CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021

Page created by Eddie Patel
 
CONTINUE READING
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
CSAH 12 (TH 244 Turnback)
     Improvements
   Mahtomedi City Council Workshop

          February 16, 2021
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
Overview
•Project Introduction
•Roadway History
•Turnback Process/History
•Community Driven Project Goals
•Public Engagement Summary
•Recommended Improvements
•City Council Feedback

                                  2
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
Project Introduction
•1.3 miles
•Pavement Condition is Yellow/Red
•12,100 vpd @ Century
•11,800 vpd @ CSAH 12
•Arterial Classification
•40/45 MPH

                                    3
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
WHITE BEAR LAKE                  Roadway History
                                                 •1957 – Reconstruction

                                   WARNER ROAD
                                                   • Realignment
                                                 •1963 – Shoulder Construction
                      LOST LAKE                  •1973 – 1” Bit Overlay
                                                 •1985 – 1.5” Mill and Overlay
   CENTURY AVE

                                                 •2003 – 3” Mill and Overlay
                                                 •2010 – Microsurface/Seal Coat

1947                                                                       4
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
5
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
6
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
7
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
8
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
9
CSAH 12 (TH 244 Turnback) Improvements - Mahtomedi City Council Workshop February 16, 2021
10
Turnback Process/History
•Washington County is best suited to efficiently and
 effectively manage this roadway
  • Freight/Bus/Truck/Commuter Route
  • High volume route allowing Washington County to thrive

•MnDOT would focus only on pavement quality/longevity
  • NO Pedestrian Facilities
  • NO Safety Improvements
                                                             11
Turnback Process/History
•$4,000,000 to Washington County
  • Pavement Improvement
  • Replacement of Bridge #90754
     • 123” x 81” Steel Arch Culvert
  • Pedestrian Crossing near East Shore Place / ALDI
  • Turn Lanes to Ridge Way/Old Wildwood
  • Turn Lanes to Birchwood/Lincolntown

                                                       12
Public Engagement
•Project Website
•Open House #1
  • March 5, 2020
  • Promotion:
    • 3000 mailed postcards
    • News Release
    • Social Media Promotion
  • 50 attendees
  • 17 Comments
  • 244 Online Open House Views

                               13
Community Driven Goals
• Replace Failing Infrastructure
• Construct a Comprehensive Transportation
  Network
• Improve Safety for All Users
• Develop Infrastructure Improvements that are
  Compatible with the Natural Environment
• Fiscal Responsibility
• Responsible Construction Schedule

                                                 14
Public Engagement
•Project Website
•Open House #2
  • December 15-31, 2020
  • Promotion:
     • 3000 mailed postcards
     • News Release
     • Social Media Promotion
  • 1164 Online Engagement Visits
  • 192 Comments

                                15
Theme #1
Speed
•“Would recommend speed reduction at Ridgeway and Old
 Wildwood Rd. highway section. Better maintenance of
 brush control for visiability (sic) purposed off of Ridgeway
 and Old Wildwood Rd.”
•“I never understood why the speed limit changes from 30
 to 45 as one approaches Stillwater Road from the east.
 Drives hit the gas and go high speed up the hill to
 Wedgewood Road where it changes to 40. Maintain 40
 from Century Avenue to Stillwater Rd.”

                                                                16
Theme #2
Wedgewood Drive Intersection
•“Wedgewood Drive - Traffic Light and Improved
 Crosswalk”
•“Great opportunity for great improvements! No
 stoplight. Reduce speeds. Traffic calming efforts:
 bump outs, warning lights, landscaping, narrow lanes.
 Roundabouts where allowed. Greening/beautification.
 Business development friendly designs.”

                                                     17
Theme #3
Left Turn Lanes
•“I am in support of a left hand turn lane on to Old
 Wildwood Road from 244 west. I have been almost
 rear-ended too many times to count. Vehicles often
 travel on the shoulder in order to pass a car that is
 trying to turn left on to Old Wildwood Road.”
•“The Left Hand Lane on Birchwood Rd is much
 needed. I was rear-ended turning left back in 2004.”

                                                         18
Theme #4
Pedestrian Crossings
•“There needs to be a pedestrian crossing here with center
 refuge and flashing lights (as per Mahtomedi Ave crossing
 400 yards to the East and Neptune crossing) . There are a
 lot of pedestrians who use the lincolntown streetcar trl to
 get to Lake Links”
•“Prefer to have pedestrian crossing here (ridge way), don't
 need another one at view rd. When driving north on
 Wildwood and wanting to take a right on Old Wildwood, it
 wouldn't make sense to have to stop for pedestrians in that
 exact spot.”

                                                           19
Theme #5
 Causeway
•“Please provide design options and costs
 for current and future investment in the
 corridor for bike, runners, commuters and
 micro-mobility, for the city council and
 advocates to include: … Moving Guard
 Rails, narrowing car lanes and placing bike
 paths to north and south, outside of guard
 rails.”

                                               20
Theme #5
Causeway

           REMOVED FROM
           CONSIDERATION

                           21
Theme #5
Causeway

           REMOVED FROM
           CONSIDERATION

                           22
Recommend Improvements
Recommended Improvements
•MnDOT Project:
  • Pavement Improvement
  • Replacement of 123” x 81” Steel Arch Culvert
  • Pedestrian Crossing near East Shore Place / ALDI – COMPLETE!

                                                           24
Recommended Improvements
•Turnback Project:
  • Pavement Improvement – Full-Depth Pavement Reclamation
  • Replacement of 123” x 81” Steel Arch Culvert
  • Pedestrian Refuge near East Shore Place / ALDI – COMPLETE!
  • Turn Lanes to Ridge Way/Old Wildwood
  • Turn Lanes to Birchwood/Lincolntown

                                                          25
Recommended Improvements (cont.)
•Community Driven Additions:
  • 11-foot lanes
  • Continuous off-road trail from Century Avenue to city trail on Old
    Wildwood Road – South Side

                                                                  26
Recommended Improvements (cont.)
•Community Driven Additions (continued):
  • South curb modifications to reduce ALDI crossing distance
  • Traffic Signal (stoplight) at Wedgewood Drive

                                                            27
Recommended Improvements (cont.)
•Community Driven Additions (continued):
  • Extend sidewalk to Ridge Way – North Side
  • Pedestrian Crossing Refuge Median at Ridge Way
  • Causeway 11-lane width
  • Causeway paved shoulder
  • Pedestrian Crossing Refuge Median at Lincolntown Avenue

                                                         28
County        Mahtomedi           Total
Grading, Drainage, Pavement, and
                                      $2.7M to $2.9M             $0 $2.7M to $2.9M
                          Guardrail
                               Curb     $200k - $300k   $10k - $20k   $260k - $370k
       Pedestrian Crossing Islands        $60k - $70k   $60k - $70k   $120k - $140k
                     Sidewalk/Trail     $150k - $180k $100k - $120k   $160k - $200k
      Retaining Wall/Right-of-Way               $330k         $330k           $660k
                      Traffic Signal            $150k         $150k           $300k
                        Box Culvert             $800k            $0           $800k
 Wedgewood Drive Improvements                      $0 $75k - $100k    $100k - $200k
          Erosion Control and Turf      $300k - $400k   $10k - $20k   $350k - $470k
                     Streetscaping                tbd           tbd             tbd
                       Other Misc.      $450k - $500k   $40k - $50k   $520k - $580k
                         SUBTOTAL $5.1M - $5.6M $750k - $850k        $5.9M - $6.5M
                       City Utilities                   $20k - $40k     $20k - $40k
          Preliminary Engineering                  $0            $0              $0
            Final Engineering (3%)              $180k          $60k           $240k
    Construction Engineering (8%)               $450k         $100k           $550k
                         SUBTOTAL $5.8M - $6.3M $950k - $1.1M        $6.8M - $7.4M
                   Turnback Funds              $3.2M          $400k          $3.6M
                             TOTAL $2.6M - $3.1M $550k - $700k       $3.2M - $3.8M    29
Next Steps
•City Council Resolution of Support
•Final Engineering and ROW Acquisition
•Cooperative Agreements
•Contractor Bids
•Construction

                                         30