Reference projects HVAC/sanitary - Success through quality - Subauftrag

Page created by Nicholas Robertson
 
CONTINUE READING
Reference projects HVAC/sanitary - Success through quality - Subauftrag
Reference
       projects
       HVAC/sanitary

       Success through quality.

www.subauftrag.com
Reference projects HVAC/sanitary - Success through quality - Subauftrag
subauftrag.com                        S   02

                 03   Amazon

                 04   Atotech

                 05   BMW

   Content       06

                 07
                      Kuka Robotics

                      Lidl

                 08   Mercedes

                 09   UPS

                 10   Voith
Reference projects HVAC/sanitary - Success through quality - Subauftrag
subauftrag.com                                                        S   03

REFERENCE

MO82
Project title
MO82

Location
Munich

Number of skilled workers
15

Activities
Installation of heating, ventilation and sanitary facilities.

The MO82 project has created a multifaceted building complex,
including a hotel, a student apartment complex, office space and a
boarding house. For a building project of this size, reliable and
competent companies from a wide range of industries are
indispensable. A well-rehearsed team from Subauftrag.com was also
able to participate in this project. The scope of work included the
installation of the heating, ventilation and sanitary facilities.
Reference projects HVAC/sanitary - Success through quality - Subauftrag
subauftrag.com                                                          S            04

REFERENCE

Trivago
Projekt title
Trivago Headquarter Düsseldorf

Location
Düsseldorf

Number of skilled workers
16

Activities
Sanitary installations, laying and screwing of
waste water pipes

For the new headquarters of the online giant Trivago, the world's
largest hotel search engine, Subauftrag.com procured qualified
subcontractors. The contract for our subcontractors started in              Photo: Witte

June 2017. 2 large teams, including site managers, were deployed
over an area of 30,000 m2. The skilled workers carried out sanitary
installations of water pipes, wash basins, toilet cores, urinal racks
and drains. In addition, dirty water pipes (rainwater pipes and dirt
pipes) were laid and screwed together.
Reference projects HVAC/sanitary - Success through quality - Subauftrag
subauftrag.com                                                      S   05

REFERENCE

DHL
Project title
DHL distribution centre

Location
Euskirchen

Number of skilled workers
4

Activities
Heating and sanitary installations

For the DHL distribution centre in Euskirchen the company sub-
contracted 4 well trained HVAC-assemblers from one of our top
subpartners. The duration of the contract was about 2 months,
during which the workers were responsible for the installation of
the heating and sanitary elements.
Reference projects HVAC/sanitary - Success through quality - Subauftrag
subauftrag.com                                                       S   06

RERERENCE

MEWA
Projekt title
MEWA Weil im Schönbuch

Location
Weil im Schönbuch

Number of skilled workers
5

Activities
Assembly of fastenings (clamps); assembly of ventilation ducts and
winding fax pipes

The textile company MEWA has built one of the most modern and
ecological companies in Europe for the care of workwear and
protective clothing in the Sol industrial park on the border to
Holzgerlingen. Subauftrag.com arranged for ventilation fitters for
various assembly activities in the HVAC sector.
Reference projects HVAC/sanitary - Success through quality - Subauftrag
subauftrag.com                                                      S   07

REFERENCE

Adidas
Project title
Adidas WOS Arena

Location
Herzogenaurach

Number of skilled workers
2

Activities
Installation work in a refrigeration and heating plant, pipe
installation, including brackets, connection of containers, heat
exchangers, pumps, etc.

Adidas AG expanded its headquarters, among other things, with a
new office building that is unique in its form and construction
worldwide. For various assembly works in a refrigeration and
heating centre, 2 HVAC-assemblers were arranged by
Subauftrag.com. The exact scope of work included the installation
of piping, connection of heat exchangers, pumps, etc.
Reference projects HVAC/sanitary - Success through quality - Subauftrag
subauftrag.com                                                            S   08

REF ERENCE

Eurofins
Project title
Eurofins Hamburg

Location
Hamburg

Number of skilled workers
4 MAG/E welders, 4 jigs

Activities
Welding work, roof structure reinforcement

Within the global production network of Mercedes-Benz Cars, the
plant in Rastatt is responsible for the global control of production as
well as for quality and supplier management. A total of 8 workers (4
certified MAG/E welders and 4 fitters) were employed here, who
were subcontracted. The activities included welding work, such as
welding TT girders with gusset plates and reinforcing plates.
Reference projects HVAC/sanitary - Success through quality - Subauftrag
subauftrag.com                                                           S   09

REFERENCE

Norske Skog
Project title
Norske Skog Bruck GmbH

Location
Bruck an der Mur

Number of skilled workers
6

Activities
Disassembly of an existing duct in a hall, reassembly and
modification of a new ventilation duct.

Norske Skog Bruck GmbH is part of the Norwegian paper group
Norske Skog. The globally active group of companies is one of the
world's largest producers of publication papers. In the plant in Bruck
an der Mur, Austria, 6 subpartners of the company Subauf-trag.com
were used for various activities in ventilation technology. The order
covered a period of one month.
Contact
Subauftrag.com
T: +43 (0) 1336 0151-191
office@subauftrag.com
www.subauftrag.com
You can also read