EASA/FAA alidation Improvement Roadmap 2022

Page created by Jay Estrada
 
CONTINUE READING
EASA/FAA alidation Improvement Roadmap 2022
EASA/FAA
 alidation Improvement
Roadmap – 2022
Issue 3
Updated August 2018
EASA/FAA alidation Improvement Roadmap 2022
Backg ound

In 2014, the Ce tification Management Team (i.e.
ANAC, EASA, FAA, TCCA) ag eed to g eate
collabo ation between autho ities...
     „to mo e efficiently and effectively develop and
    implement egulato y and policy solutions to
    common ce tification issues”
Globalization of aviation business and eme ging
count ies t igge g owing esou ce demands on
autho ities
Maximum use of the BASA and full ecognition of
ce tificating autho ities‘ capabilities a e essential to
 educe effo ts fo validation
                                                           2
Backg ound

In 2015, the U.S.- EU Bilate al Ove sight Boa d (BOB)
di ected Ce tification Ove sight Boa d (COB) to
develop Validation Imp ovement Roadmap (VIR)
  Objective: By 2022, educe validation effo t (time and costs)
  to a level of 20% compa ed to fi st TIP implementation in
  2011
COB developed VIR in sync with the CMT objectives
COB VIR app oved on 29 Feb ua y 2016
COB will annually eview VIR implementation and
adjust as necessa y
VIR issue 3 signed on 24 August 2018
                                                                 3
COB VIR Visions and Objectives

Optimize implementation of the BASA by
enhancing acceptance of ce tificating autho ity
(CA) approvals and findings of compliance
Objective, unde a isk-based app oach, is to
maximize acceptance by the validating
autho ity (VA), without any technical
assessment o issuance of a validation app oval
VIR applies isk-based validation p inciples to
 educe level of technical involvement in
validation

                                                  4
COB VIR St ategic Focus A eas
Th ee new avenues fo app ovals between FAA and EASA:
  Recip ocal Acceptance of Ce tificates and App ovals
     An app oval by the CA constitutes a valid app oval in the VA’s system
     without any technical involvement o app oval by the VA
  St eamlined Validation of Ce tificates and App ovals
     An app oval by the CA leads to an app oval being issued by the VA
     without any technical involvement
  Validation Wo k-Plan
     Level of involvement by the VA is established based on isk based
     p inciples athe than a comp ehensive eview of compliance findings
     made by the CA
     A wo k-plan is used fo each p oject equi ing active management
     ove sight to ensu e common p inciples and p ocedu es a e applied to
     maximize eliance on the CA’s findings

                                                                             5
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  Recip ocal acceptance of Ce tificates and App ovals
  Description                       Desired Outcome                            TIP Rev   Completion
                                                                                           Date
  Define c ite ia fo ecip ocal      An app oval in the system of one pa ty       5       Sept 2015
  acceptance of TSOA/ETSOA          constitutes a valid app oval in the othe     6       Sept 2017
  a ticles by EASA and FAA.         pa ty’s system without any technical
                                    involvement o issuance by the VA
                                    (impo ting autho ity)

  All epai s app ovals a e                                                       6       Sept 2017
   ecip ocally accepted

  Refine c ite ia fo majo level     Level 1 and 2 design change catego ies       6       Sept 2017
  1 changes (change                 disca ded and b ought in line with
  classification c ite ia in TIP)   “Acceptance and Validation”

                                                                                                      6
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  St eamlined validation of Ce tificates and App ovals
Description                      Desired Outcome                        TIP Rev   Completion
                                                                                    Date
Develop me ged (design           An issuance of an app oval in the        6       Sept 2017
change [STC] and post TVP        system of one pa ty leads to an
changes) classification          issuance by the validating autho ity
c ite ia fo st eamlined          without any technical involvement
validation of low- isk design
changes to include in
addition to Basic STCs; ATCs,
ASTC
Define classification c ite ia                                            6       Sept 2017
fo st eamlined validation of
low- isk TCs (Pa t 33* and
35)
(* ecip ocal engine only)

                                                                                               7
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  St eamlined validation of Ce tificates and App ovals
  Description                      Desired Outcome                        TIP Rev   Completion
                                                                                      Date
  Define classification c ite ia   An issuance of an app oval in the        8
  fo st eamlined validation of     system of one pa ty leads to an
  low- isk TCs (Pa ts 23, 27,      issuance by the validating autho ity
  and 33 (tu bine engines))        without any technical involvement

  Define classification c ite ia                                            9
  fo st eamlined validation of
  all TCs (Pa ts 25 and 29)

  St eamlined validation of                                                 9
  STC and TCs fo all p oducts

                                                                                                 8
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  Validation Wo k-Plan fo app ovals
  Description                    Desired Outcome                         TIP Rev   Completion
                                                                                     Date
  Identify policy on the         The level of technical involvement by     6       Sept 2017
  development and                the validating autho ity is
  implementation of a wo k-      established based on a set of isk
  plan, applying isk-based       based p inciples athe than a
  c ite ia to show VA level of   comp ehensive eview of
  technical involvement          compliance findings made by the
                                 ce tifying autho ity

                                                                                                9
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  Common Ce tification Basis
  Description                      Desired Outcome                          TIP Rev   Completion
                                                                                        Date
  Inco po ate as default VA to     One single ce tification basis will        9
  use CA ce tification basis fo    facilitate ecip ocal acceptance of
  all validation p ojects with a   Ce tificates and App ovals, and
  wo k plan.                       st eamlined validation of Ce tificates
                                   and App ovals

                                                                                                   10
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  Regulato y Coope ation and Ha monization
  Description                        Desired Outcome                   TIP Rev   Completion
                                                                                   Date
  Modify issue esolution p ocess                                         6       Sept 2017
  to include engagement with the
  applicable EASA-FAA CA G oup       Enhance the ha monization of
  membe ship fo esolution of         technical standa ds and
   egulato y/policy issues           policies to fu the st eamline
                                     the ecip ocal acceptance of
  St eamlined ope ational            app ovals and dete minations        5       Ma ch 2017
  validation p ocess by optimizing   of compliance. Ultimate goal      Amend-
   eliance on the CA system (MRB)    of CA ce tification basis being   ment 1
                                     acceptable to the VA with no
  Develop necessa y p ocedu es       additional technical                7
  fo acceptance of Ce tificate of    conditions.
  Confo mity in lieu of 8130-3 fo
  comme cial pa ts

                                                                                              11
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  Regulato y Coope ation and Ha monization
 Description                    Desired Outcome                           TIP Rev   Completion
                                                                                      Date

 St eamlined ope ational                                                    8
 validation p ocess by          Enhance the ha monization of technical
 optimizing eliance on the CA   standa ds and policies to fu the
 system (OSD/MMEL)              st eamline the ecip ocal acceptance of
                                app ovals and dete minations of
 Develop c ite ia/p ocedu es    compliance. Ultimate goal of CA             8
 fo ecip ocal acceptance of     ce tification basis being acceptable to
 ADs & Alte nate Means of       the VA with no additional technical
 Compliance to ADs.             conditions.

 St eamlined envi onmental      This initiative suppo ts the concept of     8
 validation p ocedu es by       using one common ce tification basis
 optimizing eliance on the CA   fo CA and VA. This initiative has
 system                         va ious exte nal facto s which may not
                                be unde AIR cont ol (e.g. FAA
                                 ulemaking p ocess).

                                                                                                 12
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  Regulato y Coope ation and Ha monization
 Description                 Desired Outcome                  TIP Rev   Completion
                                                                          Date
 Ha monize o dete mine       This initiative suppo ts the                Ongoing
 equivalent SMS egulations   concept of a global ecognition              activity
                             of SMS when app oved by the
                             state of design o manufactu e

                                                                                     13
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  T aining
  Description                 Desired Outcome                     TIP Rev   Completion
                                                                              Date
  FAA-EASA jointly develop    T aining on the implementation of              Ongoing
  implementation p ocedu es   the bilate al aviation safety                  Activity
  (i.e. TIP) t aining         ag eement implementation
                              p ocedu es is ha monized between
                              FAA and EASA, setting common
                              expectations ac oss the technical
                              community. This will fu the
                              p omote and enhance ecip ocal
                              acceptance of findings and
                              app ovals.

                                                                                         14
COB VIR initiatives 2017 onwa ds
Specific Initiatives:
  UAS/RPAS
  Description                 Desired Outcome                      TIP Rev   Completion
                                                                               Date
  Int oduce UAS/RPAS to TIP   Develop necessa y p ocedu es in        7
                              TIP to apply validation p inciples
                              to UAS/RPAS p oducts

                                                                                          15
COB VIR Status Ove view August 2018
                                              Reciprocal Acceptance -   Streamlined validation -   Validation – Work-Plan+
                                              no validation*            no technical
                                                                        involvement*
Type Certificates
Part 23
Part 25
Part 27
Part 29
Part 33
Part 35
Light Sport Airplanes
Articles (Parts and Appliances)
Parts Manufacturers Approval (non-critical)
Parts Manufacturers Approval (critical)
Technical Standard Order Authorization
Design Changes
Basic STCs (All Products)
Non-Basic STCs (All Products)
Non-Basic Design Changes
Basic Design Changes                          No change to TC/TCDS      Change to TC/TCDS
Minor Change
Articles
Parts Manufacturers Approval                  Non-Critical PMA                                     Critical PMA
Technical Standard Order Authorization
Repairs
Major repair
Minor repair
Alterations (Only applies to FAA)             to Non-Critical parts                                to Critical parts
                                                                                                                             16
Suppo ting COB VIR Elements

Post-App oval Audit/Sampling P ocess
•   Objective: Maintain confidence and communication channels
    in domains with no technical involvement
Ha monisation of ai wo thiness equi ements
•   Objective: One single Ce tification Basis fo CA and VA
Common T aining
•   Objective: All teams have same unde standing

                                                                17
You can also read