PUBLIC NOTICE - US Army Corps of Engineers, New York ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
PUBLIC NOTICE US Army Corps of Engineers New York District In replying refer to: Jacob K. Javits Federal Building Public Notice Number: NAN-2022-00176-EMI New York, N.Y. 10278-0090 Issue Date: March 24, 2022 ATTN: Regulatory Branch Expiration Date: April 23, 2022 To Whom It May Concern: The New York District, Corps of Engineers has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act (33 U.S.C. 1344). APPLICANT: Suffolk County Department of Public Works 335 Yaphank Avenue Yaphank, New York 11980 ACTIVITY: Ten-Year Maintenance Dredging with Beach Placement WATERWAY: Stony Brook Harbor LOCATION: Dredge Location: Stony Brook Harbor, Towns of Brookhaven and Smithtown, Suffolk County, New York Dredge Material Placement Location: Smithtown Bay Shoreline (Long Beach Peninsula, West Meadow Beach and Old Field Club), Towns of Brookhaven and Smithtown, Suffolk County, New York A detailed description and plans of the applicant's activity are enclosed to assist in your review. The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
CENAN-OP-RE PUBLIC NOTICE NO. NAN-2022-00176-EMI are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. ALL COMMENTS REGARDING THE PERMIT APPLICATION MUST BE PREPARED IN WRITING AND EMAILED TO REACH THIS OFFICE BEFORE THE EXPIRATION DATE OF THIS NOTICE, otherwise, it will be presumed that there are no objections to the activity. Comments submitted in response to this notice will be fully considered during the public interest review for this permit application. Comments provided will become part of the public record for this permit application. All written comments, including contact information, will be made a part of the administrative record, available to the public under the Freedom of Information Act. The Administrative Record, or portions thereof, may also be posted on a Corps of Engineers internet web site. Due to resource limitations, this office will normally not acknowledge the receipt of comments or respond to individual letters of comment. Any person may request, in writing, before this public notice expires, that a public hearing be held to collect information necessary to consider this application. Requests for public hearings shall state, with particularity, the reasons why a public hearing should be held. It should be noted that information submitted by email is considered just as carefully in the permit decision process and bears the same weight as that furnished at a public hearing. Our preliminary determination is that the activity for which authorization is sought herein is not likely to affect any Federally endangered or threatened species or their critical habitat. However, pursuant to Section 7 of the Endangered Species Act (16 U.S.C. 1531), the District Engineer is consulting with the appropriate Federal agency to determine the presence of and potential impacts to listed species in the project area or their critical habitat. The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act (Public Law 104-267), requires all Federal agencies to consult with the National Oceanic and Atmospheric Administration Fisheries Service (NOAA/FS) on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The proposed work, fully described in the attached work description, could cause the disruption of habitat for various lifestages of some EFH-designated species as a result of a temporary increase in turbidity during construction. However, the New York District has made the preliminary determination that the site-specific adverse effects are not likely to be substantial because it is expected that fish populations would avoid the small area of disturbance. Further consultation with NOAA/FS regarding EFH impacts and conservation recommendations is being conducted and will be concluded prior to the final decision. Based upon a review of the latest published version of the National Register of Historic Places, there are no known sites eligible for, or included in, the Register within the permit area. Presently unknown archeological, scientific, prehistorical, or historical data may be lost by work accomplished under the required permit. Reviews of activities pursuant to Section 404 of the Clean Water Act will include application of the guidelines promulgated by the Administrator, U.S. Environmental Protection Agency, under authority of Section 404 (b) of the Clean Water Act and the applicant will obtain a water quality certificate or waiver from the appropriate state agency in accordance with Section 401 of the Clean Water Act prior to a permit decision. This public notice serves as notification to the Administrator of the Environmental Protection Agency (EPA) pursuant to section 401(a)(2) of the Clean Water Act. If EPA determines that the proposed discharge may affect the quality of the waters of any state
CENAN-OP-RE PUBLIC NOTICE NO. NAN-2022-00176-EMI other than New York, it will so notify such other state, the district engineer, and the applicant. If such notice or a request for supplemental information is not received within 30 days of issuance of this public notice, the district engineer will assume EPA has made a negative determination with respect to section 401(a)(2). Pursuant to Section 307 (c) of the Coastal Zone Management Act of 1972 as amended [16 U.S.C. 1456 (c)], for activities under consideration that are located within the coastal zone of a state which has a federally approved coastal zone management program, the applicant has certified in the permit application that the activity complies with, and will be conducted in a manner that is consistent with, the approved state coastal zone management program. By this public notice, we are requesting the state's concurrence with, objection to, or waiver of the applicant's certification. No permit decision will be made until one of these actions occur. For activities within the coastal zone of New York State, the applicant's certification and accompanying information is available from the Consistency Coordinator, New York State Department of State, Division of Coastal Resources and Waterfront Revitalization, Coastal Zone Management Program, One Commerce Plaza, 99 Washington Avenue, Albany, New York 12231, Telephone (518) 474-6000. Comments regarding the applicant's certification, and copies of any letters to this office commenting upon this proposal, should be so addressed. In addition to any required water quality certificate and coastal zone management program concurrence, the applicant has obtained or requested the following governmental authorization for the activity under consideration: • New York State Department of Environmental Conservation It is requested that you communicate the foregoing information concerning the activity to any persons known by you to be interested and who did not receive a copy of this notice. Please send all comments and questions concerning this application to Christopher.W.Minck@usace.army.mil. In order for us to better serve you, please complete our Customer Service Survey located at http://www.nan.usace.army.mil/Missions/Regulatory/CustomerSurvey.aspx. For more information on New York District Corps of Engineers programs, visit our website at http://www.nan.usace.army.mil. Date: 2022.03.21 20:26:36 -04'00' FOR AND IN BEHALF OF Stephan A. Ryba Chief, Regulatory Branch Enclosures
CENAN-OP-RE PUBLIC NOTICE NO. NAN-2022-00176-EMI WORK DESCRIPTION The permit applicant, Suffolk County Department of Public Works (SCDPW), has requested Department of the Army (DA) authorization to conduct dredging, with ten-years maintenance with placement of all resultant dredged material at two designated beach placement areas. The project is located at Stony Brook Harbor, in the Towns of Brookhaven and Smithtown, Suffolk County, New York. The proposed work would involve the following: Maintenance dredge with ten-years maintenance, by hydraulic dredge, approximately 50,000 cubic yards (CY) of material from an approximately 960,935 square foot (22.06 acres) channel system to a depth of five or seven feet below the plane of Mean Low Water (MLW). The approximate slope of the channel system would be 1 to 3. The dredged material would be placed at two designated beach placement areas along the Smithtown Bay shoreline to the northeast of the channel (West Meadow Beach and Old Field Club) and west of the channel (Long Beach Peninsula) via a dredge pipeline. The channel system consists of the following: • Yacht Club Spur: Dredge approximately 25,000 CY of material from an approximately 100- foot-wide by 2,400-foot-long channel to a depth of seven feet below the plane of MLW. • Porpoise Channel: Dredge approximately 6,000 CY of material from an approximately 100-foot-wide by 5,200-foot-long channel to a depth of seven feet below the plane of MLW. • Porpoise Channel Spur: Dredge approximately 9,000 CY of material from an approximately 100-foot-wide by 1,200-foot-long channel to a depth of seven feet below the plane of MLW. • Youngs Island: Dredge approximately 10,000 CY of material from an approximately 375- foot-wide by 500-foot-long triangular area to a depth of five feet below the plane of MLW. The approximately 50,000 CY of material would be placed at either of the two beach nourishment areas, or a combination of both after each dredge event. The volumes and areas below assume the full volume of material will go to one location per dredging event: • Long Beach Peninsula (Western Area): Approximately 18,700 CY of the total 50,000 CY of dredged material will be placed below the plane of SHW over 240,000 square feet (5.51 acres). The remaining 31,300 CY would be placed landward of the plane of SHW. • West Meadow Beach and Old Field Club (Northeastern Area): Approximately 12,900 CY of the total 50,000 CY of dredged material will be placed below the plane of SHW over 199,500 square feet (4.58 acres). The remaining 37,100 CY would be placed landward of the plane of SHW. The applicant plans to conduct three (3) additional dredging events within the ten-year maintenance dredging period removing a maximum of approximately 50,000 CY per event from within the same dredging area with beach placement at the above referenced areas. The applicant has stated that they have avoided, minimized, and mitigated for potential impacts proposed to the maximum extent practicable by limiting the dredged area to the minimum area required for safe and reasonable navigation of Stony Brook Harbor. Any potential impacts would be temporary and would be offset by implementing best management practices associated with
CENAN-OP-RE PUBLIC NOTICE NO. NAN-2022-00176-EMI the proposed use of a hydraulic dredge and floating pipeline. The use of a hydraulic dredge and floating pipeline would provide the cleanest and least obtrusive method for sediment removal and transport, minimizing to the greatest extent possible any potential adverse effects to the aquatic environment. The stated purpose of this project is to maintain safe navigable depths for vessel use in the waterway.
USACE FILE: NAN-2022-00176-EMI PROJECT LOCATION LAT. 40°55'22.814"N LONG. 73°9'16.598"W SOURCE: SAINT JAMES USGS QUADRANGLES 0 1,500 3,000 6,000 Feet ± GEI CONSULTANTS, INC., P. C. MAINTENANCE DREDGING AT: HUNTINGTON STATION, NEW YORK STONY BROOK HARBOR APPLICATION BY COUNTY OF SUFFOLK TOWNS OF BROOKHAVEN AND SMITHTOWN JOSEPH T. BROWN, P.E. SUFFOLK COUNTY, NEW YORK COMMISSIONER DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 1 OF 11 1 OF 11
USACE FILE: NAN-2022-00176-EMI MAINTENANCE DREDGING APPLICATION GENERAL NOTES: SHEET 6 1. TYPE OF DREDGING: Maintenance. 2. METHOD OF DREDGING: Hydraulic. 3. APPROX. AMOUNT TO BE DREDGED: Up to approximately 50,000± cu. yrds. 4. TYPE OF MATERIAL TO BE DREDGED: Sand. 5. MATERIAL PLACEMENT LOCATION: West and northeast shorelines of Smithtown Bay. 6. NAVIGATION CHANNEL DIMENSIONS: Yacht Club Spur- Approx 2,400'L x 100' W x -7 MLW (Up to approx. 25,000 cy) Porpoise Channel- Approx 5,200'L x 100' W x -7 MLW (Up to approx. 6,000 cy) Porpoise Channel Spur- Approx 1,200'L x 100' W x -7 MLW (Up to approx. 9,000 cy) Youngs Island- Approx 500'L x 375' W and Variable x -5 MLW (Up to approx. 10,000 cy) 7. SURVEY PROVIDED BY SCDPW: Soundings show results of survey performed October 2017, based on Local Plane of MLW. 8. EXISTING SHORELINE AND TIDAL AREAS DRAWN FROM AERIAL: Due to coastal vegetation and hard structures, tidal lines such as SHW, are not apparent along certain shoreline sections. 9. TOTAL DREDGE AREA: Stony Brook Harbor: 960,935 sq. ft. TOW 10. AMOUNT OF MATERIAL TO SETTLE TOW BELOW SHW: NO Western Beach Nourishment (Assumes up to NO approx. 50,000 cy): Approx. 18,700 cy FB Northeastern Beach Nourishment (Assumes up FS to approx. 50,000 cy): Approx. 12,900 cy. RO 11. AREA OF FILL BELOW SHW: MIT Western Beach Nourishment (Assumes up to OK approx. 50,000 cy): Approx. 240,000 sq ft HTO HAV Northeastern Beach Nourishment (Assumes up to approx. 50,000 cy): 199,500 sq ft. WN EN SHEET 3 SHEET 4 A B U H TI G SHEET 5 SJ FC RK ED O N MP Q L SOURCE: ESRI WORLD IMAGERY, 2020. 0 875 1,750 3,500 Feet ± GEI CONSULTANTS, INC., P. C. MAINTENANCE DREDGING AT: HUNTINGTON STATION, NEW YORK STONY BROOK HARBOR APPLICATION BY COUNTY OF SUFFOLK TOWNS OF BROOKHAVEN AND SMITHTOWN JOSEPH T. BROWN, P.E. SUFFOLK COUNTY, NEW YORK COMMISSIONER DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 2 OF 11 2 OF 11
USACE FILE: NAN-2022-00176-EMI K KK K K KKKK KK KKK KK KK KKKK 0800-19000- MAINTENANCE DREDGING APPLICATION MAINTENANCE DREDGING APPLICATION 0800-19000- NAVIGATION CHANNEL 0100-001004 GENERAL NOTES: GENERAL NOTES (CONTINUED): 1. TYPE OF DREDGING: Maintenance. 0100-001004 10. AMOUNT OF MATERIAL TO SETTLE A B -5.6 -4.2 SHW -5.2 -7.1 -9.1 2. METHOD OF DREDGING: Hydraulic. BELOW SHW: 0200-00100- K -4.8 -6.3 -4.4 3. APPROX. AMOUNT TO BE DREDGED: Western Beach Nourishment (Assumes up to -4.6 -8.3 -7.4 Up to approximately 50,000± cu. yrds. approx. 50,000 cy): Approx. 18,700 cy 0200-001000 Northeastern Beach Nourishment (Assumes upMHW AL 4. TYPE OF MATERIAL TO BE DREDGED: -5.8 -6.3 -7.0 -4.8 R -5.9 Sand. -5.1 KKK to approx. 50,000 cy): Approx. 12,900 cy. TO IFT 5. MATERIAL PLACEMENT LOCATION: KKKKKKK 11. AREA OF FILL BELOW SHW: West and northeast shorelines of Smithtown Bay. Western Beach Nourishment (Assumes up to MLW K LIT DR KKK -6.2 -6.3 -5.1 -5.0 -4.8 -5.5 6. NAVIGATION CHANNEL DIMENSIONS: K approx. 50,000 cy): Approx. 240,000 sq ft U K KK KK Yacht Club Spur- Approx 2,400'L x 100' W x -7 MLW Northeastern Beach Nourishment (Assumes up (Up to approx. 25,000 cy) FLOOD to approx. 50,000 cy): 199,500 sq ft. -6.5 -6.8 -7.2 -5.6 -3.6 -3.5 -4.2 -3.4 EBB Porpoise Channel- Approx 5,200'L x 100' W x -7 MLW K (Up to approx. 6,000 cy) -6.6 -7.0 Porpoise Channel Spur- Approx 1,200'L x 100' W x -7 MLW -6.5 -5.9 -2.2 -2.1 -3.8 K -3.5 -3.3 -2.3 (Up to approx. 9,000 cy) KK KK Youngs Island- Approx 500'L x 375' W and Variable x -5 MLW VEGETATION -4.2 -5.7 K KK -7.7 -8.5 -5.5 -3.7 -2.2 (Up to approx. 10,000 cy) KK -7.3 0.0 -0.9 -2.4 -4.6 -2.7 -7.1 KK 7. SURVEY PROVIDED BY SCDPW: -8.3 Soundings show results of survey performed -5.3 H KKKKKK K KK K -2.8 -5.2 -1.0 K -5.7 1.1 -7.1 1.8 0.8 -1.1 October 2017, based on Local Plane of MLW. KK -3.8 -5.4 -0.4 8. EXISTING SHORELINE AND TIDAL KK -6.3 -7.5 KK AREAS DRAWN FROM AERIAL: KKK -5.0 -8.0 3.4 2.1 0.8 -2.0 -3.3 Due to coastal vegetation and hard -7.6 -7.0 -5.8 -5.3 KK K KKKK structures, tidal lines such as SHW, are not KKKK -7.1 -6.9 YOUNGS G apparent along certain shoreline sections. ISLAND KK -5.8 -6.2 T -6.9 0.8 0200-00100- -7.2 9. TOTAL DREDGE AREA: Stony Brook Harbor: KK -0.2 -2.7 -5.3 KKKKKKK 0200-001000 960,935 sq. ft. -7.5 KK -5.2 KK -5.6 K -7.1 -6.3 -7.1 -6.1 I 0.7 -2.5 K -6.7 -5.6 KK -6.3 -4.3 -4.0 -7.4 -6.2 -6.7 KK -8.7 -5.8 -5.3 -4.1 -7.3 -8.8 -9.4 -6.8 -3.5 K -4.7 -0.9 -2.9 -5.2 -4.4 -4.7 -5.8 S SHW K -9.3 -5.0 -4.7 K -8.7 -3.6 PORPOISE CHANNEL KKK KK -5.1 0.3 -2.8 -4.5 J -2.9 -4.2 -8.4 -6.6 -6.6 -6.0 MHW K -8.3 -7.5 K KK -3.0 -3.3 -5.3 K -8.7 -7.7 -5.5 KK K 0802-00700- -4.4 -5.1 -5.7 -2.8 -8.3 0100-001000 MLW KK -8.9 -7.6 KK -3.5 -5.3 -4.4 -6.5 -6.4 K -8.9 -8.5 YACHT SHEET 4 -4.2 CLUB KK -5.0 -7.0 -6.5 -8.5 -8.0 SPUR K -1.9 K YOUNGS ISLAND -4.8 -6.2 K -7.1 -7.5 -6.1 -7.8 MLW K -2.6 K -6.2 -6.7 KK -7.1 -6.4 -6.8 -6.2 -6.2 -3.3 MHW F -7.1 -4.6 KK -7.1 -6.6 -5.0 -7.1 SHW -8.1 C -6.5 K -4.7 KK -6.3 -1.9 -8.2 -5.0 0802-00700- -8.3 KK -5.4 KK -7.3 KK -5.6 0100-002000 -3.8 -9.0 -6.8 -8.5 -7.7 -7.5 K -6.6 -7.4 -4.7 -4.9 -9.8 R -7.4 -6.9 -7.9 -6.4 -4.1 -8.7 -7.5 K -1.8 -7.0 -7.4 -8.9 E -8.2 -5.2 -6.4 -8.9 -5.2 -6.3 0200-19600- D KK -8.6 -7.3 -6.8 0100-001000 -8.0 BULKHEAD BOAT KK DREDGE AREA COORDINATES: KK RAMP A 40° 55' 37.974" N 73° 8' 57.706" W K K KKKK B 40° 55' 37.806" N 73° 8' 54.456" W DOCKS K K C 40° 55' 19.659" N 73° 8' 56.087" W K K KK D 40° 55' 15.348" N 73° 9' 2.133" W E 40° 55' 16.068" N 73° 9' 3.026" W K K K F 40° 55' 20.114" N 73° 8' 57.352" W K K 0200-19600- KK K G 40° 55' 30.149" N 73° 8' 56.450" W KKK H 40° 55' 31.882" N 73° 9' 0.895" W 0100-002000 I 40° 55' 28.617" N 73° 9' 5.721" W J 40° 55' 26.572" N 73° 9' 17.593" W KK KKK K 40° 55' 16.769" N 73° 9' 23.161" W R 40° 55' 17.463" N 73° 9' 24.186" W K K S 40° 55' 27.425" N 73° 9' 18.527" W K KK K K VEGETATION KK T 40° 55' 29.524" N 73° 9' 6.337" W KK KKK KKK U 40° 55' 35.193" N 73° 8' 57.956" W KK KK ± KK KKK 0 200 400 800 Feet KK GEI CONSULTANTS, INC., P. C. MAINTENANCE DREDGING AT: HUNTINGTON STATION, NEW YORK STONY BROOK HARBOR APPLICATION BY COUNTY OF SUFFOLK TOWNS OF BROOKHAVEN AND SMITHTOWN JOSEPH T. BROWN, P.E. SUFFOLK COUNTY, NEW YORK COMMISSIONER DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 3 OF 11 3 OF 11
USACE FILE: NAN-2022-00176-EMI MAINTENANCE DREDGING APPLICATION MAINTENANCE DREDGING APPLICATION GENERAL NOTES: GENERAL NOTES (CONTINUED): 1. TYPE OF DREDGING: Maintenance. 10. AMOUNT OF MATERIAL TO SETTLE 2. METHOD OF DREDGING: Hydraulic. BELOW SHW: 3. APPROX. AMOUNT TO BE DREDGED: Western Beach Nourishment (Assumes up to Up to approximately 50,000± cu. yrds. approx. 50,000 cy): Approx. 18,700 cy 4. TYPE OF MATERIAL TO BE DREDGED: Northeastern Beach Nourishment (Assumes up Sand. to approx. 50,000 cy): Approx. 12,900 cy. 5. MATERIAL PLACEMENT LOCATION: 11. AREA OF FILL BELOW SHW: West and northeast shorelines of Smithtown Bay. Western Beach Nourishment (Assumes up to 6. NAVIGATION CHANNEL DIMENSIONS: approx. 50,000 cy): Approx. 240,000 sq ft Yacht Club Spur- Approx 2,400'L x 100' W x -7 MLW Northeastern Beach Nourishment (Assumes up (Up to approx. 25,000 cy) to approx. 50,000 cy): 199,500 sq ft. Porpoise Channel- Approx 5,200'L x 100' W x -7 MLW 0800-19000- (Up to approx. 6,000 cy) 0100-001004 MLW Porpoise Channel Spur- Approx 1,200'L x 100' W x -7 MLW MHW (Up to approx. 9,000 cy) Youngs Island- Approx 500'L x 375' W and Variable x -5 MLW SHW (Up to approx. 10,000 cy) 7. SURVEY PROVIDED BY SCDPW: Soundings show results of survey performed October 2017, based on Local Plane of MLW. 8. EXISTING SHORELINE AND TIDAL BEACH NOURISHMENT AREAS DRAWN FROM AERIAL: Due to coastal vegetation and hard structures, tidal lines such as SHW, are not apparent along certain shoreline sections. 9. TOTAL DREDGE AREA: Stony Brook Harbor: 960,935 sq. ft. 0802-00600- 0100-006000 0802-00600- 0100-005000 K K 0802-00600- SHEET 3 KK 0100-015000 KK 0802-00600- K 0100-016000 K K KK 0802-00600- 0802-00600- 0100-004000 KK 0100-017000 RD K 0802-00600- H EAC KK 0100-018000 GB LON KK KKKKKKKK K KK PARKING LOT KK KK BULKHEAD VEGETATION KKK KK -6.9 APPROXIMATE LOCATION KK K K KKKKKKKKKK OF DREDGE DISCHARGE KK KK -7.4 KK PIPE KK K DOCKS -6.4 K -8.9 KKK KK K -4.8 PORPOISE KK K KK KK KKKK KK -8.6 -7.3 -6.1 CHANNEL SPUR KK KKK -8.0 -5.4 -8.2 KK D OO KK KKKK -6.7 K FL KKKKKK -6.4 KK -1.1 -8.1 KKK -0.3 -5.7 O 0802-00700- -6.2 -7.0 B K -1.3 EB -7.0 -6.8 BOAT RAMPS K -6.0 -1.9 -7.0 -6.4 0100-001000 -1.9 -6.5 KKKK -7.7 KKKN -6.1 -7.2 -7.3 P -6.6 -7.3 PARKING LOT -6.6 -7.3 -6.6 -5.3 -6.5 -6.8 K -6.4 -6.9 -6.9 -8.0 -7.1 M -0.2 -1.3 -6.7 KKKK KKKKKKK -1.6 -7.3 KK -6.9 -3.1 -6.2 -7.1 -7.6 -6.8 -7.5 KK K K K -6.5 KKKKK K -6.6 -6.6 K KK KKK -6.5 0802-00500- K -5.5 -6.4 K -6.1 -6.5 0100-003000 -8.0 KK KK -5.5 -7.5 K -7.3 -6.4 -7.1 -6.1 K K -5.1 -6.4 K KK SHEET 5 KK -7.6 -7.4 KKKKK KK -8.0 -3.2 -6.0 -7.6 -6.5 KKKKKKK -8.2 -7.6 -8.0 -6.6 DREDGE AREA COORDINATES: -5.8 -5.4 -7.7 L 40° 55' 7.345" N 73° 9' 44.910" W -4.3 -5.5 -6.4 K -6.0 -8.6 -8.5 M 40° 55' 12.985" N 73° 9' 48.938" W -7.5 -8.0 N 40° 55' 13.491" N 73° 9' 55.795" W -7.7 Q KK -6.8 -5.9 O 40° 55' 14.229" N 73° 9' 55.701" W -7.1 KK -8.1 -7.0 KK KKKKKKK -6.5 -6.6 P 40° 55' 13.655" N 73° 9' 47.935" W Q 40° 55' 8.702" N 73° 9' 44.402" W VEGETATION -6.0 -6.3 KK KK -6.1 L -5.5 KKK KKKKKK K 0 200 400 800 Feet ± GEI CONSULTANTS, INC., P. C. MAINTENANCE DREDGING AT: HUNTINGTON STATION, NEW YORK STONY BROOK HARBOR K APPLICATION BY COUNTY OF SUFFOLK TOWNS OF BROOKHAVEN AND SMITHTOWN JOSEPH T. BROWN, P.E. SUFFOLK COUNTY, NEW YORK COMMISSIONER DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 4 OF 11 4 OF 11
USACE FILE: NAN-2022-00176-EMI MAINTENANCE DREDGING APPLICATION MAINTENANCE DREDGING APPLICATION BEACH NOURISHMENT GENERAL NOTES: 1. TYPE OF DREDGING: Maintenance. GENERAL NOTES (CONTINUED): TOTAL LENGTH OF BEACH NOURISHMENT ~ 4,230 LF 10. AMOUNT OF MATERIAL TO SETTLE 2. METHOD OF DREDGING: Hydraulic. BELOW SHW: UP TO ~ 50,000 CY DREDGE MATERIAL 3. APPROX. AMOUNT TO BE DREDGED: Western Beach Nourishment (Assumes up to Up to approximately 50,000± cu. yrds. approx. 50,000 cy): Approx. 18,700 cy 4. TYPE OF MATERIAL TO BE DREDGED: Northeastern Beach Nourishment (Assumes up Sand. to approx. 50,000 cy): Approx. 12,900 cy. 5. MATERIAL PLACEMENT LOCATION: 11. AREA OF FILL BELOW SHW: West and northeast shorelines of Smithtown Bay. Western Beach Nourishment (Assumes up to 6. NAVIGATION CHANNEL DIMENSIONS: approx. 50,000 cy): Approx. 240,000 sq ft Yacht Club Spur- Approx 2,400'L x 100' W x -7 MLW Northeastern Beach Nourishment (Assumes up (Up to approx. 25,000 cy) to approx. 50,000 cy): 199,500 sq ft. Porpoise Channel- Approx 5,200'L x 100' W x -7 MLW (Up to approx. 6,000 cy) 0800-19000- 0802-00600- Porpoise Channel Spur- Approx 1,200'L x 100' W x -7 MLW 0100-001004 0100-004000 (Up to approx. 9,000 cy) Youngs Island- Approx 500'L x 375' W and Variable x -5 MLW 0802-00600- (Up to approx. 10,000 cy) 0100-001000 7. SURVEY PROVIDED BY SCDPW: Soundings show results of survey performed 0802-00500- October 2017, based on Local Plane of MLW. 0100-002000 K KKKK K KKKK 8. EXISTING SHORELINE AND TIDAL 0802-00600- K KK AREAS DRAWN FROM AERIAL: KKK Due to coastal vegetation and hard KKKK 0100-003001 BULKHEAD K KKKK KKKK K structures, tidal lines such as SHW, are not KK apparent along certain shoreline sections. KK 0802-00500- 9. TOTAL DREDGE AREA: Stony Brook Harbor: T 0100-003000 K LO K 960,935 sq. ft. ING K D KKK CH R PAR K KK K KK G BEA KKKK DOCKS LON K K KK K KKK K KKK K KKKKK K K KK KKKKK KK KKKKK KK KKK 0802-00500- K 0100-001000 KK KK MLW MHW KKK KK K K SHW K SHEET 4 SHW KKKK KK OT KKK KK K GL KKKKK KK K IN K K KK PAR KK K KKK KK KK KKKKK KK KK KK KK KK KKKK KKK K KK K SHW KKKK KKK KKKKKKKKKKKKKK KK VEGETATION KK K 0802-00400- 0802-00500- KKK KK K K K K KK KKK KK 0200-006016 0100-006000 K K K K KK K KKKK KK KKK KKKKK KK KK K KKK K K KKKKKKKKKK KKKKK K KK KK K K K KK K KK K KKKKKK KKK KKKK K K K K KK KKKKKKK K KK K KK KVEGETATION K KK KK KKK K K EDGE K KK K KK KK KK KK KK KK KKK KK K KK K KKK KKKK KKK K KKK K KKKKK KK KK K K KK K KKK KKK K K K KKKKK K SHW KKKK K KK K K KKK KK KKK KKKKK K K 0802-00500- KK K KK 0200-001001 KK KK KK SHW KK MHW K K K KK K K MLW K KK KK K 0802-00700- 0100-001000 0 250 500 1,000 Feet ± GEI CONSULTANTS, INC., P. C. MAINTENANCE DREDGING AT: HUNTINGTON STATION, NEW YORK STONY BROOK HARBOR APPLICATION BY COUNTY OF SUFFOLK TOWNS OF BROOKHAVEN AND SMITHTOWN JOSEPH T. BROWN, P.E. SUFFOLK COUNTY, NEW YORK COMMISSIONER DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 5 OF 11 5 OF 11
USACE FILE: NAN-2022-00176-EMI MAINTENANCE DREDGING APPLICATION GENERAL NOTES: 1. TYPE OF DREDGING: Maintenance. 2. METHOD OF DREDGING: Hydraulic. 3. APPROX. AMOUNT TO BE DREDGED: Up to approximately 50,000± cu. yrds. BEACH NOURISHMENT 4. TYPE OF MATERIAL TO BE DREDGED: TOTAL LENGTH OF Sand. BEACH NOURISHMENT ~ 4,100 LN 0203-02000- 5. MATERIAL PLACEMENT LOCATION: West and northeast shorelines of Smithtown Bay. UP TO ~ 50,000 CY DREDGE MATERIAL 0100-005000 PARKING 6. NAVIGATION CHANNEL DIMENSIONS: LOT Yacht Club Spur- Approx 2,400'L x 100' W x -7 MLW (Up to approx. 25,000 cy) Porpoise Channel- Approx 5,200'L x 100' W x -7 MLW (Up to approx. 6,000 cy) Porpoise Channel Spur- Approx 1,200'L x 100' W x -7 MLW TRUSTEES RD (Up to approx. 9,000 cy) Youngs Island- Approx 500'L x 375' W and Variable x -5 MLW (Up to approx. 10,000 cy) 7. SURVEY PROVIDED BY SCDPW: W MEADOW RD Soundings show results of survey performed October 2017, based on Local Plane of MLW. 8. EXISTING SHORELINE AND TIDAL PARK AREAS DRAWN FROM AERIAL: Due to coastal vegetation and hard structures, tidal lines such as SHW, are not apparent along certain shoreline sections. 9. TOTAL DREDGE AREA: Stony Brook Harbor: 960,935 sq. ft. 10. AMOUNT OF MATERIAL TO SETTLE BELOW SHW: 0200-12900- Western Beach Nourishment (Assumes up to 0100-014001 PARKING approx. 50,000 cy): Approx. 18,700 cy MLW LOT Northeastern Beach Nourishment (Assumes up to approx. 50,000 cy): Approx. 12,900 cy. 11. AREA OF FILL BELOW SHW: MHW Western Beach Nourishment (Assumes up to approx. 50,000 cy): Approx. 240,000 sq ft Northeastern Beach Nourishment (Assumes up 0200-00100- SHW to approx. 50,000 cy): 199,500 sq ft. 0200-001000 TRUSTEES RD 0800-19000- 0100-001004 0 275 550 1,100 Feet ± GEI CONSULTANTS, INC., P. C. MAINTENANCE DREDGING AT: HUNTINGTON STATION, NEW YORK STONY BROOK HARBOR APPLICATION BY COUNTY OF SUFFOLK TOWNS OF BROOKHAVEN AND SMITHTOWN JOSEPH T. BROWN, P.E. SUFFOLK COUNTY, NEW YORK COMMISSIONER DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 6 OF 11 6 OF 11
USACE FILE: NAN-2022-00176-EMI 0.0 MEAN LOW WATER 7’ MAX. DEPTH OF EXCAVATION 1 3 AREA TO BE DREDGED ~ 100 FT AND VARIABLE TYPICAL CHANNEL SECTION N.T.S. 0.0 MEAN LOW WATER 5’ MAX. DEPTH OF EXCAVATION 1 3 AREA TO BE DREDGED VARIABLE WIDTH TYPICAL CHANNEL SECTION YOUNGS ISLAND N.T.S. GEI CONSULTANTS, INC., P. C. HUNTINGTON STATION, NEW YORK MAINTENANCE DREDGING AT: APPLICATION BY COUNTY OF SUFFOLK STONY BROOK HARBOR JOSEPH T. BROWN, P.E. TOWNS OF BROOKHAVEN AND SMITHTOWN COMMISSIONER SUFFOLK COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 7 OF 11 7 OF 11
USACE FILE: NAN-2022-00176-EMI WIDTH OF SURPLUS MATERIAL AREA VARIABLE TO CONFORM WITH EXISTING AVERAGE BEACHFRONT ~ 50 FT W ABOVE SHW DREDGE PIPELINE (LOCATION APPROXIMATE) UNCONTROLLED HYDRAULIC SLOPE 1 ON 15 +/- 4-5 FT AREA TO BE FILLED SHW MHW MLW EXISTING SURFACE TYPICAL BEACH NOURISHMENT WEST (ASSUMES 50,000 CY OF DREDGE MATERIAL ON BOTH SECTIONS) N.T.S. ~ 75 FT W ABOVE SHW DREDGE PIPELINE (LOCATION APPROXIMATE) UNCONTROLLED HYDRAULIC SLOPE 1 ON 15 +/- 3-4 FT AREA TO BE FILLED SHW MHW MLW EXISTING SURFACE TYPICAL BEACH NOURISHMENT SECTION NORTHEAST (ASSUMES 50,000 CY OF DREDGE MATERIAL ON BOTH SECTIONS) N.T.S. GEI CONSULTANTS, INC., P. C. HUNTINGTON STATION, NEW YORK MAINTENANCE DREDGING AT: APPLICATION BY COUNTY OF SUFFOLK STONY BROOK HARBOR JOSEPH T. BROWN, P.E. TOWNS OF BROOKHAVEN AND SMITHTOWN COMMISSIONER SUFFOLK COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 8 OF 11 8 OF 11
USACE FILE: NAN-2022-00176-EMI PROPOSED DREDGE DISCHARGE PIPE ROUTE DREDGE PIPELINE CROSSING DUNE AREA (SECTION A-A) DREDGE DISCHARGE PIPELINE LONG BEACH RD KKKKK KKKKKKKKKKKKKKKKK DREDGE PIPELINE CROSSING ROAD (SECTION B-B) PARKING AREA KKK TOWN MARINA KK KK KKK KK KK K KK K KKKK KKKKK K KKKKKKKKKKKKKKKKK KK 0 75 150 300 Feet ± GEI CONSULTANTS, INC., P. C. MAINTENANCE DREDGING AT: HUNTINGTON STATION, NEW YORK STONY BROOK HARBOR APPLICATION BY COUNTY OF SUFFOLK TOWNS OF BROOKHAVEN AND SMITHTOWN JOSEPH T. BROWN, P.E. SUFFOLK COUNTY, NEW YORK COMMISSIONER DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 9 OF 11 9 OF 11
USACE FILE: NAN-2022-00176-EMI TOE OF DUNE XA XA TOP OF DUNE TOE OF DUNE 1. DUNE PIPE DREDGE CROSSING AT DISCHARGE PREVIOUSLY LINE APPROVED AREA 2. 3. INSTALL PIPE REMOVE PIPE PLAN VIEW PIPE CROSSING DUNE (SECTION A-A) 4. RESTORE DUNE AFTER PIPE N.T.S. REMOVAL TOP OF DUNE ~6 FT DREDGE DISCHARGE LINE PIPE CROSSING DUNE SECTION XA-XA N.T.S. GEI CONSULTANTS, INC., P. C. HUNTINGTON STATION, NEW YORK MAINTENANCE DREDGING AT: APPLICATION BY COUNTY OF SUFFOLK STONY BROOK HARBOR JOSEPH T. BROWN, P.E. TOWNS OF BROOKHAVEN AND SMITHTOWN COMMISSIONER SUFFOLK COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 10 OF 11 10 OF 11
USACE FILE: NAN-2022-00176-EMI PIPE CROSSING ROAD (SECTION B-B) GRAVEL ROAD CROSSING XB XB GRAVEL ROAD DREDGE DISCHARGE PIPE BURIED OR RAMPED (TEMPORARILY) EXCAVATE GRAVEL ROAD STONE BLEND OR INSTALL RAMP (TO BE DETERMINED) ~2 FT RAMP OVER PIPE BURIED PIPE PIPE CROSSING ROAD (SECTION XB-XB) N.T.S. DREDGE PIPELINE MHW MLW CRIBBING TO VEGETATED TIDAL SUPPORT DREDGE WETLAND PIPE ABOVE GRADE PIPE CROSSING WETLANDS TO BE DETERMINED N.T.S. GEI CONSULTANTS, INC., P. C. HUNTINGTON STATION, NEW YORK MAINTENANCE DREDGING AT: APPLICATION BY COUNTY OF SUFFOLK STONY BROOK HARBOR JOSEPH T. BROWN, P.E. TOWNS OF BROOKHAVEN AND SMITHTOWN COMMISSIONER SUFFOLK COUNTY, NEW YORK DEPARTMENT OF PUBLIC WORKS DATE: FEBRUARY 2022 SHEET 11 OF 11 11 OF 11
You can also read