Rapid Growth Strategy - APRIL 2021 - Northern ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Disclaimer This presentation contains forward-looking statements. The words “anticipate”, “assume”, “believe”, “estimate”, “expect”, “intend”, “may”, “plan”, “project”, “should” and similar expressions are used to identify forward-looking statements. Forward-looking statements are statements that are not historical facts; they include statements about Northern Data’s beliefs and expectations and the assumptions underlying them. These statements are based on plans, estimates and projections as they are currently available to the management of Northern Data AG. Forward-looking statements therefore speak only as of the date they are made, and Northern Data AG undertakes no obligation to correct, update any of them in light of new information or future events. By their very nature, forward-looking statements involve risks and uncertainties. These statements are based on Northern Data AG management’s current expectations and are subject to a number of factors and uncertainties that could cause actual results to differ materially from those described in the forward-looking statements. Actual results may differ from those set forth in the forward-looking statements as a result of various factors (including, but not limited to, future global economic conditions, changed market conditions affecting the industry, intense competition in the markets in which we operate and costs of compliance with applicable laws, regulations and standards, diverse political, legal, economic and other conditions affecting our markets, and other factors beyond our control). This presentation is intended to provide a general overview of Northern Data AG’s business and does not purport to deal with all aspects and details regarding Northern Data AG. Accordingly, neither Northern Data AG nor any of its directors, officers, employees or advisers nor any other person makes any representation or warranty, express or implied, as to, and accordingly no reliance should be placed on, the accuracy or completeness of the information contained in the presentation or of the views given or implied. Neither Northern Data AG nor any of its directors, officers, employees or advisors nor any other person shall have any liability whatsoever for any errors or omissions or any loss howsoever arising, directly or indirectly, from any use of this information or its contents or otherwise arising in connection therewith. The material contained in this presentation reflects current legislation and the business and financial affairs of Northern Data AG which are subject to change. This Presentation shall not constitute an offer, nor a solicitation of an offer, for the sale or purchase of any securities or assets or to enter into any transaction. This Presentation should not be relied upon to form the basis of any investment decision. In all cases, the recipient should conduct its own investigation and analysis of the Northern Data and the information set forth and provided in this Presentation. The recipient should not construe the contents of this Presentation as legal, business, accounting or tax advice. NORTHERN DATA AG | 2
A lot has happened since the beginning of 2020 2020 2021 9 APR 24 APR 14 SEP 25 NOV 14 DEC 8 MAR 07 APR 08 APR Takeover of the First DC in the Takeover of Canadian DC-Specialist Netherlands first fully Sale of Texas Kelvin Emtech Group green DC in site to RIOT for Sweden ~550 m EUR Capital raise of Beginning of Capital raise of Capital raise of 30m EUR GPU-based HPC 52m EUR 60 m EUR Mega-Project DC in general for USD 200 m HPC Vision NORTHERN DATA AG | 3
Focusing on value accretion: Northern Data post sale of Texas site DC setup Crypto Hosting Downside protection Higher contribution Supply chain / partners from profit share Multi site strategy agreements Renewable Energy HPC Services ESG-compliant NORTHERN DATA AG | 4
We re-invented the modern datacenter (mobile and stationary) High efficiency through AI Special setup of cold- and ▪ Proprietary AI technology hot-zones ▪ Initiates each processor and ▪ Often makes active cooling maximizes their performance unnecessary ▪ Runs constant surveillance ▪ Reduces costs programs ▪ Makes ND-HW 30% more energy- efficient than conventional HW Innovative software-concepts ▪ Allows moving applications and Use of air cooling rather than workloads between different parts water cooling of the DC (cloud-based) ▪ Possible due to innovative ▪ Increases DC flexibility and software-concepts and use of reduces cooling-costs Use of renewable energy cold- and hot-zones ▪ Running the DCs on scalable wind ▪ Allows for massive cost-reduction and hydro energy in setup and maintenance ▪ Using locations with low-cost green energy and mild climate NORTHERN DATA AG | 5
Our DC roll-out is well under way – 350 MW capacity in total in FY2021 Additional >700 MW in planning beyond FY2021 Location US 1-3 Location Hydro66 Capacity >30 MW Capacity 40 MW Location Norway 3 LL Location Norway 2 GN Scale 80 MW Scale >100 MW Capacity 11.8 MW Capacity 36 MW Status Operating Status Deployment Scale 100 MW Scale 50 MW Use HPC & C.-H Use HPC & C.-H Status Operating Status In planning Use HPC & C.-H Use HPC & C.-H Location Norway 1 NN Capacity 36 MW Location Norway 7 GD Capacity 15 MW Scale 50 MW Scale 15 MW Status Deployment Status In planning Use HPC & C.-H Use HPC & C.-H Location Canada 1-3 Location Norway 4 KL Capacity >20 MW Capacity 50 MW Scale >100 MW Scale 50 MW Status Deployment Status In planning Use HPC & C.-H Use HPC & C.-H Location Norway 5 LA Location Netherlands 1 Location Norway 6 VK Location Frankfurt 1 Capacity 100 MW Capacity 1.4 MW Capacity 10 MW Capacity 0.4 MW Scale 250 MW Scale 1.4 MW Scale 10 MW Scale 1.5 MW Status In planning Status Operating Status In planning Status Operating Use HPC & C.-H Use HPC & C.-H Use HPC & C.-H Use HPC only HPC and Crypto Hosting HPC only NORTHERN DATA AG | 6
The Multisite Strategy based on renewables offers a range of advantages in FY21 DC Specs Hardware Specs # ASICs under # GPUs under Risk Reduction1 Mild Climate management management 14 locations Average Temp of 6°C ~70,000 ~250,000 Green Energy Usage / Developed Capacity High DC Standards Time to Market PUE in MW >90% / ~1.04 Up to Tier 3 ~350 2-4 months Financials FY2021 Locations in Planning Beyond FY2021e Average Revenue2 per Average Costs2,3 per Additional Capacity in Additional Sites4 MW MW MW EUR ~1 m EUR ~0.7 m 20 >700 Average Capex per Additional GPUs and EBITDA Margin De-Centralization MW ASICs ~ 35% EUR ~0.4 m 4-6 countries > Triple-digit k 1. Sites operating or currently in development as of April 2021 2. Blended 3. COGS & all SG&A 4. Sites currently in the planning phase NORTHERN DATA AG | 7
DCs are the foundation to our well-established crypto hosting and the accretive HPC services business The most successful cloud 2 Crypto Hosting 3 HPC Services companies today used a profitable core business to One of the world leading Guaranteed recurring distributed HPC cluster by build up a price competitive revenues with Q2 2021 cloud offering downside protection and upside gain share depending on crypto Perfectly positioned to prices via profit share serve the growing demand agreements Using crypto hosting as a Crypto hosting provides the base load case enables us to avoid idleness and offer the platform from which we can best prices in the market sell revolutionary HPC services 1 Datacenter Operations We will be the only ESG-compliant scale DC for crypto and HPC services Our DCs are future-ready and design tailored for application specific processors (ASICs) to be installed NORTHERN DATA AG | 8
1 Leading in specialized datacenters One of the world leading specialized datacenters, both in scale & innovation, Northern Data is solving Vision the world’s most challenging computing problems quickly, cost-efficiently and sustainably. Cost Efficiency Speed Scale Sustainability Leading AI powered container Long standing preferential Not just provider of the largest 90% of our sites exclusively software. Operational supplier relationships GPU Cluster in the world with use renewable energy – We efficiency through proprietary Backlog of future DC sites more than 250,000 even aim for a circular tower design and full DC Agile development approach processors but also provider ecosystem. ND is committed integration. Lowest energy offering HW & SW out of one of around 70,000 ASIC to global ESG standards costs through global location hand processors. advantages. 1 year 2.5x #1 90% until customer’s HW is faster than an average Most powerful distributed of our sites are fully fully amortized1 DC clusters2 cluster by 2021 renewable 1) Calculation based on current Crypto Prices March 2021 2) Calculation comparing NDs average to CyrusOne, Digital Realty, AWS and Equinix average NORTHERN DATA AG | 9
2 A simplified view of our crypto hosting business Crypto Northern Miner Data Specification and supply chain by ND Hardware HW Suppliers Base Case (recur. ) Hosting Fee Datacenter Run Costs Energy Provider Infrastructure & Engineering Fee Maintenance Costs DC Infrastructure Upside Case Profit Share Investment amortization Crypto Market Crypto Rewards NORTHERN DATA AG | 10
2 Our approach to crypto hosting is unique… Committed Growth Path ND operating model secures resilient mining revenue streams for our customers, creating high demand for growth projects Profit Share Agreements Related revenues are fully recurring with a profit- sharing upside potential depending on the crypto price – Translating to >35% EBITDA margins in FY2021 Scale Advantage Through long standing supplier relationships we secured our server infrastructure growth of >10 exahash in an otherwise dried up market NORTHERN DATA AG | 11
2 …which has allowed us to become a crypto hosting market leader Scale – powerful Growth – Mastering an Profitability – customer base exponential roll-out Unparalleled margins The world’s largest mining Despite increased speed and We will operate at very high profit companies are amongst our complexity of our exponential roll- margins even for Crypto and customers out plans our supply chain and DC market standards operations are delivering on target NORTHERN DATA AG | 12
Besides Crypto, also the HPC market is growing rapidly – 3 primarily due to a number of emerging trends Technology Mega Trends HPC Market Growth Trend Automation HPC Cloud Forecast shows massive growth Rise of AI & AR are just two examples of tech Values in $M requiring increased data processing 8.800 Digitization +23.6% p.a. 7.600 Trend fueling the exponential need for more 6.400 data processing at faster speeds 5.300 Explosion of Data capacity 4.300 3.910 New technologies exponentially expand the data volumes generated, stored & processed 2.466 Generation Z Digital Natives, looking to get content faster, are driving the greater processing need 2018 19 20 21 22 23 2024 Source: Hyperion research, 2020 NORTHERN DATA AG | 13
HPC Life AI Physics Rendering Science Customers A simple Fees Scale Storage Security view of our HPC Platform for HPC Applications business Crypto Base Case (100% load of GPUs) Crypto Miner Provisioning Northern Data Clustering Virtualization HPC DC Operations Renewable Energy NORTHERN DATA AG | 14
3 There are three factors that will put us ahead of the competition Due to our base case we have a cost Crypto Base advantage over competition: 40% Lower price than comparable AWS Case We have no processor vacancies and can offerings1 cross-finance our offering Specialized Our DCs are built for specialized processors 10 years and optimized to such a degree that our Processor proprietary design allows PUE levels of
We have a three horizon business plan to become the world leader in specialized HPC used for crypto hosting and other HPC use cases Crypto hosting New HPC services 2021 2022 2023 2024 Horizon 1 Horizon 2 Horizon 3 Goal Deliver on crypto & HPC roll- Establish ourselves as an EU Stay ahead of the market by out plans and enter HPC leader for specialized HPC services upgrading technology stack to market as a major player and further expand crypto hosting application specific hardware Advance roll-out of new Boost crypto hosting profits Expand into new crypto ASIC cluster until EoY 2022 through increased profit hosting use cases as share needed Milestones Complete roll-out of new 250k Dominate EU market for a Upgrade hardware stack to GPU HPC cluster by Q2 2021 single specialized HPC use application specific processors case (ASICs) for target markets Acquire first customer base in Build up software Secure new supply lines for AI HPC in financial services, ecosystem to expand into technology shift telecom, and life science other use cases NORTHERN DATA AG | 16
Why to invest in Northern Data Leading specialized HPC DC operator – We are building the largest GPU cluster in the world with a future proof DC design Rapid growth – With our revenue growth we outperform a double-digit growth market that is fueled by mega trends Stellar profitability– Market leading operational efficiency and a profit share model allow us to gain EBITDA margins of 35+% (FY2021) Thank you Low risk – Our HPC growth efforts are 100% protected by a for your time crypto hosting base case Strong market position – Our customer base & our preferred supplier relationships are unmatched in the market Clear outlook – Our order back log and site development pipeline fully cover our growth plans of the next years (>700 MW) Sustainability platform – All our newly developed sites are entirely green and we are building towards a circular ecosystem NORTHERN DATA AG | 17
Northern Data AG An der Welle 3 60322 Frankfurt am Main Deutschland Jens-Philipp Briemle Head of Investor Relations Phone: +49 171 557 6989 Email: jens-philipp.briemle@northerndata.de ir@northerndata.de N OR THE RN DA T A. DE
You can also read