STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH Table of Contents 1. Introduction ............................................................................................................................................. 5 2. National and Regional Planning Policy ..................................................................................................... 6 National Spatial Strategy (2002) ......................................................................................................................... 7 National Planning Framework – Ireland 2040 .................................................................................................... 8 Rebuilding Ireland; Action Plan for Housing and Homelessness (2016) ............................................................. 9 Schools .............................................................................................................................................................. 11 Density .............................................................................................................................................................. 12 Urban Design Manual – A Best Practice Guide (2009)...................................................................................... 14 Delivering Homes, Sustaining Communities (2008).......................................................................................... 20 Design Manual for Urban Roads and Streets (DMURS) (2013) ......................................................................... 22 Guidelines for Planning Authorities on Childcare Facilities (2001) ................................................................... 23 Smarter Travel – A Sustainable Transport Future: A New Transport Policy for Ireland 2009-2020 ................. 24 Guidelines for Planning Authorities on ‘The Planning System and Flood Risk Management (November 2009)’ .......................................................................................................................................................................... 25 Birds and Habitats Directive – Appropriate Assessment .................................................................................. 25 Appropriate Assessment of Plans and Projects in Ireland Guidance for Planning Authorities (2009) ............. 26 Draft Guidelines for Planning Authorities and An Bord Pleanála on carrying out Environmental Impact Assessment (2012). ........................................................................................................................................... 26 Regional Planning Guidelines for the Greater Dublin Area (2010 – 2022) ....................................................... 26 Transport Strategy for the Greater Dublin Area 2016 - 2035 ........................................................................... 28 3. Local Planning Policy .............................................................................................................................. 29 Fingal County Development Plan 2017 – 2023 ................................................................................................. 29 Core Strategy & Settlement Strategy ............................................................................................................... 29 Development Strategy for Howth – Objectives for Howth ............................................................................... 32 Development Plan Zoning and Site Specific Local Objectives ........................................................................... 33 Compliance with Residential Development Policies of the Fingal County Development Plan ......................... 34 Energy Efficiency and Climate Change .............................................................................................................. 34 Design Principles ............................................................................................................................................... 34 Mixed Use and Vitality of Sustainable Communities ........................................................................................ 35 Housing Mix ...................................................................................................................................................... 36 Part V – Social Housing ..................................................................................................................................... 37 Residential Densities ......................................................................................................................................... 37 Apartment Development .................................................................................................................................. 37 Open Space ....................................................................................................................................................... 38 2 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH Childcare Facilities ............................................................................................................................................ 39 Flood Risk .......................................................................................................................................................... 40 4. Development Management Standards (Chapter 12 of Fingal Development Plan) .................................. 41 Objective ....................................................................................................................................................... 42 AA Screening ................................................................................................................................................. 42 Detailed Design Statement ........................................................................................................................... 42 Public Art ...................................................................................................................................................... 42 Shopfronts/Signage ...................................................................................................................................... 42 Green Roofs For SUDS and Green Corridors ................................................................................................. 42 Utility Providers/ESB Substations ................................................................................................................. 43 Dual Aspect ................................................................................................................................................... 43 Floor to Ceiling Heights ................................................................................................................................. 43 Units per Core ............................................................................................................................................... 43 Minimum Gross Floor Areas ......................................................................................................................... 43 Floor Area Standards .................................................................................................................................... 43 Floor Plans indicating furniture .................................................................................................................... 43 Separation Distances/Overlooking/Overshadowing .................................................................................... 44 Daylight/Sunlight .......................................................................................................................................... 44 Sound Transmission ...................................................................................................................................... 44 Management Companies.............................................................................................................................. 44 Communal Facilities ...................................................................................................................................... 45 Communal Laundry/Storage ......................................................................................................................... 45 Bin Storage/Refuse ....................................................................................................................................... 45 Naming and Numbering................................................................................................................................ 45 Height and Massing ...................................................................................................................................... 45 Visual Harmony/Design ................................................................................................................................ 46 Residential Character .................................................................................................................................... 46 Open Space – Permeability ........................................................................................................................... 46 Open Space Quantity .................................................................................................................................... 46 Open Space – 10% of Site/Financial Contribution in lieu of shortfall ........................................................... 47 Access to Public Parks ................................................................................................................................... 47 Taking in Charge of Open Spaces .................................................................................................................. 47 Open Spaces within Management Companies ............................................................................................. 47 Playground Facilities ..................................................................................................................................... 48 Tree Policy/Planting Plan .............................................................................................................................. 48 Private Open Space – Apartments and Duplex ............................................................................................. 49 Private Open Space ....................................................................................................................................... 49 Roads - Design in accordance with DMURS and Traffic Impact Assessment ................................................ 49 Objective DMS128 & DMS130 ...................................................................................................................... 49 Car Parking Standards ................................................................................................................................... 50 Bicycle Parking Standards ............................................................................................................................. 50 Waste Management ..................................................................................................................................... 51 Lighting Plan ................................................................................................................................................. 51 Site Assessment ............................................................................................................................................ 51 3 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH Archaeology .................................................................................................................................................. 52 Protected Structures..................................................................................................................................... 52 Architectural Heritage .................................................................................................................................. 52 Architectural Conservation Areas ................................................................................................................. 52 Signage in Architectural Conservation Area ................................................................................................. 52 Biodiversity ................................................................................................................................................... 53 Coastal Erosion ............................................................................................................................................. 53 Flooding ........................................................................................................................................................ 54 5. Conclusions ............................................................................................................................................ 55 4 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH 1. Introduction 1.1 On behalf of the prospective applicant, Crekav Trading GP Limited, this Statement of Consistency with Planning Policy has been prepared to accompany a proposed planning application in relation to a proposed strategic housing development at a c. 1.55 hectare (c.3.8 acres) site comprising a site located south of the Martello Tower on Balscadden Road & the former Baily Court Hotel, Howth, County Dublin. The development will consist of: • The demolition of existing structures on site including the disused sports building (c. 604 sq m) on the Balscadden Rd. Site and the Former Baily Court Hotel Buildings on Main St (c. 2051 sq m) and a reduction in ground levels. • Construction of 164 no. residential units in 3 no. separate apartment blocks and 1 mews building, comprising 158 no. apartments and 6 duplexes which includes 40 no. 1 bed units, 97 no. 2 bed units and 27 no. 3 bed units. • Provision 397 no. bicycle parking spaces and a total of 120 no. car parking spaces, which comprises 112 no. spaces in an underground basement in Block C and 8 no. on-street parking spaces. • Provision of commercial/retail space (c. 757 sqm), which includes a community room (c. 161sqm), 2 no. retail units (c. 429sqm and c. 96sqm) and a café (c. 71sq m). • The main vehicular entrance to the scheme will be from Main Street to serve the underground car park in Block C • The scheme provides for a new linear plaza which will create a new pedestrian link between Main St and Balscadden Rd to include the creation of an additional 2 no. new public plazas and also maintains and upgrades the pedestrian link from Abbey Street to Balscadden Road below the Martello Tower. The public footpath on the opposite side of Balscadden Road will be widened for the length of the site as part of the development. • All other ancillary site development works, site services, a sub-station, public lighting, plant, bin stores, bike stores, boundary treatments and landscaping; • Commercial and retail signage (c. 75 sqm) 1.2 The final design has evolved through a lengthy collaborative process involving the planning and various local authority departments and the Marlet Design Team, including architecture, conservation as well as roads and drainage. The feedback from An Bord Pleanala following our pre-planning meeting has necessitated design changes to the development which been included in our final application. 5 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH 1.3 The scheme provides for a new town centre quarter, at an appropriate and efficient residential density, a safe vehicular access arrangement, creation of new connections between the village core and Balscadden Road through the provision of new accessible streets and plazas which are accessible to all. 1.4 This statement of consistency with planning policy has been prepared to specifically address the requirements of the strategic housing development guidance document issued by An Bord Pleanala. This planning application is also accompanied by a Planning Report which includes further details in respect of the proposed development in relation to the site location and context, the development description and the relevant planning history. The planning policy section is included below. 1.5 This standalone planning policy consistency statement, prepared by Marlet Property Group Ltd., demonstrates that the proposal is consistent with the relevant national planning policy, guidelines issued under Section 28 of the Planning and Development Act 2000 (as amended), and with local planning policy. It should be read in conjunction with the accompanying detailed documentation prepared by CCK Architects, Murray & Associates Landscape Architects and OCSC Consulting Engineers as well as specialist input from conservation and archaeology. 1.6 For further details of consistency with the quantitative standards for residential units as set down in the Apartment Guidelines 2015, the Quality Housing for Sustainable Communities and the 2016-2022 Development Plan please refer to the Housing Quality Assessment document prepared by CCK Architects. 2. National and Regional Planning Policy 2.1 The key provisions of national (including relevant Section 28 guidelines) and regional planning policy as it relates to the proposed development is set out in the following sections. The key policy and guidance documents of relevance to the proposed development are as follows: ➢ National Spatial Strategy (2002); ➢ National Planning Framework 2040 (2018) ➢ Rebuilding Ireland; Action Plan for Housing and Homelessness (2016) ➢ Guidelines for Planning Authorities on Sustainable Residential Development in Urban Areas (2009), and the accompanying Urban Design Manual; 6 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH ➢ Delivering Homes, Sustaining Communities (2008) and the accompanying Best Practice Guidelines- Quality Housing for Sustainable Communities; ➢ Design Standards for New Apartments - Guidelines for Planning Authorities (March 2018) ➢ Design Manual for Urban Roads and Streets (2013); ➢ Guidelines for Planning Authorities on Childcare Facilities (2001); ➢ Smarter Travel – A New Transport Policy for Ireland (2009-2020); ➢ The Planning System and Flood Risk Management (2009); ➢ Birds and Habitats Directive – Appropriate Assessment ➢ Guidance on Appropriate Assessment for Planning Authorities (2009) ➢ Draft Guidelines for Planning Authorities and An Bord Pleanála on carrying out Environmental Impact Assessment (2012). ➢ Regional Planning Guidelines for the Greater Dublin Area (2010 – 2022); ➢ Greater Dublin Area Transport Strategy 2016-2035 National Spatial Strategy (2002) 2.2 The National Spatial Strategy (NSS) provides a broad planning framework for the location of development in Ireland. The key objective of the National Spatial Strategy is to provide an overarching planning framework for the Country and to result in the achievement of more balanced regional development. 2.3 The NSS provides for increasing urbanisation of the population and achievement of critical mass in large urban areas. The National Spatial Strategy (NSS) is a twenty-year planning framework designed to achieve a better balance of social, economic, physical development and population growth between regions. 2.4 One of the core objectives of the NSS is the consolidation of the Greater Dublin Area (GDA) in a manner which protects local character and amenity through the achievement of higher development densities at sustainable locations proximate to public transport and services. The subject lands are located adjacent to the Bus Stop for Dublin Bus into the City and c. 800m from Howth DART Station (10 minute walk). The NSS supports the consolidation of the GDA in order to limit the spread of the GDA into surrounding counties and to ensure the efficient operation of the public transport system. 2.5 The proposed development seeks to deliver a new quarter for Howth Village, which is designed to take account of the village grain and scale and will open up new streets and plazas for the community. It provides for appropriate new residential 7 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH development which will help to promote local services & schools along quality transport routes. As such the development of these lands is considered to be fully in accordance with the recommendations of the National Spatial Strategy. National Planning Framework – Ireland 2040 2.6 The Department of Housing Planning and Local Government, on behalf of the Government, has recently published the National Planning Framework called Ireland 2040 Our Plan. The high-level objectives of the plan are as follows: 1. In addressing future change, Ireland will continue on a path of economic, environmental and social progress that will improve our prosperity, sustainability and well-being. 2. Ensuring that Ireland’s many unique assets can be built upon, with an emphasis on improving economic output and stability as well as quality of life, environmental performance and the liveability of Dublin, our cities, towns and rural areas. 3. Setting out likely future change in Ireland and the spatial pattern required for effective and co-ordinated investment in a range of sectors to best accommodate and support that change. 4. Putting in place a strategy for the sustainable development of places in Ireland and how that can be achieved, through planning, investment and implementation. In particular, the redevelopment of this zoned Town Centre/Residential site in Howth Village would contribute to compact growth. The proposed development, would ensure the much needed provision of residential units in an area and site that have has not seen housing development for a substantial period. It is submitted that the proposed development is consistent with the objectives of the NPF in seeking to consolidate and densify an urban area proximate to primary transport routes. 8 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH Rebuilding Ireland; Action Plan for Housing and Homelessness (2016) 2.7 In 2016, the Government launched Rebuilding Ireland which targeted solutions to the ongoing supply issues in the residential sector in the country. The overarching aim of this Action Plan is to ramp up delivery of housing from its current under-supply across all tenures to Figure 1: Five Pillars of the Rebuilding Ireland Action Plan help individuals and families meet their housing needs, and to help those who are currently housed to remain in their homes or be provided with appropriate options of alternative accommodation, especially those families in emergency accommodation. This Plan sets ambitious targets to double the annual level of residential construction to 25,000 homes and deliver 47,000 units of social housing in the period to 2021, while at the same time making the best use of the existing housing stock and laying the foundations for a more vibrant and responsive private rented sector. The five pillars of the action plan are as follows: The development proposed will directly contribute to Pillar 2 seeking to ‘Accelerate Social Housing’, and Pillar 3 which seeks to ‘Build More Homes’. 159 no. residential dwellings are proposed in a wide mix of unit types and sizes to fit a broad tenure demand. 10% of the units are proposed for transfer as social housing. The scheme will therefore indirectly assist in Pillars 1 and 4 which seek to ‘Address Homelessness’ and ‘Improve the Rental Sector’, respectively. 9 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH Guidelines for Planning Authorities on Sustainable Residential Development in Urban Areas (2009) 2.8 The role of the Guidelines for Planning Authorities on Sustainable Residential Development in Urban Areas is to ensure the sustainable delivery of new development throughout the country. The Guidelines focus on the provision of sustainable residential development, including the promotion of layouts that: ➢ Prioritise walking, cycling and public transport, and minimise the need to use cars; ➢ Are easy to access for all users and to find one’s way around; ➢ Promote the efficient use of land and of energy, and minimise greenhouse gas emissions; ➢ Provide a mix of land uses to minimise transport demand. 2.9 The Guidelines also provide guidance on the core principles of urban design when creating places of high quality and distinct identity. The Guidelines recommend that planning authorities should promote high quality design in their policy documents and in their development management process. In this regard, the Guidelines are accompanied by a Design Manual discussed below which demonstrates how design principles can be applied in the design and layout of new residential developments, at a variety of scales of development and in various settings. 2.10 These Guidelines support a plan-led approach to development as provided for in the Planning and Development Act 2000. Section 2.1 of the Guidelines note that ‘the scale, location and nature of major new residential development will be determined by the development plan, including both the settlement strategy and the housing strategy’. 2.11 The Guidelines reinforce the need to adopt a sequential approach to the development of land and note in Section 2.3 and ‘the sequential approach as set out in the Departments Development Plan Guidelines (DoEHLG, 2007) specifies that zoning shall extend outwards from the centre of an urban area, with undeveloped lands closest to the core and public transport routes being given preference, encouraging infill opportunities…’. 2.12 Having regard to the above the subject site has been zoned to provide for residential development having a Town Centre zoning on the former Baily Court Hotel site and a Residential zoning on the Balscadden Road sites. 10 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH 2.13 Sustainable neighbourhoods require a range of community facilities, and each district/neighbourhood will need to be considered within its own wider locality, as some facilities may be available in the wider area while others will need to be provided locally. Schools 2.14 Section 4.4 of the Guidelines relates to the provision of school spaces with large scale residential development. It is respectfully submitted that there is a very good provision of school places in this area of the County. The following 9 no. schools and 8 no. crèches are located within the Howth/Sutton/Dublin 13 area (within 5km from the site): Crèche/Montessori 1. Deerpark Montessori School 2. Bracken Hill Nursery School 3. Little Rainbows, Sutton 4. Rainbow Montessori, Sutton 5. Sutton Playgroup 6. The Cottage Montessori 7. Howth pre-school playgroup 8. Bumblebee Montessori & Childcare Primary Schools 1. Howth primary school, Scoil Mhuire 2. Sutton Park School 3. St. Fintans National School 4. The Burrow, National School, Sutton 5. North Bay Educate Together Secondary Schools 6. Santa Sabina Dominican College 7. St. Fintan’s High School 8. Pobalscoil Neasain 9. Saint Marys for Girls, Baldoyle 11 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH Density 2.15 The subject lands would be considered to be lands adjacent to ‘Public Transport Corridors’ in the context of the densities required under the Guidelines for Planning Authorities on Sustainable Residential Development in Urban Areas (2009), as the lands are located within c. 1km of DART Station and the No. 31/A bus serves the site hourly with a bus stop situated directly outside the development site. 2.16 Section 5.8 of the Guidelines recommends that ‘in general, minimum net densities of 50 dwellings per hectare, subject to appropriate design and amenity standards, should be applied within public transport corridors, with the highest densities being located at rail stations / bus stops, and decreasing with distance away from such nodes’. 2.17 The proposals for the lands is to provide for a net density of c. 106 units per hectare. Thus, the proposed development of the subject lands would be consistent with the guidelines in respect to residential density and regard to Government Guidelines and the Development Plan policies, with a mix of apartments and commercial & community space. 2.18 In addition to recommending appropriate densities, the Guidelines focus on the provision of sustainable residential development, including the promotion of layouts that: ➢ prioritise walking, cycling and public transport, and minimise car use; ➢ are easy to access for all users and to find one’s way around; ➢ promote the efficient use of land and of energy, and minimise greenhouse gas emissions; and ➢ provide a mix of land uses to minimise transport demand. ➢ reduce traffic speeds in housing developments 2.19 The proposed development incorporates design principles such to reduce traffic speeds with a no-through access road to eliminate the possibility of a rat-run. The layout is highly accessible for all users, with a permeable layout both internally and externally as new linkages are provided to surrounding land uses, with a new linear plaza being opened up which will bring pedestrians directly from Howth Village to Balscadden Road and the Howth SAAO lands. The layout is considered to be legible, with a clear distinction in design, character and treatment. 12 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH 2.20 The Guidelines also provide guidance on the core principles of urban design when creating places of high quality and distinct identity. The Guidelines are accompanied by a Design Manual which demonstrates how design principles can be applied in the design and layout of new residential developments, at a variety of scales of development and in various settings. 2.21 In respect to pre-application consultations with the Planning Authority and An Bord Pleanala the design team had regard to the advice set down in the ‘In Practice’ section of the Urban Design Manual (2009), which recommends the following approach Development Brief: An analysis of the site was carried out which included reviewing the local development plan & framework plan, precedent, planning history, visual impact assessment, utilities and services etc. Site Analysis: The characteristics of the subject lands and surrounding context were established and potential linkages and vistas to adjoining lands were analysed. Concept Proposals: An initial proposal responding to the parameters established by the development brief and site analysis was prepared describing aspects of the scheme such as land use and density range, boundary conditions and connections. Pre-planning: Pre-planning consultation is designed to respond to initial designs to encourage an interactive process, particularly for sites in excess of approx. 50 units. 13 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH Extensive pre-planning consultation was undertaken consisting of a series of preapplication consultations with the Planning Authority under Section 247. In addition, separate informal consultations were undertaken with relevant personnel in the Planning Authority to ensure all relevant matters have been addressed as part of the pre-application process. A pre-planning meeting was held with An Bord Pleanala and this application has been informed by the opinion received. 2.22 The above approach is reflected in the structure of the Conroy Crowe Kelly Architectural Design Statement. 2.23 The Design Manual sets out a series of 12 criteria which it recommends should be used in the assessment of planning applications and appeals. The 12 criteria are discussed in detail below. 2.24 This planning application is accompanied by a Design Statement, prepared by CCK Architects, which demonstrates how the proposed development has regard to and has been developed in accordance with best practice in respect to urban design. The Design Statement should be read in conjunction with this Statement of Consistency and the Planning Report and with the plans and particulars accompanying this planning application. Urban Design Manual – A Best Practice Guide (2009). 2.25 The Design Manual sets out a series of 12 criteria which it recommends should be used in the assessment of planning applications and appeals. The 12 no. criteria are listed below, with a response to each provided, which should be read in conjunction with the Design Statement. Fingal County Development Plan states ‘To achieve good urban design in developments, the 12 Urban Design Principles set out in the Urban Design Manual – A Best Practice Guide (2009) should be taken into account in designing schemes. These principles are: Context, Connections, Inclusivity, Variety, Efficiency, Distinctiveness, Layout, Public Realm, Adaptability, Privacy/Amenity, Parking and Detailed Design. Every area of the County is different, therefore the rules of good design should, in so far as possible, respond to the characteristics, history and culture of a place to which they are applied’. 14 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH 2.26 Context: How does the development respond to its surroundings? Response: As part of the preparation for the design for this project careful analysis was carried out to identify the important urban characteristics of the area. The proposal aims to provide a scheme design that creates a sustainable, liveable community within a quality landscaped environment that will also be an attractive addition and useful to Howth Village and environs. The development will be finished in materials of a high-quality design which integrates sympathetically with surrounding residential areas. The scheme has been designed with the Martello Tower, a protected structure, in mind. The scheme is lower than the level of the Martello Tower and provides for views from the top to the mound towards the church steeple on Main St. The entire scheme has been designed in a 3-D context to take account of the views towards Howth Village/Howth Head, which includes a detailed design on the roof plan which provides for well-designed roof gardens. This view across the roof gives visitors to the Martello Tower an appropriately designed green roof vista, which adds to the views from the Mound. The urban design of the scheme looks to take clues from the immediate context and the site layout is structured around forming a new street and making new connections between Howth Village and Balscadden Bay. The development encourages pedestrian and cyclist movements through enhanced permeability and will result in a high quality new residential neighbourhood. The subject site is located in Howth Village which makes it accessible to a wide range of shops, services and bus/DART routes to the city centre. It is well connected in terms of public transport links. The proposed development has been designed to respond positively to the existing residential developments surrounding. 2.27 Connections: How well is the new neighbourhood / site connected? Response: The proposal adds to existing context by; ➢ Creating pedestrian links between Howth Village and Balscadden Road and beach through a new linear plaza ➢ Providing an access route that is DMURS compliant to provide access for all. ➢ Creating 2 no. new public open space plazas to serve the proposed and existing community. 15 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH ➢ Providing a wide range of unit size to allow for a diverse community. The proposed development will provide for a main vehicular access point from Main St. which will serve the underground carpark under Block C. Emergency vehicles will be able to traverse along the linear plaza to access the apartments located at the rear of the scheme in case of emergency. A pedestrian access routes is also provided from Abbey St. along the bottom of the mound of the Martello Tower. This is currently an informal pedestrian route which is not well managed. This footpath will be brought into the development site and will be improved for universal access. Footpaths will be provided within the scheme rather than along the roadway. On suggestion by the Roads Dept., we have set back our scheme by 600mm from the road verge, which provides sufficient room to upgrade the size of the existing footpath on the opposite side of Balscadden Road. This would enable a footpath of 1.8m. As part of the scheme, safe pedestrian access crossing points are provided where the internal footpaths meet Balscadden Road. These proposals were agreed in conjunction with the Roads Dept and will enable safe and legible connectivity to Balscadden Bay and the Howth SAAO. A letter of consent has been proved by Fingal County Council to apply for the footpath widening on Balscadden Road. 2.28 Inclusivity: How easily can people use and access the development? Response: The main access point into the site is via the new vehicular, pedestrian access road off Main St. It is proposed to provide a community building and retail/commercial on the new block at Main St. This commercial space will wrap around the ground floor of the building and will meet the new proposed plaza. On the far side of the public plaza is a proposed new community building. This will make a great addition for local people and will be very easily accessible. The street will not be heavily trafficked and will be used only for access to underground car park in Block C for the residents of the scheme. A new linear plaza is proposed through the site. At the end of the street where it meets Balscadden Road, a café is proposed which will have outdoor seating looking out onto a 2nd new plaza. This will be a new public space which will face Balscadden Bay and its fantastic views. 16 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH 2.29 Variety: How does the development promote a good mix of activities? Response: The proposed development gives variety to the greater context of the Howth Village by providing a higher density in an existing area that is predominately made up of family houses with rear gardens. This development fills the gap by providing apartment units aimed at smaller households for which there is a great demand due to the changes in the demographics of the area. Variety is provided within the development in terms of architecture through a mix of unit types. The mix of unit types and sizes apartment ranging in size from c. 50 sqm to 100 sqm and caters for a variety of demographics. Architecture unity is ensured through the use of similar materials and finishes on all units. It is considered that the proposed development provides for the necessary ancillary land uses required for this large scale residential development, whilst having regard to the significant range of community, commercial and social infrastructure in the immediately surrounding area. This scheme proposes a community room, a large retail/cafe space on ground of Block A, 2 no. retail units on the ground floor of maisonette building facing civic plaza, & café on the corner of Block C facing Balscadden Bay. 2.30 Efficiency: How does the development make appropriate use of resources, including land? Response: The development aims to maximise the potential of the site by both conserving the views from the important areas of the landscape (Martello Tower and Balscadden Road) and by increasing the density in Howth Village, an area which is fully serviced with roads, piped infrastructure, public transport networks, schools, shops, services, restaurants etc. The proposed density is 106 units per hectare. The layout is designed to maximise natural sunlight, views and air into the open space. The proposed density makes efficient use of these valuable residential/town centre zoned lands and includes an appropriate quantum of public open space which will link 17 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH to the wider green network of Howth. The layout and orientation of the scheme has been designed by CCK to have regard to aspect and views and ensure both dwellings and areas of open space achieve light throughout the day. 2.31 Distinctiveness: How do the proposals create a sense of place? Response: The proposed development will provide for a new quarter to Howth Village. It will connect the village with Balscadden Bay and the Martello Tower. It will be open an accessible to the public with proposed new civic plazas which will create a sense of place for Howth Village and for residents of the new scheme. The residents of the scheme will have a private area of open space which Block C has been designed around. This is also true of Block B. The residents will have access to semi-private roof gardens also. Native planting from the Howth SAAO species list is proposed in the planting scheme along Balscadden Road and this will provide a soft buffer boundary treatment along the Balscadden Road which is the main route to the SAAO lands. 2.32 Layout: How does the proposal create people-friendly streets and spaces? Response: The layout allows for new pedestrian connections onto public plaza areas, to Balscadden Bay and the Howth SAAO and The Martello Tower promoting connectivity and accessibility through safe, overlooked footpaths. A community building is providing on the new plaza off Main St. and a café is proposed on the second plaza on Balscadden Road with the aim of drawing people into the space and providing a friendly new quarter for all to enjoy. Furthermore, a large retail/café is proposed in Block A which faces onto Main St. and will provide for a large type restaurant/retail store. 2.33 Public Realm: How safe, secure and enjoyable are the public areas? Response: The layout and design of the proposed development has been heavily influenced by the level of security and overlooking obtained by the future residents. The design of the development has been carefully considered as to provide a high level of passive surveillance on areas of open space and publicly accessible areas. The 18 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH design of the dwellings provides for direct frontage onto all public areas ensuring the provision of a safe, secure and enjoyable residential development. There will be beautiful views of the sea and the Martello Tower as you pass down the new pedestrian linear plaza to Balscadden Road. There will be improved access to the tower with an upgraded pedestrian footpath at the base of the mound. The new civic plaza at the junction with Main St. will be a great new addition to Howth Village. 2.34 Adaptability: How will the buildings cope with change? Response: Each of the proposed dwellings meets or exceeds the minimum standards for residential unit size. For schemes over 100 units, guidelines state that the majority of apartments must exceed the minimum floor area by 10% . The size of the units are proposed to be 1 bed x c.50-55sq m, 2 bed x 85 sq m, 3 bed 100 sq m, thus the apartment sizes are compliant with the guidelines. The development provides a mix of 1, 2 & 3 bedroom units that can be easily reconfigured to adapt to the changing life cycles and personal needs of each resident. 2.35 Privacy / Amenity: How do the buildings provide a high quality amenity? Response: Each dwelling is provided with an area of useable private open space which meets or exceeds the Development Plan standards. All of the dwellings meet or exceed the Section 28 Guidelines unit size requirements. The design of dwellings has also had due regard to the siting and orientation of the development in order to maximise the views of the sea, views onto open space, solar gain and natural light aspect of each dwelling. The design of balconies maintains a high level of privacy and amenity obtained by residents, and reduces the level of overlooking and overshadowing. Class 2 open space is provided through a number of well-designed public open space and wide landscaped paths/plazas throughout the scheme (See Murray and Associates drawings for detailed design of the open spaces). These spaces include the Main Street Plaza and Balscadden Plaza, Linear Plaza, Martello Path and Plaza, Balscadden 19 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH Path South and Public Right of Way and Public Plaza. (See Murray & Associates Drawing indicating this – Howth SHD_Open Space Areas). The layout is designed to maximise natural sunlight, views and air into the open space. 2,686sqm of landscaped high amenity public open space is provided on site. 0.19 ha Class 2 Open Space is required for the proposed development. There is a shortfall of Class 1 Open Space. It is proposed to make a payment in lieu of Class 1 open space as per Objective PM53 of the Development Plan. 2.36 Parking: How will the parking be secure and attractive? Response: Parking is provided in an underground basement carpark under Block C. It is designed to be secure and attractive. 2.37 Detailed Design: How well thought through is the building and landscape design? Response: The proposed design of the development has been subject to a number of pre-application consultations between the design team and the Planning Authority. The design rationale from an urban design and architectural perspective is explained in the Design Statement prepared by CCK. The landscape design rationale is set out in the Landscape Design Statement prepared by Murray & Associates. We consider the end result of this collaborative process is a well thought out design which addresses the main concerns including relationship of the new scheme to the existing village’s grain and scale, impact on views, impact on buffer of the Howth SAAO. The proposed landscaping aims to enhance the amenity of the area by providing a quality overall character and visual amenity in the development. Full details on the rationale for the landscaping design can be found in the Landscape Design Report and Landscape Plan prepared by Murrays. Delivering Homes, Sustaining Communities (2008) 2.38 The Department’s policy statement Delivering Homes, Sustaining Communities, Guidance provides the overarching policy framework for an integrated approach to 20 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH housing and planning. The statement notes that demographic factors will continue to underpin strong demand for housing, which in turn will present considerable challenges for the physical planning of new housing and the provision of associated services. The quality of the housing environment is stated as being central to creating a sustainable community. 2.39 Sustainable neighbourhoods are areas where an efficient use of land, high quality design, and effective integration in the provision of physical and social infrastructure combine to create places people want to live in. 2.40 The Delivering Homes, Sustaining Communities policy statement is accompanied by Best Practice Guidelines entitled ‘Quality Housing for Sustainable Communities’. The purpose of these Guidelines is to promote high standards in the design and construction and in the provision of residential and services in new housing schemes. They encourage best use of building land and optimal utilisation of services and infrastructure in the provision of new housing; point the way to cost effective options for housing design that go beyond minimum codes and standards; promote higher standards of environmental performance and durability in housing construction; seek to ensure that residents of new housing scheme enjoy the benefits of first-rate living conditions in a healthy, accessible and visually attractive environment; and provide homes and communities that may be easily managed and maintained. 2.41 This planning application is accompanied by a Housing Quality Assessment (HQA) document prepared by CCK Architects which demonstrates the consistency of the proposed development with the relevant standards in the Quality Housing for Sustainable Communities document and the County Development Plan where relevant. Design Standards for New Apartments - Guidelines for Planning Authorities (March 2018) 2.42 The new Apartments Guidelines are also intended to promote sustainable housing, by ensuring that the design and layout of new apartments provide satisfactory 21 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH accommodation for a variety of household types and sizes, including families with children over the medium to long term. 2.43 This planning application is accompanied by a Housing Quality Assessment document, prepared by CCK Architects which demonstrates the compliance of the proposed development with the relevant quantitative standards required under the 2018 Apartment Guidelines. The HQA illustrates how each apartment meets or exceeds the relevant standards for example in respect to apartment size, internal areas, dimensions, private open space, dual aspect etc. 2.44 The proposed apartment buildings and units are considered to be suitability located on the subject site, integrated within the landscape and well connected to adjacent facilities including public transport, and will provide high quality residential development on the subject site. In additional following pre-planning with An Bord Pleanala, a decision was made to reduce the level of parking on the site in line with National Guidance for sites located within a 10 minute walk of a DART Station. The level of bicycle parking is in excess of Development Plan standards and complies with the New Apartment Guidelines. A total of 397 no. bicycle parking spaces are provided with the aim of promoting sustainable transport modes. In addition, it is proposed to provide 3 no car sharing spaces in the underground basement for use by the residents. Design Manual for Urban Roads and Streets (DMURS) (2013) 2.46 The Design Manual for Urban Roads and Streets (DMURS), 2013, sets out design guidance and standards for constructing new and reconfiguring existing urban roads and streets in Ireland. It also outlines practical design measures to encourage more sustainable travel patterns in urban areas. The Engineering Infrastructure Report, and DMURS Statement of Compliance prepared by OCSC Consulting Engineers provides further detail in respect of the compliance of the proposed development with DMURS. 2.47 DMURS aims to end the practice of designing streets as traffic corridors, and instead focus on the needs of pedestrians, cyclists, and public transport users. The Manual sets out design guidance and standards for constructing new and reconfiguring existing urban roads and streets in Ireland. Incorporating good planning and design practice and focus on the public realm, it also outlines practical design measures to encourage more sustainable travel patterns in urban areas. The principle design guidance of DMURS has been considered in the design of this development. The 22 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH proposed development seeks to prioritise pedestrian and cyclists throughout and around the site in accordance with the policies set out in DMURS. 2.48 In line with DMURS and on the advice of An Bord Pleanala the linear plaza has been created to replace a trafficked street. Surface car parking was also omitted. This has created a wonderful pedestrian and cycle friendly urban environment within this new proposed quarter of Howth Village. 2.49 Connectivity and permeability are encouraged throughout the development. Pedestrian linkages in the form of a new linear plaza have also been proposed to encourage and improve connectivity in the wider area. 2.50 DMURS also suggests that measures should be considered that reduce the dominance of the vehicle in favour of pedestrian and cyclists having dominance within a street. This is provided within the scheme, with local access provided and no through traffic allowed which will encourage sustainable modes of transport. 2.51 The Design Manual for Urban Roads and Streets notes that drivers are more likely to maintain lower speeds over shorter distances than over longer ones, therefore the proposed road layout has been designed according to this principle. Guidelines for Planning Authorities on Childcare Facilities (2001) 2.52 Guidelines for Planning Authorities on Childcare Facilities (2001) indicate that Development Plans should facilitate the provision of childcare facilities in appropriate locations. These include larger new housing estates where planning authorities should require the provision of a minimum of one childcare facility with 20 places for each 75 dwellings. The threshold for provision should be established having regard to existing location of facilities and the emerging demography of the area where new housing is proposed. Following a review of creches in the area and an assessment of the requirement of the scheme, a childcare demand assessment was prepared which concludes that a creche within the scheme would not be viable. It is proposed that the community room could be used for a dual use, with mother and toddlers groups being accommodation. 23 CREKAV TRADING GP LIMITED MAY 2018
STATEMENT OF CONSISTENCY SITE AT BALSCADDEN ROAD & FORMER BAILY COURT HOTEL, HOWTH Smarter Travel – A Sustainable Transport Future: A New Transport Policy for Ireland 2009-2020 2.53 The Government has committed in ‘Smarter Travel – A Sustainable Transport Future: A New Transport Policy for Ireland 2009 – 2020’ to reducing the total share of car commuting from 65% to 45%, a rise in non-car trips by 55% and that the total vehicle miles travelled by the car fleet will not increase. The key targets are as follows: Future population employment growths will predominantly take place in sustainable compact forms which reduces the need to travel for employment and services; ➢ 500,000 more people will take alternative means to commute to work to the extent that the total share of car commuting will drop from 65% to 45%; ➢ Alternatives such as walking, cycling and public transport will be supported and provided to the extent that these will rise to 55% of total commuter journeys to work; ➢ The total kilometres travelled by the car fleet in 2020 will not increase significantly from current levels; ➢ A reduction will be achieved on the 2005 figure for Greenhouse gas emissions from the transport sector. 2.54 Key to the achievement of these targets is better alignment between land-use and transport to minimise travel demand. The subject site is located within a 10 minute walk from Howth DART station and is also served by Dublin Bus services. There are QBC’s located along the Howth Road and along the Clontarf Road from Raheny into the City Centre. Thus, the principle of a residential development at a density in excess of 35 units per hectare in this location would be in accordance with the principles set down in Smarter Travel. It is proposed to provide c. 0.7 spaces per residential unit based on the high level of public transport available to the residents of the scheme. This is in keeping with the principles of Smarter Travel. As mentioned previously, 397. No bicycle parking spaces will be provided which is in excess of Development Plan Standards. 24 CREKAV TRADING GP LIMITED MAY 2018