GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs

Page created by Jason Santiago
 
CONTINUE READING
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM
IRELAND | 2019/20

                                                 1
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
AMAZING IS SEEING OUR             THIS JOB WILL BE
    CLIENTS’ VISIONS BECOME A         WHAT YOU MAKE IT
    REALITY, THANKS TO THE HARD
    WORK AND IMAGINATION OF           04 DIVERSITY AND THE COMMUNITY
                                      06 WHAT WE DO

    18,000 ENGINEERS, PLANNERS,       08 AECOM’S GRADUATE DEVELOPMENT PROGRAMME
                                      09 BENEFITS PACKAGE
    ECONOMISTS, SCIENTISTS AND        10 ENVIRONMENTAL CONSULTING
                                      14 BUILDING ENGINEERING
    PROGRAMME MANAGERS.               16 TRANSPORTATION, ENGINEERING AND PLANNING
                                      18 PROJECT MANAGEMENT, COST MANAGEMENT
    LARA POLONI                          AND BUILDING SURVEYING
                                      20 WATER ENGINEERING
    CHIEF EXECUTIVE, AECOM, EUROPE,   22 LANDSCAPE ARCHITECTURE AND ARCHITECTURE
    MIDDLE EAST AND AFRICA            24 DESIGN AND PLANNING
                                      26 POWER AND ENERGY
                                      28 OUR OFFICES
                                      30 WORK PLACEMENTS
                                      32 HOW TO APPLY
2                                                                                   3
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
Curragh Racecourse Grandstand
    DIVERSITY AND THE COMMUNITY

                                                                  WE HIRED OVER 150
                                    WE ARE A KEY SPONSOR OF
        DIVERSITY
                                                               FEMALE GRADUATES IN 2019
                                   THE ROYAL ACADEMY            WE STRIVE TO
                                     OF ENGINEERING
        MATTERS                   DIVERSITY & INCLUSION
                                                               REPRESENT THE
                                                                COMMUNITIES
          TO US                        PROGRAMME                  WE SERVE

              LAUNCHED                     WON THE
                                          AWARD FOR
          AECOM                      DIVERSITY &
                                                                WE ARE NOT JUST ABOUT
                                                                RED BRICK UNIVERSITIES
        RETURNERS                     INCLUSION               WE HIRED FROM OVER
                                                               80 UNIVERSITIES IN
       A PROGRAMME THAT ASSISTS
        PEOPLE TO RETURN TO THE      PROGRAMME                2019 FROM ACROSS
           WORKPLACE AFTER A            AT THE BUSINESS
          PROLONGED PERIOD OF           CULTURE AWARDS           15 COUNTRIES
                ABSENCE                      IN 2017

4                                                                                                                         5
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
WHAT WE DO
    For full details of what we do
    please see our business line
    spreads from page 10 onwards.

                                              ECOLOGY
                                                                                                                                                               LANDSCAPE
                                                                                                              AVIATION                                         ARCHITECTURE
                                                                                                                                                  BRIDGES
                                                                            POWER                                        BUILDING
                                                                                                                         ENGINEERING                                          GEOTECHNICAL
                                 WATER                                                                                                                                        + TUNNELLING

                                                         ARCHITECTURE                        URBAN DESIGN +                                                       SURVEYING
         EIA                                                                                 TOWN PLANNING
                                         PROJECT
                                         MANAGEMENT
      RAIL
                                                 TRANSPORT PLANNING          REMEDIATION
                                                                             + GROUNDWATER               STREETS                INTERIOR DESIGN                DEVELOPMENT
                                                                                                                                                               PLANNING

                                                        ACOUSTICS
                                                                                                                                  Connecting people and economies with roads,
                                                                                                                                  bridges, tunnels and transit systems. Delivering clean
                                                                                                                                  water and energy. Designing sustainable buildings.
                                                                                                                                  Planning new cities. Restoring damaged environments.
                                                                    ROADS                                                         Designing parks where children play.

6                                                                                                                                                                                            7
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
WE ARE COMMITTED TO YOU                                                                  OUR BENEFITS
    At AECOM, we have over seven hundred                                                     As a graduate at AECOM, your salary comes with a range of
    graduates in the UK and Ireland on our                                                   benefits and those available in the UK and Ireland include:
    Graduate Development Programme
    (GDP): learning from the best in the
    business; developing their technical                        TECHNICAL
    skills; and working towards professional                    DEVELOPMENT
                                                                                                                                                                                                           BI-ANNUAL
                                                                                                        25
    accreditation. The programme includes:                                                                                                         2 PAID DAYS FOR
                                         AECOM                  AECOM                                                                           COMMUNITY                                              SALARY
                                         PROJECTS
                                         IN ACTION
                                                                UNIVERSITY                         DAYS’ ANNUAL
                                                                                                      LEAVE
                                                                                                                                                OR CHARITY
                                                                                                                                                      WORK A YEAR
                                                                                                                                                                                                       REVIEW
                                                                                                                                                                                                       WHILST ON GDP
      2 YEARS
      IN DURATION    EMOTIONAL
                     INTELLIGENCE                                STEM                 CSR
                                                           AMBASSADOR
                                                              TRAINING                             PRIVATE
                                                                                                                                                                            FLEXIBLE                                  COMPANY
                                                                                                MEDICAL                              INCOME                                 BENEFITS
                                                                                                                                                                                                                    CONTRIBUTORY

                                                                    PROJECT                    INSURANCE                           PROTECTION                                                                       PENSION
                                                                                               + LIFE ASSURANCE                                                             PACKAGE                                 SCHEME
                                                                       CASE
                                                                      STUDY
GRADUATE
INDUCTION
                                                     INTRODUCTION                                  FREE                                   ANNUAL                                                                   15 DAYS’ PAID
                                                     TO AECOM                                     ADVICE                            SEASON                                    SHARESAVE                          LEAVE A YEAR FOR
    PRESENTATION                                     PROJECT                                   ON FINANCE, LEGAL                 TICKET LOANS                            SAVING PLAN                            FORMALLY SIGNED UP

          SKILLS                                     DELIVERY                                    AND MEDICAL                          AND CYCLE TO                                                              RESERVISTS*
                                                                                                   CONCERNS                           WORK SCHEME

                                                          PROFESSIONAL        SECONDMENTS              * AECOM has been recognised as a Gold Employer by the Ministry of Defence for our work with the Armed Forces Covenant.

8
                                                         QUALIFICATIONS          /TRANSFER                                                                                                                                           9
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
ENVIRONMENTAL CONSULTING                                                                                                                                          KEY DEGREES                        DEGREE
                                                                                                                                                                   WE LOOK FOR                        CLASSIFICATION
                                                                                                                                                                   Environmental Science,             Minimum 2:2
                                                                                                                                                                   Environmental Management/          or equivalent
                                                                                                                                                                   Impact Assessment
                                                                                                                                                                   Geographical Information Systems   Masters preferred
                                                                                                                                                                   Natural Sciences                   for some disciplines
                                                                                                                                                                   (Botany, Zoology, Ecology,
                                                                                                                                                                   Marine Science)
                                                                                                                                                                   Earth Sciences
                                                                                                                                                                                                      SPONSORSHIP
                                                                                                                                                                   (including Geology and
                                                                                                                                                                   Ocean Sciences)
                                                                                                                                                                                                      TOWARDS
                                                                                                                                                                                                      CIEEM

     AMAZING IS HAVING THE
                                                                                                                                                                   Environmental Economics            LI
                                                                                                                                                                   EIA                                RTPI
                                                                                                                                                                   Environmental Engineering          CIWEM

     OPPORTUNITY TO TRAVEL
                                                                                                                                                                   Acoustics                          CIWM
                                                                                                                                                                   Air Quality                        CMet
                                                                                                                                                                   Archaeology                        IWO

     AS PART OF MY JOB.
                                                                                                                                                                   Town Planning                      RGS
                                                                                                                                                                   Landscape Architecture             IAQM
                                                                                                                                                                   Hydrogeology                       IOA
                                                                                                                                                                   Geography                          ICRS
                                                                                                                                                                   Physics                            CIfA
     CLARE                                                                                                                                                         Chemistry
                                                                                                                                                                   Sustainability
                                                                                                                                                                                                      IEMA
                                                                                                                                                                                                      GEOLSOC
     GRADUATE ENVIRONMENTAL                                                                                                                                        Carbon Management                  ICF
     SCIENTIST, DUBLIN                                                                                                                                             Applied + Environmental Geology
                                                                                                                                                                   Geo-science
                                                                                                                                                                                                      AA
                                                                                                                                                                                                      IGI

     OUR SERVICES                                                                             ADDRESSING THE GLOBAL
     EIA, SEA + ESHIA
     REMEDIATION
                              GROUNDWATER
                              HYDROGEOLOGY
                                                                PLANNING CONSULTANCY
                                                                ENVIRONMENTAL ECONOMICS
                                                                                              BIODIVERSITY CRISIS
                                                                                              In recent years, AECOM has led the way in Biodiversity No
     ECOLOGY                  HYDROMORPHOLOGY                   ENVIRONMENTAL POLICY
                                                                                              Net Loss and Net Gain, vital elements in addressing the global
     CLIMATE CHANGE           SUSTAINABILITY                    CORPORATE EHS SERVICES
                                                                                              biodiversity crisis. In 2019, AECOM ecologists published and
     ACOUSTICS                CARBON MANAGEMENT                 ENVIRONMENTAL DUE DILIGENCE
                                                                                              presented a paper at the Irish Ecological Association and also
     SUSTAINABILITY           APPLIED + ENVIRONMENTAL GEOLOGY
                                                                                              at a lecture at Trinity College Dublin for the Chartered Institute
     ARCHAEOLOGY              ARBORICULTURE + FORESTRY
                                                                                              of Ecology and Environmental Management, to promote
     GIS                      LANDSCAPE ARCHITECTURE
                                                                                              greater understanding of policy and technical approaches
     STAKEHOLDER ENGAGEMENT   BUILT HERITAGE
                                                                                              in Ireland, and supporting professional ecologists in
                                                                                              delivering meaningful benefits for biodiversity in Ireland.
                                 xxxx                                 xxxx

10                                                                                                                                                                                                                           11
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
Example projects
     PROPOSED RELOCATION OF ABBEY COMMUNITY COLLEGE,                              DuPont
                                                                                  Since 2015, we have been working
     WHITEABBEY, COUNTY ANTRIM                                                    with DuPont to investigate a seven-
     Our Heritage team comprises           Historic Environment Division          hectare historic lime deposition area
     people located in nine offices        (HED). The associated scheduled        in Derry, Northern Ireland, to inform
     across the UK and Ireland. The        protected area encompasses the         a future improvement/reconversion
     team is spilt into archaeology        whole of the south half of the site    scheme for the site. AECOM’s
     and built heritage, providing         severely limiting opportunities for    technical experts designed a staged
     a broad spectrum of services          the client.                            site investigation methodology,
     throughout the entire life cycle of                                          where the results of each stage
     a project from pre-development        The project required                   informed the scope of the next. The
     through construction phase to         collaboration with other AECOM         site investigation works included
     post-development. Services            teams such as Planning and             electromagnetic survey, Cone
     include desk-based research,          Ecology, alongside extensive           Penetration Test (CPT) including
     management of investigative           consultation with HED. This led        Membrane Interface Probe (MIP)
     fieldwork and archaeological          to two phases of archaeological        coupled with a Hydraulic Profiling Tool
     excavation. All projects also         fieldwork — non-invasive               (HPT), drilling and trial pitting, multi-
     involve co-operation and              geophysical survey followed by         level monitoring well installation,           Timber treatment facility
     collaboration with various other      targeted sensitive archaeological      soil/groundwater/surface water/air
     disciplines and specialisms           testing involving specifically-        and gas monitoring and passive flux
     within AECOM.                         placed hand dug trenches. The          meter (PFM) installation.                   Management of legacy                     affecting groundwater were present         wastewater treatment plant (WwTP).
                                           archaeological survey and testing                                                  contamination at a timber                locally near areas where a historical      This was a truly multidisciplinary
     The proposed construction of a        were successful in determining                                                     treatment facility                       spills occurred. Additionally, an          project where a holistic approach
     new college, Abbey Community          that the Abbey location is                                                         We have been involved in the             area where low levels of diffused          was taken to remediate ground
     College, is such a project. A         restricted to one area within the                                                  PDM Ltd site since 2014,                 contamination were observed was            contamination while at the same
     Premonstratensian Abbey dating        south of the site. In light of this,                                               investigating and developing a           understood to affect surface water         time improving discharge water
     to the 13th century, the college is   HED agreed after discussing                                                        solution to surface water and            quality in a near-by drain.                quality and drainage performance.
     located within the south extent       the results with us, that they                                                     groundwater contamination issues                                                    Multiple disciplines, from process
     of the site and would have            would consider reducing the                                                        associated with historical soil          Remediation was complicated by             and civil engineering to ecology
     originally consisted of a large       extent of the scheduled area to                                                    contamination from PAHs at their         the fact that this is the only facility    and environmental science,
     complex of buildings. There are,      encompass the true extent of                                                       facility in Ireland. An extensive site   of its kind in Ireland and by the nature   collaborated to develop the scope
     now no upstanding remains and         the Abbey. This released a large                                                   investigation and the installation of    of the contaminant of concern,             of the remedial effort which ranged
     its exact position is unknown. The    portion of the site, rendering                                                     dual level monitoring wells for ground   creosote: a dense non-aqueous              from the installation of a Hydraulic
     monument has been awarded             it available for development                                                       water sampling allowed the team to       phase liquid (DNAPL) for which             Containment System, protecting
     scheduled protected status            and a practical location for the                                                   develop a strong conceptual site         relatively minimal literature exists.      groundwater, to the construction
     which means it is illegal to carry    proposed community college.                                                        model (CSM) and identify key areas       Additionally, aging of the drainage        of new drainage infrastructure,
     out works within the site without     The determination was a great                                                      for intervention. Two main types         infrastructure was identified as a         including Sustainable Urban
     permission granted by the             success for AECOM.                                                                 of contaminant distribution were         main factor contributing to non-           Drainage Systems (SuDS) and soil
     Department for Communities                                                                                               identified affecting water quality at    compliant surface water discharges         stabilisation solutions.
                                                                                                                              the site. Hot-spots of contamination     and over-loading of the site

                                                                                     DuPont, Derry, Northern Ireland

12                                                                                                                                                                                                                                                       13
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
BUILDING ENGINEERING                                                                                    KEY DEGREES                  DEGREE                         SPONSORSHIP
                                                                                                         WE LOOK FOR                  CLASSIFICATION                 TOWARDS
                                                                                                         Civil/Structural             2:2 or above                   ICE
                                                                                                         Mechanical                   (Civil & Structures            IStructE
                                                                                                         Electrical                   require a minimum 2:1)         IMechE
                                                                                                         Building Services                                           IET
                                                                                                                                      Masters preferred
                                                                                                                                                                     CIBSE
                                                                                                                                      for all disciplines
                                                                                                                                                                     CIOB

      AMAZING IS BEING INVOLVED IN
      THE GRANDSTAND DESIGN FOR
                                                                                                       Example projects
                                                                                                       Royal Victoria Maternity                  SSHRB — TU Dublin, Tallaght
                                                                                                       and Childrens Hospitals                   We’re helping deliver a new Sport

      THE CURRAGH RACECOURSE,                                                                          One of the most forward thinking
                                                                                                       projects in the UK, this modern and
                                                                                                       innovative £250m project will provide
                                                                                                                                                 Science, Health and Recreation
                                                                                                                                                 Building (SSHRB) for the
                                                                                                                                                 Technological University of Dublin.

      AN ICONIC PROJECT IN IRELAND.                                                                    a world leading facility in the sphere
                                                                                                       of caring for woman and children.
                                                                                                       We are currently carrying out the
                                                                                                       detailed Civil and Structural
                                                                                                                                                 Located at the Tallaght Campus, the
                                                                                                                                                 proposed development includes a
                                                                                                                                                 two storey teaching block, a single
                                                                                                                                                 storey sports hall and a viewing

      DANIEL                                                                                           and Architectural design.                 balcony overlooking a new GAA
                                                                                                                                                 pitch. Our Civil, Structures and MEP
      GRADUATE ENGINEER, DUBLIN                                                                        The Curragh Racecourse
                                                                                                       We provided multidisciplinary
                                                                                                                                                 teams have developed the detailed
                                                                                                                                                 design which will go to site in late
                                                                                                       services for the development,             2019. We also provided the project
                                                                                                       including Civil and Structural,           management and quantity surveying
                                                                                                       Mechanical and Electrical, Fire           services for the project.
                                                                                                       Safety, PSDP and Cost Management.
                                                                                                       Phase 1 of the construction works         West Quad
                                                                                  OUR SERVICES         included the refurbishment of the         Our Civil, Structural, MEP and Cost
                                                                                  BUILDING SERVICES    existing stables, deconstruction          Consultancy teams are currently
                                                                                  CIVIL + STRUCTURES   and reconstruction of the Queen’s         working to deliver the West Quad
                                                                                                       Room, and demolition of the existing      development, a third-level education
                                                                                                       East and West stands. Phase 2             facility which will form part of the TU
                                                                                                       included the construction of the          Dublin campus in Grangegorman.
                                                                                                       saddling stalls, museum arm, and          Currently under design development,
                                                                                                       the grandstand with its soaring linear    the proposed building will include six
                                                                                                       roof structure.                           superstructure storeys over a single
                                                                                                                                                 basement level. Ribbed concrete
                                                                                                                                                 slabs and a 21m transfer structure
                                                                                                                                                 are two of the key structural and
     Renzo Piano                  Ulster Clinic   Curragh Racecourse Grandstand                                                                  architectural features.

14                                                                                                                                                                                         15
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
TRANSPORTATION ENGINEERING AND PLANNING
                                                                                           Curragh Racecourse redevelopment
                                                                                                                                KEY DEGREES                 DEGREE                       SPONSORSHIP
                                                                                                                                WE LOOK FOR                 CLASSIFICATION               TOWARDS
                                                                                                                                Civil                       2:2 or above                 ICE
                                                                                                                                Structural                                               IStructE
                                                                                                                                Transport Planning                                       CIHT
                                                                                                                                Geography                                                TPS
                                                                                                                                Mathematics
                                                                                                                                Economics

      AMAZING IS HELPING CREATE                                                                                               Example projects

      WORLD-CLASS FACILITIES FOR
                                                                                                                              York Street Interchange, Belfast        BusConnects
                                                                                                                              A £125-165m strategic road              Focused on removing the current
                                                                                                                              improvement scheme being                delays and uncertainties associated

      THE SPORTING EVENT I LOVE.
                                                                                                                              promoted by the NI Department           with bus journeys in Dublin so that
                                                                                                                              for Infrastructure (DfI) to alleviate   trips will be faster, more punctual
                                                                                                                              traffic congestion on the busiest       and more reliable. This project will
                                                                                                                              road junction in Northern Ireland.      deliver 50% journey time savings
                                                                                                                              We have been appointed by DfI to        along Dublin’s bus corridors. We
      BRENDAN                                                                                                                 develop the scheme which proposes       are providing engineering design

      SENIOR CONSULTANT, DEVELOPMENT                                                                                          a new interchange with a series of
                                                                                                                              underpasses and overbridges to
                                                                                                                                                                      services to the National Transport
                                                                                                                                                                      Authority for 35km of the bus
      ENGINEERING, TRANSPORTATION, DUBLIN                                                                                     create free flowing links between the
                                                                                                                              Westlink, M2 and M3 motorways.
                                                                                                                                                                      corridors across three schemes.

                                                                                                                                                                      Strabane Footbridge
                                                                                                                              Ebrington Development                   We undertook the detailed design
                                                                                                                              Framework Transport                     of the Strabane Footbridge, working
                                                                                                                              Assessment, Derry                       as Contractor’s Designer for Fox
                                                                                                                              A 10.5 hectare site offering a mix      Contracts. This landmark cable-
                                                                                  OUR SERVICES                                of hotel, leisure, retail, office and   stayed structure is visible for miles
                                                                                  BRIDGE STRUCTURES                           residential development, generating     around and is a spectacular addition
                                                                                  ROADS                                       almost £100 million and creating        to the town of Strabane, Northern
                                                                                  TRANSPORT PLANNING                          around 5,000 jobs. Commissioned by      Ireland. The design required detailed
                                                                                  DEVELOPMENT PLANNING                        the Strategic Investment Board, we      FE analysis of both the construction
                                                                                                                              were responsible for the Transport      sequence and the potential for
                                                                                                                              Assessment and other traffic and        pedestrian induced excitation.
                                                                                                                              transportation matters, including       In addition to office based work,
                                                                                                                              site access design, external highway    on-site testing of cable vibrations
                                                                                                                              improvements, travel and service        was also undertaken. The technical
                                                                                                                              management plans, car park design,      innovation resulted in a technical
                                                                                                                              and negotiations with planning and      paper published in the Bridge
     Strabane Footbridge        A6 Randalstown to Castledawson   Pearse Station                                               highway authorities.                    Engineering Journal of the Institution
                                                                                                                                                                      of Civil Engineers.
16                                                                                                                                                                                                             17
GRADUATE AND PLACEMENT OPPORTUNITIES IN AECOM IRELAND | 2019/20 - TARGETjobs
PROJECT MANAGEMENT, COST MANAGEMENT AND BUILDING SURVEYING                                                                 KEY DEGREES                   DEGREE                       SPONSORSHIP
                                                                                                                            WE LOOK FOR                   CLASSIFICATION               TOWARDS
                                                                                                                            Quantity Surveying            2:2 or above                 RICS
                                                                                                                            (we do consider non-                                       CIOB
                                                                                                                            cognate applicants)
                                                                                                                            Construction Project
                                                                                                                            Management
                                                                                                                            Building Surveying

      AMAZING IS ALL THE NEW
                                                                                                                          Example projects
                                                                                                                          Courts Services Ireland                   LinkedIn were so impressed with
                                                                                                                          Surveying 66 courthouses in Ireland,      our performance, they are replicating

      FRIENDS I HAVE MADE                                                                                                 many of them heritage buildings.
                                                                                                                          The surveys assess the condition
                                                                                                                          of the buildings, identify backlog
                                                                                                                                                                    the Dublin Model globally; and we are
                                                                                                                                                                    now actively rolling out commercial
                                                                                                                                                                    projects in Ireland, UK, Continental

      SINCE I JOINED AECOM.                                                                                               maintenance issues and provide a
                                                                                                                          20-year life cycle costing. Part of
                                                                                                                          the survey includes a measured
                                                                                                                          survey and the preparation of floor
                                                                                                                                                                    Europe; and are in discussions to
                                                                                                                                                                    advance a rollout in Americas
                                                                                                                                                                    and APAC.

                                                                                                                                                                    Central Bank of Ireland HQ
      JOHN                                                                                                                plans. Any issue relating to statutory
                                                                                                                          compliance are also identified.           We provided full Cost Management
      GRADUATE QUANTITY SURVEYOR, DUBLIN                                                                                  LinkedIn EMEA HQ
                                                                                                                                                                    services on the partially-built,
                                                                                                                                                                    reinforced-concrete structure,
                                                                                                                          Our Dublin-based PM team defied           located on North Wall Quay and the
                                                                                                                          market norms, delivering a cutting-       fit-out for a quality specification,
                                                                                                                          edge 17,650sqft EMEA HQ 100%              fit-for-purpose office building.
                                                                                                                          on-time, 100% on-budget, and with         We continuously managed and
                                                                                                                          100% client satisfaction. This was        reported on the financial status of
                                                                                                     OUR SERVICES         LinkedIn’s first building constructed     the project including commercial
                                                                                                     QUANTITY SURVEYING   outside the USA, and we were the          risk allocations through the process.
                                                                                                     PROJECT MANAGEMENT   fully-integrated turnkey service          We collaborated closely with the
                                                                                                     BUILDING SURVEYING   provider of the EMEA HQ. Our work         Henry J. Lyons Team and the wider
                                                                                                                          commenced at the very start, from         team to ensure that the project’s
                                                                                                                          site search, technical due diligence      capital expenditures were stringently
                                                                                                                          and site acquisition; to designing,       managed from inception to
                                                                                                                          costing, procuring, and managing          completion, ensuring at all times that
                                                                                                                          works on site. Impeccable planning,       the client and the team had timely
                                                                                                                          communication, and collaborative          and accurate cost intelligence to
                                                                                                                          technologies were key to delivering       facilitate confident decision making.
                                                                                                                          this project on time and on budget.
     NUI, Galway               Glucksman Library, University of Limerick   Central Bank of Ireland

18                                                                                                                                                                                                           19
WATER ENGINEERING                                                                                                                           KEY DEGREES                  DEGREE                        SPONSORSHIP
                                                                                                                                             WE LOOK FOR                  CLASSIFICATION                TOWARDS
                                                                                                                                             Civil/Structural             2:2 or above                  ICE
                                                                                                                                             Mechanical                                                 IStructE
                                                                                                                                             Electrical                                                 IMechE
                                                                                                                                                                                                        IET

      AMAZING IS INSPIRING
                                                                                                                                           Example projects
                                                                                                                                           Untreated Agglomeration                  prioritisation, project management
                                                                                                                                           Studies, Wexford                         delivery and site supervision for

      THE NEXT GENERATION                                                                                                                  Untreated sewage from the
                                                                                                                                           equivalent of 120,000 people across
                                                                                                                                           44 areas enters Ireland’s coastal
                                                                                                                                                                                    hundreds of kilometres of sewerage
                                                                                                                                                                                    network assets. By proactively
                                                                                                                                                                                    increasing infrastructure lifespans,

      OF CIVIL ENGINEERS.                                                                                                                  waters and rivers each day. We are
                                                                                                                                           working with Irish Water to provide
                                                                                                                                           first-time sewage treatment for four
                                                                                                                                           of these areas in County Wexford.
                                                                                                                                                                                    the team strives to be good
                                                                                                                                                                                    stewards of Ireland’s infrastructure
                                                                                                                                                                                    asset legacy.

                                                                                                                                                                                    Stillorgan Reservoir
      NIAMH                                                                                                                                The scheme will involve constructing
                                                                                                                                           new sewage pumping stations,             Upgrade Project
      GRADUATE CIVIL ENGINEER, BELFAST                                                                                                     pipelines and treatment works for
                                                                                                                                           these coastal communities and
                                                                                                                                                                                    After almost 150 years serving the
                                                                                                                                                                                    community, the Stillorgan Reservoir
                                                                                                                                           will result in cleaner bathing and       will be modernised to adequately
                                                                                                                                           fishing waters.                          meet current requirements and the
                                                                                                                                                                                    needs of future generations .This is
                                                                                                                                           National Sewers                          a priority project for Irish Water and
                                                                                                                                           Asset Management                         necessary to ensure a secure and
                                                                                                                        OUR SERVICES       Irish Water and Northern Ireland         sustainable supply of water to over
                                                                                                                        WASTEWATER         Water must deliver safe and              200,000 people in south Dublin.
                                                                                                                        WATER RESOURCES    sustainable infrastructure for public    Our team is delivering full design
                                                                                                                        FLOOD PREVENTION   good while balancing cost, risk and      services on this major resilience
                                                                                                                        DAM STRUCTURES     performance. Our team has applied        project in Ireland.
                                                                                                                        HYDROLOGY          asset management best practice for
                                                                                                                        ASSET MANAGEMENT   Irish Water to prioritise and deliver
                                                                                                                                           rehabilitation solutions for sewerage
                                                                                                                                           assets. We bring asset planning,

     Belfast Wastewater Treatment Works   Ballymore Eustace Water Treatment Plant   Swords Wastewater Treatment Works

20                                                                                                                                                                                                                           21
LANDSCAPE ARCHITECTURE AND ARCHITECTURE                                                                                KEY DEGREES                   DEGREE                        SPONSORSHIP
                                                                                                                        WE LOOK FOR                   CLASSIFICATION                TOWARDS
                                                                                                                        Architecture (Part 1&2)       2:1 or above                  RIBA (& ARB)
                                                                                                                        Landscape Architecture                                      MCSD
                                                                                                                                                                                    BIID
                                                                                                                                                                                    LI

      AMAZING IS PRESENTING
      MY OWN RESEARCH PAPER
                                                                                                                      Example projects
                                                                                                                      Portrush Public Realm                     Strangford Integrated College
                                                                                                                      Portrush Public Realm aims to             This multi-disciplinary project is a

      AT AN INTERNATIONAL                                                                                             provide a safe, accessible, attractive
                                                                                                                      and well-connected place for local
                                                                                                                      people and visitors to enjoy, with
                                                                                                                                                                new build of over 10,500m2 which
                                                                                                                                                                will be constructed on the existing
                                                                                                                                                                live school site. This involves careful

      CONFERENCE IN BELGIUM.                                                                                          increased economic benefit for
                                                                                                                      local businesses. It is part of a wider
                                                                                                                      revitalisation project which has
                                                                                                                      transformed the town from an out-of-
                                                                                                                                                                consideration of phasing, decanting
                                                                                                                                                                and temporary accommodation
                                                                                                                                                                to provide clear delineation
                                                                                                                                                                between the construction works

      LIBBY                                                                                                           date, unattractive and inaccessible
                                                                                                                      place. The scheme extends over
                                                                                                                                                                and the functioning school. The
                                                                                                                                                                project, currently at RIBA stage 3,
      GRADUATE LANDSCAPE ARCHITECT, BELFAST                                                                           eight streets comprised of new
                                                                                                                      lighting, paving, art features and
                                                                                                                                                                is a design and build project with
                                                                                                                                                                AECOM preparing the Employers
                                                                                                                      bespoke street furniture sympathetic      requirements and providing the
                                                                                                                      with the outstanding natural              technical advisor role during the
                                                                                                                      environment around it.                    construction of the building on site.

                                                                                                                      The Royal Belfast Hospital                Dundonald International
                                                                                             OUR SERVICES             for Sick Children                         Ice Bowl, Belfast
                                                                                             ARCHITECTURE PART 1&2    A £200m state-of-the-art children’s       We have been appointed as the
                                                                                             LANDSCAPE ARCHITECTURE   hospital which will act as a regional     design team for the replacement
                                                                                                                      healthcare facility for children and      of this family entertainment centre.
                                                                                                                      young people throughout the whole         The new complex will include an
                                                                                                                      of Northern Ireland. The building         Olympic-sized ice rink, ten-pin
                                                                                                                      has been designed to provide a            bowling, gymnasium and adventure
                                                                                                                      dedicated paediatric Emergency            play areas, grouped around a
                                                                                                                      Department and Theatres along with        dynamic central hub containing a
                                                                                                                      Outpatient, Imaging Suite and Wards.      café and exhibition space. The new
                                                                                                                      The concept for the building focuses      building will measure 13,000m2 and
                                                                                                                      on the child’s journey and has been       is currently at RIBA Stage 3.
     Royal Victoria            Portrush Public Realm, Northern Ireland   Dundonald Icebowl                            designed with this in mind at each
                                                                                                                      stage, from architecture through to
22                                                                                                                    the interior design fit-out.                                                        23
DESIGN AND PLANNING                                                                                                       KEY DEGREES                   DEGREE                       SPONSORSHIP
                                                                                                                           WE LOOK FOR                   CLASSIFICATION               TOWARDS
                                                                                                                           Town Planning                 2:1 or above                 RTPI
                                                                                                                           Urban Design                  MSc preferred                IPI
                                                                                                                           Urban Planning
                                                                                                                           Landscape Architecture
                                                                                                                           & Architecture

      AMAZING IS HAVING THE
      FREEDOM TO BALANCE
                                                                                                                         Example projects
                                                                                                                         Portrush Public Realm                     Gasworks Northern
                                                                                                                         Portrush Public Realm aims to             Fringe Masterplan

      MY WORK, HOLIDAYS                                                                                                  provide a safe, accessible, attractive
                                                                                                                         and well-connected place for local
                                                                                                                         people and visitors to enjoy, with
                                                                                                                                                                   We have been working with Belfast
                                                                                                                                                                   City Council and Consarc Design
                                                                                                                                                                   Group to develop a mixed-use

      AND SOCIAL ACTIVITIES.                                                                                             increased economic benefit for
                                                                                                                         local businesses. It is part of a wider
                                                                                                                         revitalisation project which has
                                                                                                                         transformed the town from an out-of-
                                                                                                                                                                   masterplan to regenerate the largest
                                                                                                                                                                   brownfield city centre site within the
                                                                                                                                                                   Council’s ownership. We facilitated
                                                                                                                                                                   a robust community consultation

      ROISIN                                                                                                             date, unattractive and inaccessible
                                                                                                                         place. The scheme extends over
                                                                                                                                                                   and stakeholder engagement
                                                                                                                                                                   process over a period of six months,
      GRADUATE TOWN PLANNER, BELFAST                                                                                     eight streets comprised of new
                                                                                                                         lighting, paving, art features and
                                                                                                                                                                   to ensure that the interests of local
                                                                                                                                                                   residents, neighbouring commercial
                                                                                                                         bespoke street furniture sympathetic      businesses and the interests of
                                                                                                                         with the outstanding natural              the city were considered during
                                                                                                                         environment around it.                    the process. We are now working
                                                                                                                                                                   towards submission of an outline
                                                                                                                         SIB Planning Framework
                                                                                              OUR SERVICES               Since 2016, we have been the sole
                                                                                                                                                                   planning application for consent
                                                                                                                                                                   for the principle of uses identified
                                                                                              TOWN PLANNING              provider, offering planning advice to     in the masterplan. The planning
                                                                                              URBAN DESIGN               the Strategic Investment Board on         application is a demonstration of
                                                                                              URBAN PLANNING             various government-owned sites            the multi-disciplinary approach
                                                                                              LANDSCAPE ARCHITECTURE +   in Northern Ireland. Commissions          that we can offer in house. We are
                                                                                              ARCHITECTURE               have included detailed feasibility and    currently working with colleagues
                                                                                                                         option appraisals for a wide variety      from transportation, environment,
                                                                                                                         of sites, formulation of planning         civil engineering, ecology and
                                                                                                                         strategies and guidance on their          archaeology to deliver the technical
                                                                                                                         execution, discussions with local         expertise to support this important
                                                                                                                         authorities and relevant stakeholders     scheme for the city.
                                                                                                                         including as part of pre planning
     Belfast Streets Ahead    Dundonald International Ice Bowl, Belfast   Horgan Quay, Cork                              application discussions.

24                                                                                                                                                                                                          25
POWER AND ENERGY                                                                                          KEY DEGREES                  DEGREE                       SPONSORSHIP
                                                                                                           WE LOOK FOR                  CLASSIFICATION               TOWARDS
                                                                                                           Electrical                   2:2 or above                 IET
                                                                                                           Power related degrees

      AMAZING IS PROVIDING
      SOLUTIONS TO REAL PROJECTS
                                                                                                         Example projects
                                                                                                         Facebook datacentre                      EIRGRID
                                                                                                         We completed the planning                We are on a framework contract

      THAT WILL HAVE A REAL                                                                              application to ABP for the first
                                                                                                         contestably-built 220kV substation in
                                                                                                         Ireland. This required system studies
                                                                                                                                                  with EIRGRID for the client engineer
                                                                                                                                                  services for the construction of high
                                                                                                                                                  voltage transmission infrastructure

      IMPACT ON THE WORLD TODAY.                                                                         and preliminary electrical design. We
                                                                                                         then acted as owner’s engineer for
                                                                                                         the 18-month construction phase
                                                                                                         for the 220kV substation. We have
                                                                                                                                                  in Ireland.

                                                                                                                                                  Castlebaggot 220kV substation
                                                                                                                                                  After completing a successful
                                                                                                                                                  planning application for EIRGRID, we
      CILLIAN                                                                                            completed the second planning
                                                                                                         application for another 220kV            were contracted by ABB to complete
      ELECTRICAL ENGINEER, DUBLIN                                                                        substation at the same site. This
                                                                                                         substation will start construction
                                                                                                                                                  several detailed design elements for
                                                                                                                                                  this project including the Earthing
                                                                                                         in summer 2019, for which we have        study, Busbar forces calculations, HV
                                                                                                         completed the detailed electrical        cable ampacity calculations, and HV
                                                                                                         design for the 220kV cable.              cable installation drawings.

                                                                                                         Daa
                                                                           OUR SERVICES                  We are completing an analysis
                                                                           TRANSMISSION + DISTRIBUTION   of the HV distribution for daa in
                                                                                                         Dublin airport. This project involved
                                                                                                         surveying the many substations and
                                                                                                         modelling load flows, and analysing
                                                                                                         contingency. The deliverable for this
                                                                                                         project is a framework to logically
                                                                                                         develop the HV network in Dublin
                                                                                                         airport for the next 30 years.

     daa-MV Feasibility Study   EirGrid substation   Facebook Datacentre

26                                                                                                                                                                                        27
WORK PLACEMENTS

                                                                                                          AND                                      NORTHE
                                                                                                      E L                                                   RN
                                                                                                   IR
      GET AHEAD                                                                                                                                                        HOW TO APPLY
                                               Each year we offer around 50 summer

                                                                                            RN

                                                                                                                                                             IRE
                                               and industrial placement opportunities                      SUMMER

                                                                                          NORTHE
                                               across Ireland. Our summer placements                     PLACEMENTS                            INDUSTRIAL              Applications open from October

                                                                                                                                                                 L
                                                                                                                                                                 AND
                                               tend to be 6-12 weeks and our industrial                                                       PLACEMENTS               onwards. You can search for ‘placement’
                                                                                                   SALARY PRO-RATA
      WITH WORK
                                               placements 6-12 months. This will give                                                                                  opportunities at aecom.com/amazing
                                                                                                                                              SALARY
                                               you the opportunity to develop your
                                               technical and industry knowledge, and
                                               to experience the AECOM culture. It
                                                                                                    £15-17K                                   £17K
                                                                                                                                                                       where you can apply to any roles of
                                                                                                                                                                       interest by submitting your CV and
                                                                                                                                                                       Cover Letter if you have one. If you can’t

      EXPERIENCE
                                               also gives you the opportunity to
                                                                                                     DEPENDING ON YEAR
                                                                                                                                                                       find any roles of interest you can enquire
                                               demonstrate your skills and attributes,
                                                                                                         OF STUDY
                                                                                                                                                                       about potential opportunities at:
                                               which may lead to a permanent                                                                                           grad_recruit.europe@aecom.com
                                               graduate opportunity upon graduation.
                                                                                                                          BL IC OF IREL AN
                                                                                                                      EP U                D                            Business lines

                                                                                                                R
                                                                                                                                                                       Transportation
                                                                                                                                                                       Engineering + Planning
                                                                                                                      SALARY PRO-RATA                                  Environmental Consulting
                                                                                                                                                                       Building Engineering

                                                                                                                           €21K                                        Water Engineering
                                                                                                                                                                       Surveying + Project Management
                                                                                                                                                                       Design, Planning
                                                                                                                                                                       Landscape Architecture + Architecture

                                                                                                                                                                         QUICK FACT
                                                                                                                                                                         Our apprentices and graduates
                                                                                                                                                                         are regularly recognised in
                                                                                                                                                                         national awards, including
                                                                                                                                                                         Charlotte Jones who won
                                                                                                                                                                         Apprentice of the Year and
                                                                                                                                                                         Diamond Award at
                                                                                                                                                                         the 2018 Consultancy and
                                                                                                                                                                         Engineering Awards.

     Portrush Public Realm, Northern Ireland
28                                                                                                                                                                                                                  29
Glucksman Library, University of Limerick

     HOW TO APPLY
                                                                                                                                                                  Equal opportunities
                                                                                                                          When completing the Situational
                                                                                                                                                                  We are an equal opportunities
                                                                                           USEFUL TIPS                    Judgement Test, answer the
                                                                                                                          questions honestly, don’t try to
                                                                                                                                                                  employer, committed to creating
                                                                                                                                                                  a work environment that values
                                                                                     You can only submit one              second guess what you think
                                                                                                                                                                  diversity and positively encourages
                                                                                     application form, but you can        we want to hear.

     1                                         2
                                                                                                                                                                  applications from suitably qualified
          ONLINE                                    SITUATIONAL                      select and be considered for up to
                                                                                     three practice areas.
                                                                                                                          Please consult the various job          and eligible candidates from all
          REGISTRATION                              JUDGEMENT TEST                                                        descriptions attached to the job
                                                                                                                          number on page 30 before starting
                                                                                                                                                                  walks of life. All applications will
                                                                                                                                                                  be considered on merit alone.
                                                                                     In preparation for the final stage   your application as these will
     There is a short online registration to   Our online, engaging and
                                                                                     assessment, make sure you can        indicate which practice areas
     enter your details and to                 interactive assessment, bespoke
                                                                                     demonstrate your knowledge of
     demonstrate your suitability for the      to AECOM and designed with our
                                                                                     AECOM; your knowledge and
                                                                                                                          you can apply to, based on
                                                                                                                          your degree.
                                                                                                                                                                  ANY QUESTIONS?
     practice area(s) you select.              graduates, helps us assess how                                                                                     Please email us at:
                                                                                     expertise relevant to the team you
                                               you would react in scenarios likely   are applying to; and your passion    If you are totally flexible on office   grad_recruit.europe@aecom.com
     Apply at www.aecom.com/amazing            to happen at AECOM. Just as           and enthusiasm. Come prepared        location, please select the ‘totally
     and search for reference 217367.          importantly it helps you decide                                            flexible’ option.
                                                                                     with some insightful questions.
     There is no application deadline so       whether AECOM is right for you.
     please apply as soon as possible.

     3    FINAL STAGE
          ASSESSMENT
     If successfully shortlisted for
     final stage, you will be invited for
     a technical assessment or full
     assessment day with the team
     you are being considered for.

30                                                                                                                                                                                                            31
About AECOM
     AECOM is built to deliver a better world. We design, build,
                                                                     OUR UK AND
     finance and operate critical infrastructure assets for
     governments, businesses and organizations. As a fully
                                                                     IRELAND OFFICES
     integrated firm, we connect knowledge and experience
                                                                     Belfast       Cambridge      Newcastle
     across our global network of experts to help clients solve      Dublin        Cardiff        Norwich
     their most complex challenges. From high-performance            Cork          Chelmsford     Nottingham
     buildings and infrastructure, to resilient communities and      Galway        Chesterfield   Oxford
     environments, to stable and secure nations, our work is         Londonderry   Croydon        Peterborough
                                                                                   Edinburgh      Plymouth
     transformative, differentiated and vital. A Fortune 500 firm,   Altrincham    Exeter         St Albans
     AECOM had revenue of approximately $20.2 billion during         Ashford       Glasgow        Southampton
     fiscal year 2018. See how we deliver what others can only       Basingstoke   Leeds          Swindon
                                                                     Bedford       Liverpool      Telford
     imagine at aecom.com and @AECOM.
                                                                     Birmingham    London         Warrington
                                                                     Bristol       Manchester     York

     facebook.com/AecomTechnologyCorporation
     instagram.com/aecom
     linkedin.com/company/aecom
     pinterest.com/aecomtechnology
     twitter.com/AECOM
     youtube.com/user/AECOMTechnologyCorp

     aecom.com/amazing
32
You can also read