DIRECT PUBLIC INVESTMENT - Upgrade and Rehabilitation of Route 11 CH - Optimization of Route 41 CH - Improvement of Route E-30-F - Upgrade of Route 7 by sections - Canelillo Reservoir - Pocuro Reservoir - Cautín Reservoir - New Hospital of Puente Alto
PROJECT DATA SHEET NATIONAL ROAD DEPARTMENT UPGRADE AND REHABILITATION ROUTE 11 CH Updated: MAY 2017 Project Information Location Arica & Parinacota Region Improvement of the international highway Arica Location Map Objective to Tambo Quemado (border with Bolivia), 192 km. Maintenance and upgrade of Route 11 CH. 127 1 Main works 2016-2019: Asphalt repair, construction of auxiliary tracks, road safety measures, path rectification, bridge construction and environmental measures. 100 36 Description of 18 76 Works 2016-2019: US$ 130 million Estimated Investment 2020-2023:US$ 150 million Type of Public Investment Improvement of connectivity between Chile and Bolivia and the Port of Arica. Benefits Reduction of risk of accidents and travel times and improving road safety. Current Situation Timetable Activity Date Section km. Working section km. 36-60, asphalt repair, path rectification, st 36-60 and 137- End of works 1 Semester 2017 construction of auxiliary tracks, road safety measures 147 From first term 2016, works on km. 170-192, asphalt replacement, road Section km. th safety measures, path rectification, and environmental measures in End of works 4 Quarter 2018 170-192 Lauca National Park In process design studies sections km 18-36; 76-100 and 100- nd 127. Construction begins at the end of 2018. All projects consider End of works 2 Semester 2023 citizen consulting process Source: Sub-Department of Development, Sub-Department of Works
PROJECT DATA SHEET NATIONAL ROAD DEPARTMENT - OPTIMIZATION OF ROUTE 41 CH Updated: MAY 2017 Project Information Location Coquimbo Region Improvement of the international connection from Location Map Objective Coquimbo - La Serena to Argentina (San Juan) and the Mercosur. Improvement works and expansion in some sections. Description Construction of bridges and protection structures in of Works an international route of 233 km in the Chilean side. Estimated 2016-2019: US$ 34 million Investment 2019-2024: US$ 81 million Type of Public Investment To improve connection between Chile, Argentina and the Mercosur, and the access to the Port of Benefits Coquimbo as well the touristic areas in La Serena and Vicuña. Reduce the risk of accidents, reduce travel times and improve safety on the route. Current Situation Timetable Activity Date Call for tender: Design of expansion Las Rojas- 2017 Marqueza Design Project of section La Serena-Las Rojas ready Design of expansion Marqueza- 2018 Puclaro bridge New call for tender to finish section Juntas del Toro y Puente El Camarón (km 147-162) during first term 2017 Design of expansion Works 2018 Puclaro Tunnel - Vicuña Plans for Citizen Participation during the whole Project. Improvement Works: La 2020 Environmental management measures should be taken even if the Laguna- Llano Las Liebres Project is not located in a National Park Enlargement La Serena-Las 2019 Rojas (exprop) Source: Sub-Department of Development, Sub-Department of Works
PROJECT DATA SHEET NATIONAL ROAD DEPARTMENT - IMPROVEMENT OF ROUTE E-30-F Updated: MAY 2017 Project Information Valparaíso Region, from the crossing of Location National Highway 5 to Zapallar - Puchuncaví - Concón. Location Map Improve the standard of urban and interurban Objective roads between Zapallar and Concón. Route of 83 km. The first section will have 7 m. wide and an outer Description of berm of 2 m. Works In the urban section (2 km.) a roundabout is considered together with a new bridge over the Aconcagua river Estimated 2016-2019: US$ 44 million Investment 2020-2024: US$ 108 million Type of Public Investment Improvement of coastal connectivity in Northern Valparaiso Region with a reduction of travel Benefits times, reduction of the risks of accidents and improvement in safety of the route. Current Situation Timetable Activity Date Call for tender: Expropiation process and Interurban section works in progress - Improvement of section 2017 Engineering studies for section Concón - Quintero (17 km) ready at the Concón-Cantonera Norte end of 2017 Concón Bridge Improvement of Route F30-E sector Cementerio Concón-Límite urbano - Upgrading works of section 2018 under progress ending july 2017 Concón-Cantonera Norte II phase Citizen Participation during the whole process -Expansion Cantonera Norte- 2021 Road Junction F-240 Source: Sub-Department of Development, Sub-Department of Works
PROJECT DATA SHEET NATIONAL ROAD DEPARTMENT Updated: MAY 2017 - UPGRADE OF ROUTE 7 BY SECTIONS Project Information Location Map Location Los Lagos and Aysén Regions - Improvement of connectivity in Route 7 between Coyhaique and Puerto Montt with only 3 seatransfers - Studies for road construction of section Pichanco - Caleta Gonzalo and beginning of expropiation process. Objective - Paving of central section in Villa Ortega - Paving from Cerro Castillo to South Access of Cochrane (250 km) - Design studies road Cochrane-Puerto Yungay (120 km) - Length of the road: 1,075 km (Pto. Montt – Coyhaique – Cochrane – Pto. Yungay), 475 km paved in asphalt or concrete. Description - Construction of a paved road for average of Works speed of 50-70km/hr. - Sections of mountain road will be 4-6 mt.wide to allow average speed of 40 km/hr. Estimated US$ 1,200 million for improvement of remaining 600 Investment kms Type of Public Investment Improve connectivity of the Region, with the reduction of travel times, risk of accidents and the Benefits improving of road safety. Benefits for the population, tourism and economic activities of 16 % of the national territory.
Current Situation Timetable 2016 – 2018 Activity Date This initiative is part of the portfolio of projects of the Special Plan for the Development of Extreme Areas (PEDZE) of the Region of Aysén. Citizen participation plans are considered. Northern Section, Call for bids nd 2 sem 2016 Section Puñon – Ex Pte. Parafina, 8 km nd 2 sem 2016 Section Pte. Cisnes – Pichicolo, 11 km 2018 - 2019 Section Pte. El Blanco – Pichanco, 25 km The Project has been divided in 3 sections: Section Leptepú – 2018 - 2019 - Northern Section: Pto. Montt – Coyhaique Fiordo Largo, 11 km - Central: Intersection R 240 CH – Intersection Route X-50, Section C. Gonzalo – 2017 - 2018 - Southern: Villa Cerro Castillo – Cochrane – Pto. Yungay. Pte. Bonito, 35 km Section Lím. Reg – La st 1 sem 2017 Tolva, 22 km Section Lago nd 2 sem 2017 Risopatrón, 14 km Section Las Pulgas – nd 2 sem 2016 F. Queulat, 12 km Sector F. Queulat – Bif. 2018 - 2019 Cisnes, 27 km Central Section, Call Northern Section: Puerto Montt – Coyhaique: for bids Not paved section: 230 km nd 2 sem 2016 Section 1 Intersection Studies under progress: 96 km – 2018 R 240 CH – V. Ortega Paving under progress: 65 km Southern Section, Call for bids: Section V. Cerro 2017-18 Castillo – Laguna Central Section: Intersection R 240 CH and Route X-50: Verde Not paved section: 52 km Studies under progress: 28 km Section 1 Acc. Murta 2017-18 – Pto. Tranquilo Section 1 Confluence 2017-18 River Baker/Nef – Cochrane Southern Section: Villa Cerro Castillo – Cochrane: Not paved section: 245 km Studies under progress: 65 km Basic Works under progress: 30 km Source: Sub-Department of Development, Sub-Department of Works
NATIONAL DEPARTMENT FOR PROJECT DATA SHEET HYDRAULIC WORKS - CANELILLO RESERVOIR Updated: MAY 2017 Project Information Location Map Location Province of Choapa in Coquimbo Region, Capacity: 200 Hm3 Description Flood area 800 ha of Works Wall height: 84 m. Netwrk of new irrigation channels: 300 kms. Irrigation 15.000 ha. Area Communes Illapel, Canela, Los Vilos Estimated Wall of the dam US$ 169 million Investment Hydroelectric Under analysis generation The National Department for Hydraulic Works has Water Rights 3 rights for 150 Hm /year. Possibilities to capture the water near the reservoir under study Current Situation Timetable Activity Date Feasibility studies Ready Study of environmental 2017 – 2018 Feasibility studies are been executed by Empresa SMI. assessment Design of Project and environmental studies 2017-2018 Design studies 2018 – 2019 Construction 2020 – 2024 Source: Department of Irrigation Projects
NATIONAL DEPARTMENT FOR PROJECT DATA SHEET HYDRAULIC WORKS - POCURO RESERVOIR Updated: MAY 2017 Project Information Location Map Province of los Andes, Commune of Calle Larga, Location Valparaíso Region Volume of the reservoir: 100 Hm3 Dam wall height: 100 m Description Feeder Channel: 17 km (from Aconcagua River) and a of Works capacity of 20 m3/s Main channel: 10 km Irrigation 30.000 Has Area River st nd 1 and 2 sections of Aconcagua river sections Area of the Wall Dam Estimated US$ 290 million Investment Hydroelectri 5 to 10 MW installed capacity c generation The National Department has permanent water rights 3 Water Rights for 400 Hm /year in the first section of Aconcagua river. Current Situation Timetable Activity Date st 1 sem. 2017 Social and economic 1. Feasibility studies and environment assessment under progress, State Evaluation System ending first semester 2017 st 1 sem 2017 Council of Ministers 2. Working on a model to run in a single contract both design and construction Allocation of budgetary st 1 sem. 2017 resources Expropiaton nd 2 sem. 2017 Call for bids nd 2 sem. 2017 Source: Department of Irrigation Projects
NATIONAL DEPARTMENT FOR PROJECT DATA SHEET HYDRAULIC WORKS - CAUTIN RESERVOIR Updated: MAY 2017 Project Information Location Map Location Province of Cautín, Araucanía Region 3 Capacity: 142 Hm CAUTÍN Description of Dam wall height: 62 m Works Irrigation Area 32.274 Has Communes Victoria, Perquenco and Lautaro Estimated US$ 427 million Investment Hydroelectric Under evaluation generation The National Department has permanent water Water Rights rights for 670 Hm3/year and temporal water 3 rights for 534 Hm /year. Current Situation Timetable Activity Date Feasibility studies 2017- 2018 Environmental 2019 – 2020 Prefeasibility studies ready since 2013 Assessment Feasibility studies from 2017 2020 - 2021 Design Construction 2022 - 2024 Source : Department of Irrigation Projects
NATIONAL DEPARTMENT OF PROJECT DATA SHEET ARCHITECTURE - NEW HOSPITAL OF PUENTE ALTO Updated: MAY 2017 Project Information Location Commune of Puente Alto, Santiago Metropolitan Region Set up a health infrastructure to give high complexity coverage to 1.5 millon Objective inhabitants in the south of Santiago city Description of It will have 400 beds (48 for critical Works patients), 10 surgical pavilions Estimated US$ 243 million (including equipment) Investment Public. Ministry of Health Type of Investment Other Priorities It should cover: open care, hospitalization, therapeutic procedures, emergency telemedicine and a nursery. Current Situation Timetable Activity Date Proyecto delayed nd CCall for bids 2 semester 2017 Design studies by the Ministry of Health in progress Source: Planning and Coordination Division Término de obras
CONCESSIONS - The Loa Route - Route 5, Section Antofagasta – Iquique - Route 5: Section Caldera - Antofagasta - Re-tender of Route N° 5 Los Vilos – La Serena and Conurbation - Route 5, Section Santiago - Los Vilos - Interconnection Santiago-Valparaíso-Viña del Mar (Route 68) + Alternatives - Costanera Central Highway - Section Av. La Florida – Camilo Henríquez - Eastern Américo Vespucio Urban Highway - Príncipe de Gales – Grecia - Interconnection Highway 68 with Highway 78 - Highway Santiago – San Antonio (Route 78) - Transversal Route of O’higgins Region - Fruit Highway, G-66 - Re-tender Route 5 - Talca – Chillán - Re-tender Route 5 - Chillán – Collipulli - Nahuelbuta Route - Route Freire – Villarrica – Pucón - Re-tender Route 5: Temuco – Rio Bueno + Access to Valdivia - Metropolitan Highway of Puerto Montt - North-South Route of Chiloé - Las Palmas Reservoir - Los Angeles Reservoir - Catemu Reservoir - La Jaula Reservoir - La Tranca and Murallas Viejas Reservoirs
PROJECT DATA SHEET PUBLIC WORKS PPP - THE LOA ROUTE Updated: MAY 2017 Project Information Location Map Communes of Sierra Gorda and Calama in Antofagasta Location Region Increase service levels and improving connectivity and Objective territorial integration of the Region Rutas del Loa Revamping and expansion up to 2 lanes each side Description of the Route 25 of Works Construction of the Eastern bypass to Calama connecting Routes 21, 23, 24 and 25 Economic It considers MGI and ITC Conditions R Estimated ut US$ 293 million Investment as Type of PPP – BOT de Investment l Improvement of service and standard levels of Lo Route 25. Benefits a Improvement of safety conditions and shorter travel times (1 36 K Current Situation m. Timetable Call for Bids ) nd 2 Quarter 2017 h • Bidding conditions ready Receipt of Tenders 4t Quarter 2017 Contract award 1st Semester 2018 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - ROUTE 5, SECTION ANTOFAGASTA – Updated: MAY 2017 IQUIQUE Project Information: Location Map Route 5 between the cities of Antofagasta and Location Iquique Improvement of the standard in Route 5, Carmen Objective Alto and Humberstone in the junction with Route 16. Description of Two lanes in each side. Works Max speed 120km/h Economic Road tolls Conditions State subsidy 30% aprox. Estimated US$ 458 million Investment Type of PPP - BOT Investment Rehabilitation and improvement of a section of the Route 5. Benefits Improvement of safety conditions and shorter travel times More secondary access roads Current Situation Timetable st Call for Bids 1 Semester 2020 Private initiative nd Receipt of Tenders 2 Semester 2020 Studies under progress nd Contract award 2 Semester 2021 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - ROUTE 5: SECTION CALDERA - Updated: MAY 2017 ANTOFAGASTA Project Information: Location Map Route 5 between the cities of Caldera and Location Antofagasta Improvement of the standard in this section of the Objective Route 5 Description of Two lanes in each side. Works Max speed 120km/h Road tolls Economic Conditions State subsidy 30 % Estimated US$ 640 million Investment Type of PPP – BOT - Investment Expansion of the 4 lanes highway from Antofagasta to the south Benefits Improvement of safety conditions and shorter travel times More secondary access roads Current Situation Timetable rd Call for Bids 3 Quarter 2018 st Studies of this private proposal under progress Receipt of Tenders 1 Quarter 2019 nd Contract award 2 Semester 2019 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - RE-TENDER OF ROUTE N° 5 LOS VILOS – LA Updated: MAY 2017 SERENA AND CONURBATION Project Information Location Map Location North of Santiago from km 229 to km 474 Re- tender of the contract for Route N° 5 from Los Objective Vilos to Coquimbo, including urban sector between Coquimbo and La Serena Description of 229 km 4-lanes intercity road Works 17 km of urban highway with three lanes in each direction Economic Road tolls Conditions Estimated US$ 328 million Investment Type of PPP – BOT Investment Improve urban connectivity Increase transport capacity on the urban sector Benefits Reduce accidents With this section the concessioned highway from Caldera to Pargua goes up to 1.955 km Current Situation Timetable Private Initiative Call for bids rd 3 Quarter 2017 Developing studies for: design, expropriations, environmental assessment Reception of bids End of 2017 Finishing project proposal st Preparation of bidding conditions Contract award 1 Semester 2018 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - ROUTE 5, SECTION SANTIAGO - LOS Updated: MAY 2017 VILOS Project Information: Location Map Communes of Quilicura, Colina, Lampa, Til Til, Location Llay Llay, Hijuelas, La Calera, Nogales, Zapallar, La Ligua, Papudo and Los Vilos in Central Chile Increase service levels and improving connectivity Objective and territorial integration of this part of the national territory Improvement of the standard of the Route 5 Description of between Santiago and Los Vilos. Works Economic Road tolls - Not subsidies Conditions Estimated US$ 225 million Investment Type of PPP – BOT Investment • Standard improvement of a section of the Route 5. Benefits • Improvement of safety conditions and shorter travel times • More secondary access roads Current Situation Timetable Call for Bids End of 2019 rd Evaluating necessary studies to develop this re-tender project Receipt of Tenders 3 Quarter 2020 st Contract award 1 Quarter 2021 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - INTERCONNECTION SANTIAGO-VALPARAÍSO- Updated: MAY 2017 VIÑA DEL MAR (ROUTE 68) + ALTERNATIVES Project Information: Location Map Location Provinces of Valparaíso and Santiago Increase service levels and improving the standard Objective of the highway Route 68, has 110 km. It needs a better standard Description of with different secondary roads, junctions and Works additional lanes. Economic Road tolls Conditions Estimated US$ 600 million Investment Type of PPP – BOT Investment Promotes regional economic growth and Benefits territorial integration of 2 of the most important metropolitan areas of the country and Valparaíso seaport Current Situation Timetable st Call for Bids 1 Semester 2019 Studies of demand and Social Evaluation under progress Receipt of Tenders End of 2019 Re-tender Route 68 Santiago – Valparaíso – Viña del Mar. nd Contract award 2 Quarter 2020 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - COSTANERA CENTRAL HIGHWAY - SECTION AV. LA FLORIDA – CAMILO HENRÍQUEZ Updated: MAY 2017 Project Information: Location Map South-east side of Santiago Location Metropolitan Area. Communes of La Florida and Puente Alto. Improvement of transport system, connectivity and Objective infrastructure standard of the city Building a high standard underground highway of 12 km.. 9 km is an underground route with 3 lanes in each side and the Description of other 3 km will have 2 lanes in each side. Works The project includes connections to local roads and Américo Vespucio Sur Highway. Road tolls Economic State subsidies 36 % Conditions Free flow tolls Estimated US$ 1.1 Billion Investment Type of Private Initiative - PPP – BOT Investment Improvement of connectivity between south-east districts and downtown Reduction of traffic congestion Benefits New public transport corridor Reduction of operational costs. Improvement of safety conditions and shorter travel times. Current Situation Timetable nd Call for bids 2 Quarter 2018 Developing of technical studies and bidding conditions st Citizen participation in local communities Receipt of tenders 1 Quarter 2019 th Contract award 4 Quarter 2019 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - Eastern Américo Vespucio Urban Updated: MAY 2017 Highway - Príncipe de Gales – Grecia Project Information Location Map Location Eastern side of Santiago Complete the Americo Vespucio ring road with high Objective quality and service standard Construction of two underground double tracks with 3 lanes each side Description of Works Urban redeveloping in surface considering larger green areas and more facilities for public urban transportation. Road tolls Economic Estimated 15% of state subsidy Conditions Free flow tolls Estimated US$ 786 million Investment Type of PPP – BOT Investment Complete the Américo Vespucio ring road in Santiago with a high service standard Reduce accidents and traffic jams, mainly during rush hours. Benefits Reduce commuting time and pollution emissions. Improve public transportation and connectivity in the city. Current Situation Timetable Call for Bids August 2016 Finishing technical studies and bidding bases nd Prequalification process re-open Receipt of Tenders 2 Quarter 2017 Closing agreements and approval with authorities h Contract award 4t Quarter 2017 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP INTERCONNECTION HIGHWAY 68 WITH HIGHWAY 78 Updated: MAY 2017 Project Information: Location Map Western side of Santiago Location Metropolitan Area. Communes of Pudahuel and Maipú. Improvement of transport system, Objective connectivity and infrastructure standard of Western Santiago Construction of a 9.4 km 4- lanes road, to reduce traffic impact in urban zones Internal roads, lighting and drainage Description of Works Construction of different flyovers and structures in the junctions with Route 68 and Route 78 Internal roads and road safety measures Road tolls Economic Conditions Free flow tolls Not subsidies Estimated Investment US$ 250 million Type of Investment Private Initiative - PPP – BOT Improve connectivity between central and western areas of Santiago Improve connection to the main Benefits national seaports avoiding to cross through Santiago. Better local urban development Reduction of accidents, travel times and pollution emissions Current Situation Timetable rd Call for bids 3 Quarter 2017 Finishing technical studies and developing of bidding contracts Reception of bids End of 2017 st Contract award 1 Semester 2018 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - HIGHWAY SANTIAGO – SAN ANTONIO Updated: MAY 2017 (ROUTE 78) Project Information: Location Map Provinces of Santiago, Talagante, Melipilla and Location San Antonio. Upgrade the standard of the route Objective Better service levels Route 78 highway has 4 lanes and an extension of 105 kms Description of It needs a better standard with different Works secondary roads, junctions and local roads. Replacement of old bridges and construction of a few new ones. Road tolls Economic Not subsidies Conditions One trunk toll area in Melipilla and in some junction roads. Estimated US$ 300 million Investment Type of PPP – BOT Investment Benefits Promotes regional economic growth and territorial integration in medium size localities and between Santiago and the main national port: San Antonio Current Situation Timetable st Call for Bids 1 Quarter 2020 Re-tender of Route 78 Santiago-San Antonio rd Studies of demand and social evaluation under progress Receipt of Tenders 3 Quarter 2020 st Contract award 1 Quarter 2021 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP TRANSVERSAL ROUTE OF O’HIGGINS REGION Updated: MAY 2017 Project Information: Location Map Location From south-west Rancagua to the village of Alhué Create a new connection to the port of San Antonio Objective from Rancagua and the commune of Alhué Building of a new road (68 km.) including Description of auxiliary tracks and road safety measures. Works Tunnel of 6 km. Economic Road tolls Conditions State subsidy almost 30% Estimated US$ 306 million Investment Type of PPP – BOT Investment Improve travel time between Rancagua and San Antonio Create a better connection to the Fruit Highway Benefits G-66 Complementary to the future binational tunnel Las Leñas between Chile and Argentina Current Situation Timetable st Call for Bids 1 Semester 2020 nd First stages of a private initiative. Studies under progress Receipt of Tenders 2 Semester 2020 st Contract award 1 Semester 2021 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - FRUIT HIGHWAY, G-66 Updated: MAY 2017 Project Information Location Map 120 km south from Santiago to the port of San Location Antonio Improve connectivity for small and medium scale producers (fruits, vegetables and wine) from Objective O’Higgins and Maule Regions to the port of San Antonio Restore and improve 138 km of the existing road and construction of a bidirectional road to reduce traffic impact in urban zones Description of Construction of a 21 km 4-lanes road Works Construction of different flyovers and structures to reduce negative impact on population Road tolls Economic State subsidies 50-60 % Conditions Free flow tolls Estimated US$ 600 million Investment Type of PPP – BOT Investment Improvement of connectivity Reduction of transport costs for local Benefits producers Reduction of accidents Current Situation Timetable rd Call for Bids 3 Quarter 2017 Technical studies ready Agreements with local authorities and citizen participation Receipt of Tenders st 1 Quarter 2018 Preparation of bidding contracts st Contract award 1 semester 2018 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP RE-TENDER ROUTE 5 - TALCA – CHILLÁN Updated: MAY 2017 Project Information: Location Map Communes of Río Claro, San Rafael, Talca, Maule, San Javier, Villa Alegre, Linares, Longaví, Location Retiro, Parral y Ñiquén, San Carlos, San Nicolás, Chillán and Chillán Viejo. Increase service levels and improving the standard Objective of the highway with additional works 4-lanes road and 193.3 km, It will have: Description of New local roads Works Junctions – bridges Bypass sectors Free flow toll system Economic Road tolls Conditions Not subsidies Estimated US$ 225 million Investment Type of PPP – BOT Investment Improve connectivity between central and southern Chile Better local and regional economic Benefits development and integration Reduction of accidents, travel times and pollution emissions Current Situation Timetable st Call for Bids 1 Quarter 2019 Studies of demand and social evaluation under progress rd Receipt of Tenders 3 Quarter 2019 TOR of basic engineering studies in preparation. st Contract award 1 Quarter 2020 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - RE-TENDER ROUTE 5 - CHILLÁN – Updated: MAY 2017 COLLIPULLI Project Information: Location Map Communes of Chillán, Bulnes, Cabrero, Los Location Ángeles, Mulchén and Collipulli in Biobío Region Improvement of actual highway standard, including Objective additional works and the increase of service levels while improving user safety Section of 160 km. in Route 5 with 2-lanes in each side. To include: Description of Works New local roads Junctions – bridges Bypass sectors Free flow toll system Economic Road tolls Conditions Not subsidies Estimated US$ 225 million Investment Type of PPP – BOT Investment Improvement of connectivity Reduction of transport costs for local producers Reduction of accidents Improve connectivity between central and Benefits southern Chile Better local and regional economic development and integration Current Situation Timetable st Call for Bids 1 Semester 2019 Studies under progress Receipt of Tenders rd 3 Quarter 2019 nd Contract award 2 Quarter 2020 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - NAHUELBUTA ROUTE Updated: MAY 2017 Project Information Location Map Location Km 520 south of Santiago Improve connectivity and maximize economic and Objective social benefits in an area mainly focused on forests and forestry 55 km road Description of 4-lanes highway Works Uneven junctions Road tolls Economic Estimated 41% of state subsidy Conditions Manual tolls Estimated US$ 245 million Investment Type of PPP – B5OT Investment Connectivity improvement Benefits Reduction of transport costs for local producers Reduction of accidents Current Situation Timetable Call for Bids November 2016 nd Bidding bases and procedures in progress Receipt of Tenders 2 Quarter 2017 Agreements with local authorities and indigenous communities th Contract award 4 Quarter 2017 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - ROUTE FREIRE – VILLARRICA – PUCÓN Updated: MAY 2017 Project Information: Location Map Location Freire, Villarrica and Pucón Improvement of Route 199 CH between Freire and Objective Villarrica and additional works Construction of a road with 2-lanes in each side Description of High safety standard Works 40.8 km. of auxiliary roads Economic Road tolls Conditions Estimated US$ 330 million Investment Type of PPP – BOT Investment Connectivity improvement Benefits Reduction of transport costs for local producers Reduction of accidents and congestion Current Situation Timetable Call for Bids End of 2019 st Private initiative under study Receipt of Tenders 1 Quarter 2020 rd Contract award 3 Quarter 2020 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - RE-TENDER ROUTE 5: TEMUCO – RIO BUENO + Updated: MAY 2017 ACCESS TO VALDIVIA Location Map Project Information: Communes of Gorbea, Loncoche, Lanco, San José Location de la Mariquina, Máfil, Los Lagos, Paillaco, La Unión, Río Bueno and Valdivia Improvement of actual highway standard, including Objective additional works and the increase of service levels while improving user safety and better access to Valdivia city Improvement of 172 km. of the 4 - lanes road Upgrade to 2-lanes in each side to Valdivia (88 Description of km.) Works New local roads Junctions – bridges Bypass sectors. Economic - Road tolls Conditions - Not subsidies Estimated US$ 250 million. Investment Type of PPP – BOT Investment Increase of safety standard to decrease accident rate in acess to Valdivia Connectivity improvement Reduction of transport costs for local producers Benefits Reduction of accidents and congestion Better local and regional economic development Current Situation Timetable Call for Bids End of 2017 Private initiative. Proponent R y Q Ingeniería. Time limit for th Receipt of Tenders 4 Quarter 2018 presentation of first studies: April 2017 nd Contract award 2 Quarter 2019 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - METROPOLITAN HIGHWAY OF PUERTO Updated: MAY 2017 MONTT Project Information Location Map Location Puerto Montt - 1.000 km. south of Santiago • Improvement of transport system, connectivity Objective and infrastructure standard of Puerto Montt • Improvement of connection between Puerto Varas and El Tepual Airport Description of 4-lanes highway in 32 km. Works Urban highway standard Road tolls Economic Estimated State subsidy; 30 % Conditions Free flow tolls Estimated US$ 321 million Investment Type of Investment PPP – BOT Improvement of connectivity between Puerto Montt and Puerto Varas Benefits Reduction of traffic congestion. Reduction of operational costs. Improvement of safety conditions. Current Situation Timetable Private initiative Call for Bids End of 2017 Developing of technical studies (demand, environmental nd assessement, business model, etc..) Receipt of Tenders 2 Quarter 2018 Defining economic conditions nd Contract award End of 2018 Citizen participation from 2 Semester 2016 Source: CCOP
PROJECT DATA SHEET PUBLIC WORKS PPP - NORTH-SOUTH ROUTE OF CHILOÉ Updated: MAY 2017 Project Information Location Map Location 1,100 km south of Santiago Improve and extend the transportation system in the Objective island of Chiloé Improvement of 101 km road with 2-lanes each side Description of Construction of auxiliary tracks, road safety Works measures, path rectification, construction of new bridges and maintenance of existing ones and environmental measures. Economic Road tolls Conditions Not subsidies Estimated US$ 250 million Investment Type of Private initiative – PPP BOT Investment Improve connectivity Increase transport capacity on the trunk road of the island Benefits Reduce accidents Contribute to the economic development of the island Current Situation Timetable rd Call for Bids 3 Quarter 2017 Private initiative (Constructora Internacional). Developing of nd studies until MAY 2017 Receipt of Tenders 2 Quarter 2018 Preparation of bidding conditions st Contract award 1 Quarter 2019 Source: CCOP
NATIONAL DEP. FOR HYDRAULIC PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP - LAS PALMAS RESERVOIR Updated: MAY 2017 Project Information: Location Map Petorca Province, Petorca Commune Location 3 Volume of the reservoir: 55 Hm . Description of Feeder channel: 58 km Works . Irrigation área 2.932 Ha and 1,285 rural properties River sections In communes of Petorca and Cabildo Estimated VAN MM$ 35,000. investment and TIR = 8,9 % economic conditions US$ 161 million – State subsidy near 100 % Hydroelectric Not generation The National Department has water rights for 10 Water rights Hm3/year, in rivulet Las Palmas. Current Situation Timetable Activity Date End of design December 2016 Environment December 2016 1. Design studies under process Assessment rd Call for bids 3 Quarter 2017 2. Project in the National System for Environment Assessment Receipt of Tenders End of 2017 End of construction 2022 Source: Department of Irrigation Projects
NATIONAL DEP. FOR HYDRAULIC PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP - LOS ÁNGELES RESERVOIR Updated: MAY 2017 Project Information Location Map Location Petorca Province, Commune of La Ligua. Multipurpose reservoir with capacity of 30 Description of 3 Hm and a feeder channel of 24 km (from Works Alicahue River). Irrigation Area 2,160 Ha. and 676 rural properties Socio-economic indicators VAN: MM$ 280 Estimated US$ 161 million – State subsidy near 100 % Investment Hydroelectric No Generation Water rights under study. The reservoir has Water rights water rights from users. Current Situation Timetable Activity Date st Design Studies 1 Semester 2017 1. Environment assessment studies under progress. nd Environment Assessment 2 Semester 2017 2. Complementary design studies are developing th Call for bidding 4 Quarter 2017 3. The MOPW is analyzing PPP conditions st Receipt of Tenders 1 Quarter 2018 Source: Department of Irrigation Projects
NATIONAL DEP. FOR HYDRAULIC PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP - CATEMU RESERVOIR Updated: MAY 2017 Project Information Location Map San Felipe Province, Commune of Catemu in Location Valparaiso Region 3 Volume of the reservoir: 180 Hm Description Dam wall height: 65 m of Works Feeder Channel: 25 km (from Aconcagua River) and 3 a capacity of 20 m /s Irrigation 33,100 Ha and 4,160 rural properties área nd rd th River Lower areas of 2 , 3 and 4 sections of Aconcagua sections River Estimated US$ 423 million – State subsidy near 100 % investment Hydroelectric 5 to 10 MW generation The National Department has water rights for 630 Water rights nd Hm3/year in the 2 section of Aconcagua River. Water rights of users equivalent to 70 % during winter. Current Situation Timetable Activity Date Environment nd Assessment 2 Sem. 2017 Technical studies to review and complement the feasibility of the dam are performed nd Expropiation 2 Sem. 2017 Study of environmental assessment under progress. nd Bidding process 2 Sem. 2017 Tender conditions in elaboration st Receipt of Tenders 1 Sem. 2018 Source: Department of Irrigation Projects
NATIONAL DEP. FOR HYDRAULIC PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP Updated: MAY 2017 - LA JAULA RESERVOIR Project Information Location Map Location Commune El Romeral (Teno river), Maule Region SECTOR LA JAULA 3 Description of Capacity: 160 Hm Works Dam Wall height: 115 m Irrigated área 53,045 Has.- Commune of Teno CURICÓ Estimated US$ 384 million Investment Hydroelectric 20 MW (estimated) Generation The National Department has water rights for 320 Water rights 3 Hm in the Teno River from October to January Current Situation Timetable Activity Date Feasibility Studies 2017 - 2019 Prefeasibility studies developed during 2014. Environment Feasibility studies to be developed by the National Department for 2019 – 2020 Assessment Hydraulic Works 2017-2019 Design 2020 – 2021 2017 Evaluation as a potential PPP project Construction 2022 - 2024 Source: Department of Irrigation Projects
NATIONAL DEP FPR HYDAULIC WORKS – PROJECT DATA SHEET PUBLIC WORKS PPP LA TRANCA RESERVOIR Updated: MAY 2017 Project Information Location Limari Province, commune of Combarbalá, Cogotí River Multipurpose reservoir type CFRD 3 Description of Capacity: 50 Hm . Works Dam wall height: 120 m It includes some complementary works. Benefits Commune of Combarbalá inhabitants 4,940 Ha of irrigation area and 432 rural properties. Estimated Investment US$ 177 million and 100 % subsidy Hydroelectric Generation 2.4 MW Water rights Mainly from rural users Current situation Timetable End of basic design nd 2 Semester 2017 Complementary design studies under progress studies nd Environment assessment studies developing End of EAS 2 Semester 2017 Call for bidding End of 2017 rd Receipt of Tenders 3 Quarter 2018 Source: Department of Irrigation Projects
NATIONAL DEP. FOR HYDRAULIC PROJECT DATA SHEET WORKS – PUBLIC WORKS PPP MURALLAS VIEJAS RESERVOIR Updated: MAY 2017 Project Information Location Limarí Province, commune of Combarbalá, Combarbalá River Description of Works Multipurpose reservoir type CFRD 3 Capacity: 50 Hm Dam wall height: 107 m It includes some complementary works Inhabitants and agriculture producers of Combarbalá commune Benefits 2,370 Ha irrigation area and 500 rural properties Rural drinking water programme Estimated US$ 118 million with 100 % subsidies Investment Hydroelectric 1 MW Generation . Water rights Mainly from rural users Current Situation Timetable End of basic design nd 2 Semester 2017 Complementary design studies under progress studies Environment assessment studies developing nd End of EAS 2 Semester 2017 Call for bidding nd 2 Semester 2017 st 1 Semester 2018 Receipt of Tenders Source: Department of Irrigation Projects La Tranca and Murallas Viejas reservoirs will be jointly tendered
BINATIONAL PROJECTS - Agua Negra Binational Tunnel
PROJECT DATA SHEET CHILE-ARGENTINA - AGUA NEGRA BINATIONAL TUNNEL Updated: MAY 2017 Project Information Location Map Coquimbo region in Chile and San Juan Province Location in Argentina Improve integration between Chile and Argentina Objective and extend the transportation system with Mercosur countries Description of Construction of a tunnel of 13.9 km in the Works Andes Mountains at 3,600 mt of altitude Economic Total costs according to the territorial part: 72 % Conditions Argentina and 28 % Chile Estimated US$ 1.4 billion Investment Type of Direct public investment financed by IABD Investment Improve connectivity of Chile and Mercosur countries Benefits Contribute to the economic development mainly of Coquimbo region and San Juan Province Current Situation Timetable Call for October 19th, 2016 prequalification Institutional organization of a binational entity: EBITAN nd Call for Bids 2 Semester 2017 Prequalification in progress st Contract award 1 Quarter 2018 Source: MOP
CONTACTS PUBLIC DIRECT INVESTMENTS Road Projects: Walter Bruning, Director of the National Road Department, Morandé 59, 2º piso, Santiago, Chile, email: walter.bruning@mop.gov.cl Public Building Projects: Claudia Silva, Director of the National Department of Architecture, Morandé 59, 10º piso, Santiago, Chile, email: claudia.silva.p@mop.gov.cl Reservoir Projects: Reinaldo Fuentealba, Director of the National Department for Hydraulic Works, Morandé 59, 5º piso, Santiago, Chile, email: reinaldo.fuentealba@mop.gov.cl CONCESSIONS Concessions Coordinator: Eduardo Abedrapo, Merced 753, Santiago, Chile, email: eduardo.abedrapo@mop.gov.cl INTERNATIONAL COORDINATION International Coordinator MOP: Rigoberto García G., Morandé 59, 6º piso, Santiago, Chile, email: rigoberto.garcia@mop.gov.cl