2021 Company Profile - Building Great Foundations - Highrise Construction Limited

Page created by Travis Contreras
 
CONTINUE READING
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
Company
                                 Profile
                                 2021

Building Great Foundations
               www.highriseconstruc�on.co.nz
                          Highrise Construc�on - Company Profile 2021
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
About

Highrise
Construction

Highrise Construction was formed in 2003 as a specialist Formwork, Concrete and Precast
Erection Subcontractor. Since that time Highrise has executed a diverse range of Projects with
leading Contractors across the commercial construction space. Indicative project values generally
range from $1m - $8m.

Highrise has a large permanently employed workforce and management team of circa 80 staff with
the ability to undertake several projects concurrently across Auckland and the North Island. Tenure
of employment within Highrise is stable with team members having between 4 and 18 years of
employment with the Company. In addition Highrise is a financially robust business with ability to
provide project bonding if required.

Our Expertise
Highrise has expertise in the following sectors:

 ▶ Apartments: 4 – 30+ stories
 ▶ Offices
                                                   Highrise is adaptable to provide a
 ▶ Multi-Storey Carparks
                                                  range of contracting options suitable
 ▶ Retirement Villages
                                                      to your project across In-situ,
 ▶ Shopping Malls
                                                 Precast and Post-Tensioned concrete
 ▶ Stadiums
                                                      construction methodologies.
 ▶ Industrial
 ▶ Infrastructure/Civil Works

What We Provide
We offer the following Sub-contract packages direct to Main Contractor or Client:

 ▶ Full Supply & Install Concrete / Formwork / Precast Placement package
 ▶ Formwork Design, Engineering & Off-Site Assembly
 ▶ Formwork Materials & Labour Only Concrete / Precast Placement
 ▶ Labour Only Concrete / Formwork / Precast Placement package
 ▶ Skilled Labour Hire / Leading Hands / Formwork Carpenters / Concrete Placers
 ▶ Site Management
 ▶ Reinforcing Supply & Place or Place only on a negotiated basis
                                                             Highrise Construc�on - Company Profile 2021
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
Highrise Management Structure

         Steve More                                 Tim Waddell                             Mike Speck
     Operations Manager                           General Manager                        Commercial Manager
          Director                                    Director                               Director

Steve has 38 years’ experience in           Tim has 26 years’ experience in          Mike a qualified Civil Engineer has
construction     of   large    scale        various roles from Quantity              40 years’ experience in multiple
structures    in    New     Zealand,        Surveyor to General Manager              roles in civil and building
Australia and Asia. Steve started as        across     New      Zealand     and      construction in New Zealand and
a Formworker becoming familiar              Internationally. Tim has previously      the UK. Mike started his career with
with most insitu, precast and post          worked with large contracting            the Ministry of Works as a Cadet
tensioned construction techniques           companies and is adept at setting        and progressed through Site
before promotion to supervision             up functional operating systems,         Engineering       and        Project
and management roles. Steve is a            formation of high performing teams,      Management roles prior to co-
co-founder of Highrise Construction         robust training processes and the        founding Highrise Construction with
and career highlights include Hong          necessary H&S / QA for larger            Steve.    Mike    undertakes      all
Kong Airport, Petronas Towers and           scale projects. Project experience       estimating for Highrise and career
PB Com Tower, Manila. Steve has             is varied across heavy civils /          highlights includes the Marsden
an on-site presence across all              building and career highlights           Point Refinery expansion and
Highrise Projects.                          include Dubai Airport, Pluto LNG,        Precinct Apartments.
                                            Macedon Natural Gas and Otahuhu
                                            Power Station.

  Edgars Strazdins - Contracts Manager                                  Denton Sander - Contracts Manager

Edgars a qualified Civil Engineer has 15 years’                     Denton has 18 years’ experience in the construction
experience on building and infrastructure projects in               industry in New Zealand and South Africa. Starting out
New Zealand and Internationally. Edgars has                         on the tools Denton progressed through Foremen, Site
significant experience in utilisation of modular                    Manager & Project Manager roles with substantial
formwork systems such as - Peri, Doka, Ramirent. With               experience in management of self-performing teams
over 5 years’ experience in NZ he is also fully                     on the civil and structural elements of projects. Denton
conversant in the erection of precast concrete on multi-            is particularly experienced in the Apartment, Hotel &
storey & industrial facilities. Past experience includes            Retirement Village sector and led the operation of the
Disneyland China, 450MW Power Station in Latvia and                 Jump Form system on the 17 level Antipodean
more recently Horizon Apartments and Countdown                      Apartments Project.
Waiata Shores.
                                                                            Highrise Construc�on - Company Profile 2021
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
Highrise Construction

    Projects

               Highrise Construc�on - Company Profile 2021
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
Central Water
Interceptor Project
Mangere – Ghella Abergeldie JV 2020 - 2022

The Central Interceptor is a Watercare
Services Infrastructure project to bore a
giant wastewater pipe from Western
Springs to Mangere.

This will be Auckland’s largest wastewater
project in history costing around $1.2B.

We are contracted to Ghella Abergeldie JV
to construct the Insitu liner walls to the
40m deep Pump Station and Inlet shafts
using Doka Jumpform System.

                                             Highrise Construc�on - Company Profile 2021
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
Antipodean
Apartments
Beach Rd, Akl – Watts & Hughes 2018 - 2020

                                             Construction of a 17 storey structure for
                                             Watts & Hughes. CBD Auckland.

                                             Mix of precast and Insitu construction,
                                             difficult basement build having to work
                                             around temporary propping supporting
                                             neighbours and an old sea wall.

                                             Highrise provided a design, supply,
                                             installation and operation of our Boxer
                                             Jumpform System. This worked well to
                                             change some of the heavy pre-cast
                                             walls to in-situ greatly reducing the
                                             amount of pre-cast elements trucked in
                                             and installed.

                                             Highrise had a team of 10-25 men at
                                             various stages through construction.

                                                Highrise Construc�on - Company Profile 2021
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
Park
Residence
CBD, Akl – Naylor Love 2015 - 2017

Construction of 30 storey apartment building for
Naylor Love. Mix of precast and in-situ concrete
construction.

Highrise supplied a Boxer Jumpform System full
package. Design, fabrication, installation and
operation.

Top down basement construction while super
structure was underway.

                                                   Highrise Construc�on - Company Profile 2021
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
Project
Century
East Tamaki – Lion Breweries 2008 - 2010

                                           Large green field site for the construction of Lion
                                           Breweries new headquarters. Named “Project
                                           Century” for the next 100 years.

                                           Comprising of several buildings making up
                                           55000m2 in area.

                                           Highrise provided full package Labour,
                                           Formwork, Concrete Supply and Concrete
                                           Pumping.

                                                      Highrise Construc�on - Company Profile 2021
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
Precinct
Apartments
CBD Akl – Mainzeal 2004 - 2007

                                 Construction of a 33 storey apartment
                                 building for Mainzeal Construction. All
                                 Insitu construction using Highrise supplied
                                 Boxer Jumpform System and a Ischebeck
                                 Flooring Falsework System.

                                 Insitu core was built ahead of the floors
                                 with the floors following 2-3 floors behind
                                 poured in two halves.

                                 Light weight stair system was used
                                 enabling continuous access to working
                                 floor. Highrise team 12-18men.

                                     Highrise Construc�on - Company Profile 2021
2021 Company Profile - Building Great Foundations - Highrise Construction Limited
Highrise Work Force

Highrise’s workforce is experienced across a                                                                               The majority of the team are NZQA accredited
range of major projects in New Zealand and                                                                                 across the various Working at Height modules
Internationally. On average our team members                                                                               along with First Aid & EWP certification. In
have 10+ years specific concrete/formwork                                                                                  addition a large number of the team have
experience in the construction industry. We                                                                                accreditation / certification specific to
operate a structured workforce management                                                                                  Infrastructure projects like the Central Water
system with 4 x Foremen and 12 x Leading                                                                                   Interceptor and City Rail Link; e.g:
Hands directing our workforce. The ratio
generally works as 1:4.                                                                                                                    ▶ Underground Induction

All of the team are fully equipped with the                                                                                                ▶ Underground Medical
necessary tools of the trade and are
                                                                                                                                           ▶ HSK Extrusion Welding
competency assessed on power tool useage on
employment and yearly or every 2 years                                                                                     Please refer to our staff Competency Register Summary
thereafter dependent on role. In addition                                                                                  below for further detail.
Highrise carries various large scale tools & plant
necessary to execute projects.

                                                    Highrise Construction
                                              Competency Register Summary 2021
                                                                    UNDER GROUND INDUCTION - NZQA

                                                                                                                                                                                                                                   ELEVATING WORK PLATFORMS

                                                                                                                                                                                                                                                              POWER TOOLS COMPETENCY
                                                                                                                            HSK EXTRUSION WELDING
                                                                                                    UNDER GROUND MEDICAL

                                                                                                                                                                                                                                   23960/23962/23966
                                                                                                                                                                                         WORKING AT HEIGHTS

                                                                                                                                                                                                              WORKING AT HEIGHTS
                                                 CONSTRUCTSAFE ID

                                                                                                                                                                     UNIT 15757 HEIGHT

                                                                                                                                                                                                                                                              ASSESSMENT DATE
                                                                                                                                                                                         HARNESS 23229
                                                                    ACCREDITATION

                                                                                                                            CERTIFICATION
                                  GOLD CARD

                                                                                                                                                    FIRST AID
                      SITE SAFE

                                                                                                                                                                                                              17600
                NR

   DIRECTORS    3      3           2                2                          1                         1                                             3                   1

  MANAGEMENT    8      8           6                5                          4                         4                          1                  7                   8                     7                    6                   3                          8

 LEADING HAND   12   12            2                5                          4                         4                                             6                   5                  10                      7                   4                      12
   FORMWORK     44   44                          22                      19                         19                              5                  3                   6                  22                   21                     5                      44
   CARPENTER

       OTHER    4      4                            2                          1                         1                                             1                                         1                    1                   1                          4

      TOTALS    71   71           10             36                      29                         29                              6               20               20                       40                   35                 13                         68

                                                                                                                                                                Highrise Construc�on - Company Profile 2021
Health & Safety

All Highrise workforce and management are Site Safe accredited. The majority of the workforce/
management is also Construct Safe accredited and Site Foremen up are Site Safe Gold Card
accredited.

Full PPE is utilised by all staff and our overriding Health & Safety focus is on high risk activities such
as crane loading, precast placement, working at heights and the like.

Health & Safety Actions on each Project:

   ▶ Daily Pre-starts

   ▶ Weekly Tool Box Talks

   ▶ Near Miss Reporting

   ▶ Weekly recorded H&S inspections by Site Manager/Site
     Foremen

   ▶ Fortnightly recorded H&S inspections by Contracts Manager

   ▶ Monthly recorded H&S inspections by Director and H&S Adviser

   ▶ External H&S Audits

Quality Assurance

   Highrise utilise the CONQA QA software system for QA
   recording – photographs marked-up plants - along with various
   inspection templates:

       ▶ Set-out checklist

       ▶ Pre-pour inspection

       ▶ Post-pour inspection

       ▶ Precast placement checklist

                                                                 Highrise Construc�on - Company Profile 2021
Formwork Systems

Highrise has extensive experience in specific
design and modular Formwork systems
including:

   ▶ Climbtrac Jumpform

   ▶ Ischebeck Slabform

   ▶ Doka

   ▶ Peri

   ▶ Ramirent

   ▶ Steel Column Formwork

   ▶ Standard Fabricated Ply Shutters

Highrise owns considerable Formwork stock
and has a close relationship developed over a
number of years with Boxer Engineering Pty Ltd
in Sydney which specialise in the design of
climbing formwork systems incorporating multi-
level safety screens.

                                                 Highrise Construc�on - Company Profile 2021
Tim Waddell
       General Manager/Director
     tim@highriseconstruction.co.nz
             027 332 3318

              Steve More
     Operations Manager/Director
    steve@highriseconstruction.co.nz
              021 337 440

            Mike Speck
     Commercial Manager/Director
    mike@highriseconstruction.co.nz
              021 717 999

                Leanne
         Office Administration
    admin@highriseconstruction.co.nz
        Office Ph: 09 835 0332
           Fax: 09 835 0337

     PO Box 95139, Swanson 0653
        Auckland New Zealand

www.highriseconstruc�on.co.nz
                              Highrise Construc�on - Company Profile 2021
You can also read