Public Presentation Capital Bond November 27, 2017 - Port ...

Page created by Alma Mccarthy
 
CONTINUE READING
Public Presentation Capital Bond November 27, 2017 - Port ...
Public Presentation
Capital Bond
November 27, 2017
Public Presentation Capital Bond November 27, 2017 - Port ...
Capital Bond

               The Board of Education facilities
               committee working in concert with
               building administration, central
               administration, and the district
               architect weighed both district needs
               and fiscal responsibility to arrive at a
               list of necessary projects for a capital
               bond.

                                                          2
Quick Facts

Bond will address Infrastructure and Instructional Needs with a focus on
  Health/Safety of students and staff

Approximate cost will be $29,900,000

Vote is planned for December 5, 2017

Actual construction would begin summer of 2019

More immediate needs have been or will be addressed through General Fund
  budget appropriations:
   • High     School Electrical Upgrade
   • High     School Track Resurfacing
   • Masonry     Repairs of Façade at High School
   • Various    paving projects throughout the District

                                                                            3
Projects

           Location                    Description                                                                     Est. Cost
                                       Drainage and Erosion Control- Installation of drainage walls at the north side
                                       of the building to address the severe erosion, that risks the structural failure
           Middle School               of hillside as well as moisture/mold conditions.                                 $   1,590,000.00
                                       MS Main Office Relocation- Move office to existing Science room A102 and
                                       Science room to current Main Office. Create greater access for parents and
           Middle School               increase safety for students/staff.                                             $      480,000.00
                                       MS Classroom Space- Renovate multi-purpose room to enhance the use for
                                       physical education and athletics with bleachers/ wall padding/backboards,
           Middle School               and flooring.                                                                   $      110,000.00
                                       Tennis Courts- Complete replacement of 4 existing courts and proper
           High School/Middle School   drainage installation.                                                          $      600,000.00
                                       Exterior Football Bleachers- Complete replacement of bleachers with
           High School/Middle School   handicapped accessibility.                                                      $      450,000.00
           High School/Middle School   Stairs to Lower Field (the High School bowl)                                    $      145,000.00

           High School/Middle School   Auditorium- Reconfigure and upgrade sound booth to the rear of auditorium. $           125,000.00

           High School/Middle School   Security- Construct new security vestibule by installing secondary doors.       $       59,000.00
                                       Handicapped Accessibility at the High School Track- Installation of a 2-3 car
           High School/Middle School   asphalt parking area with a walkway to the bleachers.                           $       43,000.00

                                                                                                                                           4
Projects

    Location      Description                                                                                      Est. Cost
                  HS Classroom Space- Construct new 3 story addition between existing 3 story wing and science
    High School   wing adding 7 -10 classrooms                                                                    $ 7,648,250.00
                  HS Classroom Space- Construct 1 story instrumental music room and small practice rooms adjacent
                  to AP room and music portable. Once built, existing music portable in parking lot will be
    High School   demolished.                                                                                     $ 2,257,500.00

                  HS Cafeteria Space- Renovate existing cafeteria and renovate existing kitchen, including expanded
    High School   kitchen. Addition of air conditioning to student space. Demolish and replace exterior patio wall.   $   2,158,615.00
                  HS Windows- Replacement of windows installed circa 1986 (which is at end of useful life-span), will
    High School   be replaced in fashion of 1935 style.                                                               $   1,155,385.00

                  HS Interior Alterations- Reconfigure several spaces in building to improve teaching environment.
                  For example, resize classrooms, soundproofing classrooms, modify classroom space for specialized
    High School   programs                                                                                         $        225,000.00

                  Elementary Additional Classrooms- Construction of 1 additional classroom and 1 additional office,
                  while creating storage with space behind Cafeteria; renovate and create 1 large soundproof music
    Elementary    room; create 2 additional ADA toilets; and enlarge cafeteria service line opening.                $     2,471,250.00
                  Elementary HVAC- Install new ventilators to provide fresh air ventilation for the 200 and 300
    Elementary    wings.                                                                                            $       737,000.00

                                                                                                                                         5
Projects

   Location         Description                                                                                            Est. Cost
   Elementary       Elementary School All Purpose Room / Cafeteria Air-conditioning                                       $     478,000.00

   Elementary       Security Vestibule - Expand building footprint and install inner security vestibule.                  $     210,000.00

                    Locker Room Renovations - Inequitable facilities currently exist among our male and female
                    student athletes. Renovate Team Locker rooms and build new corridor along exterior wall.
   Athletics        Renovate lockers/shower facilities/plumbing/ventilation.                                              $   1,691,000.00
   Athletics        Sports Lighting- Install stadium lighting at Scraggy Fields                                           $   1,610,000.00

                    Synthetic Turf Field (1)- Remove grass from entire oval of existing running track and replaced with
   Athletics        turf. Estimated maintenance (not part of cost) is $7,500-$8,000 annually.                             $   1,378,000.00

                    Tech Ed Building- Convert to new Central Administration building, keeping existing wrestling room
   Administration   intact. Cost to renovate existing Central Administration building estimated at $4 million.        $       3,688,000.00

                    Administration Building- Vacate and demo building. Create new bus loop that can accommodate
   Administration   the current bus fleet as well as creating a parent drop off in the old bus loop.                      $     590,000.00

                                                                                                                                             6
Original Bond Payment Schedule as of 9/1/2017

                                                7
New Bond Payment Schedule as of 11/27/2017

                                             8
Munistat

           Phone: (631) 331-8888
            Fax: (631) 331-8834                    MUNISTAT SERVICES INC.
                                                                 Municipal Finance Advisory Service
                                                                       Website: www.munistat.com
                                           ●   Serving Municipalities and School Districts in New York State Since 1977   ●

                                                                         12 Roosevelt Avenue
                                                               Port Jefferson Station, New York 11776

                                                                                                         November 27, 2017

                Sean Leister
                Deputy Superintendent
                Port Jefferson Union Free School District
                Business Office
                550 Scraggy Hill Road
                Port Jefferson, New York 11777

                                   Re: Port Jefferson Union Free School District, New York
                                       $29,900,000 Proposed Capital Project
                Dear Sean:

                        Unfortunately, the last estimated debt service schedule that I provided to you contained an inadvertent
                inaccuracy pertaining to the state aid amount. The inaccuracy caused the estimated average tax rate to be
                understated.

                           We apologize for the oversight in the estimated schedule.

                                                                                                         Very truly yours,

                                                                                                         Michael J. Loguercio
                                                                                                         President
                                                                                                                                  9
Bond Estimate Changes

 State Aid Decreases from $915,000 to $453,580

 Interest rates decreased based upon recent bond sales from 3.75% to 3.00%

 Tax rate impact from 7.21 to 8.56

                                                                              10
Tax Calculator
   Port Jefferson School Tax Estimate Calculator

   2016/2017 Assessed Value - Gross                                                                                       (1)                3,725.00                             Upper Left of Statement
    Less Exemptions

      Volunteer Fire/Ambulance (enter as negative value)                                                                  (2)                (373.00)    (value)                  Upper Right of Statement
      Veterans (enter as negative value)                                                                                                           -     (value)                  Upper Right of Statement
      Senior (enter as negative value)                                                                                                                   (value)                  Upper Right of Statement

      STAR (enter as negative value)                                                                                      (3)                (510.00)    (value)                  Upper Right of Statement
      Other (enter as negative value)                                                                                                                    (value)                  Upper Right of Statement

   2016/2017 Assessed Value - Adjusted Gross                                                                              (5)        $      2,842.00                              Middle Right of Statement

   2016/2017 Tax Rate                                                                                                     (6)                  145.08                             Middle Right of Statement

   2016/2017 School Taxes - Gross                                                                                                    $      4,863.01                              Calculation

   Star Exemption (enter as negative value)                                                                               (4)                (654.00)    (Real Savings)           Upper Right of Statement

   2016/2017 Net School District TAXES                                                                                    (7)        $      4,209.01                              Middle Right of Statement

   Estimated 2017/2018 Tax Rate                                                                                                                148.74

   Estimated 2017/2018 Tax Rate with $29,900,000 Bond                                                                                          157.30

   2016/2017 School District Taxes                                                                                        (7)        $      4,209.01                              Middle Right of Statement
   Estimated 2017/2018 School District Taxes                                                                                         $      4,220.65
   Estimated 2017/2018 School District Taxes w 29.9 Million Bond                                                                     $      4,463.93

   Estimated Annual increase to taxes as a result of Capital Bond                                                         (8)        $         243.28

   *This calculator is for estimation purposes only. Port Jefferson School District is not the Assessor of Taxes nor does it represent itself to be.

   **Actual increases due to the capital bond would not occur until the 2018/2019 school year or possibly 2019/2010 school year. The purpose of the calculation is to estimate the annual individual increase in school taxes as a
   result from the proposed Capital Bond referendum

   ***These calculation are based upon current data and are subject to change by the Assesors Office

                                                                                                                                                                                                                                     11
Question and Answer

 How much will this bond cost me?
     The bond would add approximately 8.56 points to the tax rate. The 2017-2018 estimated tax rate is 148.74. So if the bond was issued in 2017/2018
      the tax rate would grow to 157.30
          For a household that pays $4,000 in School Tax, the approximate annual increase in taxes attributable to the bond will be $239
          For a household that pays $8,000 in School Tax, the approximate annual increase in taxes attributable to the bond will be $427
          For a household that pays $14,000 in School Tax, the approximate annual increase in taxes attributable to the bond will be $826
          For a household that pays $20,000 in School Tax, the approximate annual increase in taxes attributable to the bond will be $1,185

 Exactly how much will it cost me personally for the bond referendum?
          Check out the updated individual tax payer calculator.

                                                                                                                                                         12
You can also read