Connecting Central Europe with the sea - Ljubljana, 6th June 2019
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Port of Koper – efficient combination of cost, time and energy savings • more than 2.000 Nm shorter maritime route – up to 7 days shorter transit time by sea (if “slow steaming” at 12 knots) distance from TOKYO to HAMBURG ROTTERDAM KOPER 8.500 Nm KOPER ROTTERDAM 10.500 Nm Port Said HAMBURG 10.750 Nm
At the intersection of European transport corridors Baltic – Adriatic corridor Amber corridor Mediterranean corridor KOPER Alpine – Western Balkan corridor
About the Company • concession granted for the management established in • public limited company listed on the of the port area until 2043 Ljubljana stock exchange • invests in infrastructure and 1957 • terminal operator of all 12 specialized terminals – multi-purpose port suprastructure in the port area • national spatial plan for the development of the port adopted in 2011 maritime throughput in 2018 • container throughput: 988.499 TEU 1st container terminal in the Adriatic 24 • cars throughput: 754.409 units Among largest port for cars in the Mediterranean million tons 1,400 + • EU core port of the TEN-T network employees in the Luka Koper Group • important gateway for supply of CEE markets
Hinterland markets Poland Containers, Cars, General cargo Czech R. Containers, Cars, General cargo Austria: Germany Absolute market leader - more than 7 M tonnes of various goods handled Containers, Cars, every year General cargo Slovakia: Romania Container market leader Containers Hungary: Croatia,Bosnia& Container market leader + cars, electronics, Herzegovina,Serbia agro/food/fodder Containers, Cars, General cargo Slovenia: Bulgaria Domestic port Containers
Maritime throughput history Containers (TEU) ton Cars (units) total maritime throughput 30.000.000 1.200.000 25.000.000 1.000.000 20.000.000 800.000 15.000.000 600.000 10.000.000 400.000 5.000.000 200.000 0 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 ton TEU cars
Leading container terminal in North Adriatic Trieste TEU Venice Koper Rijeka 1.200.000 1.000.000 KOPER 2006: 218.970 TEU KOPER 2018: 988.499 TEU 800.000 Total 4 ports 2018: 2,6 M TEU KOPER share: 38,0% 600.000 400.000 200.000 0 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Rijeka (AGCT) Trieste (TMT) Venice (Vecon + VIT) Koper
Efficient and competitive railway services Wroclaw Katowice Melnik Ostrava Paskov Žilina Košice Wien Bratislava München Dunajska Streda Linz Budapest Salzburg Graz Current capacity: Villach Arad Maribor 85-87 trains/day Ljubljana Zagreb Padova Belgrade KOPER Container block-trains: 12-13 arrivals/departures daily
Port of Koper modal split Loaded/unloaded of total throughput wagons & trucks arrivals (tons) 350.000 300.000 250.000 59 % 41 % 200.000 150.000 100.000 50.000 0 2011 2012 2013 2014 2015 2016 2017 2018 loaded/unloaded wagons no. of trucks 100 %
Major infrastructure construction works 2014 - 2020
SECOND TRACK DIVAČA – KOPER Photo: Peter Kleva
The significance of the construction of the Second track Divača – Koper railway line 1. Rapidly growing demand for transportation of freight between Port of Koper and hinterland countries along with severe capacity constraints on the existing single railway track Divača – Koper necessitate construction of an additional railway line on this section. 2. The building of the Second track Divača – Koper railway line is the flagship logistic project in Slovenia. 3. Second Track Project will connect the port of Koper with the town of Divača and eliminate an important bottleneck of the core Mediterranean and Baltic-Adriatic TEN-T corridors. 4. The Second Track is vital for positioning of Slovenia as a key European transit country as well as for increasing competitiveness of rail transport compared to environmentally and operationally costly road traffic. 5. In addition in 2017 the Government initiated activities to amend the project scope and allow for construction of service tubes for tunnels T1, T2 and T8 in full diameter to enable the building of the additional railway track in parallel with the new railway track and to eventually remove the 45 km long outdated track.
Main elements and characteristics of the project
Key objectives of the project
Key Milestones of the project – part one 1. The 2TDK company was established by the Government of Republic of Slovenia on 31 March 2016. 2. The building permit for the entire project was issued on 31 March 2016. 3. Act regulating the investment of the second railway track from Divača to Koper (ZIUGDT) entered into force on 21 July 2018. 4. By decision, the Ministry of the Environment and Spatial Planning has amended the building permit of 31 March 2016 on 6 August 2018 and 2TDK became holder of the building permit. 5. The Government of the RS approved payment of the first part of company's share capital in the amount of EUR 20 mio on 30 August 2018. 6. The transfer of the investment from DRSI to 2TDK was completed in November 2018. 7. Investment programme was adopted by the general Meeting of the Company (the Government of the RS) on 24 January 2019 (required by national legislation; prepared by Deloitte, the 2TDK‘s financial adviser).
Key Milestones of the project – part two 8. The Concession Act was adopted on 4 April 2019. 9. The Concession Agreement between 2TDK and the Government of the Republic of Slovenia was signed on 9 Mai 2019. The concession for the second track is awarded for 45 years from the conclusion of the concession contract. 10. The Service level agreement (SLA) is currently being in the process of preparation and harmonisation between relevant stakeholders. We believe, that it will be signed in June 2019. 11. All the implementing regulations, related to the special revenues, based on Act were adopted: In order to cover financial obligations of the 2TDK, the Act is introducing higher charges for the use of railway (payed to the 2TDK from the SŽ-Infrastruktura) and availability payment payed to the 2TDK from the state budget (sources for the availability payment are highway mark-up and port tax).
Current state of the project - preparatory works in progress 1. Geological, geotechnical and hydrogeological surveys: - on-site investigations for additional geological, geotechnical and hydrogeological surveys completed. - no additional risk identified. - monitoring until September 2019. 2. Archaeological surveys: - works started in November 2018, after implementation of sheltering of the areas of the archaeological excavations and are well in progress. 3. Executive design: - the tender was published in November 2018; - It is envisaged, that the contract will be signed on 10 June 2019.
Current state of the project - preparatory works in progress 4. Access roads - contract signed on 15 December 2017 (vaule EUR 14,48 mio). - the contractor was introduced into the work in 25 January 2019. - works are in progress according to the timeline. 5. Construction of structures for bridging Glinščica Valley - the public tender was published on March 2019 (design&build). - the deadline for the submision of tender proposals was 10 Mai 2019. - 2TDK received three binding offers that are currently being in the process of evaluation. - start of works (executive design) is predicted in July 2019.
Throughput estimations till 2030 Multipurpose port (all cargo ton total maritime throughput containers cars TEU/units groups) 40.000.000 2.500.000 35.000.000 Expected accelerated growth of 2.000.000 container traffic 30.000.000 25.000.000 1.500.000 Important positon on car segment 20.000.000 1.000.000 15.000.000 Regular supply of strategic fuels 10.000.000 500.000 5.000.000 New opportunities for general cargo related to 0 0 containers and alternative fuels 2016 2017 2018 2019 2020 2025 2030 Throughput 2018 Estimation 2020 Development: 2030 Total (tonnes) 24.048.618 24.300.000 35.100.000 Containers TEU) 988.499 1.000.000 2.000.000 Vehicles (units) 754.409 850.000 1.250.000
Long term port development INVESTMENTS until 2020 INVESTMENTS until 2030 2016 – 2020: more than 300 million EUR 2021 – 2030: additional 400 mln EUR