ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021

Page created by Alfred Hubbard
 
CONTINUE READING
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
ENERGOPROJEKT                           JANUARY - JUNE 2021

                           Y E A R S O F E XC E L L E N C E

 AN EXPERIENCE THAT SETS THE FUTURE IN MOTION!
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
A YEAR OF A
    SIGNIFICANT JUBILEE
          The year of a significant jubilee, 70 years of
    successful business operations of Energoprojekt,
                                                                     Contents
                                                               Contents
                                                               A YEAR OF A SIGNIFICANT JUBILEE .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 2
    began with the execution of two new contracts for          THE REPORT FROM THE 53rd REGULAR SESSION OF ENERGOPROJEKT HOLDING PLC .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4
    deals in Uganda worth about EUR 90 million. We             ENERGOPROJEKT HOLDING PLC ANNUAL REPORT AND ENERGOPROJEKT HOLDING PLC
    have signed the contract with the Uganda National          ANNUAL CONSOLIDATED REPORT FOR 2020 ADOPTED .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4
    Roads Authority to carry out the overhaul of the           THE DECISION ON DISTRIBUTION OF RETAINED EARNINGS  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
    86 km long Mityana-Mubende road.                           THE INFORMATION REGARDING THE IMPLEMENTATION OF THE DECISION PASSED ON JULY 23, 2020, AT THE 52nd ENERGOPROJEKT
          In the field of power and water resources            HOLDING PLC GENERAL ASSEMBLY ON ISSUING ENERGOPROJEKT HOLDING PLC CORPORATE BONDS THROUGH A PUBLIC OFFERING .  .  .  . 5
    engineering, Hidroinženjering has continued                INFORMATION ON VOTING IN ABSENTIA .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 6
    the trend of successful contracting in Serbia, as          PERIODIC REPORT ON BUSINESS OPERATIONS OF THE ENERGOPROJEKT GROUP FOR THE PERIOD JANUARY-MARCH 2021 ADOPTED  .  .  .  .  . 7
    well as in Montenegro, the Republic of Srpska,             THE STATUS CHANGE OF ABSORPTION-TYPE MERGER OF EP ENERGODATA AD BELGRADE TO EP HOLDING AD BELGRADE .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
    and Algeria. Simultaneously with the contracting           THE CHANGES IN MANAGEMENT .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
    activity, Hidroinženjering successfully implements         TWO NEW PROJECTS WORTH EUR 90 MILLION CONTRACTED  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 8
    numerous already contracted projects, such as              THE PROVISION OF CONSULTING SERVICES ON THE CAPITAL PROJECT OF GEOLOGICAL STORAGE OF DRINKING WATER CONTRACTED .  .  .  . 8
    irrigation and water supply systems, environmen-           THE MOST IMPORTANT DEALS CONCLUDED IN THE FIRST HALF OF 2021 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 9
    tal protection projects, rebuilding, rehabilitation        TWO NEW CONTRACTS FOR THE TECHNICAL CONTROL OVER THE PROJECTS INVOLVING HEALTHCARE FACILITIES IN BELGRADE  .  .  .  .  .  .  .  .  . 9
    of hydroelectric power plants, etc. In Abu Dhabi,          COOPERATION OF EP URBANIZAM I ARHITEKTURA AND EP HIDROINŽENJERING ON THE PROJECT
    Entel participates in the project of the largest solar     DEVELOPMENT OF THE NATIONAL ACADEMY FOR THE TRAINING OF SHIP CREW MEMBERS IN BELGRADE .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 10
    power plant in the world, in Serbia, it continued          TWO NEW FACTORIES WITH APPURTENANT FACILITIES .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 10
    to provide the services of FIDIC engineers on the          PREPARATION OF TECHNICAL DOCUMENTATION AND CONSULTANCY SERVICES
    project for the construction of TPP Kostolac B3            FOR THE AIRPORT TRAFFIC CONTROL TOWER NIŠ – AERODROMI SRBIJE D.O.O. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 11
    and completed the design documentation for the             RECONSTRUCTION AND CONSTRUCTION OF INTERNAL TRAFFIC INFRASTRUCTURE WITHIN THE AIRPORT COMPLEX KONSTANTIN VELIKI IN NIŠ . . .11
    construction of two new wind farms Alibunar 1 and          CONTRACT ON PROVISION OF CONSULTING SERVICES ON THE CONTINUATION OF CONSTRUCTION OF KOLUBARA B NEAR COMPLETION  .  . 14
    2. Industrija has signed the contracts concerning          PARTICIPATION IN THE PROJECT OF OPTIMIZATION OF ENGAGEMENT OF EPS PRODUCTIVE CAPACITIES .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 15
    two new jobs within the airport in Niš, carries out        70 YEARS LONG TRADITION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 16
    the projects within the Nikola Tesla airport complex       70TH ANNIVERSARY OF ENERGOPROJEKT MARKED WITH A CEREMONIAL SESSION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 18
    in Belgrade and oversees the construction of a steel       70 YEARS OF ARCHITECTURE AND URBAN PLANNING IN ENERGOPROJEKT .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 19
    factory in Smederevo. Visokogradnja has success-           DESIGN AND CONSULTING IN THE FIELD OF HYDROELECTRIC POWER AND WATER MANAGEMENT
    fully completed the construction of the Chinese            -THE MOST SIGNIFICANT ACHIEVEMENTS OF HIDROINŽENJERING  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 21
    Cultural Centre and the Navigator 2 business facility      THE MOST SIGNIFICANT ACHIEVEMENTS OF DESIGN AND CONSULTING ACTIVITY IN THE FIELD OF INDUSTRIAL PRODUCTION .  .  .  .  .  .  .  .  .  .  . 23
    in Serbia, and the construction of the Delta business      THE ACHIEVEMENTS OF ENTEL IN THE 70 YEAR LONG HISTORY OF ENERGOPROJEKT  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 26
    building in Belgrade, and the sports stadium in            IRRIGATION PROJECT CHIRA–PIURA, PERU .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 28
    Russia are in the final phase. The construction of         THE MOST SIGNIFICANT PROJECTS OF VISOKOGRADNJA IN SEVEN DECADES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29
    the building of the new Flight Control Centre with a       ENTEL SUCCESSFULLY COMPLETED THE PROVISION OF SERVICES ON THE WIND POWER PLANTS
    tower is successfully progressing at the Nikola Tesla      ALIBUNAR 1 AND ALIBUNAR 2 CONSTRUCTION PROJECT .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 30
    Airport. The works also take place on the landfill in      ENGAGEMENT OF ENTEL’S EXPERTS ON THE CONSTRUCTION PROJECT OF THE COMBINED-CYCLE
                                                               PLANT FOR THE PRODUCTION OF ELECTRICITY AND DRINKING WATER  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 30
    Vinča and the project of a technical and passenger         ENTEL INVOLVED IN THE REALIZATION OF THE CONSTRUCTION PROJECT
    station in Zemun.                                          FOR THE LARGEST SOLAR POWER PLANT IN THE WORLD IN ABU DHABI .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 31
          On June 21, 2021, the 53rd regular session           ENTEL SUCCESSFULLY COMPLETED A SIGNIFICANT PROJECT IN DUBAI .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 32
    of EP Holding took place, where the company                ENTEL SUCCESSFULLY COMPLETED THE IBRI SOLAR PROJECT IN OMAN .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 33
    adopted the annual reports of EP Holding Plc and           EXTENSION OF ENERGO PET D.O.O STORAGE FACILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
    the consolidated annual report of Energoprojekt            SMATSA - PREPARATION OF TECHNICAL DOCUMENTATION FOR THE CONSTRUCTION OF INFRASTRUCTURE
    Holding Plc for 2020 during the meeting. The total         FOR THE NEEDS OF NEW SYSTEMS IN THE AIRPORT TRAFFIC CONTROL TOWER IN BELGRADE .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 35
    consolidated revenue of the Energoprojekt Group            SMATSA – ENGINEERING SUPERVISION OVER THE EXECUTION OF WORKS ON THE CONSTRUCTION OF THE AIR TRAFFIC CONTROL
    (in the country and abroad) in 2020 amounted               CENTRE BUILDING BELGRADE AND CONSTRUCTION OF THE ANNEXE OF ATCC AND ATC TOWER AT THE SURČIN AIRPORT .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 35
    to RSD 28,367,971. 000 (approximately EUR 241.3            THE RECONSTRUCTION WORKS ON THE REPUBLIC STADIUM IN SYKTYVKAR IN THE FINAL PHASE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 36
    million).                                                  EXECUTION OF WORKS ON THE NEW DELTA HOLDING BUSINESS BUILDING IN THE FINAL PHASE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 36
          On July 11, 2021, Energoprojekt complet-             THE WORKS RELATED TO THE TECHNICAL AND PASSENGER RAILWAY STATION ZEMUN .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 37
    ed 70 years of successful business operations.             PREPARATION OF THE TECHNICAL DOCUMENTATION FOR THE RECONSTRUCTION, ALTERATION, RENOVATION
    Energoprojekt marked this exceptional jubilee              AND CONSTRUCTION OF THE GENERAL HOSPITAL IN KRUŠEVAC  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 37
    with a ceremonial session in its business building         TECHNICAL MONITORING OF THE FACILITIES WITHIN THE SYSTEM OF DRINSKO-LIMSKE HPP .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 38
    and a media campaign.                                      PREPARATION OF THE INVESTMENT TECHNICAL DOCUMENTATION FOR THE RECONSTRUCTION OF HPP ĐERDAP 2 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 39
          Following the modern trends and digitalization       FORMING THE GREEN RINGS WITHIN THE FACILITIES OF ELEKTROPRIVREDA SRBIJE (PE ELECTRIC POWER INDUSTRY OF SERBIA) .  .  .  .  .  .  .  .  .  . 40
    processes, starting from January 2021, we publish          NEGOTIN LOWLAND IRRIGATION SYSTEM - A BIG STEP IN THE DEVELOPMENT OF IRRIGATION IN SERBIA .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 41
    Energoprojekt Newspaper exclusively in a digital           PROFESSIONAL SUPERVISION OVER THE EXECUTION OF WORKS RELATED TO RHPP BAJINA BAŠTA REBUILDING AND ADAPTATION  .  .  .  .  .  . 42
    form twice a year. To remind the readers, the pub-         CONSTRUCTION OF WASTEWATER TREATMENT PLANT FOR PRESERVATION OF THE DRINA AND LIM RIVERS  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 43
    lication of Energoprojekt Newspaper began in July          THE RETURN TO THE MONTENEGRIN COAST- WATER RESOURCE MANAGEMENT PLAN FOR THE REGIONAL WATER SUPPLY .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 44
    1963, and in digital form in 2010. You can download        THE APPLICATION OF GIS IN DESIGN .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 46
    the Energoprojekt Newspaper from the following             TESLA AWARD PRESENTED TO YOUNG ENGINEER DUŠAN BOJOVIĆ  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 47
    link: http://www.energoprojekt.rs/ep-list.                 TOWARDS A GREEN RECOVERY .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 47
                                                               THE PROTECTION OF THE CITY OF PARAĆIN FROM THE RIVER CRNICA FLOOD FLOW .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 48
                                                               THE COOPERATION WITH BINA (BELGRADE INTERNATIONAL ARCHITECTURE WEEK)  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 48
                                                               SPATIO UNIVERSALIS-ENERGOPROJEKT BUSINESS BUILDING .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 49
                                                               THE NEW PROMOTIONAL VIDEO MATERIAL OF ENERGOPROJEKT  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 51
                                                               MONOGRAPH 70 YEARS OF ENERGOPROJEKT .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 51
                                                               ENTEL ORGANIZED THE MANIFESTATION ENTEL BUSINESS RUN 2021  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 52
                                                               FROM INTERNSHIP IN BELGRADE TO JOB IN OMAN .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 53

                            Y E A R S O F E XC E L L E N C E                                                            The Information Board
                                                                Marijana Vasić, Irena Žunić, Nikola Pavlović, Radoje Jovanić (representative of the Unified Association of Trade Unions)
                                                                                                                               Editorial Staff
                                                                                                                  Editor in Chief: Dragan Aleksić MSci
                                                                                                               Deputy Chief Editor: Borjana Vićentijević
                                               year LVIII                                                             Contributors to this Issue:
                                                                     Dra­gan Ale­skić MSci, Mari­ja­na Vasić, Sne­ža­na Laki­će­vić, dr. Sanja Petro­vić Beći­ro­vić, Dr Mio­drag Mesa­ro­vić,
In accordance with modern trends and digitali-                      Ire­na Žunić, Alek­san­dra Milj­ko­vić, Iva­na Vuko­tić, Velj­ko Mijić, Mile­ta Bojo­vić, Slo­bo­dan Vulo­vić, Dušan Krstić,
zation, starting from January 2021 Energoprojekt
                                                                Miloš Ive­tić, Dr Vla­di­mir Beli­će­vić, Isi­do­ra Petru­šić, Dušan Bojo­vić, Alek­san­dar Osto­jić, Niko­la Pavlo­vić, Mila­na Sta­par,
(newspaper) will be published twice a year as
online edition.                                                                                                  Alek­san­dar Sta­no­vić, Dejan Jova­no­vić
To remind readers, Energoprojekt (newspaper)                                                                Translation: ­Marijana Maksimović Berković
has been published since July 1963 and from                                                 Photo: Vladimir Jablanov, Vitomir Rakočević, Energoprojekt archives
2010 it became available in digital format as well.                                                    Design and Prepress: Energoprojekt Industrija Plc
Energoprojekt (newspaper) can be downloaded                                                                                Published biannually
via link below:                                                                                        Newsroom phone number: +381 (0)11310-1020
http://www.energoprojekt.rs/ep-list/?lang=en
                                                                                                                Publisher: Energoprojekt Holding Plc

2      |    ENERGOPROJEKT                    January-June 2021
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
Contents highlights

                                                                                         04
THE REPORT FROM THE 53rd REGULAR SESSION OF
ENERGOPROJEKT HOLDING PLC
On June 21, 2021, the 53rd regular session of the Energoprojekt Holding Plc Assembly took
place in the cinema hall of the Energoprojekt business building.

                                                  04
                                                  ENERGOPROJEKT HOLDING PLC ANNUAL REPORT AND ENERGOPROJEKT
                                                  HOLDING PLC ANNUAL CONSOLIDATED REPORT FOR 2020 ADOPTED
                                                  In 2020, the Energoprojekt Group realized total consolidated revenue (in the country and
                                                  abroad) of RSD 28,367,971.000 (approx. EUR 241,3 million).

                                                                                                      08
TWO NEW PROJECTS WORTH 90 MILLION CONTRACTED
At the beginning of 2021, Energoprojekt Niskogradnja completed a very important acquisition process.
The Company contracted two deals worth a total of almost EUR 90 million in Uganda.

                                                  16
                                                  70 YEARS OF TRADITION
                                                  Investing constantly and dedicatedly in knowledge, responsibly and professionally implementing
                                                  complex projects in the country and the world, Energoprojekt has built a position as a successful,
                                                  quality, and reliable partner to investors in the country and worldwide.

                                                                                                      31
ENTEL PARTICIPATES IN THE REALIZATION OF THE CONSTRUCTION PROJECT
OF THE LARGEST SOLAR POWER PLANT IN THE WORLD IN ABU DHABI
The projects of this type, in terms of organization, technical characteristics and strategic importance, was
entrusted to Entel's company in Abu Dhabi for the first time.

                                                  36
                                                  THE RECONSTRUCTION WORKS ON THE REPUBLIC STADIUM
                                                  IN SYKTYVKAR IN THE FINAL PHASE
                                                  The works related to the reconstruction of the republic stadium in Syktyvkar, Komi Republic,
                                                  under the contract signed in December 2019, are nearing completion.

                                                                                                      51
THE NEW PROMOTIONAL VIDEO MATERIAL OF ENERGOPROJEKT
In the first half of the year, according to the plan of activities of the Marketing, Corporate Communications
and IMS Department of EP Holding, the Company completed the project of making new marketing video
presentations of Energoprojekt.

                                                                                         January-June 2021          ENERGOPROJEKT              |   3
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
Energoprojekt news                                    news
HOLDING PLC, the 53rd regular session of the General Assembly
THE REPORT FROM THE 53rd REGULAR SESSION OF
ENERGOPROJEKT HOLDING PLC
    O     n June 21, 2021, the 53rd regular ses-
          sion of Energoprojekt Holding Plc
          Assembly took place in the cinema
                                                   4. DECISION ON DISTRIBUTION OF RETAINED
                                                      EARNINGS
                                                   5. DECISION       ON     ADOPTION           OF
                                                                                                     9. DECISION ON REMUNERATION FOR WORK
                                                                                                         CONDUCTED BY ENERGOPROJEKT HOLDING
                                                                                                         PLC SUPERVISORY BOARD MEMBERS
hall of the Energoprojekt business building.          ENERGOPROJEKT          HOLDING          PLC    10. DECISION ON PREVIOUS APPROVAL FOR
The Chairman of the Assembly was Bogdan               SUPERVISORY BOARD’S REPORT                         CONCLUSION OF THE CONTRACT ON
Uzelac, secretary Snežana Lakićević.               6. DECISION ON APPOINTMENT OF AUDITOR                 REMUNERATION FOR WORK CONDUCTED
    Following the defined agenda, the mem-            AND APPROVAL OF THE AUDITOR’S                      BY ENERGOPROJEKT HOLDING PLC
bers of the General Assembly passed the fol-          SERVICE FEE (RSM SERBIA d.o.o. Belgrade            SUPERVISORY BOARD MEMBERS
lowing decisions during the session:                  was selected to perform the audit of the       11. THE INFORMATION REGARDING THE
1. THE DECISION ON APPOINTMENT OF                     individual and consolidated financial              REALIZATION OF THE DECISION PASSED ON
    CHAIRMAN OF ENERGOPROJEKT HOLDING                 reports of Energoprojekt Holding Plc for           JULY 23, 2020, AT THE 52ND ENERGOPROJEKT
    PLC ASSEMBLY                                      2021).                                             HOLDING PLC GENERAL ASSEMBLY ON
2. THE DECISION ON ADOPTION OF THE                 7. DECISION       ON      DISENGAGEMENT               ISSUING ENERGOPROJEKT HOLDING PLC
    ANNUAL REPORT OF ENERGOPROJEKT                    OF ENERGOPROJEKT HOLDING PLC                       CORPORATE BONDS THROUGH A PUBLIC
    HOLDING PLC FOR 2020 (Energoprojekt               SUPERVISORY BOARD MEMBERS                          OFFERING
    Holding Plc Regular Annual Financial Report    8. DECISION ON APPOINTMENT OF                         The Minutes from the 53rd regular
    of for 2020; Auditor’s Report for 2020, and       ENERGOPROJEKT          HOLDING          PLC    session of Energoprojekt Holding Plc
    Annual Business Report)                           SUPERVISORY        BOARD       MEMBERS         Assembly, as well as the adopted Decisions
3. DECISION ON ADOPTION OF THE                        (Dobroslav Bojović, Dragan Ugrčić,           and voting results on all items of the
    ANNUAL CONSOLIDATED REPORT OF                     Miodrag Zečević, Aleksandar Šćekić, Nada    agenda deliberated by the shareholders,
    ENERGOPROJEKT HOLDING PLC FOR 2020                Bojović were appointed the members of         are available to the shareholders on the
    (Energoprojekt Holding Plc Consolidated           the Supervisory Board were appointed the       Company website www.enerqoprojekt.
    Annual Financial Report for 2020; Auditor’s       members of the Energoprojekt Holding Plc       rs (Section “Investors”, submenu “General
    Report for 2020, and Annual Business Report)      Supervisory Board)                             Assembly”).

HOLDING PLC, the 53rd regular session of the General Assembly
ENERGOPROJEKT HOLDING PLC ANNUAL REPORT AND
ENERGOPROJEKT HOLDING PLC ANNUAL CONSOLIDATED
REPORT FOR 2020 ADOPTED
    A    t the 53rd regular session of the
         General Assembly of Energoprojekt
         Holding Plc held on June 21, 2021,
                                                       (Energoprojekt Holding Plc Consolidated
                                                       Annual Financial Report for 2020; Auditor’s
                                                       Report for 2020, and Annual Business
                                                                                                          Energoprojekt Holding Plc (the parent
                                                                                                     company) in 2020 achieved the total rev-
                                                                                                     enue of RSD 715,921.000 (approx. EUR 6.1
within items 2 and 3 of the established agen-          Report)                                       million) and gross profit (before tax) of RSD
da, the following reports were adopted:                In 2020, Energoprojekt Group achieved         269,880.000 (approx. EUR 2.3 million).
• THE ANNUAL REPORT OF ENERGOPROJEKT               total consolidated revenue (in the country             Energoprojekt Holding Plc Annual Report
    HOLDING PLC FOR 2020 (Energoprojekt            and abroad) of RSD 28,367,971.000 (approx.        for 2020 and Energoprojekt Holding Plc Annual
    Holding Plc Regular Annual Financial           EUR 241.3 million).                               Consolidated Report for 2020 were published
    Report of for 2020; Auditor’s Report for            The total achieved consolidated gross        entirely meeting the legal deadlines on the
    2020, and Annual Business Report) and          profit of the Energoprojekt Group (in the         websites of Energoprojekt Holding Plc, the
• THE ANNUAL CONSOLIDATED REPORT OF                country and abroad) in 2020 amounts to            Belgrade Stock Exchange and the Securities
    ENERGOPROJEKT HOLDING PLC FOR 2020             RSD 1,389,496.000. (approx. EUR 11.8 million).    Commission of the Republic of Serbia.

4    |   ENERGOPROJEKT             January-June 2021
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
news                                 Energoprojekt news
HOLDING PLC, the 53rd regular session of the General Assembly- a Decision
THE DECISION ON DISTRIBUTION OF RETAINED EARNINGS
   A     t the 53rd regular session of the
         General Assembly of Energoprojekt
         Holding Plc held on June 21, 2021,
                                                    2. The Company’s retained earnings
                                                       from previous years amount to RSD
                                                       1,030,030,104.41.
within item 4 of the established agenda,            3. The achieved net profit of the com-
the Decision on the distribution of retained           pany for 2020, in the amount of
earnings was adopted.                                  263,277,678.92, remains retained, thus
1. The achieved net profit of Energoprojekt            the total retained earnings amount to
    Holding Plc (hereinafter: The Company)             RSD 1,293,307,783.33.
    for 2020 is RSD 263,277,678.92.

HOLDING PLC, the 53rd regular session of the General Assembly
THE INFORMATION REGARDING THE IMPLEMENTATION OF THE
DECISION PASSED ON JULY 23, 2020, AT THE 52ND ENERGOPROJEKT
HOLDING PLC GENERAL ASSEMBLY ON ISSUING ENERGOPROJEKT
HOLDING PLC CORPORATE BONDS THROUGH A PUBLIC OFFERING

   A      t the 52nd regular session
          of the General Assembly
          of Energoprojekt Holding
Plc held on July 23, 2020, within
item 8 of the established agenda,
the General Assembly of
Energoprojekt Holding Plc passed
a Decision approving the issuing
of Energoprojekt Holding Plc cor-
porate bonds through a public
offering in the total maximum
amount up to RSD 3,300,000,000.00.
At the same time, the Supervisory
Board of Energoprojekt Holding
Plc was authorized to pass a deci-
                                        this Decision.                        Belgrade corporate bonds              Plc implemented are: The bonds
sion on the volume of the issue,
                                             According to the provisions      through a public offering from        were issued according to the
the nominal value of the bonds,
                                        of the Law on the Capital Market      July 23, 2020, the Supervisory        Decree on the Procedure for
the maturity date, the interest rate,
                                        (“Official Gazette of RS”, No.        Board of Energoprojekt Holding        Issuance of Debt Securities,
the method of repayment, the
                                        31/2011, 112/2015, 108/2016 and       Plc, Belgrade, at the 102nd ses-      issued by the Government of the
bond issuance success, the collat-
                                        9/2020), Article 89 of the Articles   sion held on November 25, 2020,       Republic of Serbia. Energoprojekt
erals for securing the payment of
                                        of Association of Energoprojekt       passed the Decision on the issu-      Holding Plc, Belgrade, in line with
bonds and other significant ele-
                                        Holding Plc, Belgrade and the         ing of the first issue of corporate   this decision, issued the first issue
ments. The Supervisory Board of
                                        Decision from the 52nd regular        bonds, which was fully and com-       of long-term corporate bonds, in
Energoprojekt Holding Plc is
                                        session of the General Assembly       pletely realized.                     the total nominal amount of RSD
obliged to inform the General
                                        of Energoprojekt Holding Plc,              The most important elements      3,300,000,000.00. 330,000 bonds
Assembly of Energoprojekt
                                        Belgrade on the issuance of           of the Decision the Supervisory       were issued (CFI code: DBVUFR;
Holding Plc at the next regular
                                        Energoprojekt Holding Plc,            Board of Energoprojekt Holding        ISIN number: RSHOLDD67850),
session on the implementation of
                                                                                                                    with the individual nominal value
                                                                                                                    of RSD 10,000.00. The issue was
                                                                                                                    successful because all 330,000
                                                                                                                    bonds, i.e., 100% of the issue, were
                                                                                                                    subscribed and paid for. The bonds
                                                                                                                    are registered and sold in the pri-
                                                                                                                    mary market at RSD 10,000.00, i.e.,
                                                                                                                    at the nominal value. The bonds
                                                                                                                    are issued with a variable interest
                                                                                                                    rate and a fixed maturity of 5 years
                                                                                                                    from the date of their issuance.
                                                                                                                    The interest rate based on bonds
                                                                                                                    consists of a variable and a fixed
                                                                                                                    part. The variable part of the inter-
                                                                                                                    est rate is equal to three-month

                                                                                            January-June 2021          ENERGOPROJEKT               |   5
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
Energoprojekt news                                           news
BELIBOR, while the fixed part of            bles from bonds by applying the
the interest rate is a fixed margin         provisions of the Law on Contract
of 295 basis points (2.95%). Interest       and Torts, the Company Law, and
is calculated and paid quarterly,           the Bankruptcy Law, as well as the
with the first interest payment             right to dispose of bonds accord-
already made on March 30, 2021.             ing to the Law.
The interest payment will be made                The purpose of the funds
to legal bondholders through the            raised through the issuance of
Central Registry of Securities in           bonds is to secure stable and long-
line with the applicable Business           term sources of finance denomi-
Rules of the Central Registry on            nated in the domestic currency.
the maturity date of each cou-              With the funds raised through the
pon (every March 30, June 30,               issuance of bonds, Energoprojekt
September 30 and December 30).              Holding Plc performs the optimal
The Issuer will redeem the bonds            management of liquidity, thus           2020, the Securities Commission        on December 30, 2020 (the date
through the Central Registry of             providing the permanent work-           passed a Decision on the approval      of entry into the Investor's propri-
Securities in the amount of their           ing capital to the members of the       of the publication of the uniform      etary accounts). The date of the
nominal value on the day exactly            Energoprojekt Group by convert-         Prospectus no. 1/3-104-3551/3-         issue of bonds is the date of reg-
five years from the date of issuance        ing/replacing short-term sources        20. The Prospectus is publicly         istration of the issue in the Central
of the bonds (The maturity date of          for long-term sources in domestic       published and available on the         Securities Depository.
the bonds is December 30, 2025).            currency.                               website of the Issuer www.ener-             Upon completion of the pro-
The Issuer will pay the liabilities              The Bond Trustee appointed         goprojekt.rs.                          cedure of subscription, payment
                                                                                         After       the      Securities
                                                                                    Commission approved the
                                                                                    Prospectus, it sent the invitation
                                                                                    for subscription and payment
                                                                                    of the Bonds. On December 28,
                                                                                    2020, Energoprojekt Holding
                                                                                    Plc published the Notice on the
                                                                                    publication of the Prospectus of
                                                                                    the first issue of long-term bonds
                                                                                    and the procedure for subscription
                                                                                    and payment of bonds in the daily
                                                                                    newspaper "Politika".
                                                                                         On December 29, 2020, the
                                                                                    subscription and payment of
                                                                                    bonds took place (the start and
                                                                                    end date of the primary market).
                                                                                    The offer for subscription of bonds    and registration of the issue,
arising from this issue from the            for the issuance of the corporate       was successfully realized because      Energoprojekt Holding Plc submit-
regular income. Pursuant to the             bonds of Energoprojekt Holding          the success threshold determined       ted the request for the inclusion
Law, the Issuer shall be liable for         Plc is the investment banking           by the decision on issuance was        of bonds on the regulated market
the obligations arising from this           company Erste bank Plc, Novi Sad,       reached, i.e., 100%.                   of the Belgrade Stock Exchange.
issue to the full extent of its assets.     with which the Bond Agreement                The report on the outcome         On January 18, 2021, the Belgrade
The bonds are not secured by any            (on the performance of the activ-       of the public offer for debt secu-     Stock Exchange passed a Decision
collaterals or payment protection           ities of the Bond Trustee) was          rities of the Issuer Energoprojekt     on the admission of Energoprojekt
insurance and rank equally as all           signed.                                 Holding Plc Belgrade was pub-          Holding Plc debt securities to the
other current and future unse-                   The procedure of subscrip-         licly announced on December            market segment Open Market-
cured liabilities of the Issuer. The        tion and payment of the Bonds           30, 2020, on the site of the Issuer    bonds (the Decision number 01/1-
legal bondholder has the right to           began with the publication of the       and the site of the Belgrade Stock     139/21), based on the request and
the principal (amount) payout,              Prospectus and making it available      Exchange.                              the prescribed documentation the
the right to the interest payout,           for inspection, i.e., for disposal of        The bond issue was registered     company previously submitted
the right to collect the receiva-           the Prospectus. On December 25,         in the Central Securities Depository   and delivered.

АД ХОЛ­ДИНГ 53. редов­на сед­ни­ца Скуп­шти­не акци­о­на­ра
INFORMATION ON VOTING IN ABSENTIA
    P     ursuant to the Law and the Articles of
          Association, the shareholders of
          Energoprojekt Holding Plc had the
                                                         Board of Energoprojekt Holding Plc (from the
                                                         123rd meeting held on May 20, 2021), the ver-
                                                         ification of the voting form and the process
                                                                                                              Central Securities Depository on Jun 11, 2021
                                                                                                              - the dividend day) regardless of the number
                                                                                                              of shares owned (shareholders could vote with
right to vote at the 53rd regular session of the         of absentee voting was carried out in the hall       a single share).
General Assembly of Energoprojekt Holding                „X“ of the Energoprojekt business building on             Shareholders who have exercised their
Plc in absentia only by verifying the sharehold-         June 16, 2021.                                       right to vote in absentia were considered pres-
er’s signature on the absentee voting form                    It is especially important to underline that    ent at the session and in the decision-making
(without additional cost).                               the right to vote had all the shareholders of        process on all items of the agenda.
     Following the decision of the Supervisory           Energoprojekt Holding Plc (registered in the

6    |   ENERGOPROJEKT                    January-June 2021
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
news                                      Energoprojekt news
HOLDING PLC
PERIODIC REPORT ON BUSINESS OPERATIONS OF THE ENERGOPROJEKT
GROUP FOR THE PERIOD JANUARY-MARCH 2021 ADOPTED
      I    n the middle of May this year, the
           Executive Board of Energoprojekt
           Holding Plc considered and adopted
                                                        signed until December 31, 2020) are dom-
                                                        inating with 98%, while new jobs (contracts
                                                        signed in 2021) participated with 2%. The
                                                                                                                 try EUR 96 million; foreign business units
                                                                                                                 EUR 128 million and foreign companies EUR
                                                                                                                 73 million).
the periodic report on business operations of           most significant market share in total rev-              In the middle of May this year, the Executive
the Energoprojekt Group for the period January-         enue had the Serbian region with 63.7%,              Board of Energoprojekt Holding Plc consid-
March 2021.                                             the Russian and Eurasian region (Russia,             ered and adopted the Quarterly report of the
     From the aspect of the total realized              Kazakhstan) with 18.4%, the Middle East              Energoprojekt Group for the first quarter of 2021.
consolidated revenue and gross profit of the            region (Qatar, UAE, Oman, Jordan) with                   Pursuant to the legislation, on May 14 of
Energoprojekt Group, we have ascertained                11.3%, African region (Uganda, Ghana,                the current year, the above-mentioned Report
that the overall business activity in the period        Algeria, Zambia, Zimbabwe, Guinea) with              was published entirely on the websites of the
January - March 2021 was at a higher level com-         4.9%, South American region (Peru) with              company, the Belgrade Stock Exchange and the
pared to the planned business parameters of             1.4%, and other with 0.2%.                           Securities Commission of the Republic of Serbia.
the reporting period and the realized business      •   In the period January - March 2021,
parameters in the same period of the previ-             Energoprojekt Holding Plc (parent com-
ous year. The contracting of new deals was at           pany) realized unconsolidated revenue in
a slightly lower level than planned, but better         the amount of EUR 6.7 million.
compared to the same period last year. Apart        •   The realized consolidated gross profit in
from business reasons, the achieved business            the reporting period amounted to EUR 2.8
results were significantly affected by the neg-         million.
ative effects of the global pandemic outbreak       •   In the period January - March 2021
caused by the Covid-19 virus.                           Energoprojekt Holding Plc (parent com-
     In the period January -March 2021 the com-         pany) achieved an unconsolidated gross                   In the first quarter of 2021, the parent com-
pany achieved the following crucial business            profit in the amount of EUR 5.7 million.             pany Energoprojekt Holding Plc realized total
parameters:                                         •   In the first quarter of 2021, the company            unconsolidated revenue of RSD 784,368,000
• The realized consolidated revenue in the              contracted a total of EUR 32.2 million of new        (EUR 6.7 million) and gross profit (before tax)
     reporting period amounted to EUR 54.3              deals: EUR 6.7 million (21%) in the country          of RSD 665,366.000 (EUR 5.7 million). Compared
     million, which is 103% of the planned level.       and EUR 25.5 million (79%) abroad.                   to the same period of the previous year, the
• In the structure of total revenue, home oper-     •   On the last day of the reporting period,             increase in the gross result of the company is
     ations participated with 64% while compa-          in Energoprojekt group the worth of the              mainly the result of the realized revenue based
     nies abroad with 36%. In the structure of          remaining projects to be implemented                 on dividend from the subsidiary Energoprojekt
     operating revenue, active jobs (contracts          amounted to EUR 297 million (in the coun-            Park 11 d.o.o. in the amount of RSD 570,671.000.

HOLDING PLC
THE STATUS CHANGE OF ABSORPTION-TYPE MERGER OF EP
ENERGODATA AD BELGRADE TO EP HOLDING AD BELGRADE
   A    t the 354th session held on December
        30, 2020, the Executive Board of
        Energoprojekt Holding Plc passed the
                                                    the provisions of the Company Law, and
                                                    Company by-laws.
                                                        The procedure for implementing the status
                                                                                                             to the Acquiring Company, shall be dissolved
                                                                                                             without being liquidated, and shall be deleted
                                                                                                             from the BRA Register. Energoprojekt Holding
Decision initiating the procedure of status         change was completed at the end of June 2021.            Plc, as the Acquiring Company, shall continue to
change by the absorption-type merger of                 By the status change of the absorp-                  operate under the same business name, com-
Energoprojekt Energodata Plc as the transferring    tion-type merger (hereinafter: the Merger), the          pany headquarters, and predominant activity,
company (hereinafter: the Transferring              Transferring Company, after registration of the          without the increase of the share capital and
Company) and Energoprojekt Holding Plc, as          merger in the Register of Business Entities of           without changing the Statute in line with the
the acquiring company (hereinafter: the             the Business Registers Agency of the Republic            provisions of the Law and the Contract on the
Acquiring Company), in all respects pursuant        of Serbia, transfers its entire assets and liabilities   status change by merger.

HOLDING PLC
THE CHANGES IN MANAGEMENT
      I n the previous period, the changes in
        the management of the Board of
        Directors of three Companies took
                                                    Čeleketić (executive director) and Rajko Tepavac
                                                    (the member of the Board of Directors - non-ex-
                                                    ecutive director).
                                                                                                             of Directors - non-executive director).
                                                                                                                 The Board of Directors of Energoprojekt
                                                                                                             Niskogradnja Plc now functions in the follow-
place: Oprema Plc, Viskogradnja Plc and                 The Board of Directors of Energoprojekt              ing make-up: Vitomir Perić (President), Duško
Niskogradnja Plc.                                   Visokogradnja Plc now functions in the fol-              Anđelić (executive director) and Miodrag
    The Board of Directors of Energoprojekt         lowing make-up: Rajko Tepavac (President),               Zečević (the member of the Board of Directors
Oprema Plc now functions in the following           Milovan Mijailović (executive director) and              - non-executive director).
make-up: Miodrag Zečević (President), Branko        Miodrag Zečević (the member of the Board

                                                                                                 January-June 2021           ENERGOPROJEKT               |   7
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
Energoprojekt news                                  news
NISKOGRADNJA PLC - a successful acquisition in Uganda
TWO NEW PROJECTS WORTH EUR 90 MILLION CONTRACTED
    A   t the beginning of 2021, Energoprojekt
        Niskogradnja completed a very suc-
        cessful acquisition process, two deals
                                                 Roads Authority (UNRA) to carry out construc-
                                                 tion works on the reconstruction of the 86 km
                                                 long Mityana-Mubende road. The project also
                                                                                                        On March 1, a second contract was signed
                                                                                                    with the Kampala Capital City Authority (KCCA)
                                                                                                    involving construction works on the overhaul
worth a total of almost EUR 90 million have      includes the rehabilitation of city roads in the   of the Kasubi road loop, including the signali-
been contracted in Uganda. The company           city of Mityana. The deadline for the imple-       zation in Lubaga district. The deadline for the
signed a contract with the Uganda National       mentation of works is 36 months.                   implementation of this project is 6 months.

ENTEL PLC - a new contract in Qatar
THE PROVISION OF CONSULTING SERVICES ON THE CAPITAL
PROJECT OF GEOLOGICAL STORAGE OF DRINKING WATER
CONTRACTED
    E     ntel has been present in the water
          resources engineering sector of
          Qatar for years, mainly through the
involvement in important projects, includ-
ing the project covering the construction
of Mega reservoirs intended for providing
strategically important drinking water
reserves in Qatar, which entered the
Guinness Book of Records. Moreover,
important activities within Entel’s scope
include the projects related to the con-
struction of plants for drinking water pro-
duction through processing procedures,
i.e., desalination of seawater. The execution
of a contract for the preparation of design
documentation for the construction of a
plant intended for geological storage of
drinking water, using the so-called ASR
(“aquifer storage and recovery”) technol-
ogies shows the trust the client puts in
Entel’s services. The mentioned technolo-
gy implies the injection of drinking water
into the appropriate aquifers in the soil, to
form underground storage from which              New drinking water storage project in Qatar
water can be exploited when needed.
                                                 of water injected into the underground             Entel's team will face during the project
      The abovementioned project of Mega
                                                 storage.                                           implementation is the obligation to pre-
tank construction, providing the storage
                                                     The scope of services envisages the            serve the long-term quality of ground-
of a seven-day reserve of drinking water,
                                                 preparation of design documentation for            water, defining and implementing legal
has been successfully completed. However,
                                                 the drinking water storage of 135,000,000          measures and other measures which will
given the steady increase in water con-
                                                 m3, with a transmission system that will           limit the project activities to the area of
sumption as well as the need for a secure
                                                 enable the conveyance of the total amount          80 km2 covered by wells, prevention of
water supply, the Government of Qatar has
                                                 of stored water and its integration into the       floods that may occur when applying ASR
identified the need to secure a long-term
                                                 existing water supply network. Such a large        technology, designing a plant that will
storage method of drinking water reserves.
                                                 amount of stored water will require the            function equally efficiently in case of low
After many years of studies that consid-
                                                 construction of about 800 wells, over 500          inflows, but also a very abundant water
ered the possibility of geological storage
                                                 kilometers of pipelines up to 1,600 mm in          yield into the existing system at speeds
of drinking water in selected regions of
                                                 diameter, several large pumping stations           of up to 1,500,000 m3 per day and many
Qatar, the Investor KAHRAMAA (the Qatar
                                                 and dozens of smaller ones and multiple            others.
General Electricity and Water Corporation),
                                                 large-volume tanks. The plant will also be             While all the countries in the Middle
the most important Entel's client in Qatar,
                                                 equipped with all necessary appurtenant            East region face problems of reliable water
decided to start the project implemen-
                                                 facilities, such as an electricity supply sys-     supply, KAHRAMAA, through its ambitious
tation and assigned the preparation of
                                                 tem, automatic control and monitoring              projects, manages to solve the water sup-
design documentation to Entel. Entel's
                                                 system, road network, etc.                         ply problem in Qatar in a way that guar-
partner in this project, the German compa-
                                                     It is not surprising that such capital         antees reliability and long-term stability.
ny Dornier Consulting, is one of the leaders
                                                 projects of strategic importance, as the           At the same time, the mentioned projects
in the application of ASR technology in
                                                 mentioned underground drinking water               enable Entel to improve its expertise in the
the Middle East region. They will provide
                                                 storage project, imply specific challenges.        area that will become increasingly impor-
specialist services involving the design-
                                                 Some of the most important ones that               tant in the coming years.
ing of wells and modelling the spreading

8   |   ENERGOPROJEKT             January-June 2021
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
news                                      Energoprojekt news
HIDROINŽENJERING PLC –new contracts
THE MOST IMPORTANT DEALS CONCLUDED IN THE FIRST
HALF OF 2021
   D       uring the first two quar-
           ters         of        2021,
           Hidroinženjering contin-
                                           with the analysis of the measurement
                                           results and assessment of the condi-
                                           tion of the facilities. This contract also
ued to successfully conclude new           covers the development of a spatial
deals, both in the country and             database and web application for the
abroad.                                    display of geodetic monitoring in the
     The most important deal con-          HPP system and RHPP Bajina Bašta.
tracted in Serbia involves the prepa-           The second contract includes
ration of the first phase of investment    the design and consulting services
and technical documentation for            for the needs of maintenance and
the construction of the reversible         revitalization of hydropower plants
hydropower plant (RHPP) Bistrica. It       in the Drinsko - Limske HPPs Branch.
includes techno-economic assess-           The said services involve designing
ment of the project based on market        services and amending the existing           Location of the future RHE Bistrica
analysis and defined optimal parame-       projects, services related to technical      again in solving the problem of          of hydropower of the waters of the
ters for RHPP, technical solution at the   control of design documentation,             water supply in the coastal area         Gornji Horizonti of the Trebišnjica
Preliminary Design level, financial and    providing various types of approvals,        of Montenegro. The contract was          River
economic analysis and a program of         as well as performing design super-          awarded to Hidroinženjering in a ten-        In Algeria, we signed a new
exploratory works necessary during         vision.                                      der announced by the EBRD, in com-       annex to the contract including
the preparation of the next phase of            At the beginning of the year,           petition with an Italian, two Czech      the continuation of services for the
documentation.                             the company concluded a contract             and one Montenegrin company.             preparation of the Final Designs,
     Two more significant deals            with Regionalni vodovod Crnogorsko                The company was also contract-      technical assistance, and supervision
have also been concluded with              primorje (Regional Water Supply              ed to draft The Preliminary Design       over the construction of the Seklafa
JP EPS (Public Enterprise Electric         Montenegrin Coast) to develop                for a multi-purpose reservoir with       Dam. Moreover, we continued our
Power Industry of Serbia). The first       a Water Resources Management                 a dam in Cerničko polje. The pur-        cooperation with AFRY involving the
is the monitoring of all 13 dams in        Plan. After exactly 15 years, the said       pose of these facilities is the water    consulting services during the con-
the system of Drinsko-Limske HPP,          project engaged Hidroinženjering             resources engineering and utilization    struction of HPP Karuma in Uganda.

URBANIZAM I ARHITEKTURA PLC – new contracts
TWO NEW CONTRACTS FOR THE TECHNICAL CONTROL OVER THE
PROJECTS INVOLVING HEALTHCARE FACILITIES IN BELGRADE
    Р      At the request and in
           cooperation with the
           Public         Investment
                                           ing number of floors: 4 basements +
                                           semi-basement 2 + semi-basement
                                           1 + ground floor + Te + 4. The total
Management Office of the                   gross floor area of the building is
Government of the Republic of              66.171 m², out of which four under-
Serbia, the United Nations                 ground levels of the garage occupy
Development Programme (UNDP)               27.860 m² and two semi-basements
implements the projects involving          occupy 12.945 m². The net floor area
the preparation of technical docu-         of the building is 55.229 m².
mentation for the reconstruction                The hospital is designed to
and expansion of the Rehabilitation        accommodate 800 full-time employ-
Clinic Dr Miroslav Zotović in              ees or up to 1.000 shift workers.
Sokobanjska Street and the con-            According to the design, the full-           between the buildings consists of        of the existing facilities is 12,560 m²,
struction of the New University            time staff will work in three shifts,        driveways, sidewalks, and green are-     and the reconstruction provides a
Children's Clinic in Deligradska Street    where 60% of staff would work in             as with pedestrian paths. Apart from     gross floor area of 16,450 m².
in Belgrade. The designer of both          the day shift, 20% in the evening            the new A1 ward building, major               All the construction works aim
projects is Arhitektonsko-građevinski      shift and the remaining 20% in the           reconstruction or the clinic expan-      to improve the conditions of hos-
institut DOO Novi Sad (AG-UNS).            night shift. The project provides for        sion has not been implemented            pital and therapeutic treatment
     The       engagement            of    154 rooms with 286 hospital beds.            since the 1960s.                         for patients and staff, increase the
Energoprojekt Urbanizam i arhitek-         The underground garage has a                      The reconstruction and expan-       energy efficiency of facilities through
tura Plc involves the development of       capacity of 524 parking spaces.              sion project of the Clinic provides      modern and quality materials, estab-
the technical control of the Design             Rehabilitation Clinic Dr Miroslav       for the demolition of eight buildings    lish up to date technological pro-
for Building Permit for both projects.     Zotović, Sokobanjska 13, Belgrade,           or their parts, the reconstruction of    cesses through the adapted function
     The new University Children's         was founded in 1956 and since then           all the remaining buildings and the      of the premises, equipment, and
Clinic, the so-called Tiršova 2, is        it has been expanded to 20 different         expansion of some of them. The pro-      flows, implement the modern instal-
located at Deligradska Street in           pavilion-type buildings that differ          ject also involves the construction of   lation systems and adjust horizontal
Belgrade. The new facility of the          in architectural style, construction         a new garage on three levels and a       and vertical circulations to persons
children's hospital has the follow-        method and function. The space               gas boiler room. The gross floor area    with reduced mobility.

                                                                                                       January-June 2021            ENERGOPROJEKT                 |   9
ENERGOPROJEKT - AN EXPERIENCE THAT SETS THE FUTURE IN MOTION! - JANUARY - JUNE 2021
Energoprojekt news                                       news
URBANIZAM I ARHITEKTURA PLC – the joint performance of two Companies
COOPERATION OF EP URBANIZAM I ARHITEKTURA AND EP
HIDROINŽENJERING ON THE PROJECT DEVELOPMENT OF THE NATIONAL
ACADEMY FOR THE TRAINING OF SHIP CREW MEMBERS IN BELGRADE
     T     he project development for the facili-
           ty NATIONAL ACADEMY FOR TRAINING
           OF SHIP CREW MEMBERS, whose inves-
                                                     Infrastructure has proposed a public-private
                                                     partnership for the implementation of this pro-
                                                     ject. Within this Project, the Republic of Serbia
                                                                                                          pared the optimal usability of facilities and the
                                                                                                          space within it.
                                                                                                              The location planned for the construction
tor is the Ministry of Construction, Transport       will invest in the construction of the infrastruc-   of the Academy is in the municipality of New
and Infrastructure, is in progress. The consortium   ture of the National Academy, while the private      Belgrade. Based on the defined training pro-
consisting of EP Urbanizam i arhitektura, as a       partner will provide technical and technological     grams, established technological principles,
Contractor, and EP Hidroinženjering and BMSK         know-how, licensed instructors, and appraisers,      and adopted parameters for the design and
carries out the project development.                 and establish a certified process of training and    implementation of facilities, we have defined the
     The preparation of technical documentation      overall management of the National Academy           necessary premises, their relation, and dimen-
for the construction of the National Academy -       in line with the international standards.            sions, as well as their grouping into facilities
ship crew training centre is a result of the need         The terms of reference are aimed at plan-       with clearly structured purposes. The complex
for the Republic of Serbia to provide conditions
for full implementation of the Regulations on
the titles of crew members of merchant navy
ships, as well as the Regulations on titles, con-
ditions for acquiring titles and authorizations
of crew members of seagoing ships, which,
among other things, regulate the conditions
and manner of acquiring the title and author-
ization of crew members of inland navigation
and seagoing ships.
     One of the most complicated requirements
of the said regulations relates to the establish-
ment of a training process within the Ship Crew
Training Centre that will ensure the acquisition
of a standardized level of knowledge and com-
petencies to obtain appropriate qualifications
in inland and maritime navigation.
     Based on the internationally conformed
standards for training, as well as the age struc-
ture of ships’ crew members, domestic legisla-
tion stipulates that the National Academy will be
established as a publicly recognized organizer       The base of the future complex of the National Academy for the training of ship crew members
of activities under the law governing adult edu-     ning the construction towards a balanced and         of the National Academy comprises facilities
cation. Based on the approval of the Ministry of     quality solution in terms of architectural design,   with a total gross floor area of about 19.000
Construction, Transport and Infrastructure, the      cost-effectiveness, and environmental prop-          m², including a facility for practical instruction,
Academy performs non-formal adult education,         erties, all according to the future purpose of       a pool hall, a connecting facility, a workshop, a
by performing theoretical and practical training     the facilities and the importance of the insti-      facility for theoretical instruction, a facility for
for acquiring the stipulated level of theoretical    tution for which the facilities are intended. The    general teaching, management and adminis-
and practical qualifications following the regu-     economy of the solution will be achieved if the      tration, a facility for accommodation of users
lations governing adult education. Due to the        invested investment funds achieve the lowest         – hotel, a sports hall, a garage and technical
high cost of the total investment needed to          possible costs during the life cycle of the facil-   facilities, a porter's lodge.
achieve the standards in question, the project       ity (construction costs, maintenance costs and            The base of the future complex of the
should be implemented in a regional context.         operating costs calculated according to the          National Academy for the training of ship crew
     The Ministry of Construction, Transport and     planned operating time of the facility) com-         members

INDUSTRIJA PLC- concluded a new deal with a long-term partner Henkel Serbia doo
TWO NEW FACTORIES WITH APPURTENANT FACILITIES
     A  t the beginning of March, EP
        Industrija has completed the nego-
        tiations with a long-term business
                                                     Kruševac after the conclusion of the Contract
                                                     on business-technical cooperation. This
                                                     Contract covers interventions related to the
                                                                                                              To enable the smooth functioning and
                                                                                                          transport of raw materials, finished prod-
                                                                                                          ucts, employees and vehicles, the design
partner on several previous joint projects           existing finished products warehouse, aiming         documentation will offer solutions for all
HENKEL Srbija d.o.o.                                 to convert it into a factory for producing the       access roads, traffic arteries and plateaus for
    We have officially started to develop the        toilet freshener balls and toilet care prod-         pedestrians and vehicles of all newly planned
design documentation for the newly planned           ucts, the construction of a new warehouse for        interventions concerning the technology,
and reconstruction of the existing facilities        packing and raw materials and a new factory          construction, and installations.
located at the HENKEL Srbija d.o.o. factory in       for laundry detergents production.

10     |   ENERGOPROJEKT               January-June 2021
news                                      Energoprojekt news
INDUSTRIJA PLC- contracted two new jobs within the Niš airport
PREPARATION OF TECHNICAL DOCUMENTATION AND
CONSULTANCY SERVICES FOR THE AIRPORT TRAFFIC CONTROL
TOWER NIŠ – AERODROMI SRBIJE D.O.O.
   A       fter 2020, marked by the Covid 19 pan-
           demic outbreak and the accompanying
           adverse       business       conditions,
                                                       Aerodromi Srbije d.o.o. Niš, as well as the further
                                                       development plans of the said Training Centre, it
                                                       is necessary to provide, within the newly planned
                                                                                                                vey and draw up of the studies on geotechnical
                                                                                                                conditions for construction, necessary recordings,
                                                                                                                and development of a cadastral and topographic
Energoprojekt Industrija started the year of 2021      facility, a floor that will be used for the needs of     map with up-to-date data on the above-ground
with intensified acquisition activities focused on     the Training Centre Aerodromi Srbije d.o.o. Niš          and underground facilities and installations, to
a wide range of economic activities offering           and the Local Airport Command Centre of the              form valid bases for the preparation of technical
opportunities for the realization of business coop-    Konstantin Veliki Airport in case of an emergency.       documentation of all professions.
eration.                                                    Given all these parameters, it is necessary               We will carry out the preparation of the
      On March 6, 2021, a public invitation of         to design a facility consisting of two independ-         technical documentation through 6 phases:
the company Aerodromi Srbije d.o.o. Niš was            ent parts, intended for the needs of two users:          the Preliminary Design, the Conceptual Design,
announced on the Public Procurement Portal, for        SMATSA doo Belgrade, i.e. its organizational unit        Feasibility Study, the Design for Building Permit,
centralized public procurement: Development            Aerodromska kontrola letenja (AKL) Niš and               the Design for Execution, research studies, stud-
of technical documentation and consulting ser-         Aerodromi Srbije d.o.o. Niš, according to the            ies, and other technical documentation in line
vices for the new airport traffic control tower Niš    principle of two physically separated units for          with the type and purpose of the facility and
- under reference number 3/2021.                       independent users, providing them with sep-              legislation.
      Since EP Industrija has already implement-       arate entrances, circulations and access to the                Aside from the mandatory documentation
ed a similar project of the airport traffic control    premises intended for different users. It is nec-        mentioned above, it is necessary to draft a facade
tower at the Nikola Tesla Airport in Surčin (the       essary to ensure independence not only in the            design, interior design, the project for the connec-
construction is underway and design supervision        physical layout of the rooms per floor but also          tion of the facility to the existing telecommuni-
is being implemented) and is fully aware of the        in functionality.                                        cations and electricity infrastructure around the
requirements of the terms of reference for such             We planned the construction of the building         runway, the project of the telecommunications
a complex and multifunctional facility with a spe-     next to the platforms and parking positions in           access and electricity infrastructure, as well as the
cific purpose, we managed to pass all application      front of the taxiway, in the lower parts with a          utility plan of all external and internal installations.
phases for participation in this tender.               structure of floors GF + 2, that is in the part of the         By signing this Contract, EP Industrija has
      The bid of EP Industrija was assessed as         tower GF+ 5. It represents a vertical circulation to     undertaken to provide the technical control of
acceptable since the commission of the Purchaser       the dome with the planned rooms and stairs and           the Design for Building Permit, draw up the tech-
determined that the business entity submitted          elevator. The planned total area is approximately        nical part of the tender documentation for the
the most favourable bid and met all the criteria       about 2,500 m².                                          tendering process and obtain in the name of and
for qualitative selection of the business entity and        The design documentation will include the           on behalf of the Investor all the necessary permits,
submitted evidence following the requirements          preparation of the necessary technical docu-             decisions and approvals for obtaining the Building
and tender documentation. On April 23, 2021, we        mentation for preparatory works, construction            Permit and the Approval of the Ministry of Interior
signed a Business Cooperation Contract.                of facilities and accompanying technical facilities,     on the technical documentation regarding the
      The existing control tower at the Konstantin     construction of airport weather stations, exterior       fire protection measures, all in line with the appli-
Veliki Airport in Niš, located within the airport      landscaping with the reconstruction of parking           cable legislation of the Republic of Serbia.
premises, with its current capacity, technical and     plateaus, construction of access and internal                  Throughout all the project development
technological level of equipment, as well as its       roads, patrol road and gate for the passage of           phases, Ep Industrija will constantly cooperate
location, meets neither current nor planned            service vehicles, construction of electricity and        with the representatives of the Investor- the
needs for air traffic control.                         telecommunications infrastructure.                       Project Implementation Monitoring Commission,
      Moreover, having in mind the current sit-             The designer EP Industrija must carry out all       to secure the unhindered fulfilment of the activi-
uation and full staffing of the Training Centre        the preparatory activities such as geological sur-       ties under contract to the benefit of both parties.

RECONSTRUCTION AND CONSTRUCTION OF INTERNAL
TRAFFIC INFRASTRUCTURE WITHIN THE AIRPORT COMPLEX
KONSTANTIN VELIKI IN NIŠ
   Н     On March 17, 2021, a public invitation
         for centralized public procurement
         has been published on the Public
                                                       Preparation of technical documentation and
                                                       consulting services for the new airport traffic
                                                       control tower Niš, the offer of EP Industrija
                                                                                                                unhindered access to the facilities of the
                                                                                                                expanded airport complex which are the
                                                                                                                subject of the Public Procurement -Technical
Procurement Portal: Other design and tech-             for PP 5/2021 was assessed as acceptable.                documentation drafting and consulting ser-
nical documentation for the needs of                   The commission of the Purchaser deter-                   vices for the new airport traffic control tower
Aerodromi Srbije d.o.o. Niš, a lot - Preparation       mined that the business entity submitted                 Niš - under reference number 3/2021, it is
of design documentation for the reconstruc-            the most favourable bid, met all criteria and            necessary to intervene in communication
tion and construction of internal traffic infra-       submitted evidence in line with the require-             links. It implies that we will have to carry
structure within the airport complex                   ments and tender documentation. On May                   out the reconstruction and construction
Konstantin Veliki in Niš under reference               14, 2021, we signed a Business Cooperation               of the internal traffic infrastructure on the
number 5/2021.                                         Contract.                                                terrestrial side of the airport complex.
    As for the previous Public Procurement-                To ensure the proper functioning and                     The subject of the design documenta-

                                                                                                  January-June 2021             ENERGOPROJEKT                  |   11