EXECUTIVE SUMMARY
Due to new imposition on ecological continuity, EDF Luminus, as a
responsible player of Meuse river, has decided to invest high resources
in order to enforce sustainable solutions.

New obligation of results for ecological continuity :
• Imposition on mortality rate for eels and salmons.
• Potential Impact on hydro business: severe production reduction,
   putting at stake the full hydro business, due to forced outages for
   downstream migration.

To be compliant we need to:
• Collect ecological information.
• Execute studies, design and implement sustainable solutions to
   improve ecological continuity on our 6 sites along river Meuse
   (predictive model - repulsive barriers and safe downstream outlets).
• Install at Monsin a new type of “Eco-sustainable” turbine.

The global Life 4 Fish project is a strong enabler to be compliant with
our permits and to secure the profitability of green hydro business.
PROJET LIFE4FISH: CONTENU ET GRANDES ETAPES - EDF LUMINUS : PIERRE THEUNISSEN COORDINATING BENEFICIARY
SINCE 63 YEARS EDF LUMINUS IS THE BELGIAN REFERENCE
          IN GREEN HYDRAULIC PRODUCTION
       Installed capacity             Installed capacity EDF   1st Hydro producer
      110MW producing                    Luminus 69 MW                since
          360GWh/an                  producing 245GWh/an            64 years

   Monsin (Liège):           1954 – 20MW – 60GWh/an
   Ivoz-Ramet :              1954 – 10MW – 39GWh/an
   Ampsin – Neuville :       1965 – 10MW – 39GWh/an
   Andenne :                 1980 – 7MW – 32GWh/an
   Lixhe :                   1980 – 16MW – 56GWh/an
   Grands-Malades (Namur):   1988 – 5MW – 19GWh/an
   Floriffoux                1993 – 0.8MW – 1.4GWh/an
THE HYDROELECTRICAL PRODUCTION CAN BE
                    PREDICTED AND IS RELIABLE
New obligation of results for ecological continuity :

•   The production forecasts, on a short and mid-term basis,
    are nowadays reliable. This situation allows a supply for
    more than 4000h/year.

•   Independence and security of supply

•   Less import of fossil fuel, and less exposure to
    fluctuating prices

•   Green energy
    No CO2, no fine particles, no acid NO, NO2 ou SO2

•   Hydraulic power plant help cleaning the Meuse river

•   ±800 tons/year of waste are collected by the 7 plants
    (140 €/T full cost 112.000 €/year)
ACTORS OF THE LIFE4FISH PROJECT

A strong team in order to design innovative solutions.

• Coordinating beneficiary : EDF Luminus as owner of the hydro power plants.

• Associated beneficiaries :
      • EDF R&D : strong expertise with their hydro plants.
      • ULiège HECE : strong expertise in hydraulics in environmental and civil engineering.
      • Unamur : strong expertise in research in environmental biology.
      • Profish Technology : strong expertise in aquatic life science.
TIME LINE OF THE LIFE4FISH PROJECT
         Installation of protective elements for downstream migration along 2 pilot sites
                                 (Ivoz-Ramet and Grands-Malades)
             Jan - June 2018           Aug - Dec 2018   Mar - June 2019
                                                                                 Aug 2019 - Fev 2020
          Design of the                 On site          Salmon
           solutions                  installation        smolt                   Silver eels

                               2018                                       2019

                          Facilities                                 Monitoring

Widespread deployment of protective elements for downstream migration along the Lower Meuse
             Jan - June 2020           Aug - Dec 2020   Mar - June 2021
                                                                                 Aug 2021 - Fev 2022
         Optimization of                On site          Salmon
          the solutions               installation        smolt                   Silver eels

                               2020                                       2021

                          Facilities                                 Monitoring
LIFE4FISH : ACTIONS
Detailed steps :
• Action A, Preparatory actions, development of management
plan
                  Adaptation of the downstream
                      predictive model to the Meuse.
                  Modeling of pilots sites (Grands
                      Malades, Ivoz Ramet)
                  Nomenclature and development of
                      fishing protocole
• Action C, Conservative actions
                  Installation and test of behavioral
                      barriers, and downstream outlets.
                  Commissioning of the downstream
                      predictive model.
• Action D, Monitoring of the impacts and the actions of the
project
• Action E, Public awareness and dissemination of the results
• Action F, Project management
ACTIONS C1&C2: INSTALLATION OF BEHAVIORAL BARRIERS
     AND DOWNSTREAM FISH PASS AT PILOT SITES
This action consists of supplying, installing, implementing, operating and maintaining bypass systems at pilot sites. The
locations for pilot sites are Grands-Malades and Ivoz-Ramet. The sites have been selected accounting for the structure's
impact on fish fauna and on the ability to reproduce the site conditions.

The behavioral barriers will be placed at the entrance to the water supply channels of the power plants to divert the fish
toward properly calibrated passes. The pass will be carefully sized to create an attraction flow that is sufficient to draw
the species to the pass without causing excessive losses of hydro-electric power.

 Aerial view of the Grands-Malades site                       Aerial view of the Ivoz-Ramet site
GLOBAL AND INNOVATIVE APPROACH (1/2)
The field approach has been set on Meuse basin. Our 6 sites are part of a global study
       • We will be able to tackle future permit issues with key facts and figures
       • It is in line with global water management agreement signed in Nov. 2017 with SPW DG02
       • Integrate as much stakeholders as possible
                              • “Comité international de la Meuse”
                              • INBO Instituut voor Natuur en Bosonderzoek
                              • SPW
                              • Rijkswatertstaat (NL),
                              • Recognized scientist (Agence Française pour la biodiverstié (AFB ex-ONEMA)

                                                                                           Probe injected for fish tracking
  Downstream Meuse
GLOBAL AND INNOVATIVE APPROACH (2/2)
• Innovation: a strong response to new constraints            Sensor Fish prototype
                                                              tested in Monsin
       Bidirectional synergies: exchange REX and
           data’s with EDF Group specialists (EDF
           R&D, CIH and DPIH). Our new and
           innovative design approach has been
           recognized and adopted by DPIH.
       Gain subsidies from Europe Commission
           through the Life program. Long run ended
           by a great success!
       “Eco-sustainable” design for the retrofit of     CFD design
           Monsin: a new design approach for hydro       approach of a
                                                         Kaplan wheel
           turbines has be chosen in order to                                         Go from FF to Eco-
                                                                                      sustainable
           determine key parameters. It is very
           promising and can also be seen as a
           premier. Investment decision of 27M€
           should soon be taken.
       New technics use to measure the
           constraints of our hydro turbine, with
           sensor-fishes (ULG). This is a premier. EDF
           R&D is also willing to use this device.