The Town of Greenville is committed to providing an annual capital improvement plan to aid
in the decision making process for the annual budget and ensure the adequate maintenance,
acquisition and construction of capital infrastructure and equipment. This plan document
gives the Town Board a tool for determining the funding of operations, capital improvements
and equipment replacement in a reasonable and financially sound manner.

Town of Greenville, Wisconsin
W6860 Parkview Drive
Greenville, WI 54942
(920) 757-5151
www.townofgreenville.com
CAPITAL IMPROVEMENT PLAN 2019 - 2023 - Town Of Greenville, WI
Table of Contents
  INTRODUCTION ................................................................................................................................ 2
  GOALS OF THE CAPITAL IMPROVEMENT PLAN ......................................................................................... 2
  RELATIONSHIP OF THE CIP TO THE OPERATING BUDGET ............................................................................ 3
  CIP DEVELOPMENT SOFTWARE............................................................................................................. 3
  CIP DEPARTMENTS (SERVICE FUNCTIONS) AND PROJECT DETAILS................................................................. 3
  PROJECT PRIORITIZATION.................................................................................................................... 5
TOWN ADMINISTRATOR’S CIP MESSAGE ............................................................................... 6
  CIP PLANNING PROCESS...................................................................................................................... 6
  TOWN MISSION, VISION & STRATEGIC DIRECTIVES ................................................................................. 7
  TOWN DEBT CAPACITY........................................................................................................................ 9
  CAPITAL IMPROVEMENT PLAN FINANCING ............................................................................................. 9
  CLOSING ....................................................................................................................................... 11
HIGHLIGHTS OF THE CAPITAL IMPROVEMENT PLAN ............................................................. 12
  SUMMARY OF 2019 PROJECTS.......................................................................................................... 13

Appendices

Appendix A:                                                                                           Summary Reports

Appendix B:                                                                         Project Detail Reports (2019-2023)

Town of Greenville Capital Improvement Plan, 2019-2023                                                                 Page 1
CAPITAL IMPROVEMENT PLAN 2019 - 2023 - Town Of Greenville, WI
INTRODUCTION
The Town of Greenville is committed to providing an
annual capital improvement plan to aid in the decision
making process for the annual budget and ensure the
adequate maintenance, acquisition and construction of
capital projects. This document gives the Town Board
and staff a tool for determining the funding of
operations, capital improvements and equipment
replacement of the Town in a reasonable and financially
sound manner. The capital improvement plan (CIP)
document also shares with the Town Board, staff, residents and developers a planning tool for
the next five years.

One of the primary responsibilities of the Town Board is to preserve, maintain and improve the
community’s investment in buildings, vehicles, roads, parks and equipment. The CIP is a short
and long range plan for physical development and infrastructure investment.

GOALS OF THE CAPITAL IMPROVEMENT PLAN
The Capital Improvement Plan (CIP) is prepared with the guidance of two major goals:

   1. Address the Town’s immediate and long-term capital needs, particularly those related
      to the following:

          a. Maintaining the Town’s investment in existing infrastructure and assets.

          b. Managing orderly growth in compliance with the adopted Comprehensive Plan
             and other adopted supporting documents, policies or codes.

          c. Expand and grow the tax base in a way that will benefit both new and existing
             residents, landowners and potential investors.

          d. Provide essential Town services and programs in the most efficient and effective
             manner possible.

   2. Provide a financial plan for the implementation of the CIP that evaluates all available
      funding resources, prioritizes projects and maintains the Town’s strong financial
      condition.

Town of Greenville Capital Improvement Plan, 2019-2023                        Page 2
3. To explore all available funding sources (as time and resources permit) in order to
      finance the Town’s capital needs.

RELATIONSHIP OF THE CIP TO THE OPERATING BUDGET
Capital improvement projects for the Town of Greenville are administered through the annual
Town Budget. Capital expenditures are defined as major, non-annual expenditures with a
useful life of more than one year, usually totaling over $3,000. Each year, the Town projects
five year capital project requirements based upon strategic objectives. The current year’s
projects are funded by the Town Board through the annual budget adoption process, with the
remaining four years shown for planning purposes only. Capital projects are not considered
final or funded until they are included in the final adopted annual budget.

CIP DEVELOPMENT SOFTWARE
The Town of Greenville utilizes software called Plan It! to assist in the CIP process. This
software allows for greater efficiency in the planning process over previously utilized
spreadsheets. Plan It! is an Microsoft Access based software product which offers the Town
flexibility in tracking projects, planning beyond five years and offers a variety of reporting
functions.

CIP DEPARTMENTS (SERVICE FUNCTIONS) AND PROJECT DETAILS
The CIP includes information for six departments (service functions) including General
Government, Parks & Recreation, Fire & Rescue/EMS-Emergency Management, Roads & Public
Works and Stormwater/Drainage. A number of fields are used to describe each project in the
CIP. The following is a brief description of each of those fields as used in the Plan It! software:

   Project Number: Unique number assigned to each project. Number reflects the
   department and the year the project was entered in the software.

   Project Name: Brief name of the project.

   Department: One of six departments in which the project is categorized.

   Contact: Individual responsible for details regarding the project.

   Type: One of four basic codes including equipment, improvement, maintenance or
   unassigned.

Town of Greenville Capital Improvement Plan, 2019-2023                          Page 3
Useful Life: Estimated useful life of the project or purchase. Anything within the CIP should
   have a useful life beyond a single year.

   Category: One of 17 codes used to categorize projects such as vehicles, office technology,
   planning, buildings, etc.

   Priority: Identification of the priority of the project. (See next section for a further
   description of project prioritization.)

   Status: One of three codes used to describe status of the project (active, completed,
   pending).

   Custom Fields: (A total of four custom fields are available for use)

         Estimate: Month and year estimate for project costs was received or updated. May
          also include notation of source of estimate such as from the Town engineer or if it is
          simply an estimate from the Administrator.
         Grant Opportunity: Notation if a grant is available for the project, if a grant has been
          applied for or if more research is needed.
         Implementation: Detail on who would complete the project, if known.
         Support Docs: Notation if more information is digitally attached to the project to
          support the request or in the CIP file, such as a cost estimate or quote.
   Description: A general and brief description of the project.

   Justification: A description on the need for the project.

Town of Greenville Capital Improvement Plan, 2019-2023                            Page 4
PROJECT PRIORITIZATION
All projects have been assigned a priority utilizing the following scale:

   1 = Critical/Mandatory: Project is mandated by law, regulation, contract, town policy, or is
   an immediate health and safety issue that must be addressed.
   2 = High Priority/Essential: Project is likely a health and safety issue or may significantly
   affect Town operations or services that must, at a minimum, be addressed within the next
   two to three years.
   3 = Priority: Project is highly desired, but is likely not a health or safety issue. The project
   should likely be addressed at least within the next five years.
   4 = Acceptable: Project is more desirable than necessary and could be deferred several
   years before becoming an average or high priority.
   5 = Future Consideration: Project is more of a wish list item and can easily be deferred
   beyond five years.
There are other factors that may come into consideration when prioritizing projects. For
example, there may be a specific dedicated funding source that must be used only for a
particular type of project for a specific timeframe. One project may be an integral part of
another project that needs to be completed. A project may result in more economical or
efficient delivery of services therefore saving money in the future. Finally, a project may take
advantage of opportunities that exist currently that may not be available in the future. The
Town Board, with assistance from staff, will prioritize projects as deemed necessary.

Town of Greenville Capital Improvement Plan, 2019-2023                            Page 5
TOWN ADMINISTRATOR’S CIP MESSAGE

September 24, 2018

Honorable Members of the Town of Greenville Town Board:

Provided is the Town of Greenville Capital Improvement Plan for years 2019
through 2023. The CIP is a culmination of the work of many parties including Town
staff and department heads, the Town engineer, and our many
contractors/vendors. The following information details the plan development
process and provides further information on CIP financing and planning.

CIP PLANNING PROCESS
The following steps were used to create the CIP:

   Step 1: To initiate the planning process, CIP worksheets were completed by staff
   members indicating what projects they would like to see added or updated.

   Step 2: A review of submitted worksheets was completed by the Town
   Administrator and requested expenditures were included in the CIP software.

   Step 3: The draft CIP was then brought forward to the Town Board for initial
   review. Revisions will be made as necessary.

Project costs should include all costs related to a project including, but not limited
to, planning, engineering, permitting, legal services, construction observation, land
acquisition, etc.

In addition, the Town Board adopted Budget and Financing Policies in 2017 which
include specific policies for debt service and capital improvement planning which
were followed during this process. A copy of policies can be provided upon request.
TOWN MISSION, VISION & STRATEGIC DIRECTIVES
The Town Board has identified strategic directives for achieving the Town’s vision.
All projects within the CIP should assist in achieving these goals and ultimately the
Town vision. Those projects which do not align should be given a lower priority for
funding. The Town will be refining a performance measurement system within the
annual operating budget. As this system is further developed, the CIP will also be
integrated in order to better link funding decisions to strategic goals and ensure
that funded projects are accountable for achieving results.

Our Mission:

“Deliver essential & desired services to the Greenville community creating a vibrant,
enriched quality of life.”

Our Vision:

“We envision developing Greenville into the desired community of the Fox Valley for
families and businesses of today and tomorrow.”

   By 2030 we will create opportunities by:
        Planning for sustainable growth and economic development;
        Preserving our community heritage;
        Developing multi-modal transportation options;
        Promoting public safety and healthy lifestyles;
        Fostering education and technology;
        Maintaining fiscal responsibility.

Strategic Directives:

Directive #1: Improve & maintain public infrastructure.

The Town of Greenville will plan, provide and maintain functionally appropriate,
sustainable, accessible and high quality infrastructure and facilities to serve the
needs of its citizens, businesses and visitors.

Town of Greenville Capital Improvement Plan, 2019-2023                           Page 7
Directive #2: Strengthen financial health.

The Town of Greenville will assure the efficient and responsible use of public funds
for current and planned community needs. The Town will do this by seeking
efficiencies in the delivery of operational services, maintaining a balanced
relationship in financing capital improvements through utilization of current
revenues and issuance of long term debt, maintaining healthy contingency reserves
and effectively managing risks.

Directive #3: Provide effective governance.

Through a citizen-centered approach to communications and recruitment, we aim to
empower our diverse citizenry to participate in local government activities and
decision making. The Town of Greenville is committed to making & implementing
policy decisions in a manner that provides accountable, innovative and results-
focused government.

Directive #4: Safeguard public health, safety & welfare.

The Town of Greenville will strive to protect the lives and property of our residents,
visitors and taxpayers. The Town will accomplish this through the professional
delivery of community policing, emergency medical services, fire & rescue
operations, municipal code enforcement, building inspection and emergency
management.

Directive #5: Preserve community heritage.

The Town of Greenville will nurture our community’s cultural fabric by advancing the
appreciation of our diverse histories, new and old traditions, and the arts. The Town
will champion outdoor recreation and scenic beauty as essential components of
Greenville’s healthy lifestyle and agricultural economy by preserving and increasing
peoples’ ability to connect with and enjoy our natural environment.

Directive #6: Encourage sustainable community development.

The Town of Greenville will encourage planned community & economic
development to assure the quality of life and economic vitality of the entire
community. The Town will accomplish this by managing development through the
implementation of the Town’s Comprehensive Plan, enforcement of the Town’s
zoning code, and compliance with county, State and federal requirements.

Town of Greenville Capital Improvement Plan, 2019-2023                           Page 8
TOWN DEBT CAPACITY
The Town’s present and future debt capacity is evaluated during the preparation of
the CIP. This is completed to provide the Board information on the ability of the
Town to issue additional debt to meet the goals of the CIP.

According to Town Policy, total annual debt service payments on tax-supported
debt of the Town shall not exceed 25% of total general fund operating revenues,
this equates to approximately $860,000 annually. Debt service payments (principal
& interest) in 2019 are estimated to be $678,900.

Wisconsin State Statutes limit the borrowing capacity of municipalities to five
percent of their overall equalized value. The Town also has a policy to limit the
issuance of debt to 75% of that statutory limit. This self-imposed limit equates to a
total debt capacity of $49,600,000.

As of September 6, 2018, the Town had an outstanding debt/loan balance of
$5,199,500. The Town is therefore only utilizing approximately 10% of its self-
imposed debt policy limit. Included in the current outstanding debt balance, the
Town recently borrowed $2,000,000 in promissory notes, with a draw date of
September 6, 2018. Principal and interest payments will begin in FY2019.

The Town will need to continue a routine system of borrowing for capital projects.
While debt payments are exempt from counting towards levy limit restrictions
(therefore allowing a levy increase to pay for additional debt service), the Town has
traditionally been conservative in considering additional borrowing that will
increase its annual debt payments or tax levy.

CAPITAL IMPROVEMENT PLAN FINANCING
Traditionally the Town has utilized “Pay as you Go” financing through the general
tax levy. Unfortunately the funds necessary to complete the capital improvement
plan have not materialized through general taxation, grants or other funding
sources. The 2019-2023 CIP funding strategy assumes the Town will deter from its
traditional full “Pay as you Go” strategy and utilize a combination of general levy
dollars and proceeds from long-term debt.

The CIP funding strategy is aligned with the Town’s Budget and Financial Policy
adopted in 2017. According to the policy, the Town shall strive to maintain a
balanced relationship financing its capital improvements through utilization of

Town of Greenville Capital Improvement Plan, 2019-2023                         Page 9
current revenues and issuance of long term debt. Furthermore, the Town may
issue bonds and notes for purposes of financing its capital improvements or to
refund existing debt. The Town will not use long term debt for financing current
operations.

In developing the financing strategy used in the CIP, the follow general guidelines
were observed:

   1. The Town shall assess the fiscal impact of the debt prior to issuance.

   2. The length of term of borrowing should not exceed the useful life of the
      assets or projects for which funding will be used.

   3. General obligation debt shall not exceed Wisconsin State statute limitations
      of 5% of equalized valuation. The Town shall also set a self-imposed limit of
      75% of the statutory limit as the ceiling for general obligation debt.

   4. Total annual debt service payments on tax-supported debt of the Town will
      not exceed 25% of total general government operating revenue.

   5. The Town shall not incur debt obligations which have variable interest rates,
      negative amortization, unusual deferred principal payment or other risky
      attributes.

Town of Greenville Capital Improvement Plan, 2019-2023                         Page 10
CLOSING
Overall, the Town will continue to face many tough decisions in regard to budgeting
and financing capital projects. The Town should take the necessary steps to make
those decisions through strategic thinking and making investments in necessary
studies and evaluations.

Project prioritization by the Town Board will be essential to having an effective CIP.
Funding limitations and high per project costs no longer allow the Town to
complete a variety of projects within each department. Prioritization will be
required and will result in some departments not receiving desired funding to meet
their planned goals while other Town priorities are pursued.

Respectfully Submitted,
Joel Gregozeski
Town Administrator

Town of Greenville Capital Improvement Plan, 2019-2023                        Page 11
HIGHLIGHTS OF THE CAPITAL IMPROVEMENT PLAN
The following are some of the most significant and key projects found in the 2019-
2023 CIP:

      Construction of new Fire & Safety Building.

      Urbanization of key Town roads: Greenwood Road (Parkview – STH 15) and
       School Road (Betty’s Rodeo – STH 76).

      Construction of CTH CB Trail from STH 96 to Levi Drive.

      Urbanization of CTH CA (CTH CB to Mayflower Drive)

      Reconstruction of Julius Drive (Spring to School & Hillview – STH 15) and
       Hillview Drive (Julius – STH 76).

      Acquisition and Development of Yard Waste & Composting Facility.

      Development of Flood Control Basins for Westgreen/School Road areas, Pro-
       Build/Builder’s Choice areas.

      Upgrades to Lift Station #2.

      Acquisition of Quint Apparatus.
SUMMARY OF 2019 PROJECTS
The following is a brief summary of key projects for the most current year of the
CIP, year 2019. For full list and detail of projects see Appendix B.

      Construction of new Fire & Safety Building.

      Completion of Sports Complex Master Plan.

      CTH CB Multi-Modal Trail.

      Yard Waste Site Acquisition & Development.

      Julius Drive Reconstruction (School – Spring).

      Spring Road Reclamation (Manley – North).

      Design Drive Reclamation (Tower View – Technical).

      Everglade Swamp Dredging Phase 2.

      STH 15 Flood Control Basin.

Town of Greenville Capital Improvement Plan, 2019-2023                       Page 13
APPENDICES
APPENDIX A
            SUMMARY REPORTS

   Projects by Department

       o Total expenditures for each project listed by department.

   Projects by Year and Priority
Town of Greenville, Wisconsin
                                                      Capital Improvement Plan
                                                                  2019   thru      2023

                                                PROJECTS BY DEPARTMENT

Department                                          Project #                   2019      2020      2021       2022       2023      Total

Fire & Rescue
Fire & Safety Building                                 FR-19-01             6,500,000                                               6,500,000
Quint Apparatus                                        FR-19-02                                               1,000,000             1,000,000

                              Fire & Rescue Total                           6,500,000                         1,000,000             7,500,000

General Government
Town Hall Chair & Table Replacement                    GG-19-01                   5,000                                                 5,000
Granicus Software AV Upgrades                          GG-19-02                  18,082                                               18,082

                      General Government Total                                   23,082                                               23,082

Parks, Recreation & Forestry
Toro Groundsmaster - 4110-D                            PR-19-02                  85,000                                               85,000
Advance SC1500 20" Floor Scrubber                      PR-19-03                   7,000                                                 7,000
Bobcat Toolcat 5600                                    PR-19-04                            60,000                                     60,000
18' Landscape Trailer                                  PR-19-05                             5,000                                       5,000
Top Dresser                                            PR-19-06                                      10,000                           10,000
1-Ton Dump Truck                                       PR-19-07                                                            60,000     60,000
Sports Complex Master Plan                             PR-19-10                  50,000                                               50,000
Lions Park Dumpster Enclosure                          PR-19-11                   6,500                                                 6,500
Community Park Drainage Improvements                   PR-19-12                  16,000                                               16,000
Community Park Pickleball Courts                       PR-19-13                            87,000                                     87,000
Lions Park Street Lighting                             PR-19-14                            40,000                                     40,000
Lions Park Parking Lot                                 PR-19-15                                     140,800    116,000               256,800
Lions Park Paving Reclamation                          PR-19-16                                                 15,000    505,000    520,000
Z-Turn Mower                                           PR-19-17                                                            15,000     15,000

           Parks, Recreation & Forestry Total                                   164,500   192,000   150,800    131,000    580,000   1,218,300

Public Works
1 Ton Single Cab Pickup Truck                          PW-19-01                  39,900                                               39,900
1/2 Ton Single Cab Pickup Truck                        PW-19-02                  38,200                                               38,200
Single Axle Dump Truck                                 PW-19-03                 231,800                                              231,800
2019 Plow Attachment                                   PW-19-04                   8,700                                                 8,700
Payloader Replacement                                  PW-19-05                           250,000                                    250,000
Enclosed Utility Trailer                               PW-19-06                            10,000                                     10,000
Sedan                                                  PW-19-07                                      20,000                           20,000
Tandem Axle Plow Truck                                 PW-19-08                                     230,000                          230,000
Rubber Tracked Excavator                               PW-19-09                                     240,000                          240,000
Skid Steer Replacement                                 PW-19-10                                                 95,000                95,000
Service Truck Replacment                               PW-19-11                                                180,000               180,000
Asphalt Hot Box                                        PW-19-12                                                 45,000                45,000
1/2 Ton Pickup Truck Replacement                       PW-19-13                                                            40,000     40,000
1/2 Ton Pickup Truck Replacment                        PW-19-14                                                            40,000     40,000
Med Sized Ag Tractor                                   PW-19-15                                                           100,000    100,000
CB Pedestrian/Bike Trail                               PW-19-16                 844,500                                              844,500

Town of Greenville - 5 Year Capital Improvement Plan                       Page 1
Department                                            Project #     2019         2020       2021        2022        2023         Total
Rapid Flash Beacons - STH 76 & Parkview                PW-19-17      35,000                                                        35,000
Traffic Calming - Glen Valley and Glenview Drives      PW-19-18       6,000      54,000                                            60,000
Parking Lot Paving - Public Works                      PW-19-19                 415,000                                           415,000
Yard Waste Site                                        PW-19-20     438,000                                                       438,000
Coverall Building Repair                               PW-19-21                  10,000                                            10,000
Fleet Scanning Tool                                    PW-19-22       4,000                                                         4,000
DPW Building Electrical Update                         PW-19-23      10,000                                                        10,000
Refridgerant Recovery,Recycling,Recharging Machine     PW-19-24                   5,500                                             5,500
DPW Shop Fan                                           PW-19-25      20,000                                                        20,000
Julius Dr Reconstruction (Hillview - STH 15)           PW-19-26      25,000      62,923                 527,264                   615,187
Hillview Dr Reconstruction (Julius - STH 76)           PW-19-27      50,000     174,497                1,234,094                1,458,591
Julius Dr Reconstruction (Spring - School)             PW-19-28    1,156,404                                                    1,156,404
Greenwood Road Urbanization (Parkview - STH 15)        PW-19-29     149,500     191,300    2,517,257                            2,858,057
Spring Road Reclamation (Manley - North)               PW-19-30     432,510                                                       432,510
Spring Road Reclamation (North - Julius                PW-19-31                 180,818                                           180,818
Design Drive Reclamation (Tower View - Technical)      PW-19-32     141,817                                                       141,817
South Creek Dr Reclamation                             PW-19-33       8,865     106,358                                           115,223
School Rd Reconstruction (Betty's Rodeo - STH 76)      PW-19-34      16,755     201,062                                           217,817
School Road Urbanization (Technical - STH 76)          PW-19-35                 105,139     100,000     262,495    3,880,613    4,348,247
Moonshadow (Greenwood to 200' of Star Dust)            PW-19-36                 488,161                                           488,161
CTH CA Reconstruction                                  PW-19-37      41,316     802,804                                           844,120

                                Public Works Total                 3,698,267   3,057,562   3,107,257   2,343,853   4,060,613   16,267,552

Stormwater Utility
Community Park Drainage                                SW-19-01      30,000                                                        30,000
Everglade Phase 2                                      SW-19-02     200,000                                                       200,000
Country Meadows Regional Pond                          SW-19-03                              60,000                                60,000
Pebble Ridge Pond                                      SW-19-05                              80,000                                80,000
Pro-Build/Builders Choice Flood Control Basin          SW-19-06                 178,000                                           178,000
Season Fields Mini-Storm                               SW-19-07                  80,000                                            80,000
Spring Road Dredging                                   SW-19-08                  20,000                                            20,000
Towering Pines Regional Pond Prairie                   SW-19-09      40,000                                                        40,000
School Rd Stream Restoration                           SW-19-10      10,000      40,000                 200,000                   250,000
Sports Complex Stream Restoration                      SW-19-11      25,000      40,000                 120,000                   185,000
STH 15 Flood Control Basin                             SW-19-12     138,400                                                       138,400
Westgreen/School Rd Pond                               SW-19-13      62,500     254,284                                           316,784

                           Stormwater Utility Total                 505,900     612,284     140,000     320,000                 1,578,184

Water & Sewer Utilities
SCADA Hardware                                         SD-19-01                  40,000                                            40,000
Lift Station Maintenance                               SD-19-02       5,000                              25,000                    30,000
STH 96 - Cleary Ct Loop                                SD-19-03                 225,000                                           225,000
Water Meter Collectors                                 SD-19-04                                                      25,000        25,000
Lift Station #2 Bypass                                 SD-19-05     170,000    1,750,000                                        1,920,000

                  Water & Sewer Utilities Total                     175,000    2,015,000                 25,000      25,000     2,240,000

                                GRAND TOTAL                       11,066,749   5,876,846   3,398,057   3,819,853   4,665,613   28,827,118

Town of Greenville - 5 Year Capital Improvement Plan              Page 2
Town of Greenville, Wisconsin
                                                      Capital Improvement Plan
                                                                    2019 thru 2023

                                                PROJECTS BY YEAR & PRIORITY

Project Name                                        Department                              Project #     Priority              Project Cost

    2019

Priority 1 Critical / Mandatory
Yard Waste Site                                     Public Works                            PW-19-20                                  438,000

                                                                                                        Total for: Priority 1         438,000

Priority 2 High Priority / Essential
Fire & Safety Building                              Fire & Rescue                           FR-19-01                                 6,500,000
Community Park Drainage Improvements                Parks, Recreation & Forestry            PR-19-12                                   16,000
1 Ton Single Cab Pickup Truck                       Public Works                            PW-19-01                                   39,900
1/2 Ton Single Cab Pickup Truck                     Public Works                            PW-19-02                                   38,200
CB Pedestrian/Bike Trail                            Public Works                            PW-19-16                                  844,500
Rapid Flash Beacons - STH 76 & Parkview             Public Works                            PW-19-17                                   35,000
Traffic Calming - Glen Valley and Glenview Drives   Public Works                            PW-19-18                                    6,000
DPW Building Electrical Update                      Public Works                            PW-19-23                                   10,000
Julius Dr Reconstruction (Spring - School)          Public Works                            PW-19-28                                 1,156,404
Greenwood Road Urbanization (Parkview - STH 15)     Public Works                            PW-19-29                                  149,500
School Rd Reconstruction (Betty's Rodeo - STH 76)   Public Works                            PW-19-34                                   16,755
CTH CA Reconstruction                               Public Works                            PW-19-37                                   41,316
Everglade Phase 2                                   Stormwater Utility                      SW-19-02                                  200,000
STH 15 Flood Control Basin                          Stormwater Utility                      SW-19-12                                  138,400
Westgreen/School Rd Pond                            Stormwater Utility                      SW-19-13                                   62,500
Lift Station #2 Bypass                              Water & Sewer Utilities                 SD-19-05                                  170,000

                                                                                                        Total for: Priority 2        9,424,475

Priority 3 Priority
Toro Groundsmaster - 4110-D                         Parks, Recreation & Forestry            PR-19-02                                   85,000
Advance SC1500 20" Floor Scrubber                   Parks, Recreation & Forestry            PR-19-03                                    7,000
Sports Complex Master Plan                          Parks, Recreation & Forestry            PR-19-10                                   50,000
Single Axle Dump Truck                              Public Works                            PW-19-03                                  231,800
2019 Plow Attachment                                Public Works                            PW-19-04                                    8,700
Julius Dr Reconstruction (Hillview - STH 15)        Public Works                            PW-19-26                                   25,000
Hillview Dr Reconstruction (Julius - STH 76)        Public Works                            PW-19-27                                   50,000
Spring Road Reclamation (Manley - North)            Public Works                            PW-19-30                                  432,510
Design Drive Reclamation (Tower View - Technical)   Public Works                            PW-19-32                                  141,817
South Creek Dr Reclamation                          Public Works                            PW-19-33                                    8,865
Community Park Drainage                             Stormwater Utility                      SW-19-01                                   30,000
Lift Station Maintenance                            Water & Sewer Utilities                 SD-19-02                                    5,000

                                                                                                        Total for: Priority 3        1,075,692

Priority 4 Acceptable
Town Hall Chair & Table Replacement                 General Government                      GG-19-01                                    5,000
Granicus Software AV Upgrades                       General Government                      GG-19-02                                   18,082
Fleet Scanning Tool                                 Public Works                            PW-19-22                                    4,000
DPW Shop Fan                                        Public Works                            PW-19-25                                   20,000
Towering Pines Regional Pond Prairie                Stormwater Utility                      SW-19-09                                   40,000

Town of Greenville - 5 Year Capital Improvement Plan                               Page 1
Project Name                                         Department                              Project #     Priority              Project Cost
Sports Complex Stream Restoration                    Stormwater Utility                      SW-19-11                                   25,000

                                                                                                         Total for: Priority 4         112,082

Priority 5 Future Consideration
Lions Park Dumpster Enclosure                        Parks, Recreation & Forestry            PR-19-11                                    6,500
School Rd Stream Restoration                         Stormwater Utility                      SW-19-10                                   10,000

                                                                                                         Total for: Priority 5          16,500

                                                     Total for 2019                                                                  11,066,749

    2020

Priority 2 High Priority / Essential
Traffic Calming - Glen Valley and Glenview Drives    Public Works                            PW-19-18                                   54,000
Coverall Building Repair                             Public Works                            PW-19-21                                   10,000
Greenwood Road Urbanization (Parkview - STH 15)      Public Works                            PW-19-29                                  191,300
School Rd Reconstruction (Betty's Rodeo - STH 76)    Public Works                            PW-19-34                                  201,062
CTH CA Reconstruction                                Public Works                            PW-19-37                                  802,804
Pro-Build/Builders Choice Flood Control Basin        Stormwater Utility                      SW-19-06                                  178,000
Westgreen/School Rd Pond                             Stormwater Utility                      SW-19-13                                  254,284
SCADA Hardware                                       Water & Sewer Utilities                 SD-19-01                                   40,000
Lift Station #2 Bypass                               Water & Sewer Utilities                 SD-19-05                                 1,750,000

                                                                                                         Total for: Priority 2        3,481,450

Priority 3 Priority
Bobcat Toolcat 5600                                  Parks, Recreation & Forestry            PR-19-04                                   60,000
Lions Park Street Lighting                           Parks, Recreation & Forestry            PR-19-14                                   40,000
Payloader Replacement                                Public Works                            PW-19-05                                  250,000
Parking Lot Paving - Public Works                    Public Works                            PW-19-19                                  415,000
Julius Dr Reconstruction (Hillview - STH 15)         Public Works                            PW-19-26                                   62,923
Hillview Dr Reconstruction (Julius - STH 76)         Public Works                            PW-19-27                                  174,497
Spring Road Reclamation (North - Julius              Public Works                            PW-19-31                                  180,818
South Creek Dr Reclamation                           Public Works                            PW-19-33                                  106,358
School Road Urbanization (Technical - STH 76)        Public Works                            PW-19-35                                  105,139
Moonshadow (Greenwood to 200' of Star Dust)          Public Works                            PW-19-36                                  488,161
Season Fields Mini-Storm                             Stormwater Utility                      SW-19-07                                   80,000
Spring Road Dredging                                 Stormwater Utility                      SW-19-08                                   20,000
STH 96 - Cleary Ct Loop                              Water & Sewer Utilities                 SD-19-03                                  225,000

                                                                                                         Total for: Priority 3        2,207,896

Priority 4 Acceptable
18' Landscape Trailer                                Parks, Recreation & Forestry            PR-19-05                                    5,000
Community Park Pickleball Courts                     Parks, Recreation & Forestry            PR-19-13                                   87,000
Enclosed Utility Trailer                             Public Works                            PW-19-06                                   10,000
Refridgerant Recovery,Recycling,Recharging Machine   Public Works                            PW-19-24                                    5,500
Sports Complex Stream Restoration                    Stormwater Utility                      SW-19-11                                   40,000

                                                                                                         Total for: Priority 4         147,500

Priority 5 Future Consideration
School Rd Stream Restoration                         Stormwater Utility                      SW-19-10                                   40,000

                                                                                                         Total for: Priority 5          40,000

                                                     Total for 2020                                                                   5,876,846

Town of Greenville - 5 Year Capital Improvement Plan                                Page 2
Project Name                                      Department                              Project #     Priority              Project Cost

    2021

Priority 2 High Priority / Essential
Greenwood Road Urbanization (Parkview - STH 15)   Public Works                            PW-19-29                                 2,517,257
Pebble Ridge Pond                                 Stormwater Utility                      SW-19-05                                   80,000

                                                                                                      Total for: Priority 2        2,597,257

Priority 3 Priority
Lions Park Parking Lot                            Parks, Recreation & Forestry            PR-19-15                                  140,800
Tandem Axle Plow Truck                            Public Works                            PW-19-08                                  230,000
School Road Urbanization (Technical - STH 76)     Public Works                            PW-19-35                                  100,000
Country Meadows Regional Pond                     Stormwater Utility                      SW-19-03                                   60,000

                                                                                                      Total for: Priority 3         530,800

Priority 4 Acceptable
Top Dresser                                       Parks, Recreation & Forestry            PR-19-06                                   10,000
Sedan                                             Public Works                            PW-19-07                                   20,000
Rubber Tracked Excavator                          Public Works                            PW-19-09                                  240,000

                                                                                                      Total for: Priority 4         270,000

                                                  Total for 2021                                                                   3,398,057

    2022

Priority 3 Priority
Quint Apparatus                                   Fire & Rescue                           FR-19-02                                 1,000,000
Lions Park Parking Lot                            Parks, Recreation & Forestry            PR-19-15                                  116,000
Service Truck Replacment                          Public Works                            PW-19-11                                  180,000
Asphalt Hot Box                                   Public Works                            PW-19-12                                   45,000
Julius Dr Reconstruction (Hillview - STH 15)      Public Works                            PW-19-26                                  527,264
Hillview Dr Reconstruction (Julius - STH 76)      Public Works                            PW-19-27                                 1,234,094
School Road Urbanization (Technical - STH 76)     Public Works                            PW-19-35                                  262,495
Lift Station Maintenance                          Water & Sewer Utilities                 SD-19-02                                   25,000

                                                                                                      Total for: Priority 3        3,389,853

Priority 4 Acceptable
Lions Park Paving Reclamation                     Parks, Recreation & Forestry            PR-19-16                                   15,000
Skid Steer Replacement                            Public Works                            PW-19-10                                   95,000
Sports Complex Stream Restoration                 Stormwater Utility                      SW-19-11                                  120,000

                                                                                                      Total for: Priority 4         230,000

Priority 5 Future Consideration
School Rd Stream Restoration                      Stormwater Utility                      SW-19-10                                  200,000

                                                                                                      Total for: Priority 5         200,000

                                                  Total for 2022                                                                   3,819,853

    2023

Priority 3 Priority
1-Ton Dump Truck                                  Parks, Recreation & Forestry            PR-19-07                                   60,000
1/2 Ton Pickup Truck Replacement                  Public Works                            PW-19-13                                   40,000
1/2 Ton Pickup Truck Replacment                   Public Works                            PW-19-14                                   40,000
School Road Urbanization (Technical - STH 76)     Public Works                            PW-19-35                                 3,880,613

                                                                                                      Total for: Priority 3        4,020,613

Town of Greenville - 5 Year Capital Improvement Plan                             Page 3
Project Name                                      Department                              Project #     Priority              Project Cost

Priority 4 Acceptable
Lions Park Paving Reclamation                     Parks, Recreation & Forestry            PR-19-16                                  505,000
Med Sized Ag Tractor                              Public Works                            PW-19-15                                  100,000
Water Meter Collectors                            Water & Sewer Utilities                 SD-19-04                                   25,000

                                                                                                      Total for: Priority 4         630,000

Priority 5 Future Consideration
Z-Turn Mower                                      Parks, Recreation & Forestry            PR-19-17                                   15,000

                                                                                                      Total for: Priority 5          15,000

                                                  Total for 2023                                                                   4,665,613

                          GRAND TOTAL                                                                                             28,827,118

Town of Greenville - 5 Year Capital Improvement Plan                             Page 4
APPENDIX B
         PROJECT DETAIL REPORTS
Provided are project detail reports for all projects which include expenditures in
fiscal years 2019 to 2023.
Capital Improvement Plan                                                  2019 thru 2023
                                                                                                           Department Fire & Rescue
Town of Greenville, Wisconsin                                                                                  Contact Fire Chief

                                                                                                                  Type Improvement
Project #        FR-19-01                                                                                   Useful Life 50 + Years
Project Name     Fire & Safety Building                                                                       Category Buildings

Description
New fire & safety building to adequately and safely house all Greenville Fire & EMS operations. This facility would be located at the north-west
corner of Municipal Dr and Parkview Dr on property the Town of Greenville currently owns. The facility would house all fire & EMS equipment
including equipment and apparatus in the cold storage building.

Justification
The needs and the challenges facing the Greenville Fire and EMS department and our community are not unique. The emergency vehicles have
increased in size and complexity since the current fire station was built. The requirements and public expectations placed on our volunteer and full
time fire and EMS personnel has increased dramatically over that same time period. The number of calls for service has increased and the
environment in which we expect our emergency responders to work in has become increasingly more dangerous. The incidence and risk of several
types of cancers is significantly higher for emergency personnel who we rely upon to preserve both life and property of those who live or visit our
community. The needs of this department has been well documented in studies dating back to 2010. The current Fire and EMS station no longer
meets the needs of the department or our community and a new fire & safety building will significantly add to the safety of those who serve.

               Expenditures                            2019        2020            2021         2022            2023           Total
               Planning/Design                          370,000                                                                370,000
               Construction/Maintenance                6,130,000                                                              6,130,000

                                         Total         6,500,000                                                              6,500,000

               Funding Sources                         2019        2020            2021         2022            2023           Total
               G.O. Debt (Town)                        6,300,000                                                              6,300,000
               Unassigned Fund Balance                  200,000                                                                200,000

                                         Total         6,500,000                                                              6,500,000

Town of Greenville - 5 Year Capital Improvement Plan                      Page 1
Capital Improvement Plan                                                  2019 thru 2023
                                                                                                             Department Fire & Rescue
Town of Greenville, Wisconsin                                                                                    Contact Fire Chief

                                                                                                                   Type Equipment
Project #        FR-19-02                                                                                     Useful Life 20 Years
Project Name     Quint Apparatus                                                                               Category Equipment: Miscellaneous

Description
Begin the planning process for the purchase a new or used Quint apparatus. A quint apparatus can provide five functions to a fire scene: pump,
water tank, fire hose, ground ladders, and aerial ladder. The Town should consider the purchase of an apparatus with these capabilities now that a
new station will be constructed that can accommodate such a vehicle. This vehicle could potentially be an addition to the fleet, or to replace engine
5321.

Justification
Ladder trucks (platforms or quints) are a vital piece of equipment for fire ground operations. Its numerous uses are, but not limited to; elevated
rescue, exposure protection, elevated streams, horizontal reach to buildings where road access and terrain create problems, roof access when
adequate personnel are not available to hoist ground ladders, ventilation operations especially for steeply pitched roofs, elevated standpipe, and
firefighter safety…just to name a few. They can assist with special rescue scenarios, help with certain overhaul and salvage operations,
investigations and even help with EMS. When the ladder truck arrives on scene, it will position in front of the building the majority of the time. It
allows the crew(s) to utilize any of the equipment from the truck, but mainly to give the truck the best position to use the ladder and elevated water
stream. Ladder trucks can increase firefighter safety and be used for incidents from single story ranch style homes up to the largest of our
commercial properties. Commercial and industrial property operations, depending on the size of the incident, will involve the use of our ladder
truck and sometimes mutual-aid ladder trucks. Having our own will decrease response time for the utilization of that piece of equipment and will
not strip our neighboring communities of that vital resource in their home response area. Additionally, there could be simultaneous incidents in
those communities where their ladder truck is already being utilized. The ladder truck allows us to gain faster access to specific parts of the roof,
to get above the fire as safely as possible, and is the firefighter's means of escape if something goes wrong. The ladder truck is also used for direct
elevated fire attack and exposure protection for significant fires when hand lines cannot be deployed. The Town is seeing larger commercial
structures and single family homes. Greenville currently has 32 commercial structures whose roof height is at or ABOVE the safe working limit
for our tallest ground ladder. Many of them have mechanicals and utilities on the roof such as HVAC, electric, and natural gas. This number does
not include the many tall agricultural structures in Town. Greenville also has at least 33 commercial structures that have a building footprint in
excess of 40,000 sq feet A ladder truck is essential to responses at all types of emergencies. Single and multi-family dwellings are being built with
lightweight construction and even glued/engineered materials that fail under a fire load faster than ever before. A ladder truck and its elevated
streams and safe working platform would greatly improve the outcomes of fires and rescues at such buildings. The addition of a ladder truck also
has the potential to positively affect the Town's ISO rating, thus positively affecting property owner's insurance rates.

               Expenditures                            2019       2020             2021           2022           2023            Total
               Equip/Vehicles/Furnishings                                                        1,000,000                      1,000,000

                                         Total                                                   1,000,000                      1,000,000

               Funding Sources                         2019       2020             2021           2022           2023            Total
                                                                                                 1,000,000                      1,000,000

                                         Total                                                   1,000,000                      1,000,000

Town of Greenville - 5 Year Capital Improvement Plan                      Page 2
Capital Improvement Plan                                                 2019 thru 2023
                                                                                                          Department General Government
Town of Greenville, Wisconsin                                                                                 Contact Town Administrator

                                                                                                                   Type Equipment
Project #        GG-19-01                                                                                  Useful Life 10 Years
Project Name     Town Hall Chair & Table Replacement                                                         Category Equipment: Miscellaneous

Description
Town Hall Board & Conference Room chair replacement.

Justification
Current chairs are torn and ripped. The replacment chairs will be more stackable for increased storage capacity.

               Expenditures                            2019      2020            2021          2022            2023          Total
               Equip/Vehicles/Furnishings                5,000                                                                    5,000

                                         Total           5,000                                                                    5,000

               Funding Sources                         2019      2020            2021          2022            2023          Total
               Unassigned Fund Balance                   5,000                                                                    5,000

                                         Total           5,000                                                                    5,000

Town of Greenville - 5 Year Capital Improvement Plan                    Page 3
Capital Improvement Plan                                                2019 thru 2023
                                                                                                      Department General Government
Town of Greenville, Wisconsin                                                                             Contact Town Administrator

                                                                                                             Type Equipment
Project #        GG-19-02                                                                              Useful Life 10 Years
Project Name     Granicus Software AV Upgrades                                                           Category Equipment: Miscellaneous

Description
Granicus Software and new camera and audio system for Board Room. Specifications to comply with Granicus System.

Justification
Granicus Software is a complete meeting and agenda management system. The software helps create meeting agendas, packets and minutues
efficiently by automating workflows . The system live streams meeting video and auto indexes to coincide with meeting minutes. The system
allow for easy use and searches on the citizen-faced web portal.

               Expenditures                            2019      2020            2021       2022           2023          Total
               Equip/Vehicles/Furnishings                5,000                                                                5,000
               Other                                    13,082                                                             13,082

                                         Total          18,082                                                             18,082

               Funding Sources                         2019      2020            2021       2022           2023          Total
               Unassigned Fund Balance                  18,082                                                             18,082

                                         Total          18,082                                                             18,082

Town of Greenville - 5 Year Capital Improvement Plan                    Page 4
Capital Improvement Plan                                                  2019 thru 2023
                                                                                                            Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                                   Contact Parks, Recreation Forestry Dir

                                                                                                                   Type Equipment
Project #        PR-19-02                                                                                    Useful Life 10 Years
Project Name     Toro Groundsmaster - 4110-D                                                                   Category Equipment: Miscellaneous

Description
The current Toro Groundsmaster mower is 6 years old with more than 4000 hours. While this machine has plenty of useful life left, it has reached
the age where downtime due to repairs and maintenance are more likely and frequent. This mower is responsible for the bulk of the mowing in our
park areas. If it goes out of service with a major repair, it would be extremely difficult, if not impossible, to keep the grass mowed. Purchasing a
new mower now will allow us reduce the use of the current mower, extending it's life and reducing the possibility of major downtime. Additionally,
we have reached the point where a second large area mower is necessary to keep the turf mowed on a reasonable schedule. The current mower
operates full time to maintain the existing turf. With the additional turf added at Lions Park this year and the potential of additional turf at the
Sports Complex and Hoffman Property in the near future, this second mower will be needed to maintain a reasonable mowing schedule.

The reasons for including a cab on this mower are two-fold. First is for the health and safety of the operator. The climate controlled cab reduces the
operators exposure to the elements including heat, cold and UV exposure. Additionally, the cab reduces exposure to potentially harmful dust and
other airborne irritants. This has become more of a concern in recent years with silica laws. Secondly is for increased productivity. The cab will
allow the operator to mow in adverse conditions. We frequently lose productivity in spring and fall due to rain. This of course coincides with when
the grass is growing the fastest. Reducing our downtime due to weather will increase our productivity and allow us to keep on schedule better.

Justification
The current Toro Groundsmaster mower is 6 years old with more than 4000 hours. While this machine has plenty of useful life left, it has reached
the age where downtime due to repairs and maintenance are more likely and frequent. This mower is responsible for the bulk of the mowing in our
park areas. If it goes out of service with a major repair, it would be extremely difficult, if not impossible, to keep the grass mowed. Purchasing a
new mower now will allow us reduce the use of the current mower, extending it's life and reducing the possibility of major downtime. Additionally,
we have reached the point where a second large area mower is necessary to keep the turf mowed on a reasonable schedule. The current mower
operates full time to maintain the existing turf. With the additional turf added at Lions Park this year and the potential of additional turf at the
Sports Complex and Hoffman Property in the near future, this second mower will be needed to maintain a reasonable mowing schedule.

The reasons for including a cab on this mower are two-fold. First is for the health and safety of the operator. The climate controlled cab reduces the
operators exposure to the elements including heat, cold and UV exposure. Additionally, the cab reduces exposure to potentially harmful dust and
other airborne irritants. This has become more of a concern in recent years with silica laws. Secondly is for increased productivity. The cab will
allow the operator to mow in adverse conditions. We frequently lose productivity in spring and fall due to rain. This of course coincides with when
the grass is growing the fastest. Reducing our downtime due to weather will increase our productivity and allow us to keep on schedule better.

               Expenditures                            2019       2020            2021           2022            2023           Total
               Equip/Vehicles/Furnishings               85,000                                                                    85,000

                                         Total          85,000                                                                    85,000

               Funding Sources                         2019       2020            2021           2022            2023           Total
                                                        85,000                                                                    85,000

                                         Total          85,000                                                                    85,000

Town of Greenville - 5 Year Capital Improvement Plan                     Page 5
Capital Improvement Plan                                                  2019 thru 2023
                                                                                                            Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                                   Contact Parks, Recreation Forestry Dir

                                                                                                                  Type Equipment
Project #        PR-19-03                                                                                   Useful Life 10 Years
Project Name     Advance SC1500 20" Floor Scrubber                                                            Category Equipment: Miscellaneous

Description
The Advance SC1500 is a stand on floor scrubber with a 20" scrubbing disc. This model has a max coverage of 26,400 sq ft. The machine
includes (4) 208 Ah wet batteries with charger, a 12 gallon solution tank and a 20" Prolene disc brush.

Justification
This machine would ultimately replace the two existing 20" walk behind scrubbers that have reached the end of their useful life. In 2017, the Town
Board approved the sale of the existing machines along with the purchase of one new large scrubber and one smaller portable scrubber to replace
the existing machines. We found that the existing machines did not have enough value to allow us to purchase both machines with the $8,000
budget. The smaller portable scrubber has been purchased with approximately $3,000 remaining in the budget. Due to the low value in the existing
scrubbers, they will not be sold and will be kept until they no longer work. They will either be used to assist with scrubbing at Lions Park or could
be used at the Public Works shop.

               Expenditures                            2019      2020             2021          2022            2023            Total
               Equip/Vehicles/Furnishings                7,000                                                                     7,000

                                         Total           7,000                                                                     7,000

               Funding Sources                         2019      2020             2021          2022            2023            Total
                                                         7,000                                                                     7,000

                                         Total           7,000                                                                     7,000

Town of Greenville - 5 Year Capital Improvement Plan                     Page 6
Capital Improvement Plan                                                    2019 thru 2023
                                                                                                          Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                                 Contact Parks, Recreation Forestry Dir

                                                                                                                 Type Unassigned
Project #        PR-19-04                                                                                  Useful Life 10 Years
Project Name     Bobcat Toolcat 5600                                                                         Category Equipment: PW Heavy Equip

Description
The Bobcat Toolcat is a heavy duty utility work machine with a dump box and front attachment arm. Features include 4-wheel drive, suspension
and steering, quick attachment arm that accepts 40+ attachments and dump box.

This machine would replace the existing Bobcat Toolcat #19, which will be removed from the fleet.

Justification
The existing Bobcat Toolcat #19 was purchased in 2007 and has more than 3,600 hours. Since 2015 $9,728.58 has been put into repairs and
maintenance for this machine. This machine has reached the end of its useful life and is in need of replacement. The floor board has rusted through
on the drivers side of the cab. The Toolcat is one of our most versatile machines and is used routinely on countless projects and tasks.

               Expenditures                            2019      2020            2021          2022            2023           Total
               Equip/Vehicles/Furnishings                          60,000                                                      60,000

                                         Total                     60,000                                                      60,000

               Funding Sources                         2019      2020            2021          2022            2023           Total
                                                                   60,000                                                      60,000

                                         Total                     60,000                                                      60,000

Town of Greenville - 5 Year Capital Improvement Plan                    Page 7
Capital Improvement Plan                                                     2019 thru 2023
                                                                                                            Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                                   Contact Parks, Recreation Forestry Dir

                                                                                                                  Type Equipment
Project #        PR-19-05                                                                                    Useful Life 10 Years
Project Name     18' Landscape Trailer                                                                        Category Equipment: Miscellaneous

Description
18' Landscape trailer to replace the existing 16' landscaping trailer. The trailer would be used for transporting two 72" Z-turn mowers.

Justification
18' Landscape trailer to replace the existing 16' landscaping trailer. The trailer would be used for transporting two 72" Z-turn mowers.

               Expenditures                            2019       2020            2021           2022           2023            Total
               Equip/Vehicles/Furnishings                            5,000                                                          5,000

                                         Total                       5,000                                                          5,000

               Funding Sources                         2019       2020            2021           2022           2023            Total
                                                                     5,000                                                          5,000

                                         Total                       5,000                                                          5,000

Town of Greenville - 5 Year Capital Improvement Plan                     Page 8
Capital Improvement Plan                                               2019 thru 2023
                                                                                                        Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                               Contact Parks, Recreation Forestry Dir

                                                                                                              Type Equipment
Project #        PR-19-06                                                                                Useful Life 10 Years
Project Name     Top Dresser                                                                              Category Equipment: Miscellaneous

Description
A tow model top dresser. More research needs to be done to determine what model machine would work best for our application. Budget number
is just a rough estimate at this time.

This would be a new addition to the fleet.

Justification
Through our yard waste site the Town produces more compost than we can currently get rid of. If we can get the compost in a spreadable condition
we would be able to utilize this material as a soil amendment with a top dresser.

               Expenditures                            2019    2020            2021          2022           2023            Total
               Equip/Vehicles/Furnishings                                       10,000                                       10,000

                                         Total                                  10,000                                       10,000

               Funding Sources                         2019    2020            2021          2022           2023            Total
                                                                                10,000                                       10,000

                                         Total                                  10,000                                       10,000

Town of Greenville - 5 Year Capital Improvement Plan                  Page 9
Capital Improvement Plan                                                 2019 thru 2023
                                                                                                          Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                                  Contact Parks, Recreation Forestry Dir

                                                                                                                 Type Equipment
Project #        PR-19-07                                                                                  Useful Life 15 Years
Project Name     1-Ton Dump Truck                                                                            Category Equipment: Vehicles

Description
Dual axel One ton truck with a dump and tool box. Other details would be determined at the time of purchase.

Replacement of unit #27

Justification
Truck #27 was purchased in 2006. It is currently near the end of its useful life. It has been well maintained and some work has been done to extend
its life further. Replacement will be needed by 2023.

               Expenditures                            2019      2020             2021         2022            2023            Total
               Equip/Vehicles/Furnishings                                                                       60,000          60,000

                                         Total                                                                  60,000          60,000

               Funding Sources                         2019      2020             2021         2022            2023            Total
                                                                                                                60,000          60,000

                                         Total                                                                  60,000          60,000

Town of Greenville - 5 Year Capital Improvement Plan                    Page 10
Capital Improvement Plan                                                 2019 thru 2023
                                                                                                       Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                              Contact Parks, Recreation Forestry Dir

                                                                                                             Type Improvement
Project #        PR-19-10                                                                               Useful Life N/A
Project Name     Sports Complex Master Plan                                                              Category Park Improvements

Description
Funding would be used to continue the planning and early development of the Sports Complex. Items may include wetland delineations, road
access engineering and bid documents. Our needs will be better known after the completion of the master plan.

Justification
With completion of the updated Master Plan for the Sports Complex by the end of 2018/beginning of 2019, we will have a good idea of the next
steps needed to begin the development of the park.

               Expenditures                            2019      2020             2021      2022           2023            Total
               Planning/Design                          50,000                                                              50,000

                                         Total          50,000                                                              50,000

               Funding Sources                         2019      2020             2021      2022           2023            Total
                                                        50,000                                                              50,000

                                         Total          50,000                                                              50,000

Town of Greenville - 5 Year Capital Improvement Plan                    Page 11
Capital Improvement Plan                                                 2019 thru 2023
                                                                                                           Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                                  Contact Parks, Recreation Forestry Dir

                                                                                                                 Type Improvement
Project #        PR-19-11                                                                                   Useful Life 20 Years
Project Name     Lions Park Dumpster Enclosure                                                               Category Park Improvements

Description
Installation of a concrete pad enclosed by a slatted chain link fence with gate to accommodate the trash and recycling dumpsters at Lions Park. It
would be located on the north side of the Lions Club shed. It would be constructed so the enclosed area extends to the rear of the shed allowing for
addional outdoor storage. This extra storage area would not be paved.

Justification
The current dumpsters are currently located off the southwest corner of the barn and are out in the open. They are frequently in the way of events
and need to be moved. They are also in a location that can be hard for the operator to dump when the barn is in use. This will provide the
dumpsters with a permanent location that is out of the way, easy for dumping and visually sheilded from view.

               Expenditures                            2019      2020             2021          2022           2023            Total
               Construction/Maintenance                  6,500                                                                     6,500

                                         Total           6,500                                                                     6,500

               Funding Sources                         2019      2020             2021          2022           2023            Total
                                                         6,500                                                                     6,500

                                         Total           6,500                                                                     6,500

Town of Greenville - 5 Year Capital Improvement Plan                    Page 12
Capital Improvement Plan                                                   2019 thru 2023
                                                                                                             Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                                    Contact Parks, Recreation Forestry Dir

                                                                                                                   Type Improvement
Project #        PR-19-12                                                                                     Useful Life N/A
Project Name     Community Park Drainage Improvements                                                          Category Park Improvements

Description
Cedar Corporation would be contracted with to engineer a drainage plan to address the drainage and erosion issues in the vicinity of diamonds B
and C.

Justification
There is a lot of water that runs from the pavilion down to the ball fields, causing erosion on the infields. Some of the existing drainage structures
are no longer functional and the problem has gotten worse recently. In order to accommodate the water and direct it appropriately the site needs to
be engineered. We have decided to hold off on installing concrete for the bleacher pads as any storm water structures should be installed prior to
the installation of the concrete.

               Expenditures                            2019       2020             2021           2022           2023            Total
               Planning/Design                           6,000                                                                      6,000
               Construction/Maintenance                 10,000                                                                     10,000

                                         Total          16,000                                                                     16,000

               Funding Sources                         2019       2020             2021           2022           2023            Total
                                                        16,000                                                                     16,000

                                         Total          16,000                                                                     16,000

Town of Greenville - 5 Year Capital Improvement Plan                     Page 13
Capital Improvement Plan                                                     2019 thru 2023
                                                                                                            Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                                   Contact Parks, Recreation Forestry Dir

                                                                                                                   Type Improvement
Project #        PR-19-13                                                                                    Useful Life 20 Years
Project Name     Community Park Pickleball Courts                                                              Category Park Improvements

Description
Reconstruction of the existing tennis/basketball courts into dedicated Pickleball Courts.

Justification
The existing tennis/basketball courts at Community Park are reaching the end of their useful life. They have been previously renovated and the
pavement is reaching the condition that they are no longer worth investing in recoating the surface. With the pending construction of new tennis
and basketball courts at Lions Park, we can use this space to install an amenity that we do not currently provide. Pickleball has become a very
popular sport in recent years and there is a demand for stand alone facilities. We currenly have Pickleball lines painted on the courts at Jennerjohn
Park but this would provide a stand alone facility.

               Expenditures                            2019       2020             2021          2022            2023           Total
               Planning/Design                                      10,000                                                        10,000
               Construction/Maintenance                             77,000                                                        77,000

                                         Total                      87,000                                                        87,000

               Funding Sources                         2019       2020             2021          2022            2023           Total
                                                                    87,000                                                        87,000

                                         Total                      87,000                                                        87,000

Town of Greenville - 5 Year Capital Improvement Plan                     Page 14
Capital Improvement Plan                                                     2019 thru 2023
                                                                                                            Department Parks, Recreation & Forestry
Town of Greenville, Wisconsin                                                                                   Contact Parks, Recreation Forestry Dir

                                                                                                                   Type Improvement
Project #        PR-19-14                                                                                    Useful Life 15 Years
Project Name     Lions Park Street Lighting                                                                    Category Park Improvements

Description
Replacement of the existing street lighting that consists of green fiberglass poles and halogen lights. These would be replaced with black steel
poles with LED lights to match the newer lighting in the park.

Justification
The existing street lights were installed more than 10 years ago and have begun to deteriorate. Many of the lens have begun to fall off, which
allows water to get in the fixture and short out the ballast. A lift needs to be rented to work on these lights which adds a maintenance cost above
just the bulbs, ballasts and lenses. The new lights would also match the much more asthetically pleasing that have been more recently installed.

               Expenditures                            2019       2020             2021          2022            2023           Total
               Construction/Maintenance                             40,000                                                        40,000

                                         Total                      40,000                                                        40,000

               Funding Sources                         2019       2020             2021          2022            2023           Total
                                                                    40,000                                                        40,000

                                         Total                      40,000                                                        40,000

Town of Greenville - 5 Year Capital Improvement Plan                     Page 15
You can also read