WORKING WITH INTEGRITY - THE DEPARTMENT OF EDUCATION AND TRAINING'S SECOND REPORT TO THE INDEPENDENT BROAD-BASED ANTI-CORRUPTION COMMISSION - APO
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
WORKING WITH INTEGRITY THE DEPARTMENT OF EDUCATION AND TRAINING’S SECOND REPORT TO THE INDEPENDENT BROAD-BASED ANTI-CORRUPTION COMMISSION
Melbourne September 2017 ©State of Victoria (Department of Education and Training) 2017 The copyright in this document is owned by the State of Victoria (Department of Education and Training), or in the case of some materials, by third parties (third party materials). No part may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968, the National Education Access Licence for Schools (NEALS) (see below) or with permission. An educational institution situated in Australia which is not conducted for profit, or a body responsible for administering such an institution may copy and communicate the materials, other than third party materials, for the educational purposes of the institution. Authorised by the Department of Education and Training, 2 Treasury Place, East Melbourne, Victoria, 3002 2
CONTENTS Secretary’s foreword............................................................................................................... 4 1. Overview ................................................................................................................................. 5 1.1 IBAC’s investigations and findings....................................................................... 6 1.2 A comprehensive response to IBAC findings.................................................7 2. A culture of integrity underpins everything we do........................................ 10 2.1 The Values.............................................................................................................................11 2.2 Setting the tone from the top — ethical leadership............................ 14 2.3 Supporting a culture of integrity in our workplaces............................ 16 3. Smart systems and controls to oversee and guide our actions.............21 3.1 Corporate governance............................................................................................... 22 3.2 Risk management........................................................................................................24 3.3 Finance and funding changes.............................................................................26 3.4 Policies for purchasing or receiving goods and services.................28 3.5 Integrity framework....................................................................................................32 3.6 Compliance.......................................................................................................................32 3.7 Complaints management..................................................................................... 33 3.8 Policies and processes to support people and performance..... 33 4. Independent and robust auditing: the third line............................................38 4.1 Audit and Risk Committee..................................................................................... 39 4.2 Internal Audit Plan......................................................................................................40 4.3 School audit.....................................................................................................................42 5. Future work and next steps...................................................................................... 43 5.1 Final Dunham report in March 2018................................................................44 Appendix A: IBAC recommendations and Department response............... 45 WORKING WITH INTEGRITY | 3
SECRETARY’S FOREWORD Being an integrity leader doesn’t just mean an absence of corruption. It means that behaving with integrity is part of the way we do things in the Department. The Integrity Reform Program has entered a new phase since my last report. Following our immediate response to the hearings, we are now focused on embedding integrity in our business as usual processes and practices. We are continuing to foster an ethical culture and encourage ethical behaviours. For example, we have an integrity I am pleased to provide the Independent Broad- moment as a standing agenda item at Executive based Anti-corruption Commission (IBAC) with Board and Education State Board meetings. this report on the Department of Education and Executives rotate in bringing a relevant issue for Training’s Integrity Reform Program. discussion which has deepened our understanding The achievements described here are a testament of these issues greatly. Integrity moments are also to the determination with which the Department included in other committee meetings, leadership has responded to the findings in IBAC’s Operation and staff forums across the Department, ensuring Ord and Operation Dunham. that integrity is part of core business. Integrity reform is essential to building and Victoria’s public education system is focused on sustaining trust in the Department and its achieving excellence in outcomes for our students, stewardship of public education. building a world-class education system and – through addressing equity – creating opportunity Our Integrity Reform Program strengthens our for every Victorian. This cannot be achieved ‘three lines of defence’ for risk management. without professional and empowered staff who It is transforming our culture, strengthening our consistently work with integrity. systems and controls, and ensuring independent and robust auditing. As the Department of Education and Training we are ideally positioned to model and teach ethical We are proud of the significant steps we have behaviour and leadership as part of delivering the taken since the Operation Ord and Dunham best possible public education for our community. hearings. Our expectations about ethical conduct are not only clear, they are supported, encouraged The Department’s commitment to integrity is and enforced with robust systems, policies ongoing. It is something that will continue to and processes. be talked about, focused on and championed well beyond the completion of the Integrity Our workplaces are already benefitting. We are in Reform Program. a very different and much more optimistic place than we were two years ago. I look forward to providing you with our final report, on Operation Dunham, in March 2018. Staff optimism is reflected in our 2017 People Matter Survey results, which reflect a corporate workforce that understands and acts according to Public Sector Values. Respondents are now Gill Callister confident about raising concerns and increasingly Secretary see their leaders modelling ethical behaviours. Department of Education and Training Through the Integrity Reform Program, the Department has not only addressed IBAC’s recommendations, it is seizing the opportunity to be a leader on issues of integrity in the public sector. 4
OVERVIEW 1
1. OVERVIEW 1.1 IBAC’s investigations and findings But it was ‘the collective failure of the Department’s three lines of defence that ultimately allowed the In Operation Ord and Operation Dunham, IBAC conduct under investigation to continue unabated’. identified systemic failings that were exploited by the actions of a few individuals. 1.1.1 IBAC’s recommendations In Operation Ord, IBAC’s investigation focused on The Department accepted IBAC’s allegations that senior officials misappropriated recommendations in both special reports for funds from the Department’s budget, through false Operation Ord and Operation Dunham. and inflated invoicing, and arranging payment of inappropriate expenses such as excessive An index showing the Department’s specific hospitality, travel and personal items. These actions in response to each of IBAC’s improper actions and behaviours were possible recommendations is provided at Appendix A. because of inadequate systems and controls and a culture that excused or ignored breaches of probity IBAC’s Department and process. recommendations actions As with Operation Ord, Operation Dunham detailed Understanding of public First line a prevailing culture of non-compliance among sector values, code of conduct and DET policies some of the most senior Department officers, which contributed to misconduct, and hindered A culture of integrity opportunities to expose and address misconduct. Leadership to set ‘tone underpins everything Operation Dunham exposed improper action from the top’ we do and behaviour by senior staff that corrupted the procurement process for a major IT project, the Ultranet. These included the receipt of gifts and Whistleblower and travel; improper communications intended to complaints management influence the tender process; and a likely attempt to influence the tender evaluation outcome by ‘stacking’ an assessment team with like-minded Financial management, procurement and Second line colleagues. compliance The main findings of the two investigations were that the Department had: School governance and • a culture of non-compliance, bullying and financial management entitlement arrangements Smart systems and • a lack of accountability, and lack of a culture of controls to oversee Employment policies and guide our integrity in senior leadership and practices, including actions • inadequate controls around procurement exclusion and disciplinary • inadequate governance of risk and processes major projects • poor controls for financial management, in the Commercial opportunities Department and in schools • incompatible financial systems • inadequate auditing. Major project governance In its summary of investigation and outcomes for Operation Dunham, IBAC reported that Third line the ‘willingness of some senior leaders in the Department to deceive’ had caused the waste of Audit and risk Independent and public funds. management robust assurance 6
1.2 A comprehensive response to 1.2.1 Integrity Reform Program and the ‘three lines of defence’ IBAC findings The Integrity Reform Program (IRP) is the The Secretary’s first report to IBAC detailed the Department’s response to IBAC findings. It goes initial, profound changes: this report demonstrates well beyond preventing corruption to embed a their effectiveness. healthy, high-performing and ethical culture in the It also details the second phase of reforms that Department’s corporate workplaces and schools. embed integrity in the Department’s business- The IRP strengthens the three lines of defence. as-usual processes and practices, as well as its culture. The first line of defence is staff, their environment, systems and culture. In other words, ‘functions The Department has now acquitted all Operation that own and manage risk’. The second line Ord recommendations. A final report on Operation oversees and supports the first line to manage Dunham will be made in March 2018. risk. The third line is auditing: independent It is important to stress that integrity reforms assurance of risk management. will be ongoing. Maintaining, measuring and Following the three lines of defence model, the IRP enhancing integrity is cemented as part of the has taken an integrated approach. Reforms to Department’s regular work, beyond the final each line of defence are mutually reinforcing and report to IBAC in 2018. provide grounds for confidence in their success. Success for each line of defence means that: First line Functions that own and manage risks • Leaders follow correct procedures and act with integrity • People feel supported to act with integrity and manage risks • People have confidence to raise concerns and speak up Second line Functions that oversee and support management of risk • The Department has smart systems and processes that are easy to use and support good practice • The Department has strong and clear policies • The governance framework provides effective oversight and monitoring of accountabilities Third line Functions that provide independent assurance over management of risk • The Department has an independent and robust audit function WORKING WITH INTEGRITY | 7
1.2.2 Integrity Reform Program: achievements These included: and next steps • the immediate cessation of the program The Department’s initial response was swift, coordinator school model. Work commenced commencing in the wake of the Operation Ord on a robust, alternative approach for providing hearings in 2015 and closing with the conclusion targeted funding to schools of the Operation Dunham hearings in early 2016. • the reconstitution of the Department’s The Secretary set clear expectations for ethical standing committees to address major conduct and took decisive actions. deficiencies with oversight, accountability and The initial response included strong actions that transparency addressed deficiencies in the first line: • legislative reform to ensure the Department could deal with misconduct confidently • all executives signed a Leadership Charter, and swiftly. This sent a clear message that holding them accountable to new standards misconduct of any kind would not be tolerated for ethical leadership • the overhaul of the Department’s internal and • the ‘Speak Up’ campaign and service school audit processes to improve the rigour of addressed one of the biggest workplace issues audits. — the fear of raising concerns. It sent a clear signal that the Department’s leaders were These initial actions, reported in the Secretary’s listening to staff, and would act appropriately first report to IBAC, reflected the deliberate and strategic prioritisation of reforms that would • the Department embraced the Public Sector Values as the Department’s Values. provide rapid structural assurance and protect public funds. At the same time, structural changes to the second and third lines were made as the basis for The Diagram demonstrates the themes in which ongoing improvements. projects in the IRP are grouped. It highlights the importance of cultural change and the Department’s Values to the overall reform program. The Integrity Reform Program is about more than preventing corruption – it is about building an ethical culture Ord response Dunham response Good Ethical governance leadership Integrity Reform Smart systems Program Staff support and controls and development Underpinned by DET’s Values 8
After the initial response, the IRP moved into a second phase to position integrity reform as a key Our 2017 People Matter Survey data contributor to system and cultural changes. demonstrates the Department’s success in effecting cultural change since the Operation In its second phase, the IRP has concentrated on Ord hearings. More than embedding a culture further cultural reform and embedding integrity of integrity, the results show an organisational in business as usual processes and practices. culture that is inclusive, responsive and Leaders continue to model values and set collegiate. In relation to measuring our culture expectations from the top, reinforcing the first line. of integrity, the results paint a picture of This phase ensures that integrity underpins all progress and good health. Engagement in the Department work, now and in the future, and that People Matter Survey was record-breaking for ethical standards are continually maintained, the Department. measured and enhanced. Percentage corporate staff participation in The ongoing focus on integrity is imperative for People Matter Survey the Department to meet the evolving and dynamic needs of our Victorian education system. The second phase seeks to effect further cultural change to ensure that all staff embrace the Department’s Values in their behaviour and delivery of work. The Department’s reform agenda has set new standards for the public sector and has allowed it to be a public sector leader in integrity reform. 39% 54% 71% These reports are one of many ways it is sharing its expertise. 2015 2016 2017 of staff were aware of the public 92% sector values of staff agreed that earning and sustaining a high level of public 92% trust is seen as important in the Department were confident to raise concerns 80% with their manager This demonstrates high levels of engagement in culture reform, a willingness to voice opinions and a confidence that these opinions will inform the shared direction. WORKING WITH INTEGRITY | 9
A CULTURE OF INTEGRITY UNDERPINS EVERYTHING WE DO 10 2
2. A CULTURE OF INTEGRITY UNDERPINS EVERYTHING WE DO IBAC’s Operation Ord and Operation Dunham 2.1 The Values identified a culture of non-compliance and entitlement among corporate and school The Department has adopted the Public employees. Sector Values as the Department’s Values. The Department has promoted the Values to IBAC also found people did not speak up about staff by incorporating them in recruitment suspicious or unusual activity for fear of reprisal, and induction processes and Performance and because they did not understand their Development Plans. The Department also obligations as public sector employees. encourages explicit consideration of the Values in These constituted failures in the Department’s everyday work. first line of defence. ‘Values’ packs were provided to all corporate IBAC recommended strengthening the first line of workplaces and then schools in late 2016 and early defence by: 2017. The packs encourage and support behaviour and decision-making based on the Values. • ensuring that employees are aware of and They include posters, quick reference sheets compliant with the Public Sector Values and and guides, and conversation cards to promote Code of Conduct, and related policies discussions about common ethical dilemmas. • ensuring that employees are trained Many schools have reported using the cards to in appropriate financial management, support staff induction. procurement and school governance An eLearning module has been available since late • encouraging and supporting employees 2016 as another tool to improve understanding to speak up and report misconduct about the Values. and corruption To reinforce the Values, the Seven Values in Seven • ensuring leaders are accountable for Weeks initiative (7in7) from April to May 2017 modelling integrity and Public Sector Values and set the tone from the top. encouraged corporate staff to explore what the Values mean for them at work. The campaign In response, the Department is building a high- included stories from leaders on ‘living the values performance culture by: every day’. Cards were distributed to teams to • embedding the Public Sector Values and a acknowledge exemplary behaviour led by the culture of integrity Values. • improving capability for financial The Department then launched a version of 7in7 management, risk management and ethical for schools, to support school leaders to apply leadership, particularly of corporate and the Values at their school and in their everyday school leaders work. The school version focuses on one Value per • ensuring people feel safe to raise concerns. month, starting with ‘Responsiveness’ in June and ending with ‘Human Rights’ in December. A key objective of 7in7 in schools is strengthening the link between the IRP and positive Education State messages, such as building pride and confidence in our schools, and aligning each Value to practical, system-related reform. For each monthly Value, 7in7 delivers information about how decision-making backed by a particular Value can improve school and student outcomes. The information also provides practical information that schools can use to reform existing systems. WORKING WITH INTEGRITY | 11
For example, as part of ‘Responsiveness’ month, Deputy Secretary, People and Executive school council governance training packs and Services Group Kate Rattigan, said the Values guides were distributed to school council ‘7 in 7’ values initiative helps us ‘stop and members. In July, to support ‘Integrity Month’, think about what the Department values Conflict of Interest Quick Reference Guides look like in our day-to-day lives’. were distributed to all principals, with a letter International Education Division from regional directors. For ‘Impartiality Month’ Executive Director, Joel Backwell said for in August, the ‘Thanks is Enough’ campaign him, the values capture ‘what it means to accompanied the launch of the Goods, Benefits be a public servant supporting families, and Hospitality policy. children and adults to learn for life.’ The sustained focus on Values is increasing At Kallista Primary School, Principal employees’ awareness about the Values. Christine Finighan has posters on the The People Matter Survey results for 2017 staffroom door describing how the school indicated that 92 per cent of corporate employees values sit alongside DET’s Values. in the Department were aware of the Values and how they apply to their work. This is a 2 per cent 'Values education is most powerfully increase from 2016, but 22 per cent higher than learned through relationships. The the 2017 average for the seven other Victorian values we, as a staff group, demonstrate Government departments. in our everyday interactions – the way we speak, listen and act – is the most Among corporate participants in the 2016 Integrity powerful vehicle for teaching values to and Risk Culture Assessment, 85 per cent reported students,' she said. understanding the Values and knowing what behaviour is acceptable. In the 2016 School Staff At Keilor Views Primary School, Principal Survey, 85 per cent of school staff agreed that Charles Branciforte uses DET resources integrity was demonstrated at their school. and conversation cards to stimulate discussion with staff about links to school community values of ‘Vision, Integrity and Pride’. ‘There has been a real cross pollination: we encourage staff to utilise both sets of values and understand that we operate by both.’ DET’S VALUES 12
2.1.1 Investing in our People Strategy 2016–2020 2.1.2 Culture of Integrity and Respect Strategy The Investing in Our People Strategy focuses The Culture of Integrity and Respect Strategy on the key areas for corporate employees that applies to all staff and was implemented in 2017. have the most impact on the Department’s It provides a roadmap for cultural reform to 2020. performance and delivery. It makes the key The strategy establishes a collaborative, cross- objectives of the IRP’s culture reform project department approach to align and strengthen business as usual activities. engagement on relevant initiatives. The strategy contains five objectives, which Under the strategy, the Department is taking steps together provide clear direction for these key to build and maintain a positive ethical culture areas. The aim of each objective is to provide a by providing guidance to all staff about ethical holistic and balanced approach to the way staff decision-making, and encouraging awareness work, ensuring they have appropriate skills, can of the Values, and reflection on their use in perform at their best, and feel empowered, valued everyday work. and supported. The strategy reinforces the commitment the The objectives are: Department made to building an ethical culture, by: • Leading for outcomes – strengthening leadership practice and developing our future • increasing awareness among employees about leaders the Values and their relevance to their work • Learning-centred organisation – developing • ensuring leaders communicate explicitly the staff to be their best relevance of the Values to their teams • Culture of integrity and respect – ensuring • encouraging employees to seek advice about staff act with the highest ethical standards, acting with integrity, being accountable and treat each other with respect for their actions and speaking up about • Safe and inclusive workplaces, free from poor behaviour physical or psychological harm, where • ensuring leaders act against poor behaviour everyone’s contribution is valued and model exemplary behaviour. • Empowered and responsible people who deliver on commitments at every level of our organisation. The plan to achieve these objectives includes a Department-wide focus, and cohesive monitoring and reporting. This ongoing program of work reports biannually to the Department’s Workplace Development and Culture Committee. WORKING WITH INTEGRITY | 13
2.2 Setting the tone from the top — As part of the program, executives were assessed ethical leadership against ethical standards (including those related to the Values, people management and financial IBAC found the following ethical leadership management). Participants in the Development failures: Centre completed: • lack of accountability for decisions and • ‘360-degree’ surveys (that is, comprehensive enforcing actions feedback from manager, colleagues, staff and • lack of awareness of how to address concerns internal and external stakeholders) • decisions made on trust and history, and not • a half-day development activity including on policy or procedures role plays, presentations and group problem- solving • lack of connectivity between schools and corporate • an intensive debrief and coaching session to guide officers through their results and • lack of mobility of senior staff, leading to the establish a development plan. development of unhealthy networks in some parts of the Department. The 360-degree surveys identified behaviours relating to leading with integrity (ethical practices The Integrity Reform Program has raised the and role-modelling the Values) as the second and standard of expectation for ethical leadership third highest-rated strengths for the executive across the Department and supported staff at all cohort. levels to lead ethically. The results have informed individual development 2.2.1 Expectations of executives plans, which leaders are now implementing to address their professional development. Another Department leaders are the key to fostering an 360-degree survey will be undertaken with all environment that encourages ethical behaviour. executive officers in late 2017. As reported to IBAC in 2016, all senior leaders have The Department is now participating in the whole committed to the Leadership Charter to model of government Victorian Leadership Academy the Values and the behaviours the community which supports leaders to develop the desired expects. capabilities for the Victorian public sector The Department’s expectations of its leaders underpinned by the Values. have been made clear in executive Performance The 2016 People Matter Survey results provided Development Plans, position descriptions, baseline data on VPS employee perception of how induction materials and the assessment criteria of well leaders demonstrate the Values. Results in the Executive Officer Development Centre. 2017 highlighted an eight per cent improvement The Executive Officer Development Centre is a from the 2016 results across the three questions program introduced in 2016 to support executives regarding leadership behaviours. to demonstrate ethical leadership in practice. In the 2016 Integrity and Risk Culture assessment, 87 per cent of corporate participants agreed that their immediate manager communicated the importance of professional and ethical behaviour to staff. 14
2.2.2 Pathways and rotation Chris Thompson committed to the To strengthen cross-Department leadership and Leadership Charter around the same knowledge-sharing, and to identify potential time as being appointed as one of the leaders, the Department has established two Department’s 17 new Area Executive initiatives: a Pathways Program, to bring school Directors. leaders into corporate roles, and an Executive The timing was no coincidence. Chris said Rotation Program. the expansion of the regional workforce The Pathways Program is in its second intake demanded clear standards for authentic, and has involved 20 school leaders. The program effective and ethical leadership across improves understanding of public administration the Department. in schools, and improves the connection between ‘The charter made it clear that we were schools and corporate areas. It also aims to accountable not just to government increase staff transitioning from schools into and the Department, but also to our corporate roles. Comments from participants communities.’ in the first intake were positive. Some said the ‘It connected our daily work to the lived experience opened new potential career pathways experiences of students and families, and provided opportunities to better connect with reminding us why we do our jobs, and who and support their school communities. A formal we are here to serve.’ evaluation of the Pathways Program will be undertaken in Term 4, 2017. Chris said the relevance of the charter made it easy to use with his team. ‘It was The Executive Rotation Program involves a strong motivating tool, particularly for executives taking short-term placements to areas the many new starters to the region.’ outside their roles. The expectation is that all executives will participate in this program and that In mid-2016, Chris completed the it will form part of leadership development plans. executive officer development centre, The Department has committed to implementing which was designed to help bring the the planned rotation of senior staff who have been leadership charter to life. in their roles for an extended period. ‘This process provided a unique As of August 2017, 68 executive rotation opportunity for reflection, both on myself opportunities have been advertised. and on the strengths, needs and styles of my colleagues. It supported me to better In an evaluation of the Executive Rotation understand them at a time when we relied Program, 79 per cent of participants said they on strong collaboration.’ were ‘very satisfied’ with the program, and 86 per cent said they were either ‘likely’ or ‘very likely’ to ‘By assessing my own development recommend the program to colleagues. through a new lens, I was better able to support my team of Senior Education Improvement Leaders and VPS staff with their Performance Development Plans.’ ‘Six months on, we have made good progress developing our influencing, negotiating and partnership building skills.’ WORKING WITH INTEGRITY | 15
2.2.3 Integrity Leadership Groups 2.3 Supporting a culture of integrity in The Department’s five Integrity Leadership Groups our workplaces are reference groups based in each region and IBAC identified systemic problems that allowed central office. Their members are acknowledged senior officials to breach public trust, including for their ethical leadership and capacity to perceived and actual lack of consequences, effect change. feelings of disempowerment, and fear of The Integrity Leadership Groups were relaunched reprisal for speaking up. IBAC also found no by the Secretary in early 2017, with some new ethical decision-making framework, a lack of members and a focus on ethical leadership. accountability for decisions and actions, and a Eighty-four school and corporate leaders now lack of awareness and emphasis on managing champion the program across the system. conflict of interest. Since 2017, Integrity Leadership Groups have made In response, the Department has supported staff a range of tangible contributions to the Integrity to understand their obligations through training. Reform Program. These include developing They are also supported and encouraged to the ‘Thanks is Enough’ awareness campaign, raise concerns. enhancing school council governance guidance To measure progress, the Department made an materials, preparing case studies on conflict assessment of Integrity and Risk Culture in a staff of interest, supporting the development of the survey. The 2016 results have provided a baseline COI Quick Guide, evaluating the 7in7 corporate measure, and the assessment will be conducted program and contributing to training material for annually for at least the next two years to inform business managers. further work and gauge progress. Members have also been engaging their peers in the Integrity Reform Program and sharing good- 2.3.1 Speak Up service practice stories across the system through the Within six months of the Operation Ord hearings, 7in7 schools initiative. They will also support the the Department established Speak Up, a service implementation of the ethical decision-making for staff to make confidential, anonymous model in new training opportunities and resources, complaints and reports if something doesn’t look including a tool to support business managers, by or feel right. December 2017. Speak Up was launched by the Secretary in The Integrity Leadership Groups are currently December 2015 and is open to receive reports supporting an action research project through the 24 hours a day, seven days a week. The rapid Department’s Pathways program to identify the establishment of the service sent a strong signal factors and measures that contribute to ethical to staff that the Department was listening to and and respectful school workplaces. The findings of supporting staff. Speak Up was promoted again this study will inform future school initiatives from in Term 1, 2016, and continues to be promoted in Term 4 2017. schools and corporate workplaces Speak Up has received 287 calls since its launch in December 2015. Employees also continue to raise concerns through established avenues, including with their managers and directly with the Integrity and Assurance Division. Work to improve staff confidence in speaking up continues. By December 2017, all corporate leaders will have received resources and direction to reiterate the importance of raising concerns, and how to do so in their teams. 16
Survey results indicate that Speak Up and its The ILOs provided examples of how promotion have supported employees to feel they help: safe to raise concerns. For example, in the 2016 South West Region ILO Kelly Bull assisted Integrity and Risk Culture Assessment, 88 per cent a new principal to mitigate a perceived of corporate participants said they knew how to conflict of interest relating to the report misconduct. The 2016 School Staff survey employment of his wife at school. found 84 per cent of school staff felt confident to raise concerns without fear of reprisal. Similarly, in ‘The Principal allocated decisions about the 2017 People Matter Survey of corporate staff, performance, progression and allocation 80 per cent of respondents said they felt confident of duties to the Assistant Principal and approaching their manager to discuss concerns Senior Education Improvement Leader.’ and grievances —an increase from 75 per cent In the North Eastern Region, Russell in 2016. Polson advised a principal on a staff member’s request to pursue other 2.3.2 Integrity Liaison Officers employment. This included measures to The Integrity Liaison Officers (ILOs) are based in manage potential conflicts of interest and the Department’s four regions to engage staff ensure the additional work did not affect in integrity reform and support the delivery of their school responsibilities. key integrity initiatives in regional workplaces Nicole Fausett ran a session with 140 staff and schools. The ILOs are also key contact at the South East Region’s Moe office to points for advice about ethical decision-making increase their understanding of ‘Thanks and integrity. is Enough’, a new standard for gifts, In 2017, as engagement with schools increases, benefits and hospitality, and processes the ILOs have led 81 presentations with for speaking up. approximately 6000 school leaders compared to Colin Wellard, in the North West Region, 48 presentations with 1555 school leaders in 2016. supported a principal to lead discussions Engagement has included attendance at Term 2 about the Department’s Values with staff. Principal Regional Forums, Term 3 Area Forums and network meetings across the state. ‘She provided feedback that the discussions have been ongoing; that staff The ILOs have been essential to improving the are more reflective and have greater ability of staff to identify and manage conflict of confidence in talking about what they interest in 2017. They are increasingly called on for expect from each other at work.’ advice and referrals, including from staff groups with particularly complex conflicts, such as allied health professionals. The ILOs have contributed to the Department’s library of case studies, based on de-identified examples, to support ‘integrity moment’ discussions in teams. As of September 2017, 42 are available on the dedicated Integrity Portal. The ILOs have been critical to the reinvigoration of Integrity Leadership Groups. Throughout 2017, they have worked with the ILG chairs to ensure representation across all corporate groups and regional areas, and to develop and deliver work plans aligned to Integrity Reform Program priorities. WORKING WITH INTEGRITY | 17
2.3.3 Integrity training and ethical decision- Ethical decision-making model making The ethical decision-making model has been embedded in induction programs for corporate staff, financial management training programs Recognise the nature of the issue for corporate and school staff, school councillor training, principal professional development courses offered through the Bastow Institute of Educational Leadership (Bastow Institute), and the Schools Policy and Guidance resource. Get the facts Ethical decision-making is also used as a basis for ‘integrity moments’, when staff and leaders talk about integrity at the start of meetings. The Ethical Decision Making Framework is provided as a standalone resource which includes case studies and online learning materials. The 2017 People Matter Survey of corporate staff Evaluate alternative actions showed 79 per cent of respondents agreed that people in their work group demonstrate objectivity in decision-making (an increase from 73 per cent in 2016), and 80 per cent agreed that their manager demonstrates objectivity in decision- making (up from 72 per cent in 2016). Make a decision Among the respondents to the Integrity and Risk Culture Assessment, 82 per cent said they knew the indicators for fraud or corruption, and 88 per cent believed people in their work area were good at recognising ethical issues. Test it 2.3.4 Training and support for school leaders Operation Ord identified a lack of appropriate school governance, particularly in relation to principals and business managers, a culture of non- compliance with financial and procurement policies, Act and a lack of oversight by the Department’s central or regional offices of the program coordinator school model. In response, the Department committed to strengthening financial controls and compliance in relation to school governance. This included Reflect on the outcome strengthening the first line of defence with training to build the capacity of school leaders, including school councillors, to understand and comply with the requirements of their role. This training will allow the Department to improve the effectiveness of reforms to the second and third lines of defence, such as the school audit program, funding governance and the cessation of the program coordinator school model. 18
Melody Yang has two daughters in Grades 2.3.4.1 Principal training Prep and One at Serpell Primary. In 2017, To ensure principals, assistant principals and she joined the school council to make a business managers understand their finance and difference to her school community. procurement responsibilities, the Department Within a matter of weeks, Melody had has developed two courses: Finance Matters and completed face-to-face training in school Procurement Mindset. council governance to help her feel Finance Matters improves the financial confident in her new role. competence of principals, assistant principals, ‘The training was very informative and business managers and, where relevant, leading assisted in making me an effective teachers, and provides flexible and scalable member and active contributor to training options. To date, 1767 school leaders have meetings.’ completed Finance Matters modules. Melody said the training also helped The Department’s ethical decision-making model her understand and uphold high ethical has been incorporated in Finance Matters and standards. ‘Practices on how to handle in the Strategic Management for School Leaders Conflict of Interest issues were shared by program, delivered by the Bastow Institute. experienced school councillors. Having the opportunity to discuss these issues 2.3.4.2 Business manager training face-to-face was very valuable for IBAC found some business managers failed in their somebody new to council.’ financial management duty by not questioning School Council Treasurer, Richard Turner illegitimate or inappropriate invoices. and NEVR Integrity Leadership Group The importance of the business manager role in member has noticed the positive impact schools was also noted in the 2015 Government of the training on the council. Schools Funding Review (Bracks Review). It ‘I definitely believe the training has recommended the compulsory accreditation of empowered new councillors to better business managers with an appropriate course communicate and participate in and that accreditation be supported by a matters relating to our integrity and comprehensive framework for business managers. accountability. For example, a new In response to the Bracks Review and as part councillor was confident to question the of its response to IBAC, the Department began approval process for upcoming school developing a capability framework for business camps. Councillors are also very receptive managers. This framework is now complete. It to hear about, and contribute to, issues includes integrity and ethical practice as part of raised through the Integrity Leadership agreed professional standards. The framework Group, including the new Conflict of was developed with Bastow and is based on a Interest Quick Guide, and their potential framework developed by the United Kingdom’s relevance to council members and National Association of School Business leadership staff.’ Management. WORKING WITH INTEGRITY | 19
New position descriptions for business managers 2.3.4.3 School councillor training have also been developed. They define the IBAC made no findings about school councils capabilities against technical skills, people during the Operation Ord and Operation Dunham skills and self-mastery, which correspond to the hearings, and they were not a key cohort targeted Business Manager Framework. Key selection by IRP reforms. However, the Department is now criteria for business managers reflect the improving the financial skills of school councillors capability framework and the Values, and as part of its efforts to strengthen school funding have been included in Recruitment Online, the governance. Department’s online job advertisement and recruitment management system for Victorian The Department has delivered a free school Government school jobs. council training package, Improving School Governance. The training clarifies the roles and The Department has partnered with RMIT as the responsibilities of school councillors in financial lead TAFE to develop a program which draws decisions, ensuring greater transparency and on the capabilities included in the framework oversight of program funding to schools. in consultation with relevant stakeholders. The Certificate IV in Business (BSB40215) will In the last financial year, this training reached 2553 be nationally recognised and develop skills participants in Victorian government schools. In in managing teams, project management, June 2017, all school councillors yet to complete governance, emotional intelligence, financial the training were mailed training materials. management and human resources. Additional support and resources are also The pilot of the training program began in Term 3, available to ensure effective governance and best 2017. The Department is funding 60 places via practice in school councils, including templates to TAFE institutes in specific school regions. An support school council operations, reporting and evaluation plan for this pilot is in development. oversight, and documents that detail the roles and responsibilities of school councils. School councils Engagement with principals to enhance are now required to comply with the procurement understanding of the role of business manager thresholds in the Finance Manual for Victorian began in August 2017. Government Schools. As part of the Learning Management System (LMS), a central repository of business manager training programs and development opportunities will be available by December 2017. It is intended that the majority of business managers will have participated in the program within three years. 20
SMART SYSTEMS AND CONTROLS TO OVERSEE AND GUIDE OUR ACTIONS 3
3. SMART SYSTEMS AND CONTROLS TO OVERSEE AND GUIDE OUR ACTIONS The IBAC investigations found that many of the In response, the Department prioritised rapid Department’s second line of defence systems and changes to processes and systems to develop processes were inadequate. structural protection against misuse of public funds. These changes included: Operation Ord found an over-reliance on internal auditing to identify non-compliance and a failure • new or improved policies and frameworks to to mitigate non-compliance through effective guide and support staff to work in a way that risk management. This allowed unscrupulous results in value for money, compliance with individuals to exploit vulnerabilities in the requirements and improved accountability Department’s systems over an extended period. • new monitoring and reporting systems IBAC found issues including: (including technology) to ensure the new processes are being followed, and that staff • a failure of controls and general lack of are held accountable rigour around procurement, such as business • refreshed governance bodies that use a risk- managers failing to check goods and services based approach to reporting. outlined on invoices had been delivered • poor financial management controls, including 3.1 Corporate governance a general acceptance of informal ‘banker’ school arrangements, the maintenance The Secretary committed to implementing a of unofficial records, and the failure of strong governance model to address: some principals to properly fulfil financial • lack of clarity about accountability at every administration obligations level, allowing people to avoid responsibility • different financial systems in schools and • delegation of authority not clearly corporate areas made it difficult to oversee documented in a holistic way schools’ detailed financial data • lack of oversight, compliance and monitoring • a culture of non-compliance with important of accountabilities and responsibilities policies and procedures, including those relating to procurement, financial • unclear roles and responsibilities between management, recruitment, travel and use of schools, head office and regions corporate credit cards. • misalignment and gaps across and between In Operation Dunham, IBAC also found that a committees, and to the Executive Board. failure of the second line of defence had enabled In early 2015, the Department conducted a broad- excesses associated with the Ultranet project. based review of departmental governance. Of In particular, IBAC identified significant failings the five stages of maturity (‘weak’, ‘developing’, in relation to governance and procurement ‘integrated’, ‘mature’ and ‘advanced’), the arrangements for major projects. IBAC review found the Department’s governance recommended that the Secretary report on action arrangements were ‘developing’. It set a target of taken to strengthen internal procurement and ‘mature’ by the end of 2017. governance arrangements for major projects, In response, the Department reconstituted including proper record keeping, maintenance its standing committees to address major of conflict of interest registers, and proper deficiencies with oversight, accountability and documentation of complaints regarding probity. transparency. Committee terms of reference, work plans, delegations and committee review processes were strengthened and aligned. Independent expert members were engaged to scrutinise and enrich decision-making and engaged a principal governance adviser was appointed to oversee reform. 22
An assessment in April 2017 indicated that the Importantly, this extends to identifying the Department was on course to achieve a ‘mature’ relationship between projects, the interventions rating by the end of 2017. associated with treatments of the Department’s Strategic Risks, and the relationship with the The Department is confident that work to Department’s output performance targets. improve governance will achieve its objectives. Ongoing work includes the development of a new corporate policy framework and a new compliance 3.1.2 Integrity Committee framework. These will be benchmarked for good Established in May 2016, the Integrity Committee practice against departments of education in oversees the Integrity Reform Program. New South Wales and Western Australia, as well The Secretary chairs the committee, which as universities. includes four other members of the Department’s Executive Board. The committee also has three 3.1.1 Enterprise Portfolio Management Office independent members, including two subject (EPMO) matter experts and the independent Chair of the To improve large-scale project management, the Department’s Audit and Risk Committee. EPMO division was established to develop and Apart from Executive Board and Education State introduce a methodology for project, program and Board, the Integrity Committee has the most portfolio management across the Department. senior membership of all committees in the new Through this, the EPMO is providing a Centre of governance structure launched in 2015. Excellence for the business life-cycle. It supports The committee receives updates on the progress the Department’s leaders to make decisions, by of the Integrity Reform Program at each meeting guiding prioritisation and investment, aligning and makes decisions about program priorities and activity, and creating productive connections integrity issues across the Department. across the Department. The Integrity Committee offers stewardship and The EPMO is integral to ensuring that: advice to support integrity reform as a whole • Education State and Department strategies and provides an important forum to debate and are implemented, and performance discuss integrity issues at the most senior level. requirements are realised via well planned programs using rigorous project methods 3.1.3 Procurement and Probity Committee • an integrated set of program benefits are The Procurement and Probity Committee provides measured, managed, monitored and refined strategic oversight of procurement activities for optimal investment and so that the to ensure value for money, accountability and Department’s strategic goals are achieved probity. Its role includes ensuring compliance with • programs and projects are invested in, Victorian Government Purchasing Board (VGPB) designed and implemented within a framework guidelines, the Financial Management Act 1994 of transparency, accountability and integrity. and any standing orders made under the Act. To achieve this, the EPMO has introduced a The committee has two permanent members: scalable, industry-standard methodology for a chair without direct ‘line management’ project implementation. An executive dashboard responsibility for procurement, and the Executive has also been introduced as a monitoring tool for Director of Procurement Division. Other members departmental executives. It supports decisions are drawn upon from the range of executive about implementation of major projects, functions across the Department. prioritisation and future investments. The dashboard includes key milestones and health indicators for projects, giving executives greater visibility over the life of a project and benefits realisation for the Education State Board. WORKING WITH INTEGRITY | 23
3.1.4 Integrity and Assurance Division 3.2 Risk management Operation Ord found an urgent need to establish The Strategy and Performance Group (SPG) a new division to manage and deliver integrity was created in 2016 to unite the functions of measures cohesively. risk management with strategic planning, data The Integrity and Assurance Division (IAD) and evidence, and program management was established in late 2015 and is now the office functions. Department’s central point for integrity reform SPG is now the central hub for frameworks and oversight. IAD leads communication, and standards for data, evaluation, system promotion and coordination of integrity reform performance and accountability. Incorporating activities across the Department. It supports risk management with planning and strategy delivery of the Integrity Reform Program projects emphasises how risk management should always as well as its own projects. These include projects be part of enduring planning, strategy and relating to audit, assurance and the Speak Up decision-making. service. In 2017, the Department introduced a new Risk IAD also investigates fraud and corruption and Management Strategy, which describes how it delivers internal audit and assurance functions. will implement the Risk Management Framework. IAD reports to the Secretary directly on serious The strategy is based on the Victorian Managed integrity matters. Insurance Authority’s (VMIA) seven domains of IAD continues to work closely with key effective risk management. stakeholders, including principal groups and The three lines of defence risk management model business manager peak bodies, to build effective was incorporated into the Risk Management integrity reforms and identify issues. Framework. This strengthens the ownership, IAD also draws on the Department’s experience accountabilities, resources and governance for risk of corruption and the consequent Integrity management activities across the Department Reform Program to provide expert leadership to by ensuring the right support mechanisms and the broader Victorian Public Sector. It has made controls are in place. presentations to leading public administration The increased focus on risk management by the bodies, the Australia and New Zealand School Department’s governance bodies is evidenced by: of Government and the Institute of Public • strategic and operational risks have or will be Administration Australia. considered at the four major planning sessions for the Executive Board in 2017 • key risks are discussed at the Executive Board as a result of the Quarterly Strategic Review (QSR) process • the Audit and Risk Committee (ARC) has dedicated time to discuss risk and for each of the Groups discusses its priorities and risks at every ARC meeting • relevant risk management information is included in procurement activities and papers that are presented to the Probity and Procurement Committee. 24
You can also read