Willmott Dixon DEVELOPMENT SOLUTIONS
Willmott Dixon
DEVELOPMENT
SOLUTIONS
Willmott Dixon DEVELOPMENT SOLUTIONS
WHY
DEVELOPMENT
SOLUTIONS?
Development programmes are
increasingly requiring a more
innovative use of land and
assets, with public and private
collaboration key.

We bring together the best in construction and development specialism under one roof,
working on projects from inception through to post completion. This gives an unrivaled
development solution that comes from years of experience and expertise.
Our solutions set out to unlock and retain value for you – our customer.
Willmott Dixon is launching a new specialist and dedicated team who will provide a
professional consultancy and a solution led service to our customers to realise and deliver
a pipeline of development led opportunities.
WIllmott Dixon believe in a purpose beyond profit. We want to be a trusted partner in
the delivery of social infrastructure through the values we uphold, the products we
offer, the services we provide and the legacy we leave. Development solutions is a
clear route to achieving this.

Willmott Dixon | Development Solutions
Willmott Dixon DEVELOPMENT SOLUTIONS
We have developed a number of services
and delivery models which can unlock
opportunities, providing our customers
with a wider solution which broadly sit
across three key areas:

ASSET                                    DEVELOPMENT                            LAND                                  FUNDING
MANAGEMENT                               MANAGEMENT                             SOURCING                              SOLUTIONS
SOLUTIONS                                SERVICES
Working with customers to                An end to end development              Through our wide ranging              Bringing forward
review and unlock potential              consultancy service, guiding           public sector partnerships and        alternative means of
and achieve better value in              our customers through the              extensive wider network, we can       funding development to
their existing assets.                   development lifecycle.                 source land opportunities for         increase capacity within
                                                                                our partners to meet their exact      our partners’ plans.
                                                                                development requirements.

CUSTOMER                                           These benefits offer real value                 Development Solutions
BENEFITS                                           to the customer, and provide                    empowers customers through
                                                   a compelling case for the                       retained control and value,
   Retain control                                  adoption and consideration                      tailored to local needs. With
   Retain assets                                   of Development Solutions on                     over a century of combined
                                                   relevant opportunities.                         construction and development
   Unlock better commercial returns
                                                                                                   expertise, our incentive is
   Provide a platform for creating                                                                 to deliver quality schemes
   longer term revenue streams to                                                                  by providing the enabling
   offset austerity cuts                                                                           benefits of a developer.

Willmott Dixon | Development Solutions
Willmott Dixon DEVELOPMENT SOLUTIONS
OUR MODELS
        AND SOLUTIONS

Willmott Dixon | Development Solutions
Willmott Dixon DEVELOPMENT SOLUTIONS
ASSET
Unlocking value in our                                                                                                   MANAGEMENT
customers’ strategic assets                                                                                                SOLUTIONS

What?                                              Such services could include:
This sees Willmott Dixon provide                   • Identifying strategic land parcels to sell
development resource and expertise to                to generate revenue to cross-subsidise
review our customers’ existing assets and            an identified development.
create development solutions which support         •R
                                                     eviewing existing assets to develop
our customers’ briefs, aims and aspirations.        more viable solutions.
Under this model we would review and               • Identifying strategic land to acquire to
appraise various design solutions to                 unlock better potential from existing assets.
maximise benefits for our customers.

CUSTOMER
BENEFITS

Generates a financially               Provides a resource to customers              We can focus outcomes                Ensures customers retain
better solution by                    who either do not have the                    against their social drivers         ownership and control of
sweating their assets                 resource or whose existing                                                         their asset holdings.
                                      resources are at capacity

                    Customer brief           Select design          Market                   Outline               Market informed
                    and success              partners               appraisal                programme             financial model
                    criteria agreed                                                                                (where required)

Feasibility                                         Asset Management                                                                  Preconstruction
                          Identify                  Solutions Process
                          stakeholders and          opportunities                Outline              Market                Business
                          communication             + constraints                design               informed              plan
                          plan                      assessment                   options              cost plan             development

Willmott Dixon | Development Solutions
Willmott Dixon DEVELOPMENT SOLUTIONS
Delivering a flexible and tailored
                                                                                                                            DEVELOPMENT
service to maximise development                                                                                     MANAGEMENT
value for our customers.                                                                                               SERVICES

What?
A service offering in which we provide a          Our customer retains the development           The key to this service is we are not the
full development service, to include design       returns – we receive our usual construction    developer – that role remains with our
and build but also sales and marketing,           contract plus a fee for the wider services.    customer – but we provide the full range of
commercial modelling and financial                                                               services required to deliver a private tenure
appraisal work.                                                                                  housing scheme.

CUSTOMER
BENEFITS

Retain control of                  Meet local needs by having            Be in control of timescales by        Enhanced returns by
land/assets                        control over what is built            directing the rate of delivery        retaining developer margins

Our development management services includes:
• Scheme concept designs, house types           • A sales and marketing strategy              •C  ustomer care for completed units
   and specifications                            • F inancial modelling                        • E stablish estate management regime
• Market appraisal and viability analysis       •M  anagement of plot sales                   •C reate and manage project governance regime
• Support with achieving planning permission

                                         Overall Development Management Services

       Feasibility           Financial          Design and        Commercial          Construction        Sales and           Aftercare
                            Appraisals           Planning          Modelling                              Marketing

                                                        Project Governance

Willmott Dixon | Development Solutions
Willmott Dixon DEVELOPMENT SOLUTIONS
Supporting our customer’s development plans
                                                                                                                                           LAND
through a professional land sourcing service.                                                                                  SOURCING

What?
Through our extensive network of contacts,        For example, our appointments to both             Alongside our site sourcing capability, we
we are able to identify and source land for       Homes England’s DPP3 framework and the            carry significant technical and construction
our customers to support in delivering their      GLA’s LDP2 framework give us access to public     expertise, which ensures we can undertake
overall development objectives and pipeline.      sector residential sites.                         early due diligence on site to assess and
                                                                                                    establish its viability before we take it to
We can source sites in an off-market or           Further to this, we are appointed to two single
                                                                                                    our partners.
mini-competition scenario through our             source frameworks, Scape and Procurement
public sector partnerships and our                Hub, both of which provide flexibility for
framework appointments.                           public sector bodies to dispose of sites linked
                                                  to wider construction opportunities.

CUSTOMER
BENEFITS

Direct access to public            One to one public body                Due diligence checks are              Single point of responsibility is
sector land through                access through frameworks             undertaken on all sites               provided by Willmott Dixon who
our framework                      such as Scape and                     by our legal and technical            will deliver the entire process
appointments including             Procurement Hub which                 teams which provide                   from initial site identification,
DPP3 and LDP2                      give us single source access          comfort on the viability              through due diligence, planning
                                   to all public sector bodies           of sites early                        and delivery of new schemes

                                                        Land Sourcing Process

                Understand                      Match with                 Undertake initial                Establish land
                  partner                      land sources                 due diligence,                value expectations
               requirements                                               planning potential

               Take forward                  Agree HOTs                    Agree acquisition                Introduce site
                and deliver                 with landowner                     strategy                       to partner

Willmott Dixon | Development Solutions
Willmott Dixon DEVELOPMENT SOLUTIONS
Enhancing capacity through                                                                                                FUNDING
funding solutions                                                                                               SOLUTIONS

What?                                                Such options could include:
We will work with partners to identify funding       • Cross subsidy models
requirements on projects and identify a              • Grant funding solutions
suitable partner with whom we can work to            • Lease and leaseback models
provide a funding offer or solution.                 • Strip income models
This will include Adjuto as an option, but also      We can also explore partnership models
look to generate wider partnerships with             to design, build, finance and operate
other funds and providers to create.                 new public facilities.

CUSTOMER
BENEFITS

Public sector borrowing                  Our cross-subsidy                 Our approach can remove   Through Adjuto,
capacity can be                          model can introduce               the requirement for an    an authority can
preserved for use on                     flexible development              Authority to engage an
                                                                                                     • Choose to act in the
other developments.                      partners to share risk.           external development
                                                                                                       capacity of ‘bank’ and
                                                                           company, thereby
                                                                                                       receive a market return for
                                                                           retaining margins.
                                                                                                       cash loaned into the model.
                                                                                                     • Choose to act in capacity
                                                                                                       of ‘developer’ and receive a
                                                                                                       percentage of developer profit.

Willmott Dixon | Development Solutions
Willmott Dixon DEVELOPMENT SOLUTIONS
PROCUREMENT
ROUTES
All of the models and solutions outlined
in this document are procurable under
the following national frameworks:

                                         Scape Group is a public sector organisation, dedicated
                                         to creating efficiency and social value via the built environment.

                                         Major Works England and Northern Ireland value £1.75bn
                                         Major Works Wales value £500m

                                         Scape Venture is a collaborative procurement specialist that
                                         offers an innovative approach to delivering exceptional
                                         outcomes for the private sector.

                                         Scape Venture Construction Framework

                                         Procurement Hub offers a number of free-to-join
                                         procurement frameworks that bring together top suppliers,
                                         consultants and contractors.

                                         Major Projects Framework value £2.5bn

                                         The Delivery Partner Panel 3 (DPP3) has been procured through
                                         fully compliant Official Journal of the European Union (OJEU)
                                         processes, and will be used to enable the efficient procurement of
                                         housing-led development on land owned by public sector bodies
                                         and Homes England.

                                         Delivery Partner Panel 3

Willmott Dixon | Development Solutions
Willmott Dixon DEVELOPMENT SOLUTIONS
PROJECT
        CASE STUDIES

Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

MOBERLY LEISURE
& PRIME PLACE                                                                                                         SOLUTIONS
                                                                                                                                FUNDING

KENSAL RISE

                                                                                 CUSTOMER:
                                                                                 Westminster City Council
                                                                                 SOLUTION:
                                                                                 Funding Solution – social
                                                                                 infrastructure cross-subsidy
                                                                                 CONTRACT START DATE:
                                                                                 March 2016
                                                                                 CONTRACT FINISH DATE:
                                                                                 June 2018
                                                                                 VALUE:
                                                                                 £47 million
                                                                                 PROCUREMENT ROUTE:
                                                                                 Scape 3 (single source)

Kensal Rise is a collection              BENEFIT OF PROCUREMENT                              CUSTOMER CHALLENGE
of 200 beautifully designed              ROUTE USED                                          • No capital with which to fund a new centre.
apartments and townhouses                • The council were able to access the
                                           construction and development/funding              OUR SOLUTION
built on top of and around the
                                           expertise of Willmott Dixon. This provided        • Using an innovative cross-subsidy method,
Moberly Leisure Centre which               them with a free feasibility, development           Moberly Leisure was delivered at a time
offers two pools, a 120 station            advice and appraisal together with                  when there was a shortfall in public spending
gym, two exercise studios and              funding propositions.                               for facilities of this scale. The facility was
a large eight-court sports hall.                                                               delivered at no cost to the public purse,
                                         CUSTOMER OBJECTIVES                                   with Westminster City Council land being
                                         • To create a vibrant new residential                 transferred for residential development
                                           and wellbeing hub in a central London               as payment.
                                           location, combining modern city living
                                           for residents with strong connections
                                           to the wider community.
                                         • To increase sports provision in the local area.

                                                                                                                                      1/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

MOBERLY LEISURE
& PRIME PLACE                                                                                                                      SOLUTIONS
                                                                                                                                             FUNDING

KENSAL RISE

THE OUTCOME                                            • The Moberly development’s housing was             BENEFITS OF OUR APPROACH
• Opened in June 2018, the brand-new                    called Prime Place, Kensal Rise; a collection of   FOR THE CUSTOMER
   Moberly Sports Centre replaced the existing           beautifully designed one and two-bedroom            Provided a 37% increase in sports provision
   facility that was nearing the end of its life and     apartments and four-bedroom townhouses               for the area and much needed modern
   becoming uneconomical to maintain.                    built on top of and around the leisure centre.       facilities and importantly was delivered at
                                                       • It provides a great location for the demands        no cost to Westminster City Council.
• The centre provides two pools, a 120-station
   gym and two exercise studios. There is also a          of modern city living, with homes arranged         The facility is now a net contributor to
   large eight-court sports hall with a dedicated         around a beautifully landscaped roof garden,        council revenue as the new fitness and
   boxing gym and a bespoke gymnastics area.              with many benefiting from a large balcony or        leisure destination for Maida Vale.
                                                          private terrace.
• Within its first two months of operation the
   leisure centre welcomed over 100,000 visitors.
• We worked with residential development
   specialists, Be Living (now EcoWorld London)
   and Westminster City Council through Scape
   Group’s Major Works framework to cross-fund
   delivery of this and another nearby leisure
   centre for the council.

ADDED
VALUE

9/10 77% 87
Customer
satisfaction
                                         Local labour
                                         within 20 miles
                                                                                  Local labour
                                                                                  within 40 miles
                                                                                                    .5%                95.5%
                                                                                                                        Waste diverted
                                                                                                                        from landfill

387 8
School workshops                       University research
                                                                      100%Fair payment made to
                                                                                                              100,000
                                                                                                                  Visitors in first two months
                                       projects (Target:1)                supply chain within 19 days

                                                                                                                                                   2/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

CHESHUNT
SCHOOL                                                                                                                    SOLUTIONS
                                                                                                                                    FUNDING

BROXBOURNE

  BE LIVING                                                                           CUSTOMER:
                                                                                      Be Living
                                                                                      SOLUTION:
                                                                                      Funding Solution – social
                                                                                      infrastructure cross-subsidy
                                                                                      CONTRACT START DATE:
                                                                                      May 2015
                                                                                      CONTRACT FINISH DATE:
                                                                                      August 2017
                                                                                      VALUE:
                                                                                      £25 million Gross Development Value
                                                                                      PROCUREMENT ROUTE:
                                                                                      SID Framework

A scheme which saw the                          BENEFIT OF PROCUREMENT                             OUR SOLUTION
delivery of new educational                     ROUTE USED                                         • Funded the school improvements without
facilities, funded through the                  • Because the framework is focused on the            the school having to provide any capital
                                                  delivery of social infrastructure as an output     funding by utilising a cross-subsidy model,
development of 88 new homes
                                                  of housing provision, the mini-competition         whereby we developed and sold 88 homes
on surplus school land.                           process allowed us to submit plans for overall     on an adjacent site owned by the school.
                                                  school facility improvements at Cheshunt
 ADDED                                            School, which were entirely funded by the        THE OUTCOME
 VALUE                                            delivery of new homes.                           • Customer objectives met via the completion
                                                                                                     of school enhancements, together with
                We created a biodiversity       CUSTOMER OBJECTIVES                                  a unique development of 88 homes
                zone at the school after they
                                                • To deliver a new technology block, remodel         comprising of a mix of apartments and
                successfully applied for a
                Woodland Trust ‘Wildlife’         the main classroom block to create a new           family homes of up to four bedrooms
                Tree Pack.                        entrance lobby, staircases and new circulation     nestling next to Cheshunt School’s
                                                  route, plus an updated admin block to link         playing fields.
                The Woodland Trust
 420            ‘Wildlife’ Tree Pack
                included 420 trees in total,
                                                  with the new technology facility.
                                                • To improve the sports fields with new
                                                                                                   BENEFITS OF OUR APPROACH
                                                                                                   FOR THE CUSTOMER
                consisting of various species     changing facilities and a community sports
                of tree such as oak, silver       hall with dedicated entrance and parking.           Our customer saw vast enhancements to
                birch and hazel.                                                                      their own facilities without incurring any
                                                CUSTOMER CHALLENGE                                    cost to themselves.
                The pack also contained
                                                • No capital with which to fund these works.
                trees such as hawthorn,
                rowan and blackthorn that
                were planted specifically
                to become sources of food
                for wildlife.

                                                                                                                                          1/1
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

SAYER COURT                                                                                                  MANAGEMENT
                                                                                                                                   ASSET

LEAMINGTON SPA                                                                                                 SOLUTIONS

                                                                             CUSTOMER:
                                                                             Warwick District Council
                                                                             SOLUTION:
                                                                             Strategic Assets Review
                                                                             CONTRACT START DATE:
                                                                             May 2015
                                                                             CONTRACT FINISH DATE:
                                                                             November 2016
                                                                             VALUE:
                                                                             £11.1 million
                                                                             PROCUREMENT ROUTE:
                                                                             Scape 3 (single source)

Sayer Court provides a                   BENEFIT OF PROCUREMENT                           OUR SOLUTION
stylish 76 apartment block               ROUTE USED                                       • We identified and secured additional
and five separate bungalows              • Enabled the council to engage                    land for development.
                                           Willmott Dixon to undertake a
for people over 55. This is                                                               • Re-located an existing retail unit.
                                           development management role in
the first housing scheme                   unlocking the development.
                                                                                          • Progressed the scheme through planning.
commissioned by Warwick                                                                   • Undertook all design and construction works.
                                         • The council benefitted from free feasibility
District Council for over                  review work to provide a platform to take      This scheme was developed on the site of
30 years, creating quality new             the development forward. Early engagement      former bedsit accommodation with the aim
homes that replaced a scheme               through the framework made this possible.      of enhancing the quality of accommodation
no longer fit for purpose.                                                                available for local people. The site contained
                                         CUSTOMER OBJECTIVES
                                                                                          33 bedsits plus a common room. When we
                                         • To provide a high quality retirement           were initially engaged on the scheme, the site
                                           development for older people.                  contained numerous constraints which limited
                                         • To increase density and the number of units    its development to circa 40 new homes.
                                           on offer through the scheme.                   We undertook all initial site due diligence
                                                                                          at our risk to create a fully risk profiled
                                         CUSTOMER CHALLENGE
                                                                                          development solution for the council.
                                         • The council had limited capacity within
                                                                                          In carrying out this process, we developed nine
                                           the team with which to take the
                                                                                          separate feasibility studies (all at risk) in order
                                           development forward.
                                                                                          to assess the viability of different scenarios
                                                                                          linked to land acquisition.

                                                                                                                                     1/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

SAYER COURT                                                                                                             MANAGEMENT
                                                                                                                                            ASSET

LEAMINGTON SPA                                                                                                            SOLUTIONS

This all formed part of our reporting processes     fronted by ourselves and submitted in our           BENEFITS OF OUR APPROACH
in obtaining Cabinet approval to commit the         name in order that reputational risk was            FOR THE CUSTOMER
investment required to increase the density of      protected from the council.                          Ensuring greater value for council spend,
the scheme. In order to maximise the scheme’s       In addition, we supported the council with sales      we negotiated the acquisition of three
potential we undertook a land assembly              and lettings by delivering a show apartment           private parcels of land to increase
process and negotiated the acquisition of three     early in our programme. We engaged a                  development capacity.
private land parcels including an existing public   specialist interior designer and fully fitted out    We supported the Cabinet and board
house and two private houses. This enabled a        and apartment to enable the council to show           approval process to ensure approval for
significant increase to the density of housing –    prospective residents what the final quality          the investment.
almost tripling the number of units on site.        would be like in order to maximise sales and
The structure of this deal saw us negotiate the                                                           Our expert team led the planning process
                                                    lettings in the off-plan phase.
land purchases on behalf of the Local Authority                                                            and secured planning consent in 11 weeks.
(LA), with completion assigned to the council.      THE OUTCOME                                          We took full construction risk to ensure
We then entered into an NEC Delivery                • First housing scheme commissioned by               cost certainty for our customer.
Agreement to design and build the scheme,              Warwick District Council for over 30 years.
including taking the scheme through planning.
                                                    •M
                                                      et local housing needs by replacing a
Once this Cabinet approval was obtained,             scheme no longer fit for purpose, with
we entered into conditional contracts with           purpose build accommodation.
each land owner and subsequently took
                                                    •7
                                                      6 unit apartment block with five
the scheme through planning, achieving a
                                                     separate bungalows all specifically
planning consent in only 11 weeks from
                                                     designed for over 55s.
submission, thereby ensuring a swifter start
on site could be achieved. Planning was             •D
                                                      elivered on time and to budget.

ADDED
VALUE

9/10
Client satisfaction
(service)
                                            8/10 99% 43
                                             Client satisfaction
                                             (value for money)
                                                                                Waste diverted
                                                                                from landfill
                                                                                                                Considerate
                                                                                                                Constructor Score

100% 96% 88% 100%
Fair payment made to                         Local labour
                                             within 40 miles
                                                                                Local spend
                                                                                within 40 miles
                                                                                                                SME engagement
                                                                                                                and SME spend
supply chain within 19 days

                                                                                                                                             2/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

ROBIN HOOD
CHASE                                                                                                             MANAGEMENT
                                                                                                                                      ASSET

NOTTINGHAM                                                                                                          SOLUTIONS

                                                                                 CUSTOMER:
                                                                                 Nottingham City Council
                                                                                 & ASRA Housing
                                                                                 SOLUTION:
                                                                                 Strategic Assets Review
                                                                                 CONTRACT START DATE:
                                                                                 March 2014
                                                                                 CONTRACT FINISH DATE:
                                                                                 March 2015
                                                                                 VALUE:
                                                                                 £3.9 million
                                                                                 PROCUREMENT ROUTE:
                                                                                 Scape 3 (single source)

A mixed use development        BENEFIT OF PROCUREMENT                                          OUR SOLUTION
which saw the delivery of 45   ROUTE USED                                                      Our role saw us:
homes together with three      • Direct call off through the framework enabled                 • Identify and obtain the land
                                 the council to procure Willmott Dixon to
retail units, delivered in                                                                     • Secure and pre-sell the retail element
                                 work up a solution for this under-utilised
partnership with ASRA Housing. site and create a platform for securing two                     • Progress the scheme through planning
                                           development partners to deliver the site.           • Undertake all design and construction works.
 ADDED                                    • Allowed the early engagement of
                                                                                               This development followed an earlier phase
 VALUE                                      Willmott Dixon to undertake early feasibility
                                                                                               which saw Willmott Dixon deliver a
           COMMUNITY                        review in order to create a deliverable solution
                                                                                               health and wellbeing centre on behalf of
           ENGAGEMENT ACTIVITIES            for the site.
                                                                                               Nottingham City Council.
           Our community engagement       • Free feasibility through the Scape framework.
           activities included working                                                         Following completion of the Wellbeing Centre,
           with Nottingham City           CUSTOMER OBJECTIVES                                  we began working with the council (who
           Council’s Employment Hub                                                            owned the land) to develop proposals for
           to provide invaluable work     • To deliver the development in a commercially
                                                                                               the wider site. We were able to engage in an
           experience for 72 local          viable manner, with no residual development
                                                                                               exclusivity arrangement with the council on
           unemployed people.               risk for the council.
                                                                                               the land through our position on the Scape
                                          • To create a scheme which delivered both            Major Works framework, giving us direct
           BUILDING ON STRONG
           FOUNDATIONS                      residential and commercial (retail) uses.          access to the land in an off-market scenario.
           Our site team also teamed                                                           The deal structure saw us negotiate an
                                          CUSTOMER CHALLENGE
           up with trainees from the                                                           exclusivity with the vendor and then assign
           local New College Nottingham   • Commercial viability.
           and local job seekers to                                                            the land completion to ASRA Housing,
                                          • Finding a development solution for a mixed         with Willmott Dixon subsequently entering
           create the foundations for
           a new building at St. Ann’s      use scheme.
           Community Orchard.

                                                                                                                                          1/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

ROBIN HOOD
CHASE                                                                                                                  MANAGEMENT
                                                                                                                                            ASSET

NOTTINGHAM                                                                                                               SOLUTIONS

into a design and build contract to complete       the scheme. We also led the commercial              BENEFITS OF OUR APPROACH
the scheme.                                        element of the project, sourcing a commercial       FOR THE CUSTOMER
In developing proposals, we entered into           investment partner and securing pre-sales            Gained early access to the site by utilising
early dialogue with the planners and carried       on all three commercial units, enabling the           our position on the Nottingham Housing
out a series of due diligence surveys on the       development to successfully commence in a             Strategic Partnership Board.
land (including a topographical survey and         manner compliant with planning.
                                                                                                        Site secured off-market through our
site investigation) in order to understand the     Prior to the commercial investment partner            position on the Scape Major Works
full constraints of the site and develop a fully   being on board, we commenced taking the               framework, avoiding competition on the
profiled land package proposal to our end          scheme through planning, sharing planning             open market.
client, ASRA Housing.                              risk and taking full responsibility for securing
                                                                                                        Undertook early due diligence on the
We undertook all initial site due diligence        pre-sales on the commercial element.
                                                                                                         site to ensure all opportunities and
at our risk to create a fully risk profiled        We subsequently entered into separate                 constraints were understood early in the
development package solution to                    build contracts with ASRA Housing and the             development process.
ASRA Housing.                                      commercial partner, providing lump sum
                                                                                                        Successfully delivered the retail
Following engagement with the planners,            contracts and taking full construction risk, to
                                                                                                         element in a risk free manner to ASRA
it became apparent that a mixed use scheme         successfully deliver the scheme.
                                                                                                         Housing by sourcing a commercial
was required. In response we developed                                                                   investment partner.
                                                   THE OUTCOME
proposals for a scheme comprising residential
                                                   • A successful mixed use development which          Ensured community engagement was a
and retail use.
                                                      saw the delivery of 45 homes together with         key consideration in the development.
We also shared planning risk to ensure
                                                      three retail units.
all partners were equally bought into the
principle of the development from the outset.      • This development completed the wider
                                                      regeneration of the area.
Using our position on the Nottingham
Housing Strategic Partnership Board, we            • It also provided much needed homes
took the site to ASRA Housing as a package            specifically designed for over 55s, addressing
deal for the residential element and entered          housing need in the area.
into a back-to-back arrangement to deliver

ADDED
VALUE

100% 90.81% 99.70% 655
   of supply chain paid
   within 30 days
                                         Local labour
                                         within 40 miles
                                                                                   Local spend
                                                                                   within 60 miles
                                                                                                                       Short courses
                                                                                                                       completed

99.62% 209
                                                                                                                  The building is popular with
                                                                                                                  natural space within the
                                                                                                                  local St Ann’s allotments,
                                                                                                                  hosting a range of community
                                                                                                                  activities, including school
Waste diverted                             Apprentice weeks                                                       visits, activity days and
from landfill                              completed                                                              play sessions.

                                                                                                                                             2/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

SPRING
BOROUGHS                                                                                                         MANAGEMENT
                                                                                                                                       ASSET

NORTHAMPTON                                                                                                        SOLUTIONS

                                                                                CUSTOMER:
                                                                                Northampton Partnership Homes
                                                                                SOLUTION:
                                                                                Strategic Assets Review
                                                                                CONTRACT START DATE:
                                                                                October 2016
                                                                                CONTRACT FINISH DATE:
                                                                                December 2018
                                                                                VALUE:
                                                                                £6.34 million
                                                                                PROCUREMENT ROUTE:
                                                                                Scape 3 (single source)

This project entailed the                BENEFIT OF PROCUREMENT                               CUSTOMER CHALLENGE
development of 34 new                    ROUTE USED                                           • Limited resources.
affordable homes (comprising             • Enabled the council to engage Willmott Dixon       • Knowledge of available sites on the
                                           to undertake a full land availability assessment
2 and 3 bed houses), a new                                                                      estate was limited.
                                           in unlocking the development.
retail unit and remodelling                                                                   OUR SOLUTION
                                         • Early engagement through the framework
works to St Katherine’s Court                                                                 • We identified and secured additional
                                           enabled the council to benefit from free
(15 storey tower block),                   feasibility review work to provide a platform        land for development
including all external works,              to take the development forward.                   • Re-located an existing retail unit
infrastructure and drainage.             • Significant social value was created as part of    • Took the scheme through planning
                                           the development.
                                                                                              • Undertook all design and construction works.
                                         CUSTOMER OBJECTIVES                                  We were initially engaged by our customer,
                                         • To improve the environmental setting of            Northampton Partnership Homes to deliver
                                           the overall estate.                                a new build scheme comprising of 18 new
                                         • To improve the energy efficiency of the            homes off Little Cross Street within the
                                           existing tower block.                              Spring Borough estate.
                                         • To increase the provision of new homes.            We undertook a full review of the local area
                                                                                              to aid in our understanding of the scheme.
                                                                                              This highlighted the potential to expand
                                                                                              our development activities beyond this
                                                                                              initial site. As a result, we conducted a full

                                                                                                                                       1/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

SPRING
BOROUGHS                                                                                                         MANAGEMENT
                                                                                                                                      ASSET

NORTHAMPTON                                                                                                        SOLUTIONS

land development strategy with the aim              THE OUTCOME                                   BENEFITS OF OUR APPROACH
of identifying additional sites for potential       • T
                                                       he development of 34 new homes, a new     FOR THE CUSTOMER
development.                                          retail unit and remodelling works to         Ensured cost certainty for our customer
As part of this exercise, we initially identified     St. Katherine’s Court (15 storey tower        by taking full construction risk.
six potential sites within the estate itself          block). This provided the community with     Successfully secured planning consent
which we felt offered development potential.          much needed affordable housing.               on each development site with Willmott
We then undertook title searches and                • W
                                                       e also made environmental                   Dixon leading the planning process.
planning due diligence to assess which sites          improvements to the estate, by completing    Increased the development potential
were deliverable. This saw us discount three          all external works such as infrastructure     from 18 units to 34 units, increasing the
initial sites.                                        and drainage. This improved the estate’s      number of affordable homes we were
For the remaining three sites, we entered into        overall external image.                       able to provide across the estate.
dialogue with the relevant land owners to
ensure the sites could be acquired and also did
initial scoping work to understand the level of
development achievable.
Through this exercise, we were able to secure
each site and increase the development from
an initial 18 new homes to 34 new homes
plus the relocation of a retail unit to increase
the scope of the initial site.

ADDED
VALUE

                    9.7/10 100% 42
                     Customer
                     satisfaction score
                                                              BREEAM assessment rating
                                                              on all new buildings
                                                                                                    Considerate
                                                                                                    Constructor Score

100% 100% 88% 96%
Local labour
within 40 miles
                                            Local spend
                                            within 40 miles
                                                                                SME engagement                  project spend with SMEs

                                                                                                                                       2/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

LIVERPOOL HOUSING
PARTNERSHIP                                                                                                              CONSORTIUM
                                                                                                                            BIDDING
LIVERPOOL                                                                                                                     MODEL

                                                                                CUSTOMER:
                                                                                Liverpool City Council
                                                                                PARTNERS:
                                                                                Liverpool Mutual Homes
                                                                                and Redrow Homes
                                                                                SOLUTION:
                                                                                Consortium Solution
                                                                                CONTRACT START / FINISH DATE:
                                                                                2015 / 2020

                                                                                VALUE: £205 million
                                                                                (Potential investment value)
                                                                                PROCUREMENT ROUTE:
                                                                                Competitive dialogue

The Liverpool Housing                    BENEFIT OF PROCUREMENT                              • The council also had a range of other
Partnership (LHP) is a                   ROUTE USED                                            partnerships in place which were not
                                         • It provided the council with the flexibility        fully delivering against the housing needs
pioneering relationship                                                                        of the city.
                                           to create a unique partnership with a
forged between Liverpool
                                           consortium of award winning partners who
City Council, Redrow Homes,                                                                  OUR SOLUTION
                                           are committed to local investment in the
Liverpool Mutual Homes (LMH)               Liverpool City region.                            In response to the challenges, Willmott Dixon
and Willmott Dixon, delivering                                                               pulled together a consortium of partners
                                         CUSTOMER OBJECTIVES                                 with complementary skills and expertise
up to 1,500 new homes and
                                         • To deliver 1,500 new homes and bring 1,000        and who, together, could deliver the scale of
bringing 1,000 empty homes                                                                   development being sought by the council.
                                           empty homes back into use
back into use.
                                         • To deliver these homes across the entire city     Our approach entailed:
                                         • To deliver a range of tenures, including market   • A consortium of partners with expertise
                                           sale and affordable housing                         in land identification, planning promotion,
                                         • To deliver a range of higher council tax            ground remediation, construction,
                                           band homes.                                         development, sales and marketing,
                                                                                               housing management, customer service
                                         CUSTOMER CHALLENGE                                    and aftercare.
                                         • The scale of the objective was such that it was   • Development of new homes on multiple
                                           too large for any one individual organisation       sites throughout the city, providing a city
                                           to deliver.                                         wide housing programme with a variety of
                                         • The council had access to land, yet was not         housing tenures.
                                           in a position to directly deliver the housing
                                           requirements through their own investment.

                                                                                                                                      1/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

LIVERPOOL HOUSING
PARTNERSHIP                                                                                                               CONSORTIUM
                                                                                                                             BIDDING
LIVERPOOL                                                                                                                      MODEL

The council provided strategic planning and       • This includes Marwood Tower which has         The uniqueness of the partnership is that
housing need intelligence, as well as selling       delivered 80 homes for the over 55s            it is responsive to the housing market and
any council owned land suitable for housing         through the refurbishment and extension of     the partners have a direct influence about
to the partnership for development at               a tower block which was no longer in use.      where, when and the type of housing to
market value.                                                                                      be built in the city.
                                                  BENEFITS OF OUR APPROACH
Capital receipts generated by the sale of the                                                     Development of new homes on multiple
                                                  FOR THE CUSTOMER
council sites and assets were reinvested into                                                      sites throughout the city, providing a city
the housing programme, to enable more                Scale of delivery – by adopting a            wide housing programme with a variety
families to be provided with homes.                   consortium-led approach we are able to       of housing tenures.
                                                      deliver much more than our individual
Programme delivery was closely monitored                                                          The partnership worked on a wide
                                                      organisations could in isolation, thereby
by the partnership, with quarterly and annual                                                      range of initiatives to tackle empty
                                                      ensuring we could meet the council’s
reports provided to the Cabinet.                                                                   properties, including long-term voids,
                                                      objective of delivering 1,500 new homes,
                                                                                                   such as maximising voluntary action from
THE OUTCOME                                           something which would have been
                                                                                                   property owners and securing funding to
                                                      difficult for one company to achieve.
• To date, development has commenced                                                               bring houses back into use. Areas where
  either on site or through the planning             Platform to deliver 1,500 new homes and      groups of empty properties are most
  process of nine schemes providing                   bring 1,000 empty homes back into use.       heavily impacting on streets are being
  over 300 new homes across a variety of             Creating a £205 million investment, with     particularly targeted.
  tenures and uses.                                   potential for a further £200 million in
                                                      subsequent years.

ADDED
VALUE

8.4/10 8/10
Customer satisfaction
(service)
                                            Customer satisfaction
                                            (whole life performance)
                                                                               99.53% 40
                                                                                 Waste diverted
                                                                                 from landfill
                                                                                                                         Considerate
                                                                                                                         Constructor Score

100% 98                                     Local labour
                                                         .81%
                                            within 40 miles
                                                                               95.03% 100%
                                                                               Local spend
                                                                               within 40 miles
                                                                                                              SME engagement

                                           90.17%
Fair payment made to
supply chain within 19 days                                                                                   and SME spend

                                            Local labour
                                            within 20 miles

   The project has delivered the following aims and objectives:
   • 17 National Vocational Qualifications supported • 147 School/college/university site visits
   • 300 Apprentice weeks (existing), 52 Apprentice weeks (project initiated) • 829 Short courses
   • 149 School/college workshops • 38 Work experience placements • 45 University research projects supported

                                                                                                                                       2/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

ASHTON RISE                                                                                                              DEVELOPMENT
                                                                                                                MANAGEMENT
BRISTOL                                                                                                            SERVICES

                                                                                 CUSTOMER:
                                                                                 Bristol City Council
                                                                                 SOLUTION:
                                                                                 Development Management Services
                                                                                 CONTRACT START DATE:
                                                                                 8th May 2017
                                                                                 CONTRACT FINISH DATE:
                                                                                 Anticipated 15th March 2021
                                                                                 VALUE:
                                                                                 £21.2 million
                                                                                 PROCUREMENT ROUTE:
                                                                                 Scape 3 (single source)

Ashton Rise is a mixed tenure            BENEFIT OF PROCUREMENT                               CUSTOMER CHALLENGE
housing development of                   ROUTE USED                                           • Having never delivered a mixed tenure
133 new homes, with 80 homes             • Procuring through the framework provided             scheme before, the council did not have the
                                           the customer with a one stop shop for the            in-house experience required to navigate
for market sale and 53 for
                                           full suite of services that they needed: design,     the complexities of such a scheme and
council housing. It is the first           build and development management.                    successfully meet their objectives.
scheme of this nature and scale
                                         • Early engagement, at concept stage, allowed
delivered by the council for                                                                  OUR SOLUTION
                                           the customer to benefit from our expertise
over 30 years.                             from the earliest possible point.                  • Our strategic partnership sees us utilising
                                                                                                our construction, sales and marketing skills
                                         • Enabled the gradual expansion of the scope
                                                                                                to successfully deliver the largest council
                                           of employment as the project progressed;
                                                                                                development in many years.
                                           the customer could appoint us in
                                           managed packages.                                  • We are providing both contracting and
                                                                                                development management services to the
                                         CUSTOMER OBJECTIVES                                    council, selling homes to cross-subsidise the
                                         • To maximise the delivery of council                  social rent units, with sales income being
                                           housing on this site, in a way that was              used to fund the council housing.
                                           more cost effective than standard council
                                           housing programmes.
                                         • Adopt a cross-subsidy model; to use the
                                           proceeds from the sales units to cross
                                           subsidise the provision of council houses.
                                         • To set a benchmark for quality in Bristol.

                                                                                                                                       1/3
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

ASHTON RISE                                                                                                                      DEVELOPMENT
                                                                                                                         MANAGEMENT
BRISTOL                                                                                                                     SERVICES

THE OUTCOME                                      BENEFITS OF OUR APPROACH
• 133 new homes built (80 for sale,              FOR THE CUSTOMER
  53 council houses), with all houses in the         Full control of the land and all
  phase 1 sales release sold off plan.               associated decisions.
• Delivered a level of council housing beyond        Control of timescales by directing the
  many other developments in the city, with          rate of delivery.
  the proportion of council housing (40% of          Retaining all proceeds from sales income.
  the units) exceeding policy requirements.
                                                     One single point of responsibility across
• A mix of sales units specifically driven to        the scheme increases consistency,
  meet local need over best commercial               reduces duplication and improves
  performance, driven by the council retaining       working relationships.
  full control over the development. This has
  seen a higher proportion of 1 and 2 bed
  apartments delivered to meet local demand
  in the area.

SERVICES PROVIDED

                                         Overall Development Management Services

           Feasibility           Financial       Design and        Commercial           Construction       Sales and            Aftercare
                                Appraisals        Planning          Modelling                              Marketing

                                                         Project Governance

• Alongside our design and build offer,          • In order to ensure that the customer could          - Supporting the council to set up a long term
  we provided a development management             make informed decisions about their level of          stewardship agreement with a management
  service to include:                              investment and the tenure mix we:                     agent to ensure high quality and consistency
 - Market appraisal and viability analysis         - Ran multiple commercial models looking            - A project board responsible for overseeing
 - Financial modelling                               at different tenure splits through the              the delivery of a project which meets the
                                                     feasibility process                                 council’s objectives in a fully compliant way.
 - Sales and marketing strategy
                                                   - Profiled different density models to assess
 - Scheme concept designs
                                                     these against commercial parameters
 - House type design/specifications (ensuring
                                                   - Provided market intelligence and
   products most suited for market sale)
                                                     demand information
 - Achieving planning permission
                                                   - Marketing strategy and materials, including
 - Management of plot sales                          all site branding
 - Customer care for completed units.

                                                                                                                                               2/3
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

ASHTON RISE                                                                                                                DEVELOPMENT
                                                                                                                   MANAGEMENT
BRISTOL                                                                                                               SERVICES

ADDED
VALUE

8.88/10 76.1% 100% 96.69%
Customer satisfaction
(value for money)
                                         Local labour
                                         within 40 miles
                                                                          Waste diverted
                                                                          from landfill
                                                                                                              SME spend

COMMUNITY                                                  A HIGHLY
ENGAGEMENT                                                 SUSTAINABLE
ACTIVITIES                                                 PROJECT
                                                           • All renewable energy in the form of a ground source heat pump for each
Coordinating the conversion of a                             unit. By integrating this new technology on a large scale residential scheme for
building in central Bristol into 17 flats                    the first time, it is being used as a benchmark for all developments in Bristol.
for homeless people.                                         Although it is more expensive to install, we registered it for the Renewable Heat
                                                             Incentive so that the council will benefit from that income over next 20 years.
                                                           • By replacing carbon-intensive bitumen with an innovative method that uses
                                                             non-recyclable plastic on site roads, we will save the equivalent of 150,000
A BENCHMARK                                                  single-use plastic bags.
FOR QUALITY
With an all-encompassing
specification: all houses come with
the same high spec finish and
there are no hidden extras.

                                                                                                                                        3/3
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

D’URTON LANE                                                                                                           FRAMEWORK
                                                                                                                     PROCUREMENT
PRESTON                                                                                                     DEVELOPMENT
                                                                                                            SPV SOLUTION

                                                                                CUSTOMER:
                                                                                Trafford Housing Trust
                                                                                SOLUTION:
                                                                                Land Led Development
                                                                                CONTRACT START DATE:
                                                                                April 2020
                                                                                CONTRACT FINISH DATE:
                                                                                April 2024 (TBC)
                                                                                VALUE:
                                                                                £32.6 million
                                                                                PROCUREMENT ROUTE:
                                                                                Homes England DPP3 Framework

Mixed tenure housing                     BENEFIT OF PROCUREMENT                           CUSTOMER CHALLENGE
development providing                    ROUTE USED                                       • Create a housing offer which doesn’t compete
250 new homes on land                    • The DPP3 framework gave us access to a site      with surrounding development.
                                           being disposed of by Homes England for our
procured from Homes England                                                               • Deliver a project with the completion of
                                           partner, Trafford Housing Trust (THT).           off-site highways works (S278) which provide
through the DPP3 framework                 Willmott Dixon’s position on the framework       access to the site.
and to be delivered through a              enabled THT to have access to the site.
joint venture partnership with           • Enabled Homes England the delivery             OUR SOLUTION
Trafford Housing Trust.                    of more affordable housing than a              • We created a joint venture (JV) with Trafford
                                           traditional approach.                            Housing Trust to give THT access to the site
                                                                                            through our framework appointment.
                                         CUSTOMER OBJECTIVES
                                         • Homes England:                                 THE OUTCOME
                                          • Achieve the highest possible land value.      • The JV successfully bid to deliver 250 new
                                                                                            homes over a 4 year period, providing
                                          • Homes delivered at an accelerated
                                                                                            Homes England with the most competitive
                                            construction pace.
                                                                                            land offer.
                                          • Exchange land contracts prior to the end of
                                                                                          • Our solution, focussing on smaller 2, 3
                                            March 2019.
                                                                                            and 4 bed homes was designed to not
                                         • Trafford Housing Trust:                          compete with surrounding new build
                                                                                            developments, predominantly providing
                                          • Access to larger development sites.
                                                                                            larger family homes.
                                          • Ability to deliver 50% affordable housing
                                            on their schemes.
                                          • Be in full control of the development.

                                                                                                                                   1/2
Willmott Dixon | Development Solutions
P RO J E C T C A S E S T U DY

D’URTON LANE                                                                                                     FRAMEWORK
                                                                                                               PROCUREMENT
PRESTON                                                                                                 DEVELOPMENT
                                                                                                        SPV SOLUTION

BENEFITS OF OUR APPROACH                       The completion of off-site works (S278)
FOR THE CUSTOMER                                enabled us to provide greater access
   Our partnership will allow us to deliver    to the site. This in turn allowed Homes
    a scheme consisting of 50% affordable       England to determine greater certainty
    housing and 50% housing for sale, far in    over a site start date and land value
    excess of planning policy requirements.     payments, as well as allowing for overall
                                                better site delivery.
   Our tenure solution will enable us
    to deliver at an accelerated pace, a       Gave THT access to a site which
    planned delivery rate of 8 homes per        they would otherwise have been
    month (against a market average             unable to access.
    of 5 per month).
   We are making a significant contribution
    towards meeting local housing needs
    by providing a mix of homes which are
    currently under-supplied in the local
    housing market.

ADDED
VALUE

                                                                                            ELECTRICAL
LESSON                                          SAFETY                                      CIRCUIT
SUPPORT                                         TALKS                                       BOARD
FOR PUPILS                                      FOR PUPILS                                  WORKSHOPS
Pupils will be supported in building new        Our people will visit primary schools       Electrical circuit board workshops
habitats such as bird boxes and insect          during assembly or class times to           will be held to allow pupils to
hotels for local wildlife, whilst being         deliver site safety talks. These talks      create sound, motion and light
taught about the animals’ habits and            will be centred around the dangers          through building snap circuits, all
learning new skills such as basic joinery.      children could be exposed to if they        whilst learning the basic principles
                                                were to enter a site unsupervised.          of electronics.

                                                                                                                            2/2
Willmott Dixon | Development Solutions
To find out more about Willmott Dixon
Development Solutions contact:
Richard Sterling
National Head of Land & Development
07964 974 653
richard.sterling@willmottdixon.co.uk
Chris Wheeler
Regional Head of Land & Development
(Wales & West / Central South)
07828 174 884
chris.wheeler@willmottdixon.co.uk
David Atkinson
Regional Head of Land & Development
(Midlands / North)
07816 283 578
david.atkinson@willmottdixon.co.uk
Simon Boreham
Regional Head of Land & Development
(London & South / London & East)
07580 679 064
simon.boreham@willmottdixon.co.uk