Market dialogue on market area merger - Essen, 12 February 2020

Page created by Javier Cunningham
 
CONTINUE READING
Market dialogue on market area merger - Essen, 12 February 2020
Market dialogue
on market area merger
          Essen, 12 February 2020
Market dialogue on market area merger - Essen, 12 February 2020
Welcome

2
Market dialogue on market area merger - Essen, 12 February 2020
Agenda

13:00          Welcome and introduction             Ralph Bahke, ONTRAS Gastransport
                                                    GmbH

                                                    Dr Heiko Lohmann

13:15          Kap+ and KOMBI                       Jürgen Fuhlrott, Open Grid Europe
                                                    GmbH
14:00          Coffee break

14:30          Operational issues relating to the   Torsten Frank, NetConnect Germany
               market area managers                 GmbH & Co. KG

                                                    Dr Sebastian Kemper, GASPOOL
                                                    Balancing Services GmbH
around 16:00   End of event

 3
Market dialogue on market area merger - Essen, 12 February 2020
33rd Madrid Forum

Trigger, impact, outlook
Market dialogue on market area merger - Essen, 12 February 2020
33rd Madrid Forum
}       Trigger

}       Impact

                    on 24 January 2020

}       Outlook
                    34th Madrid Forum; 29/30 April 2020

    5
Market dialogue on market area merger - Essen, 12 February 2020
KAP+ and KOMBI

Interconnected and goal-orientated
KAP+ and KOMBI
Interconnected and goal-orientated

 7
KAP+ (BK7-19-037) – Status I
}       What happened so far?
        }   23.05.2019 – Opening decision ("Einleitungsverfügung")
        }   05.07.2019 – End of 1st consultation period
        }   01.10.2019 – Presentation of concept
        }   08.11.2019 – End of 2nd consultation period
        }   03.12.2019 – Submission of the process description
        }   24.01.2020 – End of consultation with neighbouring Member States
        }   10.02.2020 – Start of hearing of party to the proceedings
        }   21.02.2020 – End of hearing

    8
KAP+ (BK7-19-037)- Status II
}       Design of decision tenor
        }   Cancellation of decision BK7-13-019 from 20.09.2013 for the duration of the
            test phase, in order to enable the offering of overbooking capacities
        }   The TSO concept for the overbooking an rebuying system (incl. process
            description MBI and capacity buy-back) is approved with the following changes
            }   No price cap for MBI and capacity buy-back
            }   In case of capacity buy-back the prohibition of network harmful renominations does only
                occur, if a threat for the network integrity is expected according to estimation of the
                TSO
            }   Additional capacity can be offered for 2 years
            }   Acceptance of costs is decided by KOMBI
        }   In addition following regulations apply
            }   Information about offered additional capacity to BNetzA yearly until 1 May
            }   Submission of a joint report on the usage of MBI and capacity buy-back until 1.12 every
                year (first-time 1.12.2022)

    9
KOMBI (BK9-19-606) – Status
}    What happened so far?
     }   16.10.2019 – Start of process
     }   20.12.2019 – Publication of draft decision
     }   28.01.2020 – Comment by gas TSOs on the draft decision
     }   31.01.2020 – End of consultation period

}    What is still unresolved?
     }   Recognition of MBI and buy-back costs as volatile or permanently
         non-controllable costs
     }   Reference to unbiassed review of this matter for the period after the
         test phase planned for KAP+

}    What happens next?
     }   Wait for draft decision

    10
Annual auctions from 2020

      Annual auction           Offer for additional capacity           Comments

                                                                 Period prior to market
                       GY 2020/2021: no additional capacity      area merger

                                                                 Probably the first GY
                       GY 2021/2022: additional capacity         after the market area
                                                                 merger

                       GY 2021/2022: additional capacity

                       GY 2022/2023: additional capacity

                       GY 2023/2024: additional capacity

}   Decisions on KAP+ and KOMBI required
}   Additional capacity offer must come from the individual TSOs
}   During the test phase, the additional capacity will be offered for one GY only
}   Total capacity offered is expected to be in line with 2018 NDP

     11
Operational issues relating to
  the market area managers
Agenda
1.        Introduction
2.        Update on network balancing
3.        Update on levies
4.        (Biogas) balancing groups and network accounts
5.        Traders’ Christmas wish list for the new MAM

     13
Introduction
One year into the implementation project...
  Review and outlook
                                                             Status overview;
                                                         First information e.g. on
                                                                                                     …
                                                           balancing groups and
                                                            network accounts

     Start of MAM             Publication of                Market dialogue                    Market dialogue
implementation project        the name THE                   in Düsseldorf                        in Berlin

  Q1       Q2          Q3     Q4        Q1         Q2      Q3          Q4             Q1     Q2      Q3       Q4
 2019     2019        2019   2019      2020       2020    2020        2020           2021   2021    2021     2021

    Market dialogue             Market dialogue                Market dialogue                 Planned start of
       in Essen                    in Berlin                      in Essen                     THE market area

                             Implementation project
                              presented for the first
                                      time;                   Status overview;
                                                          Presentation of THE logo
                              Overview of questions
                                  to be clarified

    15
MAM project status
}    Overall, the MAM project is making good progress
     }   Progress is in line with the respective timetables
     }   The requirements to be met by the future THE systems have
         been recorded and described
     }   The selection process for the IT systems required has been
         completed
     }   The contracts have been awarded and the programming work
         has started
}    The MAMs still have to make a multitude of operational
     process decisions, which may have an impact on the
     implementation of the IT systems
}    Hence, further market and BNetzA involvement is
     planned where it makes sense and is possible
    16
Update on network balancing
Future network operator areas / balancing zones
Today’s 11 network operator areas / balancing zones (zones) are
to be left unchanged:

H-gas zones                     L-gas zones
GSC                             GTG
GUD                             GUD
Central ("Mitte")               NWG
North (“Nord")                  East (“Ost")
ONTRAS                          West
South (“Süd")

  18
Future portfolio of exchange products

Expected use of short-term exchange products (MOL 1 and 2)
             Within Day/Day Ahead/Bank Holiday                                                  Hour
Global                                                                           Global*
H-Gas
L-Gas                                                                            L-Gas*
TTF                                                                              TTF
H-gas zones (GSC, GUD, Mitte, Nord, ONTRAS,
Süd)
L-gas zones (GTG, GUD, NWG, Ost, West)                                           L-gas zones (Ost, West, GUD**)

* Hourly products (if any) will be shown and traded by THE as ‘flat’ products (“Bandprodukt”)
** Used temporarily use as part of the L/H-gas conversion

    19
Future portfolio of bilateral products

Bilateral products likely to be used (MOL 4)
Long-Term Options
Short-Term Balancing Services
Short-Call Balancing Services
Flexibility Services

   20
Update on balancing neutrality charges
Planning model for balancing neutrality accounts
}    There are some structural differences between the two market areas
}    These differences include in particular the network topology and the
     market/customer situation (e.g. SLP vs. RLM vs. EXITSO)
}    As a result, there are different approaches to implementing GaBi Gas and
     Konni Gas under the existing decisions
}    In a future joint market area, these different aspects will be brought
     together in a common planning approach
}    This will result in some overall changes compared with the current (still
     separate) balancing neutrality calculations. The exact impact of these
     changes cannot be predicted at this stage.
}    The balancing neutrality charges applicable to THE for the first time during
     the 2021/2022 period will be published in August 2021 in accordance with
     regulatory requirements

    22                                                        12.02.2020
Merging of the balancing neutrality accounts
}    All balancing neutrality account balances will be transferred to
     THE’s balancing neutrality accounts at the end of the
     2020/2021 balancing neutrality period
}    The existing balances will be the starting balances for THE
     balancing neutrality accounts
}    The new THE balancing neutrality accounts will be continued
     after 1 Oct. 2021 in accordance with the provisions of the GaBi
     Gas and Konni Gas rulings, as amended
}    The MAMs will liaise with BNetzA (among others) to ensure
     that the balancing neutrality accounts are merged in a way that
     complies with GaBi Gas and Konni Gas requirements

    23
(Biogas) balancing groups and network accounts

Balancing group management from October 2021
Dealing with balancing groups: Existing balancing groups
receive new nomenclature
                             GPL                            THE

                             NCG                             THE

                1 Jun 2021               1 Oct 2021

}    All balancing group contracts will remain in place and will be transferred to the Trading Hub Europe
}    The balancing group designations of the old balancing groups will be migrated to the new nomenclature
}    The contracts for connecting balancing groups will be remain in force will be transferred

Impact on BGMs:
} BGMs with business activities in both market areas can decide for themselves which contracts they want to
   continue
} BGMs may have to adjust BG connection à Obligation to connect H- and L-gas balancing groups

Impact on network operators:
} Old BG designation can be used until 30 Sep 2021 or longer for periods prior to 1 Oct 2021
} New BGs may not have to be communicated via the GeLi-Gas process because a mapping list will be
   published

    25
Traders' proposals for continuing the balancing groups
}    Following the market area merger, the balancing groups of NCG and
     GPL will be continued under a new nomenclature
     à current mandate for project
}    The following alternative implementation proposals were made from
     within the group of traders:

n-to-one mapping: A BGM can (but does not have to) merge NCG and GPL balancing
groups in advance but will then have to independently (re-)structure the BG hierarchy.

Traders who do not make use of this option will continue to be governed by the
one-to-one mapping arrangements: i.e. no obligation to take action.

    26                                                          05.11.2019
MAMs' proposals for continuing the balancing groups
}    First step: Direct migration of the GPL and NCG BGs to the new THE BG nomenclature
}    The BGMs will have the opportunity to reorganise their balancing group structures
     during the period from 1 Jun to 1 Aug 2021 (GeLi deadlines to be observed) before the
     start of the THE market area
}    Every BGM will see the migration table in the THE Portal along with an overview of all
     valid BGs
}    The THE Portal will offer the option to terminate BGs and SBGs no longer needed
     (which will require an additional agreement) or to enter into new BGs and SBGs
}    Furthermore, there will be the option to terminate and then re-establish BG
     connections
}    Market locations will have to be allocated to BGs/SBGs using the regular master data
     change process (UTILMD) via the shipper-to-network operator route
}    The MAM can no longer intervene in contractual relationships, which means:
     }   no transfers from SBG to another BG
     }   BG connections can only be changed by the BGMs affected

    27
(Biogas) balancing groups and network accounts

 Biogas balancing group management from October 2021
Dealing with balancing groups: Existing biogas balancing
groups receive new nomenclature
Dealing with biogas bálancing groups in balancing period 2021

•   Existing NCG and GPL biogas balancing groups receive new THE biogas balancing nomenclatur as of
    1 October
•   Biogas balancing group managers are able to check existing balaincing group linkings and reassign as of
    1 June 2021. Constructs of the two market areas can brought together in order to follow the
    provisions of KONNi Gas
•   Important on biogas balancing groups (in contrast to natural gas balancing groups) is,that the biogas
    balancing period is usually one calender year and the year 2021 therefore includes three market areas
    (1 January to 1 October NCG/GPL and 1 October to 1 January THE)
•   Due to the continuation of the biogas balancing groups in the THE market area and due to the
    possible balancing group linking (as of 1 October 2021) the following settlement process with regard
    to the billing is aspired:
      •   One balancing period for 2021
      •   One flexibility transmission process
      •   One settlement of the biogas balancing groups for 2021 (price for the settlement of conversion
          fee, overrun of flexibility frame and end balance in vote)
•    Biogas balancing groups with balancing period gas year are going to be settled per market area

    29
(Biogas) balancing groups and network accounts

Network account management from October 2021
Network account migration: New network account
also valid for old periods
                                                                Special feature: market area overlaps ("MGÜ")

                THE nomenclature                                                GPL
                                                                    Migration of billing data
    NCG/GPL                   THE
     "data"                   "data"                                                        THE nomenclature
                                                                    Migration of billing data
                                                                               NCG
                 1 Oct 2021
                                                                 1 Jun 2021                     1 Oct 2021

}    Trading Hub Europe will introduce new nomenclature     }   From 1 Oct 2021, market area overlaps will only have
     for network accounts effective 1 Oct 2021.                 one THE network account
}    The existing network accounts will be migrated to      }   For cancellations still relating to the NCG and GPL
     the new nomenclature, so all old periods will be           market areas, the network operators will only send two
     processed via the new network account                      cancellation INVOICs and one new SSQNOT to THE

Impact on network operators:                                Impact on network operators:
}    The network operators will use the old network         }   The network operators will use the old network
     account numbers up to and including 30 Sep 2021            account numbers up to and including 30 Sep 2021
     (also for declarations made for October 2021)              (also for declarations made for October 2021)
}    From 1 Oct 2021, only the new nomenclature can be      }   From 1 Oct 2021, only the new nomenclature can be
     used for old periods prior to 1 Oct 2021 (correction       used for old periods prior to 1 Oct 2021
     notification, clearing, MMMA)

     31
Traders’ Christmas wish list for
                    new MAM
Traders' Christmas wish list for the market area merger

 33
Publications: Wishes and their planned implementation (1/3)
Wish                                            Planned implementation
"[...] The homepage of the MAM website          The homepage will have a news module
should show all news, press releases and        which will feature news, press releases and
information about data updates [...] which      information on the availability of new data.
are not provided on daily basis [...]"
"[...] Updates should be made available as an   All news published in the news module will
RSS feed. All new information should be         be made available in an RSS feed.
sent out on a monthly basis [...] by            Furthermore, THE is planning a newsletter,
newsletter [...]"                               containing the latest news as well as further
                                                information. The newsletter will require
                                                separate subscription.

 34
Publications: Wishes and their planned implementation (2/3)
Wish                                              Planned implementation
"[...] Published data [...] should be displayed   Where appropriate, information on the THE
both in tabular and graphical form, with the      website will be provided both graphically
option of adjusting the time range and            and in tabular form.
selecting additional filter settings [...]".      A free filter has been selected as "standard
                                                  filter", but it cannot be used for every display.
                                                  Useful additional filter options will be
                                                  implemented.
"[...] data should allow downloads as a csv or All presentations will be available for
xlsx file and should be retrievable via an     download from the THE website as csv files.
XML interface [...]".                          XML retrieval will also be implemented.
"[...] messages from TSOs or other                The THE MAM will only publish information
information which have no relation to the         relating to THE.
functions of the MAM should not be
available on the MAM pages [...]".

 35
Publications: Wishes and their planned implementation (3/3)
Wish                                         Planned implementation
"[...] All old messages should be made        Implementation options to be checked
available in an archive [...] Information and
data prior to the market area merger should
also be preserved [...]".
"[...] Nice-to-have: Information such as       Will be implemented
updated network balancing trends, call
orders for the previous day, new market
participants, news updates from homepage,
the previous day's balancing gas price and
current key figures made available at a glance
in the form of a daily report or a kind of
cockpit [...]".
"[...] Clearing window shown on              Implementation options to be checked
homepage or portal [...]"

 36
Portals: Wishes and their planned implementation (1/4)
Wish                                             Planned implementation
"Nice-to-have: Show clearing window on the       Option for portal:
homepage or portal (also graphically)."          Clearing window on portal could
                                                 include automated display of the
                                                 current clearing periods (e.g.
                                                 "Clearing period for 01/2020 starts
                                                 on ...", "Clearing period for 12/2019
                                                 ends on ...")
"The proposal to have only one                   MAM recommendation: Could be
comprehensive portal in future makes             implemented after the merger as and
sense. However, it is unclear to us why the      when necessary
tender platform cannot be integrated into
such a portal. This could perhaps be done in a
subsequent step after the market area
merger."

 37
Portals: Wishes and their planned implementation (2/4)
Wish                                             Planned implementation
"Allocation of clearing numbers is more        Implementation options to be
intuitive and better with Gaspool. The         checked
allocation process for clearing numbers should
therefore be taken over by Gaspool. […]“
"[...] but the export options [for reports] as   Implementation options for download
Excel files are better at GPL (Download          processes to be checked
Manager). Gaspool should in particular look at
the download function for hourly data.           Hourly reports will also be available
                                                 in the new portal.
"The option of transferring biogas               This functionality will also be available
flexibility in the portal should be retained."   after the merger.

 38
Portals: Wishes and their planned implementation (3/4)
Wish                                              Planned implementation
"The situation concerning contact person          Please specify requirement more
changes at the companies should be                precisely.
improved."
"The very clear and intuitive display of the BG This functionality will also be available
structures as well as the functions for         after the merger.
concluding balancing group contracts and
the administration of balancing group
allocations should be maintained. There should
still be an automatic message when the BG
connection expires".
Finally, a contact person (single-point-of-       This is planned. The assigned account
contact) at the MAM during the changeover         manager will be displayed in the
phase for specific queries would be welcome.      portal.

 39
Portals: Wishes and their planned implementation (4/4)
Wish                                        Planned implementation
"A simplified termination process for       Under review for BGs.
balancing groups no longer required after
market area merger should be provided via   In addition, there will be a function in
the portal."                                the portal to terminate sub-BGs with
                                            three months’ notice at the end of
                                            the month. For this purpose, a new
                                            button will be provided for each
                                            contract. The customer will be able to
                                            determine the time of termination.

 40
Market communication: Wishes and their planned
implementation (1/3)
Wish                                            Planned implementation
"[...] establishing an AS4 connection in        AS4 connections will be offered for market
connection with Ediga's XML [...] "             communication / nominations.
"[...] In principle, as many formats as possible When THE starts, it will be possible to use
should be made available [...]."                 the current news version and the previous
                                                 version on the input side. On the output
                                                 side, only the current format will be used.

 41
Market communication: Wishes and their planned
implementation (2/3)
Wish                                            Planned implementation
"[...] one AS2 connection each for VTP and      THE will adhere to the regulatory
GaBi Gas [...]"                                 requirements and will only set up one
                                                communication link per market partner for
                                                the purpose of one-to-one communication.
"[...] fallback option for when the             Still to be assessed as part of the THE
nomination system is down would be              project
desirable [...]"
"[...] nomination of only net values instead of The proposal has been included in the MAM
both directions of flow would be desirable      project. A review of the (technical as well as
[...]"                                          regulatory) options has not yet been
                                                completed.

 42
Market communication: Wishes and their planned
implementation (3/3)
Wish                                            Planned implementation
"[...] NOMRES should include the                To be implemented by THE
counterpart’s nomination track [...]"
"Number of VTP identifiers, depending on        Still being looked at
the REMIT messages for ACER [...]"
"[...] technical changes should be defined 12   Planned for THE as early as possible, but this
months before the market area merger [...]"     will also depend on the KOV process
                                                (among others), so THE cannot give a
                                                guarantee.

                                                Further information regarding the planned
                                                system adjustments and their effects are
                                                intended for the next market dialogue event
                                                in June 2020.

 43
Thank You!

44