All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy

Page created by Irene Hunt
 
CONTINUE READING
All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy
modern modular building
   revolutionary simple
   resourceful efficient
   regenerative clean

all around profitable
OASIS 1 – Spa & Wellbeing Center
All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy
OASIS 1 at Brandon House Hotel, New Ross, Ireland
    OASIS 1 is a lifestyle building sculpture     Autumn 2006 was the starting moment for      one week by the end of April. Inspired by
    with flexible usage possibilities. OASIS is    the first OASIS 1 project worldwide. Paddy    the Celtic Heritage theme, the LiteHouse-
    covered with a high tech surface membrane     Quinn, building contractor and hotel owner   One Creative Director Gunter Thurner
    that serves as roof and façade, as well       ordered the OASIS 1 as a Spa & Wellbeing     worked out an individual interior and garden
    as projection screen for changing light       Center for his existing Brandon House        concept.
    effects. OASIS 1 works as stand-alone         Hotel, New Ross, Ireland. The foundation
    building or as an extension of existing       works started in February 2007 followed by   OASIS 1 has been handed over to the
    structures. The LiteHouseOne Creative         the main support structure in pre-manufac-   owner – turnkey and fully operational – mid
    Team conceives individual interior concepts   tured timber elements by HARING AG (CH)      September 2007.
    on client’s demand implemented on four        which has been assembled within only
    levels.

2
All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy
Interior and Design
Celtic Interior                                   gangway the guests are welcomed with the       The Sky-Dome with its 5m glass roof in the
                                                  slogan “Solas Croì“ (Gaelic: “enlightened      top floor allows a free view into the Irish
Inspired by the Celtic heritage of the            heart“) as well as a symbolized seed corn      sky and offers an unique atmosphere for
region our Creative Director Gunter Thurner       in its different phases: the seed at the       relax. With an interactive „Light Theatre“,
has created the individual ”Celtic Design“.       beginning, then nourished by water,            5 sand pendulums and a slowly moving
According to the client (Mr. Paddy Quinn)         germinating, the seedling and finally the       double helix, the guests joyfully can relax
desire, OASIS 1 has been set into a Celtic        tree. This level is dedicated to the element   and let go.
themed garden, which Thurner enriched             water, which Thurner sets in scene with
with a natural stone stele, a water creek,        a water relief and a fountain with basalt      You will find further impressions on:
a rose circle, a meditation path and an           columns. In this floor is situated: foyer,      www.brandonhousehotel.ie
organic formed exterior pool.                     bistro, consulting area and changing
                                                  room.
The elements earth, water, fire, air
separate OASIS 1 into four different worlds of    The theme in the second floor is dedicated
experience. The guiding motive in the             to the element fire (wood) which Thurner
ground floor is the “Crystal“. The finishes         themes with a Celtic Druids Forest. The
on sauna, steam bath and experience               forest is created with minimalistic trees,
showers are composed with “Stucco                 which are formed by boards of ancient
Veneziano” which seems to be like real            American oak trees and moving light and
marmoreal. Next to the hydro pool a               shadow effects behind big stylized leaves.
composition of three polished basalt steles       Romantically integrated into this forest the
with special light effects and SWAROVSKI          client finds a course for foot reflex massage,
crystals playfully and mystically establish the   the VIA SENSUS from ProConHealth
“Crystal Theme“.                                  KG, which is a perfect preparation for
                                                  different services in the seven treatment
In the first floor OASIS 1 is directly              rooms, with a great choice of massages,
connected to the hotel through a                  medical baths and other. The suite with two
“floating“ gangway. At the entrance of the         treatment places is a highlight for couples.

                                                                                                                                               3
All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy
ground floor

                  Architecture
                  OASIS 1 – Spa & Wellbeing Center                                 Spa Level (Ground Fl.) with Sauna,
                                                                                    Water World and Garden Experience
                  The      following     floor     illustrations                    Therapy Level (2nd Fl.) with Via
                  represents the OASIS 1 Concept as                                 Sensus, seven Treatment Rooms and
                  the Spa & Wellbeing Center, especially                            Wellbeing Suite
                  developed for the Brandon House Hotel in                         Relaxing Level (Roof Fl.) with
                  New Ross, Ireland. The architectural task                         Loungers, Light Theatre, Sky Dome
                  consisted in the requirement to design the                        and Sun Deck
                  OASIS 1 equally as Hotel and Day Spa, to                         Building Equipment Level (Basement)
                                                                                    houses the entire Water and Electrical
                  complement the existing Health Club with
                                                                                    Installations and the Heat Pump and
                  Swimming Pool and Fitness Center and
                                                                                    Heat Recovery Units from the
    first floor     integrates it in the operating schedule of
                                                                                    renewable geo-thermal energy
                  the Hotel.
                                                                                The circulations, with short and clearly
                  In the linking part emerged a new Spa                         defined ways for guests, minimal routes
                  reception within the existing Hotel with                      for the operator and reduced distances for
                  an internal link to the Hotel Lobby and an                    the technical staff – one of the most difficult
                  access from the outdoor parking. From this                    tasks in every project – have been solved
                  reception area with Wellness Shop and                         in a conclusive way:
                  Hairdresser Salon, the guest accedes over
                  a floating Gangway the experience world of                        The Lobby is with the bar and the
                  OASIS 1 (see also page 3, Celtic Interior).                       Bistro, Counselling area and the Spa
                  Following the analysis and evaluation                             manager Office, the communication
                  of all interests implied – the Client’s, the                      hub and starting point to the Locker
                  Wellness Consultant’s and the Irish                               Rooms, Staircase and Terraces
                  Building Officials requirements – architect                       The Staircase contains the Lift for the
                  Horst Mallmann with his Planning Team                             disabled and the utility shaft
                  developed a complete concept which                               All Sun Decks of the four Levels are
                                                                                    linked together through the “Boulevard
                  ideally and equally satisfied the needs of
                                                                                    Stairs”
    second floor   the guests and of the hotel operator.
                                                                                A remarkable whole architectural concept
                  The clearly laid out correlation of the func-                 emerged in the reverse sense of the
                  tional areas divides the OASIS 1 in the:                      slogan “form follows function” starting from
                                                                                the idea of a sphere shape structure.
                     Entrance Level (1st Fl.) with Locker
                      Rooms, Bistro, Counselling and
                      Administration

    top floor

                  © FUNKE INTERIOR DESIGN Dipl.-Ing. Katja Elena Funke Innenarchitektin BDIA AKH

4
All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy
The OASIS Family
                                                                                                OASIS S – Spa & Wellbeing Suite is
OASIS 1 with a total area of nearly 1000                                                        conceived as a sculptural building in hotel
sqm on four levels plus basement is the                                                         parks. It offers to a hotel guest couple the
flagship of the OASIS Family.                                                                    extravagance of a lifestyle suite to dine and
                                                                                                sleep, to relax and enjoy a private spa with
OASIS M has three levels with about the                                                         individual private treatments.
half of the area and a tightened operational
concept, also with the function of a Spa &                                                      With OASIS SL – Living House, LiteHouse-
Wellbeing                                                                                       One offers also an alternative for a private
                                                                                                use as a Wellbeing House.
Obviously both products, as well as the
smaller ones, can be used for other                                                             The different OASIS types combined
purposes: i.e. exclusive Office Building,                                                        into an ensemble can lead to attractive
Lifestyle Restaurant, Art Gallery, luxury                                                       architectural    solutions.     With   LULU
Villa, etc.                                                                                     VILLAGE – a “floating Pearl Village” in an
                                                                                                artificial bay – our creative team achieved a
                                                                                                spectacular design.

Clean Energy System
Challenge                                         Clean Energy System                              Heat pump for using the ground-
                                                                                                    water energy
It is a commonly known fact that, through         The LiteHouseOne Research Team set               Decentralized active Ventilation with
the advanced shortage caused mainly by            out the goal to develop buildings with            Heat Recovery
the increasing demand in the developing           decidedly lower energy consumption               Photovoltaic panels
                                                                                                   Solar Collectors
countries, the price of oil will increase up to   and this to be covered from regenerative
                                                                                                   Solar Cooling System (Absorption
4 to 5 time within the near future.               energy sources. The result of a co-
                                                                                                    Chiller unit)
                                                  operation with the building equipment
                                                                                                   Near-Surface Geothermal System
Leading researchers expect that with the          engineers Prof. Klaus Daniels from                for heating and cooling
continuing exploitation of the fossil fuel the    HL-Technik and Thomas Steinberger                Sunscreen Elements (reduction of
resource will come to an end within 30 to         from SKM-HAUSTECHNIK - Munich, the                the cooling load)
50 years. The burning of the fossil fuel is by    chief developer from GAP-SOLUTION,               Wind rotor system
far the main cause for the global warming.        Johann Aschauer – Linz, Austria and other
                                                  specialists of manufacturing companies
The whole humankind and especially the            can be seen in the Variable Clean Energy      Results
industrially developed nations face the           System.
challenge, not only to cover their own                                                          Thanks to the excellent thermal insulation,
energy demands from sustainable                   The following passive and active              solar energy gains and the implementation
ecological resources, but also to act             components will be implemented according      of Regenerative Energy Sources for
responsibly in developing alternative             to the climatic and functional requirements   heating, cooling and electricity production
energy resources and implementing them            and to the energy resources available:        there will be no requirement for Oil, Gas
worldwide.                                                                                      or Cole based Heating Systems and for
                                                     Solar Façade System – “insulate           electrical Air Conditioning.
                                                      with light”
                                                     Highly efficient Thermal Insulation,       The running energy costs will be
                                                      i.e. Vacuum Panels                        permanently cut to a minimum and the
                                                                                                dependence of the fossil fuels will be a
                                                                                                thing of the past.

                                                                                                                                                5
All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy
Implementation
    Construction                                      Client can eliminate all walls and if request,   The main entrance can be placed – upon
                                                      connect the levels vertically by cutting out     request – either in the Ground Floor or any
    The sphere shape, which is the geometry           the slab segments!                               of the other upper levels, by means of a
    of OASIS 1, is structurally divided in 12                                                          floating gangway.
    segments. The main bearing structure              Upon Client’s demand LiteHouseOne
    consists of 12 vertical curved glue-lam           develops a custom trimmed Interior
    beams, each connected with the central            Concept. All individual and modular              Project and Execution
    column through radial beams, disposed on          elements of the interior work are produced
    three levels. All slabs in the three levels are   by BOXLER GmbH in their own factory in           LiteHouseOne offers complete solutions –
    divided in 12 segments and consist – as the       Rammingen (South Germany) and within             from the first project idea to the turnkey
    partition walls too – of pre-manufactured         short time assembled on site.                    handing over. Together with our selected
    elements.                                                                                          Team of High-Tech Specialists from all
                                                      The transparent with silver dots printed         over Europe, we develop and implement
    This innovative flexible structure has             ETFE foil by HIGHTEX GmbH (Bavaria,              for our Clients, strategically and technically
    been developed in collaboration with our          Germany) creates a secondary skin in             optimal solutions.
    structural engineers Dieter Herrschmann           addition to the primary façade which
    and Werner GELTINGER from Schliersee              consists of Solar Panels and window              The very best specialists assist us in
    in Bavaria.                                       elements. The buffer zone created within         every phase of the project and plan ahead
                                                      the two skins optimizes the energy balance       the next steps, based on the already
    The entire main and secondary bearing             according to the different climatic zone.        proven and tested developments of the
    structures was manufactured with high                                                              LiteHouseOne Modular Building System
    precision by our major supplier HÄRING            The Membrane construction, as well as            and LiteHouseOne Clean Energy System.
    AG (CH) and assembled within 2 ½ weeks.           the entire OASIS 1 structure withstand
    On this is to mention, that the dimensional       without any damage also gusting winds            Thus, we set new benchmarks for Building
    tolerance of the 18m diameter structure is        over 160km/h.                                    Quality, Design, Ecology and Quality of
    less than 7mm!                                                                                     Living.
                                                      The whole OASIS 1 structure rests on a
    Thanks to this structural concept OASIS           reinforced concrete basement level which
    offers a maximum flexibility of the space:         houses the Clean Energy System building
    without constrains from walls and slabs, the      equipment.

6
All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy
Company Profile
Our Vision                                     Our Construction Method                            Our Strategy

modern modular building                        Following the results of an interdisciplinary      Before starting the process of creating,
                                               development process, the LiteHouseOne              planning and implementing, we begin with an
   revolutionary simple                       Construction Method rests on two principles:       intensive assessment of demand and client’s
   resourceful efficient                                                                          requirements. Only he who permanently
   regenerative clean                            Clean-Energy-System (see page 5)               develops the best solutions for the
                                                  Modular-Building-System (see page 6)           clients and establishes himself as the best
                                                                                                  Problem Solver in his branch can withstand
Our Passion                                    The choice of domestic timber as primary           the global competition in the long term.
                                               construction material, the shifting of the buil-
The passion of Horst Mallmann and              ding process in the manufacturer’s plants,
Wolfram Berghüser, the two company             the conversion of the “Building Site” into a       Our Enterprise
founders, for the establishment of a           “Final-Assembly-Line” and the implementati-
forward-looking Construction Method, is        on of most innovative Insulation Systems and       The internationally registered trade mark
the driving force and the foundation all       Building Services Technologies lead to clear       LiteHouseOne® stands as a symbol for
entrepreneurial activities.                    advantages for our clients. Die LiteHouseO-        trend-setting Construction Methods.
                                               ne-Construction-method is:
Our guiding themes are:                                                                           We won, with our Vision and Passion, the
                                                  extremely fast due to the industrial           leading Specialists and their Enterprises as
   Protection of natural resources                prefabrication; the production of              steady Development and Manufacturing
   High material and manufacturing                the Space Units respectively Elements          Partners for the Implementation of our
    quality                                        take place at the same time with the           projects. The main Partners are listed on
   Efficient and energy-saving                     excavation and foundation works                the reverse of this page.
    manufacture                                   efficient and cost saving thanks
   High flexibility for changing client            to the Serial Production of identical          For further information we kindly invite you
    requirements                                   Construction Elements and shortening           to visit our homepage and to a personal
   High intrinsic value / return of               of the construction period
                                                                                                  contact.
    investment for the owner                      very flexible through open spaces as a
   Minimal energy consumption and                 result of free floor plans, again
                                                                                                  LiteHouseOne GmbH
   Utilisation of Clean-Energy-Sources            resulting from the creative Structural
                                                   and Building Equipment Concepts                26 Machtlfinger Strasse
                                                  high-value thanks to Quality                   Munich 81379
                                                   Management in the Serial Production,           Germany
                                                  energy saving through excellent                phone +49 (89) 723 92 63
                                                   Insulation, Solar Energy Gain and              fax +49 (89) 724 39 00
                                                   the utilisation of Regenerative Energy         e-mail info@litehouseone.com
                                                   Sources                                        web: www.litehouseone.com
                                                  health-improving thanks to Ecologically
                                                   Clean Construction and active
                                                   Ventilation Systems

We look forward to meeting you and learn more about your requirements.

                           Yours                                                                      Yours

                           Horst Mallmann                                                             Wolfram Berghüser
                           Architect Dipl.-Ing. & Urban Planner                                       Energo Kybernetic Strategy
                           Chief Executive Officer                                                     Chief Executive Officer
                                                                                                                                                 7
All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy
Partners
        Aktiv Consult:                            HÄRING & Co. AG:                      RAUPACH & Wollert-Elmendorff:
        Wellness & Hotel Consulting               Timber Construction Engineering       Attorney of law
        www.aktiv-consult.de                      www.haring.ch                         www.raupach-we.de
        Airconmech                                HH SCHUNK Relaxing factory:           4rent - München:
        Building Equipment                        Interior                              innovative Light Tech
        www.airconengineering.com                 www.relaxfactory.com                  www.4rent-gmbh.de
        BOXLER: Innenausbau +                     HIGHTEX AG:                           SCHLEITZER baut Gärten
        Interior + Competence in Timber           Techn. Membrane Constructions         creativ & innovativ GmbH:
        www.boxler.de                             www.hightexworld.com                  www.schleitzer.de
        BUTZ & NEUMAIR:                           HL-Technik Engineering Partner:       sha. Vertrieb GmbH:
        Lift Systems                              Building Equipment Consulting         AlphaShere
        www.butz-neumair.de                       www.hl-technik.de                     www.sha-art.com
        cmr                                       IMMO PROJEKT,                         skm-haustechnik GmbH:
        Electrical Contractors                    Dr. Rothmeier:                        Building Equipment Engineering
        www.cmrelectricalcontractors.com          Real Estate Development               www.skm-haustechnik.de
        DesignFunktion:                           KLAFS Saunabau:                       Statikbüro GELTINGER +
        Interior                                  Sauna + Wellness                      Dieter Herrschmann:
        www.designfunktion.de                     www.klafs.de                          www.statik-geltinger.de
        EBERLE:                                   Koch Membranen:
                                                                                        STEFAN HÄRTL Steuerkanzlei:
        Riskmanagement                            Acoustic Membranes
                                                                                        Tax Adviser
        www.eberle-versicherungsmakler.de         www.kochmembranen.com
                                                  KOEPE & Partner:                      SWAROVSKI:
        ECKSTEIN Sigrid:
                                                  Patent Attorney                       Crystal + Lighting
        Interior
                                                  www.innovopat.de                      www.swarovski.com
        FaserMix Johann Seiderer:                 KONRAD KLEINER:                       Umwelt-Akademie: Environment
        Textile Plastering                        Bath + Sanitary Trade                 + Climate Protection
        www.fasermix.de                           www.kleiner.de                        www.die-umwelt-akademie.de
        Forschungsinstitut für anwendungsori-     KUBE GmbH:                            Utopia Werbeagentur GmbH
        entierte Wissensverarbeitung/n (FAW/n),   Lighting                              Marketing Communications
        Prof. Radermacher – www.faw-neu-ulm.de    www.kube-gmbh.com                     www.utopia.by
        FREWA Treppen &                           MARINA TOURS: Travel agency           Villeroy & Boch:
        Stair Systems                             for Ireland, Scotland, Wales          Bath & Lifestyle Culture
        www.frewa.de                              www.marinatours.de                    www.villeroy-boch.com
        FUNKE INTERIOR DESIGN:                    Pool & Spa - Enniscorthy:             WEISS & WEISS:
        Interior Consulting + Planning            Pool + Spa Services                   Window & Façade Systems
        www.funkeinteriordesign.com               www.poolandspa.ie                     www.weissundweiss.de
        gap-solution GmbH:                        ProConHealth:                         wellnetworks:
        Solar Façade System                       Via Sensus + Ice Tower                spa research-development-consulting
        www.gap-solution.at                       www.proconhealth.de                   www.wellnetworks.net

www.litehouseone.com                                                                Design by Utopia advertising
All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy All around profi table - OASIS 1 - Spa & Wellbeing Center - modern modular building - Time & Energy
You can also read