Virtual Meeting Guidelines O Everyone will be muted through the presentations - please stay muted to eliminate background noise. O Hold questions until the end of each presentation. O Use the chat box. O Ask questions related to the presentation topic O Please be respectful of time, so everyone has a chance to speak O Mute yourself after speaking O Be respectful and patient! O Talk one at a time. O This meeting will be recorded.
Agenda I. CALL TO ORDER – Alivia Coleman, Stratford Health II. INTRODUCTIONS – Alivia Coleman, Stratford Health a. OVERVIEW OF VIRTUAL MEETING STRUCTURE b. RULES OF CONDUCT c. PERIODIC UPDATES III. STATUS: a. HAUL ROAD, BARRIER AND LANDSCAPING – Jim DiLorenzo, EPA i. REMAINING ITEMS ii. HIGH SCHOOL EXCESS SOIL TO FORMER CONTRACT PLATING b. RAYBESTOS MEMORIAL FIELD (OU4) UPDATE–Mike Looney, USACE i. HAUL ROAD EXTENSION ON OU4 ii. GRANDSTAND DEMOLITION iii. SECURITY/PERIMETER FENCE/CAMERAS iv. AIR MONITORING 1. OVERVIEW 2. EQUIPMENT DEMONSTRATION VIDEO c. OU6 PROPERTIES UPDATE – Jim DiLorenzo, EPA i. 380 EAST MAIN STREET (DONE) – 42.3 yards (4 trucks) ii. 200/190 FERRY BLVD (EARLY NOVEMBER) – ABOUT 300 yards (20 to 30 trucks) iii. 250, 304. 340 EAST MAIN STREET (WINTER) – ABOUT 5,000 yards (400 to 500 trucks) with about 750 yards of the total going off-site (worst of the worst waste) iv. DOT RAYMARK WASTE – ABOUT 275 YARDS (20 to 30 trucks) v. TRUCK UPDATE
Community Advisory Group • Landscaping and Haul Road Update • OU4 Ballfield Preparations • First OU6 Parcels • Air Monitoring Demonstration Raymark Industries, Inc. Superfund Site Stratford, CT Jim DiLorenzo, EPA Mike Looney, USACE Dave Heislein, USACE October 28, 2020
Landscaping • Drainage stone • Topsoil • Trees • Shrubs • Mulch • Hydroseed • 1 Year Plant Warrantee 7
Completed Haul Road • Connects Longbrook Ave to the former ballfield (OU4) • Approximately ¼ mile long • Widened entrance • Raised to cover former Contract Plating lagoons • Approximately 12,000 yds of clean material (~300 trucks) 8
Questions? O Please ask questions relevant to the prior presentation. O Be respectful of time so everyone has a chance to speak O We will monitor the chat box for questions O Please be respectful and speak one at a time.
OU4 Access Road 11
Grandstand Demolition 12
Grandstand Demolition 13
Site Security 14
Questions? O Please ask questions relevant to the prior presentation. O Be respectful of time so everyone has a chance to speak O We will monitor the chat box for questions O Please be respectful and speak one at a time.
AIR MONITORING DEMONSTRATION • Practical demonstration • October 21, 2020 • 4:00pm at Ball Field • 45 mins to 1 hour • 8 or less (social distancing) • Will be recorded 16
AIR MONITORING DEMONSTRATION VIDEO 17
AIR MONITORING DEMONSTRATION 2.6 mg/m3 Approx. 3:15 pm 18
OU4 - Air Monitoring Results • Since 9/30/20 public meeting Daily Average Dust Measurements 0.001 to 0.007 mg/m3 • Below the 8-hour Daily Average Dust Action Level 0.014 mg/m3 criteria • No exceedances of chemicals within the dust ensuring worker and stakeholder safety • Submitting weekly Air Monitoring and Vibration Monitoring Reports • Reports posted on Town Health Dept – Raymark website • Weekly Air Monitoring Summary Reports include: – work conducted – daily weather – 8-hr Daily Average, if an exceedance, source and actions taken – Equipment used and confirmed daily calibration – Chemical analyses of dust samples and comparison to individual chemical criteria • Action Levels - Perimeter Air Monitoring Work Plan, Table 3 as posted on Town website • Air monitoring will continue • Vibration monitoring stopped 10/27/20 as OU4 Demo completed • Vibration monitoring will restart during OU4 consolidation 19
Questions? O Please ask questions relevant to the prior presentation. O Be respectful of time so everyone has a chance to speak O We will monitor the chat box for questions O Please be respectful and speak one at a time.
First OU6 Properties 21
380 E. Main Street (~40 cy = 4 trucks) • First of the OU6 removals • Completed on September 16th and 17th • Estimated 40 yds • Actual 42.3 yds (4 trucks) • Active wetting throughout • Air monitoring stations and portable devices at both 380 E. Main and ball field • Tire wash station 22
380 East Main Street Removal • Retaining wall removed • AC unit temporarily supported • Air monitoring stations placed 23
24
25
26
Placement at OU4 27
PROPOSED TRUCK REJECTED 28
ACTUAL TRUCK/ROLL-OFF CONTAINER USED First 2 containers rejected on-site. No gasket. 29
Truck to be Used 30
200 Ferry Boulevard (~300 cy = about 20 trucks) 190 Ferry Blvd 31
250, 304 and 340 East Main Street (4,490 cy or 300 trucks) 32