LOOP TYPE 3 INSTALLATION MANUAL - Durlum
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
GENERAL INFORMATION GENERAL INFORMATION GUIDELINES Building expansion joints and tolerances customary in building construction must This assembly manual addresses all metal These installation instructions have been be taken into account accordingly. ceilings manufactured by durlum. The dif- structured in accordance with the require- ferent sections describe the related/rel- ment of EN 13964:2007 and describe a durlum metal ceilings must always be as- evant products. proper assembly. sembled by expert dry building companies who are capable of assessing the overall durlum is a leading German manufacturer The description does not exempt the user situation in the building, the metal ceil- of metal ceilings and cladding elements, from examining the structural conditions, ing, the cladding surface, as well as the mainly made of galvanised sheet steel, implementing the building code regula- structural conditions and are able to take aluminium and expanded metal. tions and observing the information given suitable precautions for ensuring proper in the building permit prior to starting as- assembly. sembly. They have priority, but could not be included here. If parts from different manufacturers are used to assemble the ceiling, the relevant CERTIFICATE It is advisable always to draw up assembly diagrams/drawings, to establish the loca- mounting company must provide the cer- tificates required by EN 13964:2007 and The Certification Body of TÜV SÜD Management Service GmbH tion where assembly is to begin and to es- must obtain suitable certificates of con- certifies that tablish the required suspension points for formity itself. the relevant ceiling system prior to starting durlum GmbH assembly. Liability for proper selection of the products An der Wiese 5 79650 Schopfheim Germany and system conformity can only be as- has established and applies sumed for the systems delivered by durlum. STRUCTURAL PRECONDITIONS a Quality, Environmental and Energy Management System for the following scope of application: Planning, development, manufacturing and sales of metal ceilings, functional ceilings, wall claddings, luminaries, lighting and daylight systems. To prevent the parts from becoming dirty, Performance of audits (Order No. 70014435) Metal ceilings may usually be installed as gloves must be worn during assembly. If has furnished proof that the requirements under: ISO 9001:2015 soon as the building is swept clean, but the ceiling products are delivered laminat- ISO 14001:2015 ISO 50001:2018 at least when all wet work in the interior ed with a protective film, they must be pro- are fulfilled. has been completed and the building has tected from exposure to UV radiation [sun- The certificate is valid from 2020-05-30 until 2023-04-05. Certificate Registration No.: 12 100/104/340 25601 TMS. been closed. light], the film must likewise be removed from the goods no later than 4 weeks af- Product Compliance Management Prior to starting assembly, the suspension ter delivery, and the storage temperature Munich, 2020-04-15 points must be checked for their usabil- must not exceed 30°, since otherwise the ity, and load introduction into the building adhesive on the panel may become hard- must be guaranteed. ened, and the protective film can no long- The relevant products are described in the er be removed. marketing and sales documents. They are When using wall mounting points, such as both acoustically effective, and can also brackets or wall anchors, the load-carrying be used as design elements only. Specifi- capacity of the wall in question must be STORAGE cally, these products are: checked. • Acoustic ceilings durlum metal ceilings are usually delivered • Chilled ceilings If ceiling elements rest on brackets, pos- on pallets. It is advisable to leave the metal • CHARACTER products sible wall movements must be taken into panels on the pallets as long as possible. If account. the pallets need to be opened, the durlum durlum differentiates between a wide POLYLAM ® should always be placed on its range of ceiling systems, for example S1. Only anchors for which a general building underside. “S1” stands for system 1 clamping. In this supervisory approval is available may be system, there are different nomenclatures used, and their minimum extraction force Storage must be carried out such that that allow a further subdivision of the sys- must be greater than 100 kg. The anchors damage is excluded. tems. must be mounted as specified by the relevant anchors manufacturer. We rec- The assembly of the ceiling panels must All durlum systems are systems of modular ommend performing regular tensile stress not start until all dust-producing work has design. This applies not only to the sub- tests, to verify that anchors have been set been completed [swept clean]. structure but also the ceiling parts that are correctly. suspended, locked into place or placed durlum products are certified according on the substructure. durlum metal ceilings are dimensioned to ISO 9001 for development, production, such that they carry their own weight of sales and also for service. Nevertheless, it is durlum metal ceilings comply with the the system construction plus a surface recommended to always subject the metal standard EN 13964:2007 and are CE-cer- load amounting to 40 N/m². Higher loads ceilings immediately to an inspection and tified. must be taken into account or suspended to report any complaints right away [usu- separately in the construction, and the ally immediately following delivery or within Appropriate static certificates are avail- measures must be adapted to the situa- 3 days]. Visible damage must be noted on able for special systems marketed by us tion at hand. Usually, built-in components the delivery note. and for which no general approvals are and loads must be suspended separately. available, and appropriate designs com- pliant with EN 13964 have been construct- For ceiling systems that do not allow any STANDARDS AND REGULATIONS ed. durlum lamps comply with standard tolerance compensation within a module, EN 60598-1 and are CE-certified. suitable material expansions must be tak- The relevant regulations applicable at the en into account. installation site must be determined by 2 © durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors reserved. All rights reserved. | Issued: 09.03.2021
GENERAL INFORMATION the assembly company in question. The such as the M6 threaded rod or the ceilings marketed by durlum conform to nonius hanger to the intended length EN 13964. This standard also governs fire or order the correct length and mount behaviour in accordance with EN 13501. it on the raw ceiling. 8. Usually, the panel layout should be APPLICATION started from the centre of the room, in order to be able to compensate The application of durlum metal ceilings is the tolerance of the room and cut the restricted, unless agreed upon otherwise, to panels in half, if necessary. The precise interiors, so that, pursuant to EN 13964, class arrangement must always be done on of use 1, corrosion protection class A, has the basis of the ceiling layout plan. been defined here as standard. The use of durlum lighting is restricted to interiors. The 9. durlum metal ceilings are usually pro- lighting complies with protection class IP 20, vided with a cross support [primary protection class 1 according to EN 60598-1. profile]. Should it become necessary to adjust the 10. Use the layout plan to determine in metal ceiling panels to the building by cut- which direction the cross reinforce- ting, we recommend protecting the cut- ment profiles are laid, either in parallel ting edges from corrosion by means of a to the façade [usually] or vertically to paint, to maintain the corrosion protection the façade. The cross reinforcement class A. profiles should be mounted via a wall anchor or via a diagonal anchoring to prevent an axial movement. The corre- QUALITY STANDARD sponding primary profiles are mount- ed at right angles to the secondary For material properties, dimensions, toler- profiles. To this end, the system-specific ances, colour deviations, the TAIM Direc- connecting elements are used, see tives [Technical Association of Industrial system descriptions. The position of the Metal Ceiling Manufacturers] applies. primary profiles is established in the re- flected ceiling plan. MOUNTING SEQUENCE 11. The metal ceiling panels are often pro- vided with a joint tape [9x3mm], to 1. Prepare ceiling and lighting installa- make for easier tolerance compensa- tion plan or adopt architect's plan. tion. Should a joint tape be used, the joints must also be re-aligned from 2. Check ceiling lighting installation plan time to time, since the joint tape also versus structural conditions. has tolerances. However, owing to the high production precision, it is also 3. Prepare a bill of materials, including a possible to connect the panels without suitable work plan and retrieval/order a joint tape by using butt joints or pro- of the materials required. vide them with rubber spacer naps. Al- ways ensure that the joints are aligned. 4. Determine the required suspension points in accordance with the classes 12. If the panels are placed on a perim- of use of EN 13964. The correspond- eter trim, we recommend our F-bracket ing suspension distances for the dif- as bracket or as stepped F-bracket. The ferent systems can be taken from the bracket secures the panel and protects detailed descriptions of the individual it against lifting. The ceiling panel is cut ceiling systems. with electric sheet shears [i.e. Treco shears] and adapted to the prevailing 5. Establish which generally approved room dimensions. When calculating the anchor is suitable. Check the raw ceil- minimum support area [10mm], the ing and the walls. Mark the anchor dimensions of possible wall movement mounting holes and drill them. Mount should be taken into account. the anchors as specified by the an- chor manufacturer and carry out ex- 13. Attachments or other loads are to be traction tests using the device recom- mounted separately. For logical rea- mended by the anchor manufacturer, sons these parts are integrated during if necessary. the mounting process. 6. Use the same procedure when mount- 14. After completion and pre-acceptance ing the wall brackets, mounting dis- of the ceiling, the sequence of joints tance about 400–625 mm, check the should be re-aligned. Soiled ceiling introduction of force into the wall. panels should be cleaned to give a perfect result for assembly. 7. Shorten intended fastening elements, © durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors reserved. All rights reserved. | Issued: 09.03.2021 3
LOOP ® TYPE 3 INSTALLATION MANUAL 2 1 AP il e of Se y pr co ar nd im ar yp Pr ro fi le AS 1 U 1040 Modulgröße · Module size · Tailles du module = 966 x 1115.44 mm W2053-ST V LOOP ® steel element 80,5 60 10 LOOP® = 1004,25 x 1124,23 mm 139,43 Magnet 2 2 U1042 W2053-ST Magnet · Magnet · Magnétique Langfeldplatte · Rectangular metal panels · Panneaux rectangulaires = 956 x 1.115 mm Screw connection 4 © durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors reserved. All rights reserved. | Issued: 09.03.2021
INSTALLATION MANUAL LOOP ® TYPE 3 ABBREVIATIONS 4. When assembling the LOOP ® elements, if the instructions given below are not fol- the safety rope is screwed to the LOOP ® lowed or the luminaire is used improperly. AH: Distance of the suspension hangers in element by means of a wing nut. axial direction of the primary profile 1. Unscrew the round PUNTEO ® -J60 AP: Distance of primary profiles U 1040 mounting adapter. AS: Distance of secondary profiles W 2053- ST ASSEMBLY OF THE FALSE CEILING Note: Please take the S7 KS System Assembly in- structions into account. With the following exceptions: 5. Measure the position of the LOOP ® el- ement exactly using the laser [longi- Distannce of the primary profile: ≤800 mm tudinal and transverse rows]. Hold the 2. Guide the screw component through LOOP ® element with the rear magnet the corresponding perforation of the Assembly of the suspension [20 pieces per standard element] from LOOP ® element and screw it on the op- below horizontally against the ceiling posite side using the nut. Items 1-19 acc. to assembly instructions. S7 KS [friction force by magnet]. For the arrangement of the magnets, see Item 20 below. To simplify assembly/disassem- Cut the rail channel W 2053-ST to the re- bly, the magnets can be glued to the quired length. LOOP ® element [e.g. LOCTITE]. 966 Item 21 LOOP® At the crossing points to the primary profile, Ø 60 the rail channel W 2053-ST is screwed to the L-shaped primary carrier U 1040 using a self-securing screw connection M6. 1115,44 Item 22 The joint formation of the rail channel is performed using the rail channel connec- 3. Now clip the PUNTEO® -J60 luminaire tor W 2053-ST V. with the two lateral Clip springs into the upper part. Items 23 and 24 are withdrawn. Beispielanordnung Magnete Standardelemente 6. The installation is then performed with further elements similar to a puzzle. ASSEMBLY OF LOOP® ELEMENTS The elements are to be aligned by slid- ing them. To do so, the joints of the 1. Wear clean cotton gloves. LOOP ® ceiling are aligned horizontally 2. Preassemble the safety ropes [min. by pushing or pulling the adjacent ele- 2 pieces per standard element] as ment. Check the joint between the ele- shown on the drawing. Run rope ments for flatness and uniform width. through the damper disc and safety 7. For connection to the wall, the elements rope anchor disc and secure it in the can be simply adapted to the room, armature disc by bending the web. using a jigsaw. The cutting edge is cov- ered with a bracket or a plasterboard frieze. In the area of the glass wall, the cut is not covered. Ensure clean cut. MOUNTING OF LUMINAIRES Note: Installation and electrical connec- tion of the luminaire must be performed by an authorised skilled electrician [e.g. elec- tric installer] in accordance with VDE 0100, taking into account the technical informa- tion and the legal regulations in force in your country. 3. Then run the preassembled rope Safe operation of the luminaire is only guar- through an elongated hole [in the anteed if these instructions are observed. area of the later fastening points of the This is why the Installation manual should safety rope] in the rail channel out of be kept in a safe place. The manufacturer the ceiling void downwards. cannot assume any liability whatsoever © durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors reserved. All rights reserved. | Issued: 09.03.2021 5
LOOP ® TYPE 3 INSTALLATION MANUAL 4. If necessary, create a cutout with a diameter of 100 mm in the S7 ceiling on site. 5. Mount ballasts/drivers in the ceiling void, possibly on U 1040. 6. Perform electrical connection of the driver. 7. Prior to acceptance, align the ele- ments precisely, if they have been moved by other trades. Note: The lumininaire must not be coat- ed with a heat-insulating material. The components are fitted with electronic components, which can become damaged in case of elec- trostatic discharge. When handling the components, ensure good earthing of the environment. DISASSEMBBLY OF THE CEILING PANELS 1. Wear clean cotton gloves. 2. Pull LOOP ® elements, including PUNTEO® -J60, downwards to overcome their friction force. 3. LOOP® elements, including PUNTEO®-J60, will fall into the safety ropes, but must al- ways be held. 4. Release the safety ropes and set down the elements. 5. Open S7 false ceiling in accordance with the S7 KS Installation manual. 6 © durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors reserved. All rights reserved. | Issued: 09.03.2021
CEILING LIGHTING AMBIENCE PLAFOND LUMIERE AMBIANCE durlum GmbH | An der Wiese 5 | D-79650 Schopfheim T +49 (0) 76 22 | 39 05-0 F +49 (0) 76 22 | 39 05-42 E info@durlum.com I www.durlum.com
You can also read