ONE OF THE 5 LARGEST RENEWABLE ENERGY SOURCES IN FRANCE
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Sainte-Croix Dam ONE OF THE 5 LARGEST RENEWABLE ENERGY SOURCES IN FRANCE • The Hydraulic Operating Group of the Durance and Verdon Valleys runs 30 plants and 17 dams based in the Hautes-Alpes. Alpes de Haute-Provence, Var, Vaucluse and Bouches-du-Rhône departments. • I t produces an average 6.5 billion kWh per year, using clean and renewable energy, equal to the annual residential consumption of a city with over 2.5 million inhabitants. • It accounts for 40% of the electricity produced in the PACA Region. The Serre-Ponçon and Sainte-Croix water reservoirs in particular and the hydroelectrical infrastructures in the Durance and Verdon Valleys help serve the sources of demand for water and renewable energy across the region and foster territorial development.
Sainte-Tulle 1 Power Plant The Durance-Verdon Hydraulic Operating Group Drawing upon the winning combination of water and energy, the Hydraulic Operating Group (GEH) of the Durance and Verdon Valleys is aimed at producing renewable energy, continually combining hydroelectricity and biodiversity. The men and women at the GEH work hard each day to deliver performance and safety on the production facilities and guarantee third-party safety for those around the structures. In this manner, Durance-Verdon GEH contributes to mutually-beneficial management and water resource sharing, in cooperation with all of the players in the valleys to ensure that the territory is sustainably developed. Bruno Conty - Jean-Lionel Dias - Jean-Luc Abrairi Septlieux.com photos : EDF - Jean-Marie Huron - EDF PRODUCTION MEDITERRANEE Leading producer of renewable energies in the PACA Region, managing shared water resources, and contributing to the preservation of biodiversity. EDF Production Méditerranée - GEH Durance Verdon Bâtiment le Vérance - Chemin du Thor - 04220 Sainte-Tulle http://hydro-mediterranee.edf.com
Hydroelectricity, n° 1 Renewable Energy in the Provence-Alpes-Côte d’Azur Region Serre-Ponçon Dam EDF PRODUCTION MEDITERRANEE THE DURANCE AND VERDON BASINS Serving the public interest and driving sustainable development, the hydroelectrical production infrastructures in Durance and Verdon, built from the 1950s on, enable the shared water management policy conducted in the Provence-Alpes-Côte d’Azur Region.
HYDROELECTRICITY IN LA DURANCE AND LE VERDO CENTRALES DU GROUPE D'EXPLOITATION HYDRAULIQUE VAR-ROYA (GEH) La Durance river KEY The Durance originates in Montgenèvre and thrusts itself 300km farther south into the Rhône River, near Avignon. Since 1966, the EDF Canal is used to deviate HEAD AUTHORITY DURANCE-VERDON HYDRAULIC OPERATION GROUP PLANTS (GEH) part of the Durance River’s waters over 250km, from the Serre-Ponçon Dam EDF CANAL MAINTENANCE TEAMS to the Berre Pond. PASSAGES, CONDUITS HYDRAULIC MAINTENANCE GROUP (GMH) AND MECHANICAL REPAIR AND MAINTENANCE INSPECTION TEAMS DAMS THE EDF CANAL, PROVENCE’S ENERGY LIFELINE THREE-POINT GATE REMOTE PLANT COMMAND 15 hydroelectric plants are found down the EDF canal, turbining the waters in HYDRAULIC COMMAND CENTRE (CCH) succession in order to turn it into electricity. In addition to generating electricity, WATER UPTAKES it provides water to the entirety of the territory, to meet local demand for drinking (1.5 million customers), industrial and agricultural (150,000 hectares SAINT of land) water each year. SAUVEUR Production in millions of kWh Volume (m3) Argentière, the birthplace of hydroelectricity Maison du Roy 300,000 A single dam and six plants turbine the waters of the Les Claux 43.8 Upper Basin on the Durance River and the mountain Argentière 196 torrents. These structures are distinctive for their high Le Fournel 23.8 water falls and form a key part of the historic legacy Champcella 39.7 across the northern territory of the Hautes-Alpes. Eygliers 63.5 84 Baratier 4.7 Rh ôn e Serre-Ponçon, the largest gravity dam in Europe Le largue With a tremendous reservoir holding 1.2 billion m2 of Serre-Ponçon 718.2 1.2 billion water, Serre-Ponçon is the Provence Region’s protec- L Espinasses 3.87 million tion against drought. Built in 1955, it was the first in Curbans 442.6 AVIGNON hydroelectrical infrastructure to appear in the valley’s MA downstream. Since that time, thanks to responsi- EM GEH DURANCE-VERDON ble and controlled management techniques, water BONPAS CCH SAINTE-TULLE Du ra resources have been shared in a balanced manner nc e BEAU down to the lower Durance (tourism, drinking water, Rhô irrigation, etc.) CADARAC ne Du LAMANON ra n ce MALLEMORT La Saulce 1 million J 13 The Sisteron Infrastructure Sisteron 759 SAINT-ESTÈVE ARLES Set on the Buëch and Durance, four plants and dams Lazer 31.5 JANSON have been built for the purpose of power generation, SALON-DE-PROVENCE Saint-Sauveur 1.2 million giving a modern face to irrigation and fostering the Clares-Combes 1.1 SAINT-CHAMAS development of agriculture in the Buëch Valley since Saint-Lazare 6.2 million EM GMH 1992. AIX-EN-PROVENCE Rhône Salignac 221.4 Le Riou 840,000 Etang De berre Oraison: When Sun and Water Come Together The Oraison Complex is composed of three plants and two dams, including EDF’s first hydroelectrical L’escale 15.7 million plant equipped with photovoltaic panels: Le Largue. Malijai The plant produces two forms of renewable energy Oraison 770 EM EDF PRODUCTION in a single structure, by combining the power of water La Brillanne 97 MEDITERRANEE and sun resources. Le Largue 35.9 MARSEILLE
EDF Canal of Durance DON SAINT PIERRE CELSE NIÈRE de EYCHAUDA Du LES CLAUX BRIANÇON ran PRELLES ce L’on VALLOUISE La gy ro nd e il urnel gu Le fo Le FOURNEL L’ARGENTIÈRE isse ia 05 La b PALLON CHAMPCELLA EYGLIERSLe cristillan il Le gu MAISON DU ROY nce Dura EMBRUN GAP BARATIER LAC Torre DE SERRE-PONÇON Des vant ech ch ESPINASSES ères Bü e SERRE-PONÇON ay Ub CURBANS Riou 04 RIOU LA SAULCE LAC DU RABUONS LAZER VENTAVON CENTRALE ec (EN PROJET) Bü h Tin ISOLA LAC LONG ée SUPÉRIEUR LAC VERT SISTERON iè de LAC s oll n re M allo FORCATO LAC NOIR V LAC DE LAC MOLLIÈRES CLARES LA MUTA DU BASTO LAC Vio DE L’AGNEL nè CASTERINO COMBES ne VALABRES LAC LONG LAC MESCE Production in Roya LA FOUS BORÉON Le bo réon SAINT-LAZARE on e LES MESCE millions of kWh Volume (m3) SALIGNAC mad Bio La LA MADONE nia LAC AUTIER INFERNO LE SPAILLARD Sainte-Tulle, VÉSUBIE at the heart of theSAINT-DALMAS Durance Valley Manosque 190 BELVÉDÈRE e DIGNE With five plantsGORDOLASQUE and one dam located PAGANINat the confluence Sainte-Tulle 1 99.6 llard L’ESCALE n spai BANCAIRON éo Le ue Bl of the Durance and VerdonFONTAN Rivers, the infrastructures go rd ola sq Sainte Tulle 2 250 E Tinée CLANS SAINT-MARTIN La ROQUEBILLIÈRE ce that make up the Sainte-Tulle Production Complex, devel- n Beaumont 154 rdo VÉSUBIE ran MALIJAI L’A ITALI Ve bie Du sse oped in the 1960s are central to the renewable energies Cadarache 3.5 million Vésu ORAISON 06 Var valleyMESCLA acrossSAINT-JEAN the territory. BREIL Jouques 385 LA BRILLANNE CASTILLON COURBAISSE Va r LA RIVIÈRE LE LARGUEAsse MESCLA Roy PLAN DU VAR Mallemort, the final link in the Durance-Verdon a Mallemort 403.9 700,000 ANOSQUE L’ MOUSTIERS CASTELLANE CHAUDANNE chain MENTON Saint-Estève 665.6 Va SAINTE-MARIE r SAINTE-TULLE II Located at the end of the hydroelectrical chain, five Lamanon 5.6 SAINTE-TULLE I plants and two dams channel, from the Mallemort Dam, PONT- Salon-de-Provence 122.4 NICE Ve rd UMONT on DU-LOUP part of the flows from the Berre Pond and another portion Saint-Chamas 192 GRÉOUX LA SIAGNE Loup CHE of the Durance River’s natural bed. When the Durance’s wa- Bonpas SAINTE-CROIX Bian VINON çon MONTAUROUX ters are low, the EDF Canal channels water to the farms and Siagn QUINSON e theEMMarseille GEH VAR-ROYAWater Company’s system, to supply drinking JOUQUES CAGNES-SUR-MER water requirements. Arg THE VERDON AND THE SOLEIL DAMS ens Five dams and hydroelectrical plants Production in s Argen millions of kWh Volume (m3) 83 have been built on the Verdon Combined, they generate nearly 600 million kWh per year, Castillon 76.5 149 million or the annual consumption of a city like Aix-en-Provence. Chaudanne 57.5 16 million The great turquoise lakes of the Verdon are vital reserve Sainte-Croix 130 760 million waters tha play a major part in supplying the surrounding Quinson 40 83.8 million municipalities with drinking water and irrigating farmlands. Gréoux 80 million The water is conveyed to Aix-en-Provence and the Eastern Vinon-sur-Verdon 113.7 Var region by the water uptakes managed by Société du Canal de Provence. In 2011, two micro-plants were installed TOULON in Chaudanne and Gréoux. Since 2009, the Castillon Dam has been equipped with the world’s largest sun dial.
30 plants 17 dams 2000 MW ready for use within 10 minutes 6.5 billion kWh 40% of the power generated The Largue Plant in the PACA Region THE HYDRAULIC COMMAND CENTRE The main facilities are com- manded remotely, from the Hydraulic Command Centre. It guarantees fully-synchronised operations capable of generating up to 2 000 MW power, the equiv- alent of 2 nuclear power reactors, in less than 10 minutes, and thus supply customers in a competitive and responsive manner. BOOSTING THE TERRITORY’S ATTRACTIVENESS The creation of large reser- voirs has fostered the controlled development of tourism and water sports, in particular around the Serre-Ponçon, Sainte-Croix and Castillon Lakes. Today, these zones have turned into full- fledged activity magnets and con- tributing to the valley’s business development.
You can also read