOOR PLAN
          MT S H A STA
                         DATE: 0 1 / 1 1 / 20 21                                       STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 6
KEY NOT ES                                                 8        7         21                                                                      15
 1 MERCH BAYS                                                                      5' - 0"
                                                                                                                                                                                20
2 CONDIMENT CART                                                                                 4                                                    5
3 FRONT ENGINE                                         6

                                                                    4' - 0"

                                                                                                                                            4' - 0"
4 BACK ENGINE
                                                                                                                                                                13
 5 UNDER COUNTER THAW
                                                                                                                                          4' - 0"
   RACK                                      3' - 0"
                                                                                                                                                           12        4' - 1"

6 HAND SINK
                                                                                             3
                                                                                                                                                                                9
7 1800 lb ICE MACHINE                                                                                                                                      11         3' - 8"

8 DRY STORAGE RACKS/
  METROS - 3                                                                                                                                               10
9 3 COMP SINK + SANITIZER                         2
                                                               1
10 2 DR REFIGERATOR                                                                                                                                                             14
11 1 DR REFIGERATOR

                                                                                                     3' -
                                                                                                      6 1/2
                                                                                                                                                            18

                                                                                                           "
12 2 DR FREEZER
13 PASTRY RACK                                                                                                                                        20
                                                                                                                                                                 6

                                                                                                            C omponent#5
                                                                                                                   ent#1
                                                                                                                   ent#2
                                                                                                                   ent#3
                                                                                                                   ent#4
14 MWS + IT RACK ABOVE                                                                                                                                17
15 MOP SINK + WATER
   FILTRATION SYSTEM
   WATER HEATER (ABOVE)
                                                                                                                                                            19
16 ELECTRICAL PANELS
17 TRASH
18 WORK STATION

                                                                                                                           C omponent#5
                                                                                                                                  ent#1
                                                                                                                                  ent#2
                                                                                                                                  ent#3
                                                                                                                                  ent#4
19 LOCKERS + PARTNER                                                                                                                                                   16
   CHECK IN STATION
20 DRY STORAGE
21 FUTURE 3RD MASTRENA

SEAT ING
23 INTERIOR SEATS
9    CUSTOMER OCCASIONS

                   STO R E # TB D
FLOOR PLAN
                   C P N # 90 6 20 - 0 0 1
                                                                   PROPOSED FLOOR PLAN
    MT S H A STA
                   DATE: 0 1 / 1 1 / 20 21                                                                                                                                           STA R B U C K S D E S I G N I N T E N T PAC K AG E | 1 7