Railways for the world of tomorrow - Company presentation - DB Engineering & Consulting
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Railways for the world of tomorrow. Company presentation : Getty Photography: Photography Images xxxxxxxxx
Our group: Deutsche Bahn DB Engineering & Consulting – Who we are Our services Our references 2 DB Engineering & Consulting GmbH | 2018 Photography: TfNSW (Transport for New South Photography: Wales) xxxxxxxxx
Our group 33,200 kilometers more than On 25,000 bridges and 700 tunnels in the railway network of the DB Around 7.4 million passengers a day on trains and buses in Germany 5,700 stations in Germany 4,350 freight trains Every day, around and over 1 million metric tons of goods by rail Data as of March 2018 3 DB Engineering & Consulting GmbH | 2018 Photography: Deutsche Photography: Bahn AG/Barteld Redaktion xxxxxxxxx
Our group 1835 1933 1991 2002–2010 The beginning: Rail line connecting First DMU trains from With the ICE (Inter City Express) Various acquisitions, i.a. Arriva, Nuremberg and Fürth Hamburg to Berlin starts the first regular high-speed BAX Global, NS Cargo, DSB Gods, with the steam train „Adler“ traffic in Germany Spain-TIR, Romtrans … 1920 1949 1994 TODAY German Imperial Railway Split into Deutsche Bundesbahn Deutsche Bundesbahn and A leading international mobility (Deutsche Reichsbahn) established and Deutsche Reichsbahn Deutsche Reichsbahn merge and logistics company to form Deutsche Bahn AG 4 DB Engineering & Consulting GmbH | 2018 Photography: Deutsche Bahn AG/Axelxxxxxxxxx Photography: Hartmann;
Our group Freight Transport and Logistics Smart logistics by land, sea and air Infrastructure Passenger Efficient, future- Transport oriented rail Moving people from A infrastructure in to B – in Germany and Germany throughout Europe 5 DB Engineering & Consulting GmbH | 2018 Photography: Deutsche Bahn AG / Volker Emersleben Photography: xxxxxxxxx
Our group Freight Transport and Logistics Infrastructure Passenger Transport #1 Rail freight transport #1 Rail infrastructure #1 Regional and local rail #1 Land transport #1 Operation of rail stations #2 Long distance rail #3 Air freight #3 Public road transport #3 Ocean freight Data as of April 2018 6 DB Engineering & Consulting GmbH | 2018 Photography: Deutsche Bahn AG / Max Lautenschläger Photography: xxxxxxxxx
Our group Revenues (EUR million ) EBIT (EUR million ) 2,152 14,739 42,706 -2,998 1994 2017 1994 2017 Data as of Dec. 31, 2017 7 DB Engineering & Consulting GmbH | 2018 Photography: Deutsche Bahn AG / Max Lautenschläger Photography: xxxxxxxxx
Our group: Deutsche Bahn DB Engineering & Consulting – Who we are Our services Our references 8 DB Engineering & Consulting GmbH | 2018 Photography: TfNSW (Transport for New South Photography: Wales) xxxxxxxxx
Who we are As one of the worldʼs leading engineering and consulting firms, we shape the world of tomorrow – with customized and sustainable mobility and transport solutions. 9 DB Engineering & Consulting GmbH | 2018 Photography: Photography: Torsten Spiller xxxxxxxxx
Who we are 180 years of rail expertise Advising, designing and Cutting-edge implementing infrastructure projects, technologies and construction from the idea to operations. Economic and environmental aspects always taken into account Always the right solution – for individual jobs and large-scale projects alike 10 DB Engineering & Consulting GmbH | 2018 Photography:xxxxxxxxx Photography: Ben Bergh
Who we are 1966 2002 2007/2008 Deutsche Eisenbahn-Consulting DE-Consult is wholly owned by DB DE-Consult becomes DB International and operates as an independent founded company within the DB Group. DB ProjektBau works on DBʼs domestic projects, while DB International focuses on non-DB client business in Germany and international projects 1994 2003 2016 Deutsche Eisenbahn-Consulting, EVDR Bahn-Consult DE-Consult is made an affiliate of the new DB ProjektBau and DB International merge, and Transport Consult Int. Berlin merge to become DB company DB ProjektBau forming DB Engineering & Consulting DE-Consult Deutsche Eisenbahn-Consulting 11 DB Engineering & Consulting GmbH | 2018 Photography: Lothar Photography: Mantel xxxxxxxxx
Who we are DB Netze Track DB Netze Stations Chairman DB Netze Energy Digitalization and Technology DB Engineering & Consulting HR and Legal Affairs Deutsche Bahn DB Rail Construction Infrastructure DB Services Facility Management Passenger Transport DB International Operations Freight Transport and Logistics … 12 DB Engineering & Consulting GmbH | 2018 Photography: Getty Photography: Images xxxxxxxxx
Who we are International Markets Finance/ Human Chair and Consulting Controlling Resources Niko Warbanoff Andreas Wegerif Dr. Ulla Kopp Michael Fritz 13 DB Engineering & Consulting GmbH | 2018 Photography: Getty Photography: Images xxxxxxxxx
Who we are 4,500 employees from 73 countries for all technical disciplines Design 42 26 Construction supervision 11 Environment, geotechnics and survey 11 Project management 6 Design review and acceptance testing Consulting services Functional percentage of production staff, 4 % other (as of January 2018) 14 DB Engineering & Consulting GmbH | 2018 Photography: Abdullah Photography: Aledey xxxxxxxxx
Who Das sind we are wir Selection of our clients State-owned and private rail companies Regional and municipal transport Construction operators and industrial companies Private investors International and national finance institutions 15 DB Engineering & Consulting GmbH | 2018 Photography: fotolia/JFL Photography Photography: xxxxxxxxx
Who we are 7 regions with more than 80 locations East Headquarters Berlin North West Southeast Central South South- west 16 DB Engineering & Consulting GmbH | 2018 Photography: Lothar Photography: Mantel xxxxxxxxx
Who we are Represented on every continent Projects in over 100 countries since 1966 17 DB Engineering & Consulting GmbH | 2018 Photography: Lothar Photography: Mantel xxxxxxxxx
Our group: Deutsche Bahn DB Engineering & Consulting – Who we are Our services Our references 18 DB Engineering & Consulting GmbH | 2018 Photography: TfNSW (Transport for New South Photography: Wales) xxxxxxxxx
Our services New construction, conversion or deconstruction? We can do it all for you! Weʼll plan your project from A to Z and make sure that everything goes smoothly. Weʼll find the right balance between deadlines, budget and quality. If itʼs tested and approved by us, itʼs safe. Our services for your project: Design Project management and project control Realization management and construction supervision Design review and acceptance test for rail systems 19 DB Engineering & Consulting GmbH | 2018 Photography: Photography:Frank Kniested xxxxxxxxx
Integrated engineering and implementation In-house lab building using for sample analysis information modeling Aerial images taken by multicopter Our services Modern surveying systems such as 3D laser scanning We rely on innovative methods and have the right expertise even for special tasks. Georadar for non-destructive testing down to 4 meters 20 DB Engineering & Consulting GmbH | 2018 Photography:Photography: DB E&C, Dr. Katja Maaser xxxxxxxxx
Our services We make you a success! We advise organizations and companies in all matters relating to infrastructure, mobility and logistics. We analyze strategic and operational requirements and find the right solutions. Our services for your project: Business consulting Operations and maintenance consulting Logistics consulting Data Analytics and Digital Solutions 21 DB Engineering & Consulting GmbH | 2018 Photography: Getty Photography: Images xxxxxxxxx
Our services Our DB Rail Academy training program prepares your employees around the world Weʼre constantly expanding our range of for their responsibilities consulting services based on our clientsʼ needs. Predictive maintenance We use smart data networking to identify infrastructure and vehicle maintenance needs before problems occur 22 DB Engineering & Consulting GmbH | 2018 Photography: Photography: Fotolia xxxxxxxxx
Our services DB Engineering & Consulting Feasibility & Construction Testing & Design Operations Maintainance Finance Supervision Commissioning Infrastructure & Vehicles Structural Engi. Design of Buil- Control and Passenger Construction Running Infrastructure Passenger TOD – ding Construc- Security Approval of Rail Constructing & Operation Flow Analysis Supervision – Equipment Maintenance Flow Analysis Urban Design tions for Rail Systems Vehicles Operating Consulting Stations Building Testing Depots Stations Selection Selection Operations Design Construction System Transport System Construction Site Technology Planning, Technology Catenary Project Operations Rolling Stock Management – Testing & Tender for Construction Highspeed Demand Metro & LRT Equipment Management Planning & Maintenance Transport Comissioning Operation Optimization Consulting Modelling Consulting Design Simulation Depots Infrastructure Structure * Für jede Lebenszyklusphase bieten wir noch weitere Produkte an, bitte kontaktieren Sie .. Analsysis 23 DB Engineering & Consulting GmbH | 2018 Photography: Photography:Frank Kniestedt xxxxxxxxx
Our group: Deutsche Bahn DB Engineering & Consulting – Who we are Our services Our references 24 DB Engineering & Consulting GmbH | 2018 Photography: TfNSW (Transport for New South Photography: Wales) xxxxxxxxx
40 m height 160 km/h 530 m length in the area of the bridge Our references Location: Emskirchen, Germany Customer: DB Netz AG New construction of an eleven-section concrete bridge in semi-integral design, rerouting of the existing line to 1,750 m, increase of the line speed, deconstruction of the old steel bridge. Plan release by expert authorized to submit construction documents, construction planning, involvement with waste management, surveying, construction supervision for the entire project in all disciplines, environmental construction supervision. 25 DB Engineering & Consulting GmbH | 2018 Photography: Lothar Photography: Mantel xxxxxxxxx
Our references 288 km Location: Germany route length Customer: DB Netz AG 405 Upgrade of the twin-track, electrified Saxony-Franconia civil engineering structures Magistrale line. 55 stations Design, realization management and construction supervision for individual project sections in all railroad disciplines. 26 DB Engineering & Consulting GmbH | 2018 Photography: DB AG / Frank Photography: Barteld xxxxxxxxx
Katzenberg Tunnel, one of Europeʼs 182 km most modern tunnels route length Our references Upgrade for Location: Germany Customer: DB Netz AG 250 km/h Four-track upgrade of the Rhine Valley Railway (Rheintalbahn) with the Katzenberg Tunnel, the Rastatt Tunnel and the Offenburg Tunnel. Design, realization management and construction supervision, design review and acceptance testing for control-command and signaling, overhead line equipment, electrical power systems. 27 DB Engineering & Consulting GmbH | 2018 Photography: Erhard Photography: Hehl xxxxxxxxx
Europeʼs biggest tram-train network Our references From the region into the city without having Location: Germany Customer: Karlsruher Verkehrsverbund GmbH (KVV)/ to change trains Albtal-Verkehrs-Gesellschaft mbH (AVG) / Karlsruher Schieneninfrastruktur-Gesellschaft (KASIG) mbH Numerous individual projects in different construction 477 km stages. Systems consulting, operating simulations, feasibility study, project management, engineering tram-train lines planning, design review for rail systems, construction site management and construction supervision. in the traffic network 28 DB Engineering & Consulting GmbH | 2018 Photography: Danielxxxxxxxxx Photography: Saarbourg
Up to 300 km/h Longest tunnel: Our references 8,314 m Bleßberg Initial use of Location: Germany Customer: DB Netz AG ETCS Level 2 Part of the north/south corridor of the Trans-European Network (TEN 1) that runs from Scandinavia to Italy. Project management, design, construction site management and construction supervision for various sections of the new and upgraded line, bridges and tunnels, design review and acceptance testing for control-command and signaling, overhead line equipment, electrical power systems. 29 DB Engineering & Consulting GmbH | 2018 Photography: Photography: Klaus Heinrich xxxxxxxxx
Our references 73 km long line Location: Germany Customer: DB Netz AG Section of the freight corridor from Rotterdam to Genoa; 55 railroad crossings Replacement of with 38 bridges line upgrade (third track) with conversion of the system changeover point at the German/Dutch border, conversion of the Oberhausen hub and numerous railroad crossing replacement measures. Design, realization management and construction supervision, design review of the overhead line equipment and electrical power systems, waste analysis. ETCS Level 2 and GSM-R 30 DB Engineering & Consulting GmbH | 2018 Photography: Michael Photography: Neuhaus xxxxxxxxx
8 million metric tons transported per year Handling of 33 wagon trains as long-term goal Our references Location: Germany Customer: InfraLeuna Connection of the Leuna chemical site near Halle (Saale) to the Deutsche Bahn AG line network and supply of the individual companies at the site. 90 km Identification of the factors that influence operation of the industrial siding and track length associated assessment, derivation of measures for optimum, future-proof operations from the perspective of customers and of the operator InfraLeuna. 31 DB Engineering & Consulting GmbH | 2018 Photography: InfraLeuna GmbH / LxPRESS Bildgestaltung Photography: xxxxxxxxx
1852 year of construction of the old arched bridge 14 monthsʼ Our references construction time Location: Germany Customer: DB Netz AG Replacement of the railroad overpass on the Mittweida- 90.95 m long Chemnitz line, with design and esthetics that blend in with the Ottendorf Valley without splitting the location. tied arch bridge Design of dual-track steel bridge as frame-reinforced tied arch, construction timetable and construction supervision for deconstructing the old viaduct and the sideways insertion of the new bridge preassembled on-site. 32 DB Engineering & Consulting GmbH | 2018 Photography: aeroSACHS Photography: xxxxxxxxx
750 trains daily 250,000 visitors (long-distance/local and passengers daily Built on and S-Bahn) 59 bridges Our references Location: Germany Customer: DB Station & Service AG The replacement during operation of the station structure that has grown continually over 150 years includes all the transportation, engineering and building construction of the station. Overall coordination, surveying services, basic evaluation, preliminary design; planning coordination for Building Information Modeling (BIM): 3-D survey, 3-D modeling, 3-D real-world modeling, visualization, 3-D collision testing, generation of 2-D plans from 3-D models, 3-D route and variant comparison, 4-D simulation. 33 DB Engineering & Consulting GmbH | 2018 Graphics © Dr. Katja Photography: Maaser xxxxxxxxx
Our references Location: Germany Customer: DB Netz AG As part of the second construction stage of the upgrade line Berlin–Dresden, the platform facilities in the multi-level interchange station are being modernized, new BIM pilot project intercommunication staircases and lifts added. — first build digitally, Overall design management, BIM coordination of the technical disciplines in conjunction with the clientʼs BIM management; basic then build physically evaluation, preliminary design; Building Information Modeling (BIM): 3-D survey, 3-D real-world modeling, visualization, 3-D planning model, 3-D route and variant comparison. 34 DB Engineering & Consulting GmbH | 2018 Visualization: DB Engineering &xxxxxxxxx Photography: Consulting
Our references 600 m long, dual-track Location: Germany Customer: DB Netz AG trough construction with subsequent The BIM pilot project “Homburg embankment” is part of the overall “ Rhine-Main Plus” project in the Frankfurt (Main) central station. overbridge Overall design management, BIM coordination of the technical and an equally long disciplines in conjunction with the client's BIM management; Building Information Modeling (BIM): 3-D survey, 3-D real-world modeling, visualization, 3-D modeling (geometric model), 3-D retaining wall collision testing, planning coordination, 4-D modeling (presentation of the construction sequence), 5-D modeling (presentation of the cost development), object-based quantity calculation, semiautomated specifications creation. 35 DB Engineering & Consulting GmbH | 2018 Visualization: Martin Münnig, DB Engineering &xxxxxxxxx Photography: Consulting
154 new signals Our references Hundreds of test devices Location: Germany Customer: DB Netz AG Modernization of the control-command and signaling of the tunnel section with electronic interlocking technology to increase the route capacity and stabilize operations in the S-Bahn network. 6 km Engineering planning across all disciplines and 30 PT1 plans, stage-of-construction and construction-operations planning, design timing management, design review, acceptance and expert tunnel section, authorized to submit construction documents services pursuant to 7 stations VV Bau STE, construction supervision services pursuant to VV Bau or VV Bau-STE of the Federal Railway Authority (EBA) (rail construction supervisor), engineering authorized individual, interface coordination regarding adjacent projects, construction supervision and supervision of external planners. 36 DB Engineering & Consulting GmbH | 2018 Photography: Photography:Richard Firnges xxxxxxxxx
47.7 km long line network BOStrab Our references infrastructure is being set up from scratch in some cases Location: Germany 2 lines with Customer: RTW Planungsgesellschaft mbH 22 stops The bypass supplements the urban and regional transport network of Frankfurt and the Rhine-Main area. It improves the transport links of the districts in western Frankfurt (Main) and of Frankfurt airport. Consulting on concept for dual-system rolling stock 750 V DC / 15 kV 16.7 Hz AC; within planning community responsible for project control tasks, planning the railroad and machinery equipment; surveying and geotechnical engineering and geological survey. 37 DB Engineering & Consulting GmbH | 2018 Photography: Frank Photography: Nagel xxxxxxxxx
Our references Location: Novi Sad, Serbia Customer: EU Delegation of the Republic of Serbia Construction of a rail and road bridge with two network arch bridges (180 m and 220 m span), which is co-financed 474 m by the EU and will traverse the Belgrade–Subotica–Budapest railway line of the pan-European transport corridor. length Commissioning: March 2018. Construction supervision together with Egis International, as 160 km/h well as checking and coordinating the workflows with the Spanish-Italian construction consortium. in the area of the bridge 38 DB Engineering & Consulting GmbH | 2018 Photography: Zeljko Photography: Mandic xxxxxxxxx
26 km route length 21 elevated stations 750 V DC Our references third rail Location: India Customer: Kochi Metro Rail Limited Construction of a new elevated metro line in Kochi in the southern Indian state of Kerala. Creation of a quality and safety plan, inspection of operations, maintenance and disaster management instructions, assistance with testing and commissioning the line. 39 DB Engineering & Consulting GmbH | 2018 Photography: Photography: Rejeesh Bhaskar / Tom Job xxxxxxxxx
12 km route length 13 stations Our references 14 low-floor trams Location: Australia Customer: John Holland Pty Ltd. Connecting the fast-growing Gungahlin outskirts with the center of the Australian capital, reviving and enhancing the attractiveness of the central urban hub (Northbourne Avenue). Private-public partnership project (planning and construction, operation and maintenance) with subsequent operational management until 2039. 40 DB Engineering & Consulting GmbH | 2018 Photography: Photography:Canberra Metro xxxxxxxxx
450 km of double-track line with 5 stations 320 km/h maximum speed 35 HSR multiple units Our references Location: Saudi Arabia Customer: Saudi Railways Organization (SRO) First high-speed line with a reliable and convenient connection between Jeddah and the pilgrim sites of Mecca and Medina. Design review and construction supervision for track and rail systems, operations control center and depot; site management (on-site planning), monitoring the production of multiple units, preparation of commissioning, support in the first operational year. 41 DB Engineering & Consulting GmbH | 2018 Photography: Jose Photography: Jurado xxxxxxxxx
264 km rail connection 11,000 metric tons of granulated sulfur per train 1,700 m long freight trains Our references Location: United Arab Emirates Customer: Etihad Rail Company PJSC Development and operation of a freight line for transporting granulated sulfur from the mines in Shah via Habshan to the port city of Ruwais on the Arabian Gulf. Organizational and personnel development of the infrastructure in the ERDB joint venture, support for functional tests, management of test runs; since 2016, assumption of infrastructure management and training of technical staff in scheduled operations. 42 DB Engineering & Consulting GmbH | 2018 Photography: Martin Photography: Hagen xxxxxxxxx
Our references 83 km route section Location: Croatia Customer: HZ Infrastruktura Double-track extension of the TEN Corridor X section between Zagreb and Belgrade to EU standard (track system and rail systems). Consultation, feasibility study, environmental impact assessment, assistance with EU funding application, Upgrade to operational infrastructure planning, project management, engineering planning. 160 km/h 43 DB Engineering & Consulting GmbH | 2018 Photography: Photography:Drago Lipičanin xxxxxxxxx
146 km long-distance transport network Doha Metro (phase 1 until 2022) 350 km 4 lines, 84 km route, 37 stations metro network Our references Location: Qatar Customer: Qatar Rail Development and implementation of a rail-bound, nationwide transport system with metro and light rail in Doha, long-distance and freight transport with connection to the neighboring states. Feasibility study, system consulting, operational and network design, engineering planning for Doha Metro, support for construction of the Qatar Rail railway organization; system test of the long-distance transport network as a “shadow operator”. 44 DB Engineering & Consulting GmbH | 2018 Photography: Photography: Torsten Spiller xxxxxxxxx
Our references Location: South Africa 81 million Customer: Transnet Freight Rail metric tons per year Coal transport from the mines in the interior of the country to the port on South Africa’s east coast. Operational consulting for increasing the route capacity, simulated operations with long trains, known as “Shongololo trains”. 21,000-tonnes coal trains with 200 wagons, 8 locomotives, and a length of 2.5 km 45 DB Engineering & Consulting GmbH | 2018 Photography:xxxxxxxxx Photography: Ben Bergh
Largest port in Brazil and South America 3,779,999 TEU containers (2015) Our references Location: Brazil Customer: CentroNave (association of shipping companies) The port’s infrastructure, its technical equipment, and the organizational and administrative processes need to be improved for the growing volume of container traffic. 120 million Analysis of the port infrastructure, seaport hinterland metric tons connections, and the logistical and administrative processes, identification of bottlenecks, derivation of recommended action to be taken. of cargo handling (2015) 46 DB Engineering & Consulting GmbH | 2018 Photography: Femke Photography: Grabbert xxxxxxxxx
18 km 9 stations with 300 m route length long platforms 72,000 pilgrims per direction and hour Our references Location: Saudi-Arabia Customer: DAR Al Handassah An efficient regional transport system to accommodate the numerous pilgrims traveling between the Islamic holy places of Jamarat, Muzdalifah, the tent city of Mina, and Mount Arafat. Technical consulting, construction supervision and approval management for the elevated double-track line with automatic train protection/automatic train operation, supervision of commissioning and operations for the annual Hajj. 47 DB Engineering & Consulting GmbH | 2018 Photography: xxxxxxxxx Photography: Uwe Ramin
390,000 passengers alighting and transferring each day in Oslo in 2030 Our references Location: Norway Customer: SPACEGROUP architecture office Optimization of the connection of cities on the Oslo Fjord with InterCity transport to Oslo Central Station, design of a double- track high-speed line. Technical expert report, planning consultation and support of the construction phases for modernizing the central station during ongoing operations. 48 DB Engineering & Consulting GmbH | 2018 Photography: Photography:SPACEGROUP xxxxxxxxx
49 Photography: Getty Photography: Images xxxxxxxxx
You can also read