Bellevue and 22nd Design Review Committee - March 2nd, 2021 - District of West Vancouver
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Bespoke Homes. Forward thinking. The Bellevue and 22nd development... Build Differently. Live Better. The International Panel on Climate Buildings ought to be relied upon to The project can offer a significant benefit to The District of West Vancouver This exemplar application will serve Change (IPCC) 2018 Special Report do more to counteract their as a precedent setting development with the potential to: as a demonstration that The District on Climate Change conveys critical negative consequences. Ultimately, of West Vancouver’s ambitious findings and reinforces that now, the project strives to be an example targets can not only be met, but more than ever, it is imperative to of how buildings should respond to exceeded. It’s time we acknowledge design low emission buildings, or climate change and establish a new • Commit to Zero Emissions. The • Contribute positively to the that the buildings we make, and better still, zero emissions buildings. model for private sector urban building will not consume fossil livability, health and welfare of how we live, contribute to climate The science is clear, the solutions are development locally, nationally, and fuels, nor rely on combustion of the building inhabitants. change. We believe that through available, and we know where we internationally. any kind to operate. our conscious actions we can limit have to go. Buildings represent • Exemplify best in class healthy the negative consequences of our close to 40% of global greenhouse • Self Supply Energy. The building material procurement. industry. gas emissions, and as such, we have will produce a meaningful a responsibility to prioritize proportion of the energy it • Increase the biodiversity on site performance in the buildings we consumes, on site, through through enhancement of the design. photo-voltaic technology, public realm with native reducing demand on grid-source landscapes. The District of West Vancouver electricity. declared a climate emergency on • Be resilient to a changing July 8th, 2019. The district has • Use Less. Built to the Passive climate and withstand major dedicated itself to finding ways to House Standard, the building storm events. reduce Greenhouse Gas Emissions will require a fraction of the and adapt to climate change. We energy to operate compared to cannot stand by and allow ‘business typical West Vancouver homes. as usual’ to persist. This project will be an important step toward what we need—buildings that do not • Store Carbon. The majority of contribute to climate change, but the building will be made of with act as a source of repair. sustainably sourced BC timber, and will store more carbon than what it required to build it.
Contents 01 Project Team 5.5 Amenities and Services 31 6.16 Material Board 63 Delta Group 1 5.6 Surrounding Building Heights 32 6.17 Core Wall 65 Perkins and Will 2 5.7 Zoning Plan 33 6.17 Public Realm - Views 66 Paul Sangha Creative 3 5.8 Building Heights 34 07 Architectural Drawings 5.9 Transit Access 35 02 Development Statement Brief 7.1 Survey 67 5.10 Walkability 36 2.1 Project Description 5 7.2 Context Plan 68 5.11 Wind and Sun Characteristics 37 2.2 Site Statistics 7 7.3 Parking Plan - Level P1 69 5.12 Solar Access 38 2.3 Setbacks/Site Coverage 8 7.4 Parking Plan - Level P2 70 5.13 View Analysis 39 2.4 Project Area 9 7.5 Plan - Level 01 71 5.14 Shadow Analysis 43 2.5 Parking Counts 10 7.6 Plan - Level 02-08 72 06 Design Rationale 7.7 Plan - Roof 73 03 Sustainability Strategies 6.1 Concept Diagram 45 7.8 Elevation - North 75 3.1 Sustainability Strategies 13 6.2 Massing Diagram 47 7.9 Elevation - South 76 3.2 Overarching Principles and Goals 15 6.3 Solar Energy Potential 48 7.10 Elevation - West 77 3.3 Proposal Summary - Key Objectives 17 6.4 Concept Images 49 7.11 Elevation - East 78 3.4 Proposal Summary - Environmental Goals 18 6.5 Landscape Plan 51 7.12 Section - North South 79 6.6 Landscape Concept - Architectural Integration 52 04 Policy Response 7.13 Section - East West 80 6.7 Landscape Paving Strategy 53 4.1 Official Community Plan Compliance - Policies 19 7.14 3D View - East 81 6.8 Landscape Screening 54 4.2 Official Community Plan Compliance - Built Form Guidelines 21 7.15 3D View - West 82 6.9 Public Realm 55 4.3 West Vancouver Foundation - Vital Signs Compliance 23 7.16 3D View - North 83 6.10 Soil Depths 56 7.17 3D View - South 84 05 Local Context 6.11 Crime Prevention Strategy (CPTED) 57 5.1 Existing Site Photos 25 6.12 Accessible Design 58 5.2 Site Sections 27 6.13 Tree List 59 5.3 Site Photo Montage 29 6.14 Plant List 60 5.4 Surrounding Building Types 30 6.15 Existing Tree Retention or Replacement Study 61
1.0 Project Team WHO WE ARE Delta Land Development is a privately held Investment and Development company, operating in Vancouver for the past 35 years. WHAT WE DO Since 1997, we have delivered over 6.8 million square feet of award winning projects in British Columbia. We are a boutique shop with a low volume of projects, with the ability to focus on the details and defy convention. WHY WE DO IT We are committed to meaningful change in the building and construction industry and how we craft built forms and impact our planet. We aim to achieve shared success and a positive legacy with each of our projects. 1
WHO WE ARE Perkins and Will is a multi-disciplinary Architecture and Design firm founded on the belief that design has the power to transform lives. We have practised in Greater Vancouver since 1984. WHAT WE DO We provide a range of expertise in corporate/commercial, civic, healthcare, higher education K-12 and transportation practice areas. With hundreds of award winning projects annually, Perkins+Will is ranked as one of the top global design firms. WHY WE DO IT Since our inception, sustainability has been pivotal in all our work. We are committed to creating regenerative designs which heal their environments and enhance society. 2
WHO WE ARE Paul Sangha Creative is an award- winning landscape architectural practice based in Vancouver. With over 30 years of experience, Principal Paul Sangha’s reputation has been built on his passion for timeless, high quality and site-sensitive design WHAT WE DO Our strength lies in our ability to unite landscape, built form and site, resulting in thoughtful, experiential landscapes for both public and private spaces. Our award-winning work has established the firm as one of the Pacific Northwest’s premier design practices. WHY WE DO IT We are passionate about crafting outdoor spaces that inspire, refresh and nourish the soul. Our work is always rooted in a sensitivity to materials, water and ecology, which together form robust and resilient landscapes that thrive through
2.0 Development Statement Brief 2.1 PROJECT DESCRIPTION PRESENT AND INTENDED USE OF THE SITE: The proposal is for an 8 storey, mass The site is located within the Ambleside timber, Passive House residential building. neighbourhood. The Ambleside In addition to the main lobby level, each neighbourhood is characterized by a walkable street grid extending to the level is one home, creating suites that are waterfront. It has a strong concentration accessible, barrier free, and have access of apartment buildings (both strata to natural ventilation and daylight on all and rental) as well as civic and cultural sides, while still presenting in an apartment facilities such as the West Vancouver building form. Community Centre. It is the civic, social, economic and recreational hub of West Vancouver and serves as West Vancouver’s The site is currently zoned as RD1, Two Town Centre. Family Residential. It is the only such zoning in the immediate surrounding area. The The Official Community Plan encourages proposal seeks to rezone the site to better infill projects that match the character align with the present form and density of of the surrounding neighbourhood. The the neighbourhood. proposal fits within the typology, height, and scale of adjacent buildings. All parking will be located underground, and traffic increase will be minimal as only an The current building is 3 storey residence additional 4 homes will be added to the containing 3 suites. Parking is on grade, and site (from 3 current to 7 proposed). the property is surrounded by a solid wood The project is intended to be built of fence. The proposal seeks to redevelop predominantly mass timber construction. the property to increase the height to 8 As such, much of the fabrication will be storeys, providing 7 homes and 1 level of done off site while the parkade is being amenity uses. The ground level would built. This allows the storeys above grade be landscaped and provide a generous to be erected quickly, reducing noise and addition to the public realm. disruption to neighbours. 5
RATIONALE FOR THE PROPOSAL/ COMMUNITY BENEFITS The project serves as a benefit to the This project supports the OCP, the community by adhering to the broad goals Regional Growth strategy, and the Climate of the community as outlined in the West Emergency Response by: Vancouver Official Community Plan. West • Creating a sensitive infill project in an Vancouver has also adopted the Regional existing high density neighbourhood Growth Strategy “Metro Vancouver 2040 - shaping our Future (Metro 2040 hereafter). • Pursuing Passive House certification for The strategy has 5 key goals. energy and emissions reduction beyond the step code • Create a compact urban area • Generating sustainable energy on • Support a sustainable economy site and committing to the use of zero • Protect the environment and respond to fossil fuels on site. (Zero emissions and climate change impacts possible net carbon positive) • Develop complete communities • Providing 7 single level adaptable homes that allow residents to age • Support sustainable in place. transportation choices • Enhancing the pedestrian public realm by creating a link between the West Vancouver Community centre to the north and the Centennial Seawalk Trail public access to the south. The site will contain a pocket garden at the corner at Bellevue and 22nd with integrated seating to serve as a rest point along this path. The exemplary sustainability and radical decarbonization features of this project can also serve as an example of and catalyst for ways and means for the district to take a leadership role in addressing emissions and resilience in the face of climate change. 6
2.2 SITE STATISTICS BE 19 m LLE 17 VU m EA VE PROJECT NAME Bellevue and 22nd . CIVIC ADDRESS 177 22nd St, 2204 Bellevue Ave. LEGAL DESCRIPTION Plan VAS450 District Lot 554 Lot 1 18m ZONING BY-LAW 4662, 2010 21 .69 SITE DIMENSIONS ± 21.7m X 42.7m 11 7° 13 9m '3 0" SITE AREA 743.3m2 EXISTING ZONING RD-1 SITE PROPOSED ZONING CD-1 743.3m2 PROPOSED USE Multi-family Residential 8001 ft2 42.741m 1° 43' 08" 33.452m 1° 59' 54" 16m 15m 14m 13m 22ND STREET 91° 52' 39" 19.421m 12m 11 10 m 9m m 8m 7m 6m 5m 7
2.3 SETBACKS/ SITE COVERAGE BE 19 m LLE 17 VU m EA VE BUILDING 343m2 (includes balconies and exterior FOOTPRINT stair) SITE COVERAGE 46% 18m PROPOSED SETBACKS FRONT 6m 6m BACK 6m SIDE (EAST) 3m SIDE (WEST) 1.5m TOWER SEPARATION 14.9m SITE 1.5m COVERAGE 3m 343m2 14.9m 3692 ft2 16m 15m 14m 13m 6m 22ND STREET 12m 11 10 m 9m m 8m 7m 6m 5m 8
2.4 PROJECT AREA BUILDING STOREYS 8 RESIDENTIAL UNITS 7 UNIT TYPE 2 Bed + Den AREA/ FSR CALCULATIONS LEVEL GROSS AREA UNITS FLOOR AREA RATIO EXCLUSIONS (M2) FSR AREA M2 AREA FT 2 COUNT AREA M2 AREA FT2 PARKING STORAGE MECH/ ELEC/ ELEV/ STAIR/ LOBBY AMENITY BIKE BALCONIES/ **HIGH AREA M2 (GROSS MAINTENANCE HALLWAY ROOM EXTERIOR PERFORMANCE AREA - / GARBAGE STEPS BUILDING EXCLUSIONS) LEVEL P2 262 2818 0 0 0 0 82 102 78 0 0 0 0 0 0 LEVEL P1 604 6502 0 0 0 461 0 91 52 0 0 0 0 0 0 LEVEL 01 189 2034 0 0 0 0 0 0 0 69 71 48 0 0 0 LEVEL 02 343 3694 1 272 2930 0 0 0 0 0 0 0 70 22 251 LEVEL 03 343 3694 1 272 2930 0 0 0 0 0 0 0 70 22 251 LEVEL 04 343 3694 1 272 2930 0 0 0 0 0 0 0 70 22 251 LEVEL 05 343 3694 1 272 2930 0 0 0 0 0 0 0 70 22 251 LEVEL 06 343 3694 1 272 2930 0 0 0 0 0 0 0 70 22 251 LEVEL 07 343 3694 1 272 2930 0 0 0 0 0 0 0 70 22 251 LEVEL 08 343 3694 1 272 2930 0 0 0 0 0 0 0 70 22 251 LEVEL ROOF 32 344 0 0 0 0 0 0 0 0 0 0 0 3 29 TOTAL 3489 37553 7 1906 20513 461 82 193 130 69 71 48 492 155 1787 TOTAL FSR 2.40 **8% EXCLUSION FOR HIGH PERFORMANCE BUILDINGS 9
000 ft2) SITE AREA 743.3m2 (8000 ft2) SITE COVERAGE 46% METRIC IMPERIAL METRIC IMPERIAL PROPOSED SETBACKS 6m 19.7 ft FRONT 6m 19.7 ft 6m 19.7 ft BACK 6m 19.7 ft T) 3m 9.8 ft SIDE (EAST) 3m 9.8 ft T) 1.5 m 5.0 ft SIDE (WEST) 1.5 m 5.0 ft EVUE AVE TOWER SEPARATION 14.9 m 49 ft 2222 BELLEVUE AVE 14.9 m 49 ft STATISTICS PROJECT STATISTICS PROJECT STATISTICS TREE RETENTION 3.18 m(MIN) 10.43 ftHEMLOCK 3.18 m 10.43 ft BUILDING STOREYS 8 8 AND 22ND VERRUN PROJECT BUILDINGNAME HEIGHT 31.5 m TO ELEVPROJECT 103.3 ftBELLEVUE AND 22ND OVERRUN NAME 31.5 m BELLEVUE 103.3 ft AND 22ND CIVIC EVUE STREET, ADDRESS 177 22ND PROPOSED 2.4 AVE FSR CIVIC ADDRESS 2204 BELLEVUE STREET, 177 22ND 2.4 AVE 2204 BELLEVUE STREET, 177 22ND AVE LEGAL 0, DISTRICT ADDRESS LOT 554 LEGAL PLAN VR450, ADDRESS DISTRICT LOT 554 PLAN VR450, DISTRICT LOT 554 NEW WESTMINSTER DISTRICT GROUP 1, NEW WESTMINSTER DISTRICTGROUP 1, NEW WESTMINSTER DISTRICT CURRENT ZONING RD-1 CURRENT ZONING RD-1 PROPOSED ZONING CD PROPOSED ZONING CD PROPOSED USE ILY RESIDENTIAL PROPOSED MULTI FAMILY USE RESIDENTIAL MULTI FAMILY RESIDENTIAL 7m SITE DIMENSIONS SITE DIMENSIONS 21.7m X 42.7m 21.7m X 42.7m 000 ft2) SITE AREA SITE AREA 743.3m2 (8000 ft2) 743.3m2 (8000 ft2) SITE COVERAGE 46% SITE COVERAGE 46% METRIC IMPERIAL METRIC IMPERIAL METRIC IMPERIAL PROPOSED SETBACKS 6m 19.7 ft FRONT PROPOSED SETBACKS6 m FRONT 19.7 ft 6m 19.7 ft 6m 19.7 ft BACK 6m BACK 19.7 ft 6m 19.7 ft T) 3m 9.8 ft SIDE (EAST) 3m SIDE 9.8(EAST) ft 3m 9.8 ft T) 1.5 m 5.0 ft SIDE (WEST) 1.5 m SIDE 5.0(WEST) ft 1.5 m 5.0 ft TOWER SEPARATION EVUE AVE 14.9 m TOWERAVE 49 ft 2222 BELLEVUE SEPARATION 14.9 m 2222 49 BELLEVUE ft AVE 14.9 m 49 ft TREE RETENTION (MIN) 3.18 m 10.43 ftHEMLOCK TREE RETENTION (MIN)3.18 m HEMLOCK 10.43 ft 3.18 m 10.43 ft BUILDING STOREYS 8 BUILDING STOREYS 8 8 BUILDING HEIGHT VERRUN 31.5 m 103.3 ftTO ELEV BUILDING OVERRUN HEIGHT 31.5 m TO103.3 ELEVftOVERRUN 31.5 m 103.3 ft PROPOSED FSR2.4 PROPOSED FSR 2.4 2.4 LUSIONS (M2) FSR FSR S/LOBBY AMENITY BIKE **HIGH BALCONIES/ AREA M2 (GROSS **HIGH AREA M2 (GROSS R PERFORMANCE ROOM EXTERIORAREA - PERFORMANCE AREA - BUILDING STEPS EXCLUSIONS) BUILDING EXCLUSIONS) 0 0 0 0 0 0 0 0 0 0 0 0 69 0 71 0 48 0 0 0 0 0 0 0 0 0 0 70 0 0 0 22 70 251 22 251 70 0 0 0 22 70 251 22 251 70 0 0 0 22 70 251 22 251 70 0 0 0 22 70 251 22 251 70 0 0 0 22 70 251 22 251 70 0 0 0 22 70 251 22 251 70 0 0 0 22 70 251 22 251 0 0 0 0 3 0 29 3 29 492 69 71 48 155 492 1787 155 1787 2.40 2.40 AREA/ FSR CALCULATIONS LUSIONS (M2) FLOOR AREA RATIO EXCLUSIONS (M2)FSR FSR FSR S/ LOBBY MECH/ ELEC/ AMENITY ELEV/BIKE STAIR/ **HIGH BALCONIES/ LOBBY AREA M2AMENITY (GROSS BIKE BALCONIES/ **HIGH AREA M2 (GROSS **HIGH AREA M2 (GROSS R MAINTENANCE/ HALLWAY PERFORMANCE ROOM EXTERIORAREA - ROOM PERFORMANCE EXTERIOR AREA - PERFORMANCE AREA - GARBAGE BUILDING STEPS EXCLUSIONS) BUILDING STEPS EXCLUSIONS) BUILDING EXCLUSIONS) 2 0 0 102 0 078 0 00 00 0 00 0 0 0 0 0 0 91 0 052 0 00 00 0 00 0 0 0 0 0 69 0 71 48 0 0 69 0 71 0 48 00 0 0 0 0 70 0 0 0 00 22 070 2510 0 2270 251 22 251 0 70 0 0 0 00 22 070 2510 0 2270 251 22 251 0 70 0 0 0 00 22 070 2510 0 2270 251 22 251 LEVEL 01 LEVEL 02-08 LEVEL ROOF 0 70 0 0 0 00 22 070 2510 0 2270 251 22 251 0 70 0 0 0 00 22 070 2510 0 2270 251 22 251 0 70 0 0 0 00 22 070 2510 0 2270 251 22 251 0 70 0 0 0 00 22 070 2510 0 2270 251 22 251 0 0 0 0 0 00 3 00 290 0 30 29 3 29 2492 69 193 71 130 155 48 69 492 1787 71 48 155 492 1787 155 1787 2.40 2.40 2.40 PROVIDED FTS (X2) TOTAL FSR AREA FSR AREA 15 AMENITY AMENITY FSR AREAS FSR AREA BALCONIES/ EXTERIOR STEPS BALCONIES/ EXTERIOR STEPS 2 BIKE ROOM BIKE ROOM AMENITY AMENITY 1 ELEV/ STAIR/ HALLWAY ELEV/ STAIR/ HALLWAY 18 LOBBY LOBBY BALCONIES / EXTERIOR BALCONIES/ EXTERIOR STEPS STEPS PROVIDED MIN REQ STALLS PROVIDED TS FTS (X2)GFA m2 TOTAL TOTAL SINGLE CAR LIFTS (X2) TOTAL MECH/ ELEC/ MAINTENANCE/ GARBAGE BIKE ROOM MECH/ ELEC/ MAINTENANCE/ GARBAGE BIKE ROOM FSR AREA PARKING FSR AREA PARKING FSR AREA 7 21 25 AMENITY RESIDENTIAL AMENITY RESIDENTIAL ELEVATOR ELEV/AMENITY / STAIR / HALLWAY STAIR/ HALLWAY 7 2 25 15 15 2 BALCONIES/ EXTERIOR STEPS STORAGE BALCONIES/ STORAGE EXTERIOR STEPS BALCONIES/ EXTERIOR STEPS 0 8 2 2 LOBBY LOBBY BIKE ROOM BIKE ROOM BIKE ROOM 1 1 1 1 ELEV/ STAIR/ HALLWAY ELEV/ STAIR/ HALLWAY MECH /STAIR/ MECH/ELEV/ ELEC/ELEC / MAINTENANCE HALLWAY MAINTENANCE/ GARBAGE / GARBAGE 10 34 18 18 LOBBY LOBBY LOBBY REQ STALL PROVIDED MECH/ ELEC/ MAINTENANCE/ GARBAGE PARKING PARKING MECH/ ELEC/ MAINTENANCE/ GARBAGE MECH/ ELEC/ MAINTENANCE/ GARBAGE TOTAL HORZ. VERTICAL TOTAL PARKING PARKING PARKING RESIDENTIAL 14 14 21 14 7 21 RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL 1.4 2 2 STORAGE STORAGE STORAGE STORAGE STORAGE LEVEL P2 LEVEL P1 10
2.5 PARKING COUNTS TYPICAL STALL 2.7m x 5.8m ACCESSIBLE STALL 3.7m x 5.8m SMALL CAR STALL 2.4m x 4.9m (30% of stalls allowed) CAR PARKING Bylaw 4662, 2010 MIN REQ STALLS PROVIDED UNITS GFA m2 UNITS GFA m2 SINGLE CAR LIFTS (X2) TOTAL MARKET RESIDENTIAL Section 300 A minimum of the lesser of: 1 parking space per dwelling OR 7 7 1 space per every 84m2 of GFA 2,127 25 5 5 TOTAL 7 2,127 7 25 5 10 15 MRKT RESID. VISITOR PARKING Section 142.01 30% of req stalls 1 parking space per dwelling OR 7 2 Each unit 1 space per every 84m2 of GFA 2,127 0 8 2 ACCESSIBLE PARKING Section 142.09 Min 1 space req for between 10-75 1 parking spaces. 1 1 TOTAL 10 34 18 *All parking stalls to have EV charging capabilities as per the requirements in Policy 02-80-386 BIKE PARKING Policy 02-80-386, 2018 UNITS BED MIN REQ STALL PROVIDED ROOMS HORZ. VERTICAL TOTAL Policy Zoning Amendment Application 3.3 - Provide 1 secure bicycle parking space per bedroom 7 2 14 14 7 TOTAL 7 2 14 14 7 21 SHORT TERM BIKE PARKING Section 143.02 0.2 per dwelling 7 1.4 2 *The project will provide 3 stalls per home, as it is recognized that the flex room could be used as a 3rd bedroom. 11
ISSUED ISSUED FOR REZONING 10/09/2020 LEVEL P1 CL 4/5 CL 6/7 CL 8/9 V1 2 3 A 14 S 17 S 15 S 16 V S 18 CL 10/11 CL 12/13 KEYPLAN E E AV VU LLE BE 22ND STREET PROJECT FLOOR PLAN - PARKING LEVEL 1 BELLEVUE AND 22ND 1 1 : 50 PROJECT NUMBER 411842 1 A21-01 REVISIONS S V LEVEL 01 16800 2.00% 20.00% 5.83% LEVEL P1 13145 TITLE FLOOR PLAN LEVEL P1 VISITOR CL CAR LIFT SECTION - EAST WEST PARKING RAMP BIM 360://DELTA - Bellevue/A-BELLEVUE-Site_2020.rvt 3 1 : 100 SHEET NUMBER A11-P1 SMALL STALL 2/23/2021 3:46:27 PM 00 STALL COUNT PARKING LEGEND GE GE GE GE CN CN CN CN ISSUED ISSUED FOR REZONING 10/09/2020 PMT GE PM STAIR A LEVEL 01 H22 V1 GE V2 H21 V3 H20 V4 H19 PLANTER H18 V5 H17 V6 H8 H9 H10 H11 H12 H13 H16 V7 GE H15 H14 AC AC ST2 ST 1 GE AC AC AC PM GE GE AC KEYPLAN E E AV VU LLE BE 22ND STREET PROJECT BELLEVUE AND 22ND 0 5 10 m PROJECT NUMBER 411842 V H 6.82 m 17.48 m 22' - 4 1/2" 57' - 4" REVISIONS H A 2.04 m F G 6' - 8 1/2" 3.35 m 11' - 0" B C 7.62 m 25' - 0" 10.12 m FLOORPLAN - LEVEL 01 33' - 2 1/2" 8.81 m 28' - 11" 1 1 : 50 E D 16.69 m 54' - 9" VERTICAL TITLE FLOOR PLAN LEVEL 01 ST SHORT TERM HORIZONTAL BIM 360://DELTA - Bellevue/A-BELLEVUE-Site_2020.rvt SHEET NUMBER AVERAGE GRADE - KEYPLAN A11-01 2 1 : 200 3/2/2021 5:21:10 PM BIKE PARKING LEGEND 12
3.0 Sustainability Strategies 1 3.1 SUSTAINABILITY STRATEGIES The building has been designed to respond to it’s site, with the massing purposefully 4 oriented to maximize daylight, views and passive strategies. The one-home-per floor layout ensures 7 each home has cross ventilation which is critical to the passive cooling strategies. Public spaces are oriented to the south of the site to take advantage of views and solar gains, while private spaces, such as bedrooms, are located on the cooler north side of the site. Decks along the south 5 5 facade provide solar shading. 6 Each home has an individual high efficiency Heat Recovery Ventilator nit. These units have been located adjacent to the outdoor stair case behind the stair screening so as to not be visible to adjacent neighbours. Water will be collected from the roof and ground plane to be used for on-site irrigation. Energy is generated on site through photovoltaic panels on the rooftop. The 2 4 4 project is also looking into the viability of geo-exchange energy sources. 1 PV Panels 2 Battery Packs 4 3 3 1 Geo-Exchange PV panels 2 Battery racks 4 3 Water Collection Green roof 4 Geo-exchange pipes 5 5 Cross Water Ventilation collection 6 Cross ventilation 7 HRV Section 1 6 HRV 1 1 : 100 8 Solar shading 7 Solar Shading 13
MASS TIMBER STRUCTURE PASSIVE HOUSE HEALTHY MATERIALS ON SITE ENERGY GENERATION HIGH EFFICIENCY SYSTEMS The project seeks to avoid the use of The project will participate in the Tall Wood The project prioritizes an envelope first The current PV layout allows for an The project will specify high efficiency harmful substances as identified on the Mass Timber Early Adoption Initiative. approach that reduced the need for energy approximate 22% energy offset ratio. mechanical systems and plumbing fixtures Perkins + Will Precautionary List; and This percentage offsets grid-source GHG to reduce energy consumption and consumption. This includes: • Use locally extracted and manufactured emissions. It will be enough to power water use. materials, whenever possible the common spaces of the building, and By using wood predominantly, and concrete Heat recovery ventilators (HRV’s) with • Highly Insulated roofs and walls potentially the back up power source and steel selectively, the structure of the • Prioritize the integration of low high efficiency recovery cores support (see below). building is projected to be net zero carbon. • A comprehensive air barrier embodied carbon materials mechanical ventilation and reduce overall system to minimize infiltration The project is currently looking into the energy consumption. • Be mindful of materials selected, feasibility of incorporating geo-exchange through the building enclosure Low flow water fixtures reduce embracing an honest aesthetic strategies to increase on-site energy • Triple glazed windows on site water consumption by • Use low-emitting sustainable building generation potential. approximately 40%. • Passive cooling using natural ventilation materials to foster good air quality Landscape planting is native species that By pursuing Passive House, the project is • Dramatically limit the use of require little irrigation projected to go beyond BC Energy Step human-made materials as Code 5. finishes inside the building. BENEFITS: BENEFITS: BENEFITS: BENEFITS: BENEFITS: • Reduced energy consumption • Reduce GHG emissions • Ultra low energy building • Promote better health by • Less demand on grid source energy • Reduced water consumption avoiding known hazards • Prefabrication reduces construction • Outstanding comfort • Reduced GHG Emissions time and noise for neighbours. • Prioritize natural materials. • Optimal conditions for health 14
3.2 OVERARCHING PRINCIPLES AND GOALS PRINCIPLES GOALS • Optimize the development potential of the site to ensure high quality and exceptional DEVELOPMENT • The project will produce the desired return on investment livability • Lowest building operation cost • Provide a home layout that is accessible, barrier free, and adaptable. • The project will enhance livability for all of the inhabitants COMMUNITY • Make outdoor space meaningful and useful • The project will positively contribute to the health and welfare of • Minimize the use of materials that produce toxic emissions during the production of the inhabitants material • Eliminate the use of materials in the Perkins + Will Precautionary List and LBC Red List • The project will consider the upstream and downstream impacts of HEALTH materials • Create a sense of place and celebrate uniqueness and local identity ART + CULTURE • The project will contribute positively to culture in West Vancouver • Incorporate public art to enhance the public realm. • The project will not contribute to climate change by increasing • Carbon neutral in operation CARBON CO2e atmospheric carbon concentration • Carbon neutral in embodied carbon emissions over the life-cycle of the project • The project will minimize the use of grid-sourced energy • Energy target for the project will be 60 kWh/ m²/ year, consumes much • The project will convert solar energy to use in the project ENERGY less energy than similarly-sized buildings • The project will use waste energy sources before grid sources 15
PRINCIPLES GOALS • The project will minimize the use of grid-supplied potable water • Net zero water in operation WATER • The project will minimize stormwater flows leaving the site • Reduce stormwater flows to 40% of typical volume from a West Vancouver development project • Inhabitants have access to a ground floor, secure bike room as well as electric MOBILITY • The project will offer a range of mobility options charging stations at all parking stalls. • Provide habitat for local, small animals and insects • The extraction of materials for products in the project should not negatively affect the local • The project will support biodiversity in the area BIODIVERSITY ecosystem • The project will support global biodiversity ecosystem • Regenerate as much native site biodiversity as possible, while balancing other development objectives • The project will include elements that celebrate and encourage the • Provide access to natural light and air from every space in the building. love of nature and natural systems, and leverage the inherent health BIOPHILIA • Provide views to nature from every space in the building. and well-being benefits this brings to the occupants • The project will be resilient to major storm events • Residential spaces to stay operational through major storm events RESILIENCY • The project will increase the resiliency of natural systems • Accommodate the impacts of climate change over the next 100 years • The project will enable inhabitants and residents to reduce the gen- WASTE • Zero solid waste production from the community eration of solid waste 16
3.3 PROPOSAL SUMMARY - KEY OBJECTIVES 1. “Repair” and revitalize the corner for a better fit with the neighbourhood. 2. Enhance the public realm. 3. Adhere to the objectives of the West Vancouver Official Community Plan. 4. Create a building with an elegant, distinctive, and respectful character. 5. Showcase a new path forward that prioritizes an environmental approach, meaningful change in addressing CO2 emissions and climate change . 6. Create bespoke homes that are livable, adaptable, and healthy. 7. Orient the building towards views 8. Celebrate Place - create a neighbourhood link. 17
3.4 PROPOSAL SUMMARY - ENVIRONMENTAL GOALS 1. High building airtightness. 2. Passive House certified glazing. 3. Healthy materials, “red-list” free. 4. Generate energy on site. 5. Balanced window to wall ratio - reduced heat loss. 6. Reduced heat loss through high thermal insulation. 7. Electric vehicle charging at all stalls. 8. Distributed heating, cooling and ventilation systems with dedicated heat recovery at each floor. 9. Street level secure bike parking. 10. Natural cross ventilation for each home. 11. Store carbon in the structure. (Target is net positive embodied). 12. Zero emissions and zero fossil fuels used on site. 18
4.0 Policy Response 4.1 OFFICIAL COMMUNITY PLAN COMPLIANCE - POLICIES The project adheres to the community goals outlined in the West Vancouver Official Strengthen our centres and corridors 2.1.15 Prior to the adoption of a local area associated facilities (e.g., dedicated Community Plan and the Regional Growth Strategy “Metro Vancouver 2040 - Shaping through local area plans plan, consider proposals within the local parking, barrier-free common areas); and Our Future. area plan boundary by: 2.1.13 - Create capacity for an estimated e. Reviewing zoning regulations to remove 1,700–2,100 net new housing units through a. Applying relevant District-wide policies potential barriers to providing accessible local area plans (see Map 3) for the contained in this plan and any existing area and adaptable housing. following areas, subject to provision 2.1.14 of specific policies and guidelines; and The suites have been designed to be barrier this plan: b. Requiring the proposal’s contribution to free and adaptable to allow residents a. Ambleside Municipal Town Centre rental, non-market or supportive housing, to age in place, and to suit the needs of (1,000–1,200 estimated net new units); or its ability to advance the public interest ever changing family circumstances. Our or provide other community benefits as expectation is that this addition to the Our site is located within the Ambleside DISTRICT OF WEST VANCOUVER determined by Council. community will allow some current residents Municipal Town Centre as defined on Map OFFICIAL COMMUNITY PLAN who may live in other housing types to 16 - OCP Schedule i) pg 3. The project acts While the proposal is being submitted remain in the area as their lives change, as an urban infill, creating density close to ahead of the Ambleside Town Centre providing additional housing choice. transit, amenities, and services. Plan, the proposal seeks to align to the guidelines and principals set out in the OCP and district wide policies, while 2.1.23 Advance community energy efficiency 2.1.14 Prepare local area plans by: providing numerous community benefits and reduce GHG emissions by: Regional Growth Strategy b. Determining densities, heights such as: Providing universal adaptable Bylaw No.1136, 2010 suites, enhancing the public realm, and a. Supporting transportation alternatives and building forms that respond to Metro Vancouver 2040 Shaping Our Future through housing location, design neighbourhood context and character (e.g., going above and beyond the standards Adopted by the Greater Vancouver Regional District Board on July 29, 2011 set for energy use reduction, GHG emission and facility provisions, and parking Updated to July 28, 2017 topography, natural features, site area, reduction (operational and embodied), and requirements; transportation and amenities); and on site energy production. b. Increasing the percentage of efficient c. Prioritizing mixed-use and apartment building forms; forms in core areas and ground-oriented multifamily forms (e.g., townhouses, Advancing housing affordability, c. Requiring leading energy efficiency duplexes) to transition to adjacent single- accessibility and sustainability standards and considering site design and family neighbourhoods. orientation; 2.1.20 Ensure that new multi-family and The building proposal matches the height, mixed-use housing development meets the d. Encouraging renewable energy. form and density of the surrounding community’s needs by: The site is located close to transit. All neighbourhood. The site is identified in the b. Supporting a variety of housing forms, parking stalls will be equipped with electric OCP as within the Ambleside Apartment including lock-off units, that allow housing charging stations. A bike room amenity is Area boundary and responds with a to adapt to suit different life stages of located for residents on the ground floor. similar typology fitting the surrounding residents; The building form has been designed neighbourhood. d. Establishing the minimum provision to be compact, with minimal stepping of accessible and adaptable units and or unnecessary articulation in order to 19
improve efficiency. The building form pedestrian signals, tactile walking surface composting and reuse. quality, and biodiversity). Enabling an active community and orientation allows for optimal indicators, appropriate curbcuts and 2.5.11 Facilitate reductions in demolition The primary building material will be mass 2.9.3 Encourage the on-site inclusion of solar exposure for on site solar energy letdowns). waste through source separation and timber to store carbon in the structure. active open space and play opportunities generation. All site improvements will follow best diversion, including whole-building Storm water management will be and provision of privately owned public practices for accessibility, safety and demolition or deconstruction. implemented through pervious paving and spaces with new multi-family and mixed- efficiency. green roofs to store and use water on site. use development as appropriate. Supporting tourism and visitors The existing building will be dismantled and A commitment to use zero fossil fuels on recycled as much as possible. The parkade The project will contain indoor and outdoor 2.3.13 Support placemaking through an site will lead to dramatic GHG reductions will contain an on site composting and amenity and garden spaces for residents attractive public realm and experience by: Promoting sustainability and innovation over baseline targets. The air tight and high recycling room. at the ground floor. Active transportation a. Incorporating inviting public spaces in 2.4.24 Provide infrastructure for electric, thermal performance of the Passive House will be encouraged through the provision iii) Sewage and Drainage Systems envelope will make the building more village and town centres; alternative-fuel, and low-emission of convenient, secure, street level vehicles, including charging stations as 2.5.15 Employ low-impact storm and rain resilient to extreme weather conditions. The site is located between the West bicycle storage. a requirement of new development and water management techniques such as Vancouver Community Centre to the North, preferential parking options. infiltration, absorbent landscaping and and the Weston Park to the south which 2.6.23 Seek to incorporate renewable natural environment conservation to mimic Embracing arts, creativity and provides public access to the Centennial All parking stalls will be equipped with energy in public and private projects, and natural conditions and preserve pre- lifelong education Seawalk Trail. As such, a corner pocket electric charging stations. support the development of renewable development conditions. garden with integrated seating will be energy systems as opportunities arise. 2.9.6 Incorporate public art into both public provided to serve as a link between these 2.5.17 Employ green infrastructure or and private sector projects to enhance Applying best practices for municipal The project will implement solar photo- two areas. This will provide a welcome naturalized engineering strategies where public spaces and the walking and cycling utilities - voltaic panels on the roof top for energy moment of pause and rest for people possible to help manage anticipated environment. generation. A geoexchange system is being traversing the slope from the waterfront. i) Water conservation increases in frequent storm events and explored for passive heating and cooling. The core wall to the west has been associated flood risks. The building form lifts at the ground floor 2.5.7 Encourage use of development identified as a possible area for public art to create a more generous landscaping practices, landscape designs and built Green roofs will be used on both the as it can been seen from both Bellevue Ave areas, add articulation at the ground level, systems that reduce water demand and building rooftop and parkade roof to Promoting trails and access to nature and from The Centennial Seawalk Trail. and to provide covered barrier free access consumption. implement on site water infiltration 2.7.16 Provide access to beaches and The provision of a shared multi purpose between the resident open spaces and the and storage. Water will be collected from both the stream corridors where environmentally room at the ground level will provide an public realm. site and rooftop through landscape and appropriate. important flexible space that may be used pervious paving strategies. Planting will be by residents in a variety of ways including Mitigating climate change and building 2.7.17 Improve safety, universal accessibility, native to the area and drought resistant. fitness, performance and art. Enhancing network accessibility, safety resiliency and signage/wayfinding to parks, open and efficiency Aggressive potable water reduction spaces, and trails for community members 2.6.22 Expand the use of green strategies will be employed to limit of all ages and abilities. 2.4.14 Incorporate universal access and infrastructure through public and private consumption. age-friendly design principles in sidewalk, development to enhance long-term The project proposes to add a seating pathways, transit, and road improvement ii) Waste management and recycling ecosystem services that support multiple area at the corner, enhancing the public projects for pedestrians and cyclists of 2.5.10 Expand organics and food waste benefits (e.g., storm water management, realm on the pedestrian link between the all ages and abilities (e.g., accessible reduction through education and on-site air quality, carbon sequestration, water community centre and the Seawalk Trail. 20
4.2 OFFICIAL COMMUNITY PLAN COMPLIANCE - BUILT FORM GUIDELINES The site falls within the boundaries of the Ambleside Apartment Area as defined under the I. Context and Site Design Seawalk Trail. west is comparable to other projects in Built Form Guidelines for Development Permit Area Designations. Guidelines BF-B 4. the immediate surrounding blocks. The a. Encourage renovation and conservation f. Link ground level open spaces to adjacent proposed massing was sensitively scaled to of buildings and features of heritage streets, sidewalks and pathways. create a gradient from the lower building to character; The building features a stepping massing the south to the larger buildings to the west Not applicable to this project. along Bellevue Ave and is lifted at the and north. ground floor in order to maximize the public b. Situate buildings to maximize views c. Encourage the use of high quality realm and link resident open spaces to while minimizing impacts to surrounding materials. public access areas. buildings’ views. The project is committed to using high end g. Encourage the use of integrated public Building massing and glazing deployment healthy materials on both the exterior and art compatible with adjacent development has been considered to maximize views interior of the building, including elements and street patterns to enhance the towards the south. The massing respects of the mass timber structure being exposed. pedestrian experience. the 45˚ Building Height Grade line. d. Detailing should be designed in keeping The pedestrian experience is being c. Minimize obstruction of views from public with the character of the building and enhanced with a generous corner garden at pedestrian areas, common living areas landscape. the north west corner of Bellevue and 22nd. of other developments, and from existing Vertical divisions have been added to the residential units. h. Bury utility wires underground where facade to follow the structural rhythm economically feasible. See view impact studies for further of the building. Horizontal elements are information. To be considered alongside rezoning implemented to add shadow and texture, application. while reducing the scale of the massing. d. Enhance the quality of streetscapes through the overall design of development. Elements such as wood soffits and screening have been added to highlight the The current development is enclosed behind II) Building Design fact that the building is built of mass timber, a solid wood fence. The new development a. Vary building mass to minimize its scale. as well as tie into the west coast aesthetic will improve the surrounding streetscapes of West Vancouver. by providing a well designed and garden- The building steps along Bellevue, following like public realm. the property line to both provide more open e. Use building mass to emphasize the Site space at the public realm and to minimize entrance to buildings. e. Encourage pedestrian amenities, such the building scale. Along 22nd St, the as courtyards, within and adjacent to The building has been lifted at the ground composition of the facade likewise breaks apartment developments. floor to create a generous porte cochere the massing down into smaller elements. and entry area. The building incorporates an entry b. Address the compatibility of scale courtyard as well as a corner pocket f. Entries should be visible, clearly between new buildings and existing garden to link it to the larger pedestrian articulated, and accessible. adjacent buildings. thoroughfare between the community The main entry is located off of Bellevue centre and Weston Park which provides The height, scale and separation Ave. The entry is articulated by the stepping public access to the Centennial between the adjacent building to the facade on either side. Entry off of Bellevue 21
Ave was chosen to work with the site water views. A landscaped entry garden as well as a parameters as well. e. Ensure that site circulation is accessible to topography to keep the entry accessible. corner pocket garden with integrated persons with disabilities. k. Design buildings and landscape elements IV) Circulation/Parking seating have been planned for the g. Encourage terraced buildings adjacent to to minimize shading, and intrusion on The site will provides barrier free access development. a. Locate parking underground to maximize the shoreline. privacy of adjacent buildings. at all shared areas such as the front entry, ground level open spaces for landscape b. Avoid landscaping elements that inhibit the resident amenities at ground level Due to tall trees to the south, the See shadow studies page 43. The core has elements and treatments. pedestrian or barrier free access along and common amenities in the parkade massing has not been stepped in favor been situated so that minimal glazing is sidewalks or towards buildings. The parkade is situated underground with such as storage rooms and garbage/ of maximizing views and optimizing the deployed on the west side of the building to the entrance to the south of the site. recycling sorting. roof top for solar Photovoltaic arrays. eliminate overlook to the adjacent building. All site improvements will provide barrier Furthermore, as the project is pursuing free access to the common areas. b. Encourage underground garage entries f. Share access/curb cuts between buildings l. Provide detailing and articulation, Passive House certification, simplified forms to provide an appealing entrance from the where possible. especially at eye level. c. Maximize the use of roof spaces for roof perform better for energy use reduction. streetscape with the use of planters and/or gardens and common areas. Existing curb cuts have been maintained The building mass is lifted and articulated trellis structures. h. Avoid blank or undifferentiated facades where possible, shared access is not at the ground floor to provide covered The rooftop is currently planned for solar at the ground level. The parkade entry is underground and contemplated. pedestrian walkway and drop off areas. panels and energy generation. In lieu of a integrated with the landscape design. The ground level is articulated by soffit Furthermore, landscaping will be deployed rooftop garden, each home has a generous g. Minimize the width of curb cuts covered pedestrian access connecting the throughout the public realm to add visual outdoor deck. Furthermore, resident indoor c. Discourage large expanses of ground where possible. resident outdoor amenity to the main entry. interest and layering to create a sense of and outdoor amenity space has been level paved parking, particularly when Curb cuts will follow city engineering The ground floor contains both a resident generosity. provided on the ground floor to the south. visible from or directly adjacent to a street. guidelines. multipurpose room and bike amenities. Where ground level parking is needed, m. Site and screen garage entrances, d. Minimize the scale of apartment The public realm with contain generous provide landscape elements such as h. Design and situate garage doors so that mechanical equipment and garbage bins, buildings at ground level with the use of landscaping. fencing or planting to visually break up they are not a dominant feature of the to minimize visual and acoustical impacts trelliswork and other landscape features. and screen parking from public streets and streetscape. i. Screen roof top mechanical equipment on adjacent properties and the streetscape. The ground floor has been lifted to neighbouring properties, improve natural from neighbouring properties. Garage doors are located underground in The parkade uses the natural grading of minimize the scale at grade, provide drainage, and highlight pedestrian routes. the parkade. Mechanical equipment on the building the site to minimize appearance from the covered pedestrian access and expanded There is no ground level parking included in will be minimal as the project is Passive public realm. The parkade is screened. All landscape areas. Using a layered approach, i. Encourage the use of bicycles and the the project. House and is implementing individual heat mechanical equipment and garbage bins a variety of scale in planting, combined provision of bicycle storage areas. recovery units within each home. They are are located within the parkade and not with a range of species, will create a sense d. Design underground residential parking Bike storage for residents has been located in a screened room next to the visible from the street. of invitation to the landscape. to be readily accessible and easily used by provided at street level. exterior exit stair. The rooftop will have residents. e. Minimize glare and light spill to solar panels which are arranged to be an All parking is located on one level. The core surrounding properties through design and asset, highlighting the buildings sustainable III) Landscape siting of exterior lighting. is centrally located so as not to be far from qualities rather than an eyesore. a. Integrate landscape features and any of the parking stalls. Parking stalls are The service core was purposefully placed j. Encourage private outdoor living space elements with the adjacent streetscape, use a mixture of regular stalls and car lifts to to reduce glazing along the west side of for each unit. established vegetation where feasible, and provide options for residents. An unreserved the building to reduce overlook and glare provide a mature and varied appearance accessible stall has been located next to Each home has an outdoor deck to the to the neighbouring property. Exterior upon construction completion. the core. south to maximize access to daylight and lighting will be designed to reflect these 22
4.3 WEST VANCOUVER FOUNDATION - VITAL SIGNS COMPLIANCE Vital Signs is a community check-up led by community foundations and coordinated by Vital Signs Report 2016 Many of the key issue areas identified in the Vital Signs Report 2016 have a direct Community Foundations of Canada that leverages community knowledge to measure relationship and alignment with the principles and goals set out for the project. The Vital Signs Report 2016 identified 10 key the vitality of our communities, identify significant trends, and support action towards issue areas that serve as indicators of the improving our quality of life. community. The goals of the report are to: West Vancouver Community Foundation • Highlight areas to encourage Vital Signs Report 2016 (page 4) further dialogue and response from institutions, public leaders, charitable organization and citizens. Since 1979, the West Vancouver Community Foundation has worked to leverage the generosity, talent, and commitment of our residents to build a stronger, more caring and • Encourage cross-sector, holistic thinking inclusive community. Our vision is a healthy and vibrant West Vancouver, where everyone is on the overall vitality of our community Vital Signs 2016 22nd and Bellevue Project valued, contributes, and feels they belong. and provide impetus from cross sector 10 Key Issue Areas 12 Principles and Goals initiatives West Vancouver Community Foundation • Build community capacity through Vital Signs Report 2016 (page 4) Learning Development shared knowledge for good decision making. Health and Wellness Community Vulnerability Health Project Overarching Principles and Goals Safety Arts and Culture At the onset of the project, Delta Group and Housing Carbon Perkins and Will held a design charrette Energy Environment to establish a holistic set of principles and goals that would establish the foundation Arts and Culture Water of the project and influence every decision. Diversity and inclusivity Mobility The intent of setting these principles and Belonging Biodiversity goals was to: Volunteerism and Civic Biophilia • Ensure alignment of values within the Engagement Resiliency project team • Show leadership to change the local Waste development industry and the way we build. • Create bold and inspiring architecture with an urgent environmental imperative. 23
Vital Signs Report 2017 isolation and its negative effects on health are important activities for creating The project proposes to add gentle density five years primarily cite downsizing and and well-being. awareness, building bridges and fostering to a neighbourhood already zoned for health reasons. The Vital Signs Report 2017 took a deep The site is located close to amenities, inclusion. multifamily development. As an infill site, dive into one of the 10 Key issues identified The net size of the units falls within the transit, and the West Vancouver Community the building will be consistent with the form in 2016’s report - Belonging. The report The outdoor public spaces are intended size range listed on the survey as being and Seniors Centres. Each suite is one level and density of surrounding buildings. focused on the topic of belonging by to provide community connectivity to the desirable. and barrier free which would allow seniors delving into 3 main topics: Belonging and larger neighbourhood. The ground level The site’s proximity to amenities, community to age in place Contribution, Diversity and Inclusion, and incorporates a multipurpose room and services, and transit make it an ideal spot Housing Diversity and Attainability. The garden areas for social gatherings of to add increased density. The project The 2017 Vital Signs Housing Survey project adheres to the goals outlined in the residents. promotes connectivity by providing a highlighted that when considering a II. Diversity and Inclusion report in the following ways. ground floor integrated into the larger move, current residents most considered More generational and socio-economic public realm. The corner pocket garden will proximity to: shops and restaurants (43%), diversity is needed in our community – strengthen the pedestrian path between recreation and fitness facilities (43%), many of us can’t afford to “age in place” or the Seawalk and the West Vancouver parks and trails(43%), and access to transit III. Housing Diversity and Attainability I. Belonging and Contribution continue living near our family. Community Centre. Resident bike parking (20%) as the most important factors when Increasing density and diversity of considering a new neighbourhood. Belonging and contributing could be The 2017 Vital Signs Housing Survey will be provided at grade to encourage housing stock needs to be a priority. More more intentional and supported through highlighted that 29% of respondents multiple modes of transportation. The project is situated close to all of the secondary suites, infill or coach houses, designing public spaces for more formal considering moving to West Vancouver listed desirable amenities. multi-family dwellings, purpose-built and informal connections. Our library, and 59% of current residents who would rentals, and smaller homes should be Housing and neighbourhoods need to community centres, schools and the consider relocating within West Vancouver encouraged through zoning and incentives. be designed for better accessibility and Harmony Arts Festival do this well. would be looking at an apartment The suites add to housing diversity as they mobility, including railings, ramps, more condominium as the housing type they The project proposes to strengthen the sitting areas, safer street crossings, and would be the most interested in. are atypical for apartment buildings with public realm by providing a corner pocket other features that make it easier for only one home per level. They will appeal to garden with integrated seating, serving Each suite of this project has been designed not just those with walkers, wheelchairs, those looking to age in place and downsize, as a link and moment of pause between to be barrier free and adaptable to suit all and baby strollers, but for everyone to while still keeping the feeling of a single the community centre to the north and the kinds of changing family circumstances. get around. family home. Centennial Seawalk trail to the south. The net size of each home falls within the Both the homes and site will be designed size range listed in the survey as being to be barrier free and accessible. Different desirable. Development and re-development needs to West Vancouver has a high concentration modes of mobility will be encouraged by aim for “20 minute neighbourhoods”, where of seniors in a community a with low providing residents bike storage at grade. amenities are within a 20 minute walk or walkability score (43 out of a scale of Indoor and outdoor public spaces, as well bicycle ride from home. Increased density, 100), as well as low transit accessibility. as neighbourhoods, can be designed to mixed use developments, public spaces 33% of West Vancouver residents surveyed In addition, 26% of our seniors 65 and encourage connecting and help make designed for connecting, car sharing, expect to move from their home in the older live alone. These are some of the people feel included. Libraries, schools, better cycling infrastructure, improved next five years, with the key driver being factors that limit the ability to maintain community centres and even shopping transit, and increasing walkability with financial and economic reasons (primarily independence and social contacts and centres are valuable venues, and arts, more sidewalks would be features of these stated by those under 65 years of age). supports, and increase the risk of social festivals, sports, food, stories, and dialogue “community nodes”. Those anticipating a move in more than 24
5.0 Local Context 5.1 EXISTING SITE PHOTOS The Site is located at the corner of 22nd St and Bellevue Ave in Ambleside, West Vancouver. 22ND STREET H G F BEL B LEV UE A) View looking south from south west corner of site. AVE A E C D PROPERTY LINE B) View looking south from middle of site. 25