TAP HSE Culture Programme Jose de la Torre, TAP Senior Corporate QHSE Manager IPLOCA Regional Meeting Parma, May 2019
IPLOCA Regional meeting, Parma. May 2019 2 Agenda • TAP Project • TAP HSE KPIs • HSE Culture Programme
IPLOCA Regional meeting, Parma. May 2019 3 About TAP Part of Southern Gas Corridor (TAP, TANAP, SCPx) Aimed at improving the security and diversity of the EU’s energy supply. 878 km in length (Greece 550 km; Albania 215 km; Adriatic Sea 105 km; Italy 8 km). Its highest point is approximately 2,100 m in Albania’s mountains, while its lowest will be approximately 810 m beneath the sea. Initial capacity 10 bcm/a
IPLOCA Regional meeting, Parma. May 2019 4 About TAP Head Quartered in Baar, Switzerland Branch business offices in Athens, Rome, Lecce and Tirana. There are also project execution offices near the route of the pipeline in Thessaloniki, Tirana and in the Melendugno area. TAP currently employs over 250 specialists from 30 countries and many thousands more personnel via our EPC Contractors
IPLOCA Regional meeting, Parma. May 2019 5 TAP’s shareholders Owned by: SOCAR BP Snam Fluxys Enagás Axpo (20%) (20%) (20%) (19%) (16%) (5%) EPC Contractors:
IPLOCA Regional meeting, Parma. May 2019 QHSE KPIs 7 LAGGING INDICATORS YTD* S.I* YTD S.I YTD S.I YTD Total Fatalities 0 0 High Health & Safety 32 525 Incidents Potential 0 43 Recordable incidents 53 Lost Time (HIPO) 1 19 Environment 15 178 Injuries Serious Near YTD 2 36 Recordable misses Rest. Work incidents 1 24 Social 6 93 Day Cases Freq. Rates YTD S.I 4 3 H&S Medical LTIF Cultural heritage 0 16 1 22 0.29 0.45 0.56 1 ESCH Treatment Target 2019 < 0.60 First Aid TRIF YTD* Year to date LTIF Lost Time Injury Frequency 0.57 1.56 2.29 SI* Since Inception TRIF Total Recordable Injury Frequency 9 114 Target 2019 < 2.65 Cases RTAF LEADING INDICATORS 0.35 0.87 1.79 Target 2019 < 1.75 Near Misses 16 265 Status against Plan Man hours 3.5 41.7 (Mill) Road Traffic HSE Activity Plan On target 1 102 Km driven 8.6 116.6 Accidents (Mill) HSE Training Classroom : On target (85%) Program Online: On target (92%) QHSE Audit On target 100% Program HSE leadership On target performance Coms. & Wellbeing On target (81%) Program
IPLOCA Regional meeting, Parma. May 2019 8 Recordable Injuries – Top 3 Themes 28% 51% 2018 (29%) 2018 (45%) Slips, Trips, Falls Line of Fire 8% 2018 (16%) Unexpected Event
IPLOCA Regional meeting, Parma. May 2019 9 Serious Near Miss/ Hi-Po – Top 3 Themes 39% 12% 2018 (43%) 2018 (11%) Working at Height Machine Control Loss 9% 2018 (8%) Lifting/Uncontrolled Movement
IPLOCA Regional meeting, Parma. May 2019 10 What measures are we taking ahead of staring operations? Moving from construction to operation –a step change in the hazards associated Developing a robust HSE Culture What needs to be in place to create a robust HSE Culture*? • Management System: Safety Systems; Risk, Competence and training; Procedures & Rules (note all core elements of certified Management System) • Targeted goals and monitoring of HSE performance ? • Managerial activities & behaviour – research of common significant safety issues causing process safety / personal injury incidents 80% due to managerial activities or behaviour (or lack of) Dr D Cooper CFIOSH C.Psychol, ‘Navigating the Safety Culture Construct: A Review of the Evidence (2016)
IPLOCA Regional meeting, Parma. May 2019 11 HSE Culture Reinforce Programme. Follow up 2018 2019 2020 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Status Notes J A S O N D J F M A M J Not started New date proposed HSE Leadership Awayday WIP Work in Progress Completed HSE Guest speaker Programme e.g. Prof. Andrew Hopkins; Dr Philip Voss Below target Re:ACT training for LT Planned Leadership Visits 1/Q by ea. LT HSE Moments at all multi-functional meetings. Resources available in each meeting room to facilitate these. Revised TAP procedure Personal HSE Plan (PHP) all managers to complete 2019 Safe Start - all countries PHP 2019 all personnel + employees' PHP WIP linked to MBO LT Scorecard - LV; BBS cards; training LT Video Blog 'What HSE means to me' WIP Nominate HSE Ambassadors from each function HSE Townhall - reinforce HSE Culture & 16th October present programme HSE Event - Health & Safety Day Safety First Communication Campaign WIP 21st May
IPLOCA Regional meeting, Parma. May 2019 12 Safety First Communication Campaign Purpose Increase the safety awareness across the TAP organisation with a particular focus on managing Safety Hazards associated with the operation of a high-pressure gas system. How By showcasing the technical safety studies undertaken to date and how these activities will continue and the measures established to manage the identified risks to people, community, the environment and TAP’s commercial obligations and company reputation. Audience TAP staff and consultants
IPLOCA Regional meeting, Parma. May 2019 TAP Safety Swiss cheese model QHSE Effective Fire & Gas Management Temp System Repairs Emergency Hazard Training / Training / PTW SCE •Ops Envelopes Response Engineered Competent Competent Isolations •Procedures Plan Shut down Maintenance Solutions People People SIMOPS •Alarm Mgmt ESIA Incident Business Hazard Contractor Contractor LOTO Dispatching investigation Elimination or Overrides Continuity Mgmt Mgmt / Lesson International Substitution Hose Mgmt learned Standards Major Incident Incident Unsafe / Event / Event act / condition Safe Operations Planning & Planning & Systems Maintenance Operations Emergency in Projects Resourcing Resourcing of Work Mgmt Integrity Project OPS Design / Commissioning & Operation Phases Construction [PROJECT] 13
IPLOCA Regional meeting, Parma. May 2019 14 Personal HSE Action Plan • The action plan are specific to each individual • These are examples of what can be used to measure personal performance against • It is a self assessment although evidence should be prepared (where possible) • It should be placed on the desk • Marked ‘X’ on completion • e.g. selecting four, as per the BBS action, ‘X’ completion per quarter • Personalise with own name and signature
IPLOCA Regional meeting, Parma. May 2019 16 Thank you! Questions?