The University of North Carolina Pembroke Campus Master Plan Update Request for Qualifications | MASTER PLAN UPDATE REQUEST FOR QUALIFICATIONS | uncp.edu
1 Introduction The University of North Carolina Pembroke's (UNCP) 2021 Master Plan Update will respond to the changes in the world of higher education, the University's priorities, and those of the state and local communities. Notably, the Master Plan Update will draw from UNCP's Strategic Plan, ensuring that the physical campus environment responds to the University's broader vision and goals. Ultimately, the update integrates the impactful role UNCP’s campus has in North Carolina. The plan's recommendations should consider the rich history and traditions of UNCP. Provide a physical response, understanding that the structure and form of the built environment intent is ensuring student success within the University and beyond. | MASTER PLAN UPDATE REQUEST FOR QUALIFICATIONS | uncp.edu
2 Project Scope The project scope shall develop an Updated Master Plan that will guide the future development of the UNCP campus. The master plan update will include, but not be limited, to the following: 01 Master Plan Update Vision, Goals and Objectives: Will be developed through a series of group interactions. The groups may consist of university administrators, faculty, students, and extended community that the university feels are important to its operation. | MASTER PLAN UPDATE REQUEST FOR QUALIFICATIONS | uncp.edu
2 Project Scope 02 Master Space Planning Analysis and Programming: 05 Landscape-Hardscape: Provide a Campus Framework Analyze the UNCP Space Planning Data for historical to organize and structure the form and feel of the reference. Conduct interviews with UNCP academic landscape-hardscapes. Creating a sense of place departments as necessary to re-determine the space attracting students, staff, and study. Prioritization and needs to support all UNCP educational programs, standards for high and low impact paths, corridors, teaching and learning trends, considering the health and working as a network. A framework to maintain land-use wellness of all at UNCP. and water management integrated as a complete system. Resiliency is vital as the university's geographic location 03 An assessment of existing site conditions: Including infrastructure, utilities, vegetation, terrain, access, places it in the path of hurricanes and reoccurring 100- year floods. circulation, parking, drainage, water features and wetlands, current land use, playfields and exterior 06 Campus Expansion, Renewal, Reprogramming and recreational spaces, open space, development Asset Maintenance Plan: Evaluate and provide a new constraints, and other conditions potentially affecting Master Plan Update to incorporate modern facilities and future site development and intended uses. The planning reprogramming, renovating, and sustaining existing consultant shall also tour the campus to become familiar facilities. Provide assets that support campus growth. with all existing building needs and features. Recommendations need to address long-range 04 Evaluation of the former 2004 Comprehensive operational maintenance and utility infrastructure goals. Master Plan and 2011 Master Plan Update: To understand the progress and direction of UNCP over the past 17 years. The university is looking to build on many of the existing concepts and is open to altering its direction. This may be necessitated due to anticipated changing circumstances. | MASTER PLAN UPDATE REQUEST FOR QUALIFICATIONS | uncp.edu
2 Project Scope 07 Architectural Design Guidelines for the Campus: 11 Utilities: Broad scale utility Master Plan Update to Provide general architectural guidelines for future provide a thorough study of all existing utility architects regarding style, space shaping strategies, infrastructure planning and propose improvements at a matching of brick colors, tint colors of glass, qualities of higher level of detail that will be beneficial in upcoming entrance and approaches to buildings, and other general building projects. Electronic utility plan shall include, but design concepts of an architectural nature. Specifications not be limited to, steam, chilled water, cooling towers, or design standards are not included. data, phone, storm water and other resilient systems. 08 Land Parcel Acquisitions: Include planning strategies for land acquisitions at locations previously determined by the university and future community-based opportunities. 09 Open Space and Recreation: Playfields, practice facilities, and outdoor recreational areas, existing and proposed, shall be analyzed. Incorporated into the overall Master Plan Update. Approaching land and water as a holistic set of principles. 10 Mobility: Pedestrian, Bicycle Circulation and Vehicular Parking: Review the UNCP parking and access routes, and incorporate improvements into the planning. | MASTER PLAN UPDATE REQUEST FOR QUALIFICATIONS | uncp.edu
3 Deliverables Master Plan Update Documentation including, Overview Executive Summaries not limited to: Goals and Planning Criteria-Vision and Mission | Beliefs Narrative and Values | Project Specific Goals | Priorities • Describe concepts for campus components in sufficient clarity and detail, to provide clear direction for future Analyze Existing Populations | Departments and decision making. Development of alternative concepts Organizational Matrix | Square Footage by Department | may be necessary to achieve consensus with UNCP on an Classroom, Lab, and Office Space by Department | acceptable Master Plan Update. Department Usage by Building | Comparison of Peers Graphics Planning | Methodology | Assumptions and Parameters | • Updated site plan and 3D views showing existing and University Wide Level-One Needs: Classroom, Lab, and proposed buildings and site amenities. Office Space | Department-Level Needs: Classroom, Lab, • Updated site plan showing existing and proposed utility and Office Space infrastructure. • Additional site plans as required. Implementation | Organizational Concepts | Short-Term • Full drawing documentation, in color, showing clear Allocation Scenarios | Long-Term Allocation Scenarios | and accurate images for a full understanding of the Cost Estimates campus Master Plan Update. The majority of drawings shall be drawn with Building Information Modelling software. Revit is the preferred software package for three dimensional modelling. Three dimensional understanding is critical in understanding spatial relationships between buildings, landscape, streets, pathways, etc. | MASTER PLAN UPDATE REQUEST FOR QUALIFICATIONS | uncp.edu
4 Schedule RFP Timeline for this Process (subject to change as February 8, 2021 UNCP appointed Campus Planning necessary) is as follows: Committee December 22, 2020 RFP is issued February 10, 2021 Notification Finalists January 13, 2021 Pre-proposal virtual Cisco WebEx meeting March 10, 2021 Presentations hosted by UNCP at 4:00 p.m. (EST) Attendance is not mandatory, but highly encouraged. April 2, 2021 Notification and Contracting January 17, 2021 Deadline for proposers to submit April 15, 2021 Recommendation to UNCP Board of Clarification Questions to UNCP by 11:59 p.m. (EST) Trustees for awarding contract. Questions to be submitted via email to annie.angueira@uncp.edu October 15, 2021 Finalize Master Plan Update January 22, 2021 Responses to Clarification Questions asked November 12, 2021 UNCP Board of Trustees adopts by proposers sent, via email above deadline. Email will be Master Plan Update sent to all proposers. January 27, 2021 Proposals due to UNCP by 4:00 p.m. (EST) | MASTER PLAN UPDATE REQUEST FOR QUALIFICATIONS | uncp.edu
5 Requirements and Include the following information in your submittal: Criteria Section 1: Letter of Interest (Cover Letter) Recent experience with project costs and schedules. Historically Underutilized Business representation in Section 2: Project Team Organizational Chart proposed consultant team Adequate Staff and Proposed Design Team; Proximity to and familiarity with project area. Provide resumes of each key staff member who will be assigned to this project. Identify related experience, professional Completed projects. List any of your master planning or registration, and years of experience. (If the firm has multiple master planning update projects. Note any legal or technical branch locations, be descriptive in which location will be problems. handling which aspects of the work). Other appropriate factors. Section 3: Relevant Experience & Other Important Factors Section 4: Current 330 Current workload and State of NC projects awarded. (Provide a list of current planning projects, and the size of your current planning staff). Proposed design approach. (Submit a narrative outlining the design approach to accomplish the project scope. Include a description of how utility planning will be incorporated into the overall planning approach). | MASTER PLAN UPDATE REQUEST FOR QUALIFICATIONS | uncp.edu
6 Process Interested firms; Firms participate in the process by submitting An evaluation committee; (“Committee”) will review all a current SF-330 form and addressing the following in a written statements of qualifications to determine which proposal. Respondents shall submit Four (4) marked paper proposers have qualified for consideration according to the formatted originals plus One (1) electronic copy flash drive. criteria stated herein. The Committee’s evaluations The proposal required limit is 20-pages,10 double-sided, will be based on all available information, including qualification (exclusive of the SF-330, and exclusive of the front and back statements, discussions, reference checks, and other cover). Firms are requested to assure receipt of proposals at the appropriate assessments. The highest rated address listed on the date due. proposer(s) evaluated by the Committee will make a presentation. Deadline; Firms are requested to ensure receipt of proposals at the address listed below by 4:00 p.m. January 27, 2021. All Proposers should carefully read; the information contained questions and submittals are to be directed to: herein and submit a complete response to all requirements and questions as directed. So that the selection process is as Annie Angueira annie.angueira@uncp.edu objective as possible, from this date until a UNCP public Assistant Vice Chancellor of Facilities Design Planning and announcement, do not contact anyone affiliated with UNCP. Construction Project contact is the only source of information. UNC Pembroke Facilities Planning, Design and Construction A responsive proposal is one that complies with all material Attention: Annie Angueira aspects of the solicitation, conforms to the solicitation 1 University Drive documents, and meets the requirements outlined in this Pembroke, NC 28372 solicitation. Submissions, which do not comply with all the terms and conditions of this solicitation, will be rejected as non- responsive. | MASTER PLAN UPDATE REQUEST FOR QUALIFICATIONS | uncp.edu