In Karlsruhe 8th Meeting SC5.T6 / WG 6 - Gesellschaft Beratender Ingenieure VBI mbH - Harrer Ingenieure
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Harrer Ingenieure Gesellschaft Beratender Ingenieure VBI mbH 8th Meeting SC5.T6 / WG 6 March 9. and 10. 2020 in Karlsruhe • Anwers to the comments Discussion over the background documents • Current work – milestone 2nd draft in Nov. 2020 A warm welcome Matthias Gerold Karlsruhe, March 9, 2020 www.harrer-ing.net
01 Presentation of the City of Karlsruhe Margrave Karl Wilhelm from Baden „Carols Ruhe“ residence 1718 castle Technical University Federal Constitutional Court shafts of sunlight Kriegsstraße → www.harrer-ing.net Page 2
01 Presentation of the City of Karlsruhe > 45.000 student Karlsruhe > 260.000 inhabitants 5 km river Rhein Federal Constitutional Court France Federal Supreme Court Federal Prosecutor‘s office www.harrer-ing.net Seite 3
01 Presentation of the City of Karlsruhe Transport district New tunnel underneath the pedestrian zone www.harrer-ing.net Page 5
02 Presentation of Harrer Ingenieure One-hand competence. Founded in 1960 Since 1992 as limited company Ca. 100 permanent employees www.harrer-ing.net www.harrer-ing.net Page 6
02 Presentation of Harrer Ingenieure Employees (Permanent) 100 90 Engineers (of technical universities and 80 Mitarbeiteranzahl of employees universities of (TH Ingenieure applied und FH) 70 60 sciences) 54 57 60 Architekten 50 Architects 50 46 42 40 38 Techniker undclerical staff 5 Technicians and Numer 4 4 Sachbearbeiter 30 3 3 3 17 17 18 20 2 14 15 Verwaltungsangestellte Administrative staff 11 13 10 12 13 14 15 9 10 11 0 www.harrer-ing.net Page 7
02 Presentation of Harrer Ingenieure Locations Headquarter in Karlsruhe Reinhold-Frank-Str. 48 b D-76133 Karlsruhe Branch office in Baden-Baden Branch office in Stuttgart Gutenbergstr. 14 Felix-Wankel-Straße 6 D-76532 Baden-Baden D-73760 Ostfildern www.harrer-ing.net Page 8
03 Structural and Civil Engineering (Special constructions) Metropol Parasol in Seville (Spain) Text Time Period 2007–2011 Total Cost of Timber Construct. ca. €15 million Services • Structural verifications for the wooden components of the shell structure (stems and umbrellas) according to EC 5 • Detailed proofs for connections and knots according to EC 5 • Consultation of the executing company www.harrer-ing.net Page 11
03 Structural and Civil Engineering Tree House Hotel „Oase“, Neue Messe, Karlsruhe SKAIJO building J1, Heilbronn Weil im Schönbuch (dm-Arena) (National Garden Show 2019) Mercedes-Benz, Residential building of student branch office, union, Mannheim Munich Bell tower, Allmersbach i. T. Construction of treetop path, Waldbröl www.harrer-ing.net Page 12
03 Structural and Civil Engineering KA300-Pavillon, Residential complex Hofgarten Karree, DBK David + Bader GmbH, Karlsruhe Karlsruhe Rülzheim Bridge across Neckar River, Center Parcs, Leutkirch im Allgäu Residential building of student Haßmersheim (main building, spa area, and more) union, Tübingen Daycare, Neckarsulm Visualisation, composite floor of cross- laminated timber and reinforced concreter www.harrer-ing.net Page 13
Bürogemeinschaft 04 Bridge Constructions (Special Constructions) KUHLMANN - GEROLD - EISELE 3. Orinoco Bridge near Caicara (Venezuela) Time Period 2007–2011 Proportionate Cost for Shell Construction ca. 156 Mio. € Services • Implementation planning of steel- and reinforced-concrete construction • Support structure planning www.harrer-ing.net Page 14
04 Bridge construction Pedestrian and cyclist bridges in Schwäbisch Gmünd Built for State Garden Show 2014 Railway and Rococo bridge: integral design A bridge strong as a tree! First exhibition at State Trade Office S, then at agricultural festival (Landwirtschaftliches Hauptfest) S, then forest bridge in Warmbronn Pedestrian and cyclist bridge near Pforzheim-West across federal motorway BAB A8 BSB rod-dowel system www.harrer-ing.net Page 15
04 Bridge construction Pedestrian and cyclist bridge Access Mercedes-Benz plant in Sindelfingen Bertsche compound-anchor Pedestrian and cyclist bridge near Rheinfelden across federal motorway BAB A98 Pedestrian and cyclist bridge Reichenbach an der Fils across federal road B10, railway, and Fils River Pedestrian and cyclist bridges Remseck (D) across Neckar and Rems Rivers 1988 www.harrer-ing.net Page 16
04 Sustainability Road bridge Bad Säckingen (D) / Stein AR (CH) across Rhine 1570 Pedestrian and cyclist bridge Lucerne (CH) across Reuss River 1333 Road bridge Wangen (CH) across Saane River 1550 König-Ludwig Bridge Kempten – St. Mang (D) across Iller River Formerly railway bridge, then road bridge, today pedestrian and cyclist bridge 1847–1851 www.harrer-ing.net Page 17
05 Risk management Canteen and Medical Centre I, Kunduz (Afghanistan) Earthquake protection of Residence and Chamber of Germany in Kingston (Jamaica) BGS Bruchsal, Construction of gamma iradiation facility (Germany) www.harrer-ing.net Page 18
06 All Building Materials – in Practice, Research, Standardisation, and Teaching 2005 Glass steps with attached glass sails Co-authors M. Gerold, F. Kümmerle Matthias Gerold: More than 100 publicationsTopics: composite materials of all materials, dynamics, and more 6 books Among others: 1995 about EC 5; 2001 and 2007 about timber bridges; thereof 4x co-author on topics of cracks in buildings (2008) and of load-bearing plastic components (2014) > 90 presentations E.g. on corruption in construction industry Expert reports Examination of more than 80 halls as a result of Bad Reichenhall 2006 1988–1993 Member of DIN Standards Committee Building and Civil Engineering (NABau) 04-01-01 AA, of mirror committee for CEN/TC 124/WG 5 and CEN/TC 250/SC 5/WG 2 Since 2011 Member of mirror committee NABau-AA NA 005-04-01 AA Since 2013 Head of NABau-AA NA 005-04-01-01 Work Group, Head of German Delegation for CEN/TC 250/SC 5 www.harrer-ing.net Page 19
06 Research and Standardisation – Example: TCC Wood-concrete composite systems – tests by University of Kassel (division of building maintenance and timber construction) and Wilhelm-Klauditz Institute (WKI) Braunschweig The SC5/PT6 project team aims at reworking the EN 1995- 2:2010. In this context might be expected an update of the regulations on drops in performance and a transfer of the applicability of the TC’s existing regulations to timber bridges. Task 2: Enhanced ease of use → Sub-Task 2c: Durability and Detailing Among others (related to robustness): corrosion, maintenance costs and live span time www.harrer-ing.net Page 20
06 Our (Timber Construction) Team Employees of the Department of Structural and Civil Engineering Employees of the Department of Bridge-, Tunnel- and Soil-Engineering www.harrer-ing.net Page 21
06 General First-hand expertise. Expertise upon which you can build. www.harrer-ing.net www.harrer-ing.net Page 22
Thank you for your attention Structural and civil engineering Harrer Bridge and tunnel construction, Ingenieure foundation engineering Industrial and commercial construction Project management Risk management Gesellschaft Beratender Consultation Ingenieure VBI mbH Planning Management Karlsruhe – Ostfildern – Baden-Baden www.harrer-ing.net www.harrer-ing.net
You can also read