ALFRED Project: Status and next activities - SNETP
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
ALFRED Project: Status and next activities SNETP Forum – TS7: Advanced reactor Systems February 4, 2021 Michele Frignani Tendering and Technical Integration – Head of Unit Member of Expert Board, FALCON Consortium Corso F. M. Perrone, 25 16152 Genoa – Italy Phone: +39 010 655 8094 www.ansaldonucleare.it michele.frignani@ann.ansaldoenergia.com M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 1
More energy… of a new type 9.7 billion people by 2050 2/3 of the world’s people living in urban areas 25 % global energy increase by 2040 2 times faster electricity demand increase 1.7 % increase of CO2 in 2018 70% higher than average increase since 2010 2.8 % RES increase per year RES will provide 31% of electricity generation by 2040 M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 2
Facts and forecasts at worldwide level 7713 million people 25 602 TWh of electricity produced 10.4 % from nuclear 500-225 GWe of new installed capacity by 2050 M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 3
Facts and forecasts in Europe North/West/ Eastern Southern Europe Europe 454 million people 293 million people 2 989 TWh 1 622TWh 130-75 GWe of new installed capacity by 2050 of electricity produced of electricity produced 24.2% from nuclear 22.1% from nuclear M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 4
The «ideal» Nuclear Power Plant 100% usage of resources No carbon emissions in operation No offsite emergency No long-lived waste Cheap electricity High reliability M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 5
ALFRED: the Advanced Lead-cooled Fast Reactor European Demonstrator No other advanced reactor technology can feature the same unique aspects One of the most promising technologies for deployment in the SMR segment Steadily increasing attention by industry and utilities worldwide Recognized by inclusion in the research agendas at international level (GIF, ESNII) ALFRED, a demonstration reactor, also prototypic of a Lead-based SMR, to bridge the final gap between conducted research and industrial application M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 6
Enabling options: TES and H2 production Baseload Electrical Power Load Following V-RES market Thermal Power e.g.: 3 h of charge at 45%el NP. 130% NP el. output for 3 hrs (2 cycles per day) H2 for Load Following Electrical Power Thermal Power Energy Carrier e.g. High Temperature Electrolysis (2 kWth/Nm3/h + 2.8 kWe/Nm3/h = 8.72 kWth/Nm3/h @ 42%) M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 7
A world-class Research Infrastructure The largest pool facility in the A broad-scope laboratory world, for large-scale components on the chemistry of HLMs testing in representative ATHENA ChemLab and materials science conditions A hot facility to A pool facility for characterize long-term experiments, radioisotopes behavior Meltin’Pot ELF to characterize the in Lead under accident components and conditions systems A loop facility for full-scale HELENA-2 Hands-ON A facility devoted to the testing and complete thermal- testing and qualification of hydraulic characterization of systems and procedures for fuel and absorber assemblies the handling of core elements M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 8
Research Infrastructure: Science and Technology development Consolidate the Demonstrate the HLM science LFR technology Deploy a world-class Provide industrial research infrastructure qualification services Pool the European Support LFR safe and research community sustainable operation Science Technology M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 9
Role of the Research Infrastructure To support the final design To provide a comprehensive and licensing of the ALFRED platform to master the LFR reactor technology To support a staged approach To continuously enhance the safety for the further advancement and sustainability performances of of the LFR technology following commercial units M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 10
FALCON: A long-lasting collaboration endeavor Fuel-coolant chemistry Coatings development Engineering support CFD analysis CFD analysis Operator’s review Balance of Plant optimization Manufacturing feasibility CESINA Partnership Analysis and E&T M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 11
A challenging roadmap… Viability Preparation Construction Operation 2020 2025 2030 M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 12
…on a solid basis 2011 Jul. 2020 - Contract signed for Athena and 2015 Availability of Romania to host Chemlab construction ALFRED Apr. 2020 - Integrated National Energy and ALFRED in Smart 2017 Specialization Climate Change Plan (NECP) for 2021-2030 Strategy of Romania South-Muntenia Romanian 2018 - ESNII Exec Board promoted ALFRED in National Research and Jul.2020 the Fast Track 2017 - National Strategy for RDI (2015-2020) Innovation Plan Contract signed ATHENA and 2017 - Roadmap for Research Infrastructures in Romania for 2017-2025, Ministry of ChemLab Research and Innovation construction 2017 - CESINA (academia), ROMATOM (nuclear industry) partnerships and NUCLEARELECTRICA agreement 2019-2020 - ~2.5 M€ for National R&I 2017 - ALFRED included in the Romania plan on ALFRED (PRO-ALFRED) National Research and Innovation Plan 2021-2023 - 22 M€ for ATHENA and 2015-2020 ChemLab Infrastructure M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 13
Opportunities and benefits European Level National Level Reduce disparities and consolidate European Regional Level An opportunity for Romania leadership in nuclear to become the focal point in Local Level technology Broaden local high-skilled the LFR technology in work opportunities and Increased visibility and Europe reduce disparities in reputation recognized by peripherical areas local community • Economic competitiveness of the industrial reactors is one of the main drivers of the Project. • Competitiveness cannot be the case for the research infrastructure (including ALFRED). • Economic worthwhileness can be demonstrated if socio-economic impacts are factored in. • Short- and long-term scientific relevance and social benefits are key factors. • A combination of public and private funds is the means for project success. M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 14
Copyright © 2020 – FALCON This presentation contains proprietary and confidential data, information and formats. All rights reserved. No part of this presentation may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of FALCON. M. Frignani - ALFRED Project: Status and next activities - SNETP Forum (TS7), Feb. 4th 2021 15
You can also read