SKY Auckland TOWER Johnson Controls installs new chiller system at Auckland’s iconic Sky Tower. Located in the heart of Auckland, the Sky THE BRIEF Tower has been an icon on the city’s sky line for 20 years and boasts a hub of adrenaline activities, superb dining and breath-taking views. 1 Johnson Controls was awarded the Sky Tower project following a competitive tender process. The project Offering 360 degree panoramic views up to 80 included decommissioning all kilometres in every direction, the Sky Tower is end of life equipment, installing three brand not only a premier dining venue, it also serves new air cooled chillers on level 54, and as a telecommunications tower for broadcasting conduct all necessary testing before major television and radio networks, along with commissioning the new units. wireless internet, and weather measurement services for the region. Each chiller was to be installed in succession, as it was imperative that the system remained At the time of construction in the mid-1990s, operational throughout the project. Other the YORK chiller system was lifted up to level critical project requirements include the ability 54 using the onsite crane. Fast-forward to to supply fit-for-purpose products, within the 2014 when the chiller system was due to be limited floor-space allocated. replaced, site access limitations presented a unique challenge. PREPARATIONS & INSTALLATION Johnson Controls was appointed due to the team’s intimate knowledge of the original installation, and strong capability to deliver a solution despite rigid requirements. 2 The single biggest challenge of this project was getting all three chiller units up to level 54 in a service elevator. Over This major project came with many challenges a period of three weeks, Johnson Controls’ as the entire system needed to remain fully team completely disassembled all three chillers operational while the work was carried out. into over 1,500 pieces that could be Johnson Controls was also required to strategically packed inside the Sky Tower’s coordinate with other suppliers to ensure large single service elevator and hoisted up to the deliveries, and moving equipment caused service floor. minimal disruption to the restaurants on the upper levels. Johnson Controls Case Study – Sky Tower - 2018
Each day, Johnson Controls transported the brazed joint between the tube and fin. By parts required for the day’s work and installing this new condenser coil, the Sky meticulously loaded the service elevator – Tower gained the same cooling capacity while maximising space and weight. The service using 50% less refrigerant. elevator was exclusively booked between 5am and 6:30am every day, to enable swift product Additionally by introducing new Variable Speed transportation. Drive (VSD) scroll compressors and controlled condenser fans, the Sky Tower has total fan Harsh weather conditions also meant the metal speed control which minimises power spikes, work required a special highly durable exterior and enhances head pressure control. paint to avoid possible future corrosion, and every nut, bolt, and washer was replaced with THE OUTCOME 4 more resistant stainless steel substitutes. Johnson Controls New Additionally, the metal control panel enclosures Zealand successfully were replaced with GRP solutions to better completed this project protect the control equipment and wiring from within five weeks, while the prevailing winds, and the ocean breeze. keeping the tower’s facilities operational every day with minimal Site safety was paramount throughout this disruption. project as excessive winds could blow components off the service level where there Due to the number of technical and are no barriers. Extra diligence was required to logistical challenges, a high level of tie all tools and products down to ensure engineering expertise was required as was everyone working, and the general public meticulous project management. The below, remain safe. installation team comprised of six engineers working simultaneously on site and at the THE EQUIPMENT Johnson Controls workshop. Numerous 3 The Johnson Controls YORK® YLAA Air-Cooled Scroll Chiller was chosen for suppliers were also working at the Sky Tower which Johnson Controls team was required to work around. its superior energy efficiency, Despite the large challenges, Johnson flexible control options under different loads, Controls delivered, installed, and and size. These chillers deliver top-of-the-line, commissioned all three chillers within the full-load efficiency for assurance of required timeframe and to budget. performance in the most demanding conditions. The Sky Tower now enjoys the benefits of the new chillers which deliver greater Installing micro-channel condenser coils energy efficiency. This project was one of utilises and ultra-efficient design providing the largest, most challenging and rewarding greater heat rejection. Unlike standard projects undertaken by the New Zealand condenser construction, this is made possible service team in the last decade. by multiple channels within the tube and a ABOUT JOHNSON CONTROLS’ BUILDING TECHNOLOGIES & SOLUTIONS Johnson Controls Building Technologies & Solutions is making the world safer, smarter and more sustainable – one building at a time. Our technology portfolio integrates every aspect of a building – whether security systems, fire protection, energy management, or HVACR – to ensure that we exceed customer expectations at all times. We operate in more than 150 countries through our unmatched network of branches and distribution channels, helping building owners, operators, engineers and contractors enhance the full lifecycle of any facility. Our arsenal of brands includes some of the most trusted names in the industry, such as Tyco®, YORK®, Metasys®, Ruskin®, Titus®, Frick®, PENN®, Sabroe®, Simplex® and Grinnell®. For more information, visit www.johnsoncontrols.com.
Figure 5: First chiller removed. Space available for installing the new chiller Figure 1: Chiller delivered to the Auckland warehouse Figure 6: Installation underway on the first chiller Figure 2: Disassembly commences on the chillers Figure 7: Installation is progressing Figure 3: Replacement of the control cabinets Figure 8: One of the finished chillers, installed and Figure 4: View from level 54 commissioned ABOUT JOHNSON CONTROLS’ BUILDING TECHNOLOGIES & SOLUTIONS Johnson Controls Building Technologies & Solutions is making the world safer, smarter and more sustainable – one building at a time. Our technology portfolio integrates every aspect of a building – whether security systems, fire protection, energy management, or HVACR – to ensure that we exceed customer expectations at all times. We operate in more than 150 countries through our unmatched network of branches and distribution channels, helping building owners, operators, engineers and contractors enhance the full lifecycle of any facility. Our arsenal of brands includes some of the most trusted names in the industry, such as Tyco®, YORK®, Metasys®, Ruskin®, Titus®, Frick®, PENN®, Sabroe®, Simplex® and Grinnell®. For more information, visit www.johnsoncontrols.com.
You can also read