Webber Paddle Park Ribbon Cutting - September 24, 2020

                                         CHESTERFIELD TOWNSHIP

          PROGRESS AT A GLANCE
                                                             OCTOBER 2020
PROGRESS AT A GLANCE OCTOBER 2020 - CHESTERFIELD TOWNSHIP
OCTOBER 2020

 Upcoming Meeting Schedule
 Planning Commission                      October 6 & October 20                            7:00 PM
 Township Board                           October 13 & October 27                           7:00 PM
 Zoning Board                             October 14 & October 28                           7:00 PM
 Beautification Committee                 October 8                                         7:00 PM
 Historical Society                       October 5                                         6:30 PM
 Cannabis Committee                       October 26                                        6:00 PM
 Parks & Recreation Commission            October 28                                        6:30 PM

 Public Engagement: Looking Ahead

 Township Offices will be closed October 12, 2020 for Columbus Day.

 Township Business

 Brandenburg Park is scheduled to be closed October 28, 2020 - May 31, 2021.
    All park amenities will be closed, including the parking lot and boat launch. The walking path along
    Jefferson Avenue will remain open.

 November 9 6:00 - 8:00 PM: Budget Study Session (Current Board, Board Elect, All Department Heads)
  This meeting is an introduction to the budget process and overview of the 2021 budget.
  **Current board members and Board Elect wanting to sit with Finance/Department Heads can schedule time to individually
      review the budget November 10 - November 25.

 November 23 5:00 - 8:00 PM: Budget Study Session (Current Board, All Department Heads)

 December 8 7:00 PM: Regular Board Meeting to adopt budget
PROGRESS AT A GLANCE OCTOBER 2020 - CHESTERFIELD TOWNSHIP
TABLE OF CONTENTS

Project Management Reports
     Fire Station # 1 Renovation   (1013-2019)

     25 1/2 Mile & Gratiot PRV Station Upgrade      (1010-2019)

     23 Mile Rd. Water Main - Phase 1 Design     (1012-2019)

     Howitzer Pad - Relocation Project    (1016-2019)

     Brandenburg Shoreline - Construction     (1017-2019)

     Webber Paddle Park     (WPI-2018-001)

     ADA Township Updates       (1020-2020)

     2020 Sanitary Sewer Rehabilitation Project - C.I.P.P Lining    (1021-2020)

     2020 Sanitary Sewer CCTV & Cleaning Program (1026-2020)

     23 Mile Rd. Emergency Water Main Repair @ Fish Creek          (1022-2020)

     Senior Park   (1023-2020)

     Jefferson Avenue Pathway      (1024-2020)

     Civic Center Bridge Construction (1027-2020)

     Civic Center Pavement Rehabilitation (1028-2020)

Special Assessment Districts (SAD) Reports
     Edgewater Paving (1025-2020)

     Roselawn

Building Reports
PROGRESS AT A GLANCE OCTOBER 2020 - CHESTERFIELD TOWNSHIP
PROJECT MANAGEMENT REPORTS
   Progress Status Update as of 9.30.2020
PROGRESS AT A GLANCE OCTOBER 2020 - CHESTERFIELD TOWNSHIP
Fire Station #1 Renovation (1013‐2019)
September 30, 2020                                                 Project Manager: Joshua Sonnenberg

Funding Source: 205.340.970.000                           Phase: Construction
Estimated Project Budget: $1,912,504                      Project Cost to Date: $1,833,529.47
Estimated Completion Date: 6/8/20                         Significantly Completed: 6/15/20
Change Orders: 16 totaling $120,522.70

Project Details

Critical objective of this project is to keep fire station functioning throughout the duration of
construction. Renovation will be conducted in two phases, concurrently: 1.) one story addition
consisting of two bays and storage area; site work will be completed during this phase and 2.) second
floor living space addition. JSN Architecture will be available for consultation and inspections and also to
assist in matching materials used during the original construction 30 years ago. Fixed cost contract will
be executed with all change orders approved by township project manager.

Project Status

Project is significantly completed. Before closing out the project, the Facilities and Operations Team is
waiting until the new construction areas are subjected to several weeks of cold weather and the building
has settled. During this time the building will be monitored and any warranty concerns will be
addressed. As planned the remaining funds will be used to repair and repave the failing access road.
That work is scheduled to start mid‐October
PROGRESS AT A GLANCE OCTOBER 2020 - CHESTERFIELD TOWNSHIP
25 ½ Mile and Gratiot PRV Station Upgrade (1010‐2019)
October 1, 2020                                                             Project Manager: Donald Coddington

Funding Source: Enterprise Fund & General Fund                            Phase: Construction
Estimated Project Budget: $856,670.76                                     Project Cost to Date: $50,052.17
Estimated Substantial Completion Date: December 31, 2020
Estimated Completion Date: March 31, 2021

Project Details

Bring the meter bit above ground similar to what was done with the meter pit at 24 Mile and Fairchild Rd. Plans
will mirror what was accomplished with the 24 Mile and Fairchild Rd. site, but adjust the size of the building to fit it
on the property.

Project Status

Project bid opening was on May 12, 2020. The construction portion of the project was awarded to Z Contracting at
a cost of $633,602.20. Total project cost updated to $856,670.76.

Preconstruction meeting was held on August 31, 2020. Project is set to begin on September 8, 2020. GLWA came
out on September 1, 2020 to shut down the meter pit. The site is prepared for construction to begin on
September 8.

Meter pit has been removed from the ground, and water main being extended into the building pad. Project is
currently on schedule.

Change Orders

None.
PROGRESS AT A GLANCE OCTOBER 2020 - CHESTERFIELD TOWNSHIP
23 Mile Rd. Water Main Project – Phase 1 (1012‐2019)
October 1, 2020                                                          Project Manager: Donald Coddington

Funding Source: Enterprise Fund                                       Phase: Design
Estimated Project Budget: $2,074,500.00                               Project Cost to Date: $86,400.00
Estimated Substantial Completion Date: December 31, 2020
Estimated Completion Date: March 31, 2021

Project Details

Connect all existing water main on the south side of 23 Mile Rd. between Donner Rd. and Altman Rd. by filling in
gaps with new 12‐inch water main. The gaps total roughly 6,170 feet of new water main to be installed.

Project Status

10 easements have been recorded with the county. Three more easements being sent to the county during the
week of October 4, 2020. Public Works has made multiple attempts to reach out to the remaining six easements,
and will be seeking help to collect the remaining easements, per the direction of the township attorney.

Change Orders

None.
PROGRESS AT A GLANCE OCTOBER 2020 - CHESTERFIELD TOWNSHIP
Howitzer Cannon Project (1016‐2019)
September 30, 2020                                                        Project Manager: Josh Sonnenberg

Funding Source: GL# 101‐265‐975.000                                  Phase: Construction/Execution
Estimated Project Budget: $8,510.00                                  Project Cost to Date: $6,823.86
Estimated Completion Date: Fall 2020                                 Change Orders: N/A

Project Details

TACOM approved relocating the conditionally loaned Howitzer cannon from Vet's Memorial Park to the Municipal
Office, behind the newly‐constructed Memorial Wall. One of the conditional loan stipulations was to construct a
concrete pad to safely place the Howitzer. The Facilities Department constructed the concrete pad in‐house and
purchased the concrete and construction materials needed to execute this project.

Project Status

The Howitzer Cannon was move from Community Center Park to the Memorial Wall on June 17, 2020. The cement
pad was prepped, polished and sealed prior to delivery. Decorative stone was purchased and will be cut and
installed by the Facilities and Operations Team as soon as possible.
PROGRESS AT A GLANCE OCTOBER 2020 - CHESTERFIELD TOWNSHIP
BRANDENBURG SHORELINE (1017‐2019)
September 30, 2020                                                    Project Manager: Josh Sonnenberg

Funding Source: NOAA & Chesterfield Twp                               Phase: Bidding / Award
Estimated Project Budget: $884,870                                    Project Cost to Date: $69,005.75
Estimated Completion Date: Spring 2021
Change Orders: N/A

Project Details

The shoreline restoration is slated to include 740 linear feet of shoreline softening as well as 1.5 acres of near
shore habitat creation and is primarily funded by a grant from the National Oceanic and Atmospheric
Administration (NOAA). The project will include sections of rocky breakwater intended to promote an increase in
juvenile fish and healthy assemblages of game fish while providing forage for waterfowl, along with shoreline
bioengineering which adds habitat complexity and will provide improved habitat for herpetofauna and
macroinvertebrates. Ongoing communication and collaborative work will be between OHM Advisors, Chesterfield
Township, Great Lakes Commission, NOAA, and other regulatory agencies will be essential for a successful project.

Due to the spawning timeline for the fish habitat, in water work cannot be done between April 1st and Sept 30th.
Goal is to have additional funding secured and project awarded in August 2020. Winning contractor will have
project prepped and ready to start the site work by November 1, 2020.

Project Status

       Chesterfield Twp. Board approved agreement with Great Lakes Commission and to award the contract to
        Anglin on August 11th. OHM/Chesterfield met with Anglin to discuss the final agreement several times.
       We worked with the USACE to get clarification on the draft permit to avoid design revisions
       After a lot of work by OHM they received draft permit for in‐water work. USACE requested no design
        revisions.
       Anglin is expecting a late October construction start timeframe. They will start on shoreline then move to
        in‐water work. All parties continue to work hard to keep the project moving during ongoing COVID
        challenges
PROGRESS AT A GLANCE OCTOBER 2020 - CHESTERFIELD TOWNSHIP
   The Township facilitated a ground‐breaking ceremony on September 15th.
   OHM team provided virtual reality googles during the ground breaking to show renderings of the final
    project
   All parties executed the final contracts
   Park closing date for the project has been set October 28th – May 31st Park Closed signs posted on the
    fence and entry booth.
WEBBER PADDLE PARK (WPI 2018‐001)
September 30, 2020                                                        Project Manager: Joshua Sonnenberg

Funding Source: MDNR Trust / Chesterfield Township                      Phase: Construction
Estimated Project Budget: $379,000                                      Project Cost to Date: $348,092.81
Estimated Completion Date: Substantial date July 1, 2020

Project Details

Construction of a floating kayak launch with access gangway, picnic tables with bike trail, parking lot, and other
miscellaneous site amenities.

Project Status

The Ribbon Cutting Event on Thursday September 24, 2020 was well attended. Finishing touches are in process,
information kiosk and front gate expected to be in place this fall. In spring 2021 an entrance sign will be in place
and future concepts include adding soft launch areas along the shoreline, and the possibility of a pavilion complete
with restrooms.
ADA Township Upgrades (1020‐2020)
September 30, 2020                                                      Project Manager: Joshua Sonnenberg

             Women’s Restroom                                                   Men’s Restroom

Funding Source: CDBG $78,386 and $114,762.78 Township Funds                              Phase: Construction
Estimated Project Budget: $193,148.78                                       Project Cost to Date: $45,239.05
Estimated Completion Date: November 30, 2020

Project Details

Partners in Architecture performed an ADA study on the Township Offices in 2019. At the January 22, 2019 Board
of Trustees Meeting, the Township allocated $78,386 of CDBG funding towards architectural barrier removal. The
CDBG Committee recommended bringing the restrooms (closest to the Senior Center) up to ADA compliant and
also bring the lobby front counter up to ADA compliant. The Board approved this recommendation at the March
17, 2020 Board Meeting.

Project Status

Design details were finalized by Partners in Architecture by June 1, 2020. Township reviewed changes, sent to
Macomb County for review, and placed project out for bid. Pre Construction meeting was held on June 16th, bid
opening was held June 30th @ 10am. D & S Contractors was the lowest bidder and the recommended contractor
for the project. D&S Contractors bid was approved by Township Board on July 14, 2020.

                                                 September Update
General Comments:
o Work in restrooms is progressing at sufficient pace to meet contract completion before end of 2020. Work for
the service counter is not scheduled to start until after the November elections, but the GC is prepping to assure
everything is on site to compress the onsite work schedule.
o The project site was clean as were adjacent corridors.

Restrooms:
o Rough electrical is complete. Contractor should be scheduling above ceiling inspections this week.
o Installation of tile backer board / gyp board and finishing of joints is complete.
o Prime and painting is complete. Wall tile wainscot will cover lower unpainted portion of walls. Contractor to
finish/touch up paint after installing tile, plumbing, toilet partitions, etc.
o Floor prep is complete, and tile work is to begin soon.
o Installation of linear lighting fixtures above sinks and at wet walls is complete.
o Adjusting and leveling of ceiling grid is complete.

Service Counter:
o Demolition / New Work on Service Counter is scheduled to begin in November.
o PARTNERS and D&S Contractors met with Mica‐Tec on 9/21 to resolve questions related to shop drawing
requirements for service counter and restroom millwork. Anticipated delivery of shop drawings for PIA to review is
by end of week (9/25).

Change Orders

None.
2020 Sanitary Sewer Rehabilitation Project (1021‐2020)
October 1, 2020                                                         Project Manager: Donald Coddington

Funding Source: Enterprise Fund                                      Phase: Design & Bid
Estimated Project Budget: $486,530.00                                Project Cost to Date: $163,540.91
Estimated Completion Date: October 23, 2020

Project Details

The sewer rehabilitation project is based on the data collected from the 2017 SAW Grant. The SAW Grant found
19 areas of concern and have been determined necessary to repair through this project.

Project Status

Cured in Place (CIPP) portion of the project:

       Put out for bid on May 26, 2020
       Bid opening on June 4, 2020
       Construction awarded to Inland Water Pollution Control, Inc. at a cost of $190,100.00 at the June 23
        board meeting
       CIPP Total Project Cost updated to $240,970.70 and the June 23 board meeting
       Inland Waters started working on repairs on August 24.
       Inland Waters has two more lining sections to complete. Project is on time for completion.

Open Cut portion of the project:

       Put out for bid on June 24, 2020
       Bid opening on July 21, 2020
       Construction to be awarded at the August 11 board meeting
       Anticipated Open Cut Total Project Cost update at the August 11 board meeting
       Teltow started working on repairs on August 24.
       Teltow has completed the necessary sewer repairs; cleanup of each site still needs to be completed.
Change Orders

   None.
2020 Sanitary Sewer CCTV & Cleaning Program (1026‐2020)
October 1, 2020                                                       Project Manager: Donald Coddington

Funding Source: 591‐541‐801.000                                        Phase: Construction
Estimated Project Budget: $394,533.00                                  Project Cost to Date: $0.00
Estimated Completion Date: December 31, 2020

Project Details

Public Works maintains the sanitary sewer infrastructure by implementing a closed caption television (CCTV) and
cleaning project for a section of the sanitary sewer. The general focus is to televise the entire sanitary sewer
infrastructure over a 10‐year period to ensure that we can maintain and repair all potential major defects that are
found and to reduce or eliminate inflow and infiltration into our system. Ensuring that our sanitary sewer system
is secure and devoid of infiltration helps prevent the unnecessary treatment of clean water by GLWA.

Project Status

The project went out to bid, with the bid opening taking place on September 29, 2020. The award of the project
will be brought in front of the board in October 2020.

Change Orders

None.
23 Mile Rd. Emergency Water Main Repair at Fish Creek (1022‐2020)
October 1, 2020                                                           Project Manager: Donald Coddington

Funding Source: Enterprise Fund                                         Phase: Construction
Estimated Project Budget: $360,750.00                                   Project Cost to Date: $20,402.75
Estimated Completion Date: October 30, 2020

Project Details

This project stems from a water main break that occurred on March 7, 2020. The water main break was in the
middle of the Fish Creek, and instead of attempting to redirect the flow of Fish Creek to repair water main that was
at least five feet below the bottom of the drain (over 20 feet deep), it was decided to cut and cap the 20‐ inch main
on each side of the Fish Creek and reconnect the main at a later date this year. This water main is one of the main
"arteries" in our township that needs to be reconnected to provide continuity and redundancy in our system.

Project Status

Project was put out to bid by invitation with the bid opening scheduled for September 1, 2020. Award of
construction occurred at the September 22 board meeting, and was awarded to Pamar Enterprises.

Preconstruction meeting was held on October 1, 2020. Anticipated project start will be during the week of
October 4, 2020. The goal is the have the project substantially complete by October 30, with final completion by
November 15, 2020.

Change Orders

None.
SENIOR PARK (1023‐2020)
September 30, 2020                                                        Project Manager: Josh Sonnenberg

Funding Source: CBDG $149,734.75 & Township $63,272.50                         Phase: Design/Planning
Estimated Project Budget: $213,007.25                                          Project Cost to Date: n/a
Estimated Completion Date: August 2021
Change Orders: n/a

Project Details

Our Seniors have a beautiful indoor space for all‐season recreational programming, but their outdoor space is
limited. The addition of a Senior Park will permit individuals, who are 55 and older to experience the outdoors in
an area they can call their “own.” This park will provide outdoor activities for both the active and passive
populations of aging adults. It will include an equipment‐based exercise area, raised garden bed, open green space,
ADA accessible concrete pathways, a patio pavilion, and shaded areas for programming; all of which will be
contained within a fenced perimeter, complete with a locked gate, lush landscape, and park sign with designated
use.

This project will be finished in two phases.

Phase One 2020:
• Phase one will include site survey, fence, cement and flat work, patio pavilion foundation, garden bed
foundation, courts/programming area foundation, entrance sign, turf, green space and exercise equipment.
Upon completion of this phase, senior citizens will have an outdoor recreation area immediately available for use.

Phase Two 2021:
• Phase two includes a covered patio/pavilion for permanent shade to the patio, a doorway leading into the Senior
Center, and the raised garden/flower bed
* Engineering for both phases will occur during phase one.
Total Project Funding is $213,007.25 with $149,734.75 from CBDG Bricks & Mortar Grant and $63,272.50 Township
General Fund

Timeline for Phase 1

Concept Idea (Ways and Means) January 15, 2020
Grant Applications Due to Macomb County: February 21, 2020
Grants Awarded: April/May 2020
Grant Agreement Executed: October/November 2020
Engineering Design & Bid Package: October 2020
Bid (MTTN):October/November 2020
Board Approval ‐ Bid Award: January 2021
Construction Start: April/May 2021 Construction End: August 2021

Project Status

Waiting for the formal Grant Agreement to be executed, expected Fall 2020. Remainder of timeline is on track and
progressing.
Jefferson Avenue Pathway (1024‐2020)
September 28, 2020                                                      Project Manager: Mitch O’Connor

Funding Source: GL# 101‐446‐970.000.                                    Phase: Bidding & Award
Estimated Project Budget: $241,531.00                                   Project Cost to Date: $15,924.50
Estimated Completion Date: Spring 2021

Project Details

This project is a pathway which will connect Sutton Drive to the existing path along the north side of the newly
constructed Salt River bridge. The recently restored right‐of‐way in this area does not provide a safe route for non‐
motorized travelers and necessitates the construction of a pathway.

This pathway includes a modular block retaining wall with guardrails. This retaining wall component is necessary
due to the grade changes immediately adjacent to the bridge.

Project Status

Project is currently advertised. The bid opening is October 8, 2020. This project is scheduled for Spring 2021
construction.

Change Orders
None.
Civic Center Bridge Construction (1027‐2020)
September 28, 2020                                                    Project Manager: Mitch O’Connor

Funding Source: GL# 101‐265‐975.000.                                  Phase: Design
Estimated Project Budget: $529,759.00                                 Project Cost to Date: $3,000.00
Estimated Completion Date: May 2021

Project Details

This project will replace the existing timber superstructure with a comparable timber structure. We will build the
proposed timber superstructure adjacent to the bridge to use as a temporary crossing while the existing
superstructure is removed. Once removed, the “temporary structure” will be relocated to the existing substructure
and secured for permanent use.

Project Status

Project is currently in the design phase.

Change Orders

None.
Civic Center Pavement Rehabilitation (1028‐2020)
September 28, 2020                                                      Project Manager: Mitch O’Connor

Funding Source: GL# 101‐265‐975.000                                     Phase: Design
Estimated Project Budget: $409,458.00                                   Project Cost to Date: $7,500.00
Estimated Completion Date: May 2021

Project Details

This project is for the existing surfaces be milled 2” with isolated full depth repairs where the pavement is showing
signs of base failure as well as a crush and shape for the main driveway with 4” HMA cap from Sugarbush to the
parking area. Using this approach and with proper maintenance the pavement should last another 10 years.

Project Status

Project is currently in the design phase.

Change Orders

None.
SPECIAL ASSESSMENT DISTRICT
      (SAD) REPORTS
  Progress Status Update as of 9.30.2020
Edgewater Paving SAD (1025‐2020)
September 28, 2020                                                     Project Manager: Mitch O’Connor

Funding Source: Edgewater Drive SAD                                    Phase: Bidding & Award
Estimated Project Budget: $395,891.00                                  Project Cost to Date: $21,008.24
Estimated Completion Date: Spring 2021

Project Details

Edgewater Drive is a paving Special Assessment Project which had Public Hearing No. 1 at the April 28 Township
Board meeting. The project petition has approximately 65% of the neighborhood in favor of the project. Edgewater
is a private road and therefore will be bid and awarded by the Township. The proposed improvement is a mill and
HMA cap of the existing roadway. The work does not include drainage or driveway repair.

Project Status

Project is advertised. The bid opening is scheduled for October 15, 2020. The project is scheduled for Spring 2021
construction.

Change Orders

None.
Roselawn Paving SAD
September 28, 2020                                                  Project Manager: Mitch O’Connor

Funding Source: Roselawn Paving SAD                        Phase: Construction/Execution
Estimated Project Budget: $254,980.00                      Project Cost to Date: $254,980.00
Estimated Completion Date: Fall 2020

Project Details

Roselawn Drive is a paving Special Assessment Project. This paving project is included with the MCDR 2020
Subdivision Reconstruction Program and therefore was bid and awarded as part of a larger county wide paving
program. The project includes complete county right‐of‐way drainage improvements, crushing and shaping the
existing pavement, and placing a 4” HMA cap.

Project Status

Construction on this project is 90% complete.

Change Orders

Pending.
BBUILDING
      UILDINGRREPORTS
                EPORTS
 ProgressStatus
Progress  StatusUpdate
                 Updateasasofof9.30.2020
                                8.31.2020
74             Single Family Residential Building Permits Processed this fiscal year.                                                                   10/5/2020
            6              Multi-Family Residential Building Perrmits Processed this fiscial year.
            26             Minor Commercial / Industrial Projects. (Interior Buildouts, remodel, miscellaneous improvements etc…)
           2846            Miscellaneous Permits Processed this fiscial year. (Fence, Windows, Roofs, Sheds, Plumbing, Mechanical etc…)

            _              April                      May                                    June                July                   August                September
     Single Family                                5                                     18                   2                  15                    14                               13
      Multi Family                                0                                      0                   0                      0                     0                             0
Commercial/Industrial                             1                                      1                   4                      3                     3                             2
     Miscellaneous                               56                                    306                 521                 477                   364                              450

PLAN REVIEW STAGE                                                                                                Milestone Dates

     Project Name                  Address                      Project Type                    Applied           Permit Issued          Final / C of O               Status

Home 2 Suites              29328 23 Mile Road         New Building (BLDG)                      9/19/2018                                                         Reviews In Process
                                                      New Building (ENG) Site                   3/2/2019           11/15/2017                                        approved
        4.11.2019          * Plan revisions submitted.
Village Of East Harbor     Kiely                      New Building (BLDG)                      11/22/2019                                                      Ready to issue 2/18/20
                                                      New Building (ENG)                       10/1/2019            2/18/2020                                 Review Completed 2/18/20
                                                      *Mult. Cottage Unit within PUD

Village of East Harbor     50900 Geering Dr           New Building (BLDG)                      11/15/2019                                                      Ready to issue 2/18/20
(Independent Living
                                                      New Building (ENG)                       10/1/2019            2/18/2020                                 Review Completed 2/18/20
Building)
Village Of East Harbor     33875 Kiely                Addition (BLDG)                          11/15/2019                                                      Ready to issue 2/18/20
(Addition to existing
                                                      Addition (ENG)                           10/1/2019            2/18/2020                                 Review Completed 2/18/20
Healthcare/wellness
                                                                                                                  Ftg Only Permit
Home Goods                 26303 Bayside Drive        New Building (BLDG)                       2/3/2020                                                         Review in Process
                                                                                                                      3/11/20
                                                      New Building (ENG)                        2/3/2020                                                         Review in Process
Dental Office              52840 Gratiot              New Building(BLDG)                       5/29/2020                                                       Ready to issue 4/27/20
Sadikoff Dentistry         09-17-227-017              New Building(ENG)                        5/29/2020                                                         Review in Process
Cabela's                   45959 Towne Center         Addition/Remodel(BLDG)                    6/2/2020                                                         Review in Process
                                                      Addition/Remodel(ENG)                                                                                             N/A
Gallo Companies            45301 Market Place         New Building(BLDG)                        6/4/2020                                                         Review in Process
Chesterfield Corner, LLC                              New Building(ENG)                        1/31/2020                                                         Review in Process
                                                      *3 Story 130 Unit Multi-Family
                                                      Apartment

Macomb Power Sports        46301 Gratiot              New Sales Facility(BLDG)                 8/30/2020                                                         Review in process

                                                      New Sales Facility(ENG)                  8/30/2020                                                         Review in process

Baeumont - Urgent Care     40900 Gratiot              Interior Buildout(BLDG)                   9/3/2020                                                         Review in process

                                                      Interior Buildout(ENG)                        N/A                                                                 N/A

Value City Furniture       50400 Gratiot              Interior Buildout(BLDG)                  9/11/2020                                                         Review in process

                                                      Interior Buildout(ENG)                        N/A                                                                 N/A

Attendant Care Services    32525 23 Mile Rd           Major Office Reno.(BLDG)                 8/18/2020                                                       Ready To Issue 10/1/20
Major Office Reno.(ENG)                    N/A                                                   N/A

Chesterfield Twp. PRV
                        55800 Gratiot           New Construction(BLDG)                   9/11/2020                                        Review in process
Station

                                                New Construction(ENG)              In-House Review                                         In House Review

CONSTRUCTION STAGE                                                                                    Milestone Dates
       Project Name             Address                   Project Type                   Applied        Permit Issued    Final / C of O         Status
Grace Assisted Living   29891 23 Mile Rd        New Building (BLDG)                      8/28/2017       10/30/2017        12/21/2018        Temp. C of O
                                                New Building (ENG) Site                  9/7/2017          1/2/2018                       Under Construction
           5.23.2019    Operating under a temporary Certificate of Occupancy * Site work under construction.
Serenity Village        47640 Gratiot           New Building (BLDG)                      7/14/2016        9/12/2016         7/6/2018         Temp. C of O
                                                New Building (ENG) Site                  6/6/2016         7/27/2016                       Under Construction
Presbyterian Village    33875 Kiely             Remodel (BLDG)                        11/16/2016          2/16/2017
                                                Remodel (ENG) Site                         N/A                 N/A           N/A                 N/A
Presbyterian Village    33875 Kiely             Addition (BLDG)                       11/16/2016          5/18/2017        4/24/2018         Temp. C of O
                                                Addition (ENG) Site                      10/4/2016         3/6/2017                       Under Construction
Olive Garden            27169 23 Mile Rd        New Building (BLDG)                   10/18/2018                        Temp 6/11/2020    Under Construction
                                                New Building (ENG) Site               11/15/2019           4/5/2019                            approved
           5.17.2019    * Preconstruction Meeting 3.27.2019 - Permit Issued 5.17.2019.
Tru Hotel               45301 Market Place      New Building (BLDG)                      2/20/2019        6/10/2019                       Under Construction
                                                New Building (ENG) Site                  1/16/2019        3/29/2019                            approved
           5.7.2019     * Precon meeting complete. Waiting for owner to pick up permit.
Town Place Suites       45255 Market Place      New Building (BLDG)                      2/11/2018        6/10/2019                       Under Construction
                                                New Building (ENG) Site                  7/24/2019        3/29/2019                            approved
           5.7.2019     * Precon meeting complete. Waiting for owner to pick up permit.

Schaller                29933 Commerce          Addition (BLDG)                          12/5/2018        6/19/2019     Temp 12/19/2019      Temp. C of O

                                                Addition (ENG) Site                      9/21/2018        6/19/2019                       Under Construction
           4.11.2019    * Engineering plans approvable - Water Main Easement Necessary.
Bj's Construction       46385 Contintental      New Building (BLDG)                      3/12/2019        6/25/2019                       Under Construction
                                                New Building (ENG) Site                    N/A                 N/A            N/A         Under Construction
           5.14.2019    * Ready to issue.
BJ's Warehouse          45101 Town Center       New Building (BLDG)                      3/14/2019        5/31/2019        7/14/2020      Under Construction
                                                New Building (ENG) Site                  3/27/2019                                        Under Construction
           4.9.2019     * Foundation / Sitework approvable - Soil Erosion & NPDES Permits Necessary - Ready to issue.
Fire Station 1          26001 22 Mile Rd        Addition (BLDG)                          8/13/2019        9/10/2019                       Under Construction
                                                Addition (ENG)                           8/13/2019                                        Under Construction
Best Buy                50400 Waterside         Interior Remodel (BLDG)                  1/8/2020         1/24/2020                       Under Construction
                                                Interior Remodel (ENG)                     N/A                                                   N/A
                                                Interior Reno/Expansion of
Turbo/Industrial        46460 Continental                                                12/3/2019        1/27/2020                       Under Construction
                                                Offices (BLDG)
(Reno & Mezzanine build-                        Interior Reno/Expansion of
                                                                                           N/A                                                   N/A
out)                                            Offices (ENG)
Burlington Coat Factory 50355 Waterside         New Building(BLDG)                       12/4/2019        2/12/2020                       Under Construction
                                                New Building (ENG)                    11/26/2019          2/12/2020                       Under Construction
Aldi                    50700 Waterside         New Building (BLDG)                      8/20/2019        4/22/2020                        Under Construction

                                                New Building (ENG)                       8/20/2019         3/2/2020                       Under Construction
                        *Review is completed,
Great Lakes Foot & Ankle 32743 23 Mile Rd          Interior Remodel (BLDG)                 12/11/2019      6/30/2020                        Under Construction

                                                   Interior Remodel (ENG)                     N/A                                                   N/A
                           32743 23 Mile Rd Ste.
Metro Vein                                         Interior Remodel (BLDG)                 12/11/2019      6/30/2020                        Under Construction
                           150
                                                   Interior Remodel (ENG)                     N/A                                                   N/A
Leo's Coney Island         51800 Gratiot           New Building(BLDG)                      4/15/2020    6/4/2020                            Under Construction
                           51848 Gratiot           New Building(ENG)                       4/15/2020                                       Ready to issue 4/27/20
Center For TLC             30330 Hickory           Addition(BLDG)                          5/19/2020    7/29/2020                           Under Construction
                                                   Addition(ENG)                              N/A                                                   N/A
Green Car Wash             45115 Market Place      New Building(BLDG)                       6/2/2020    7/15/2020                           Under Construction
                                                   New Building(ENG)                       5/12/2020                                        Under Construction
Arctic Circle Brewery      27663 23 Mile Rd        Interior Buildout(BLDG)                 3/23/2020    9/18/2020                           Under Construction
                                                   Interior Buildout(ENG)                     N/A                                                   N/A

Leo's Coney Island         51848 Gratiot           Interior Buildout(BLDG)                 8/17/2020    10/5/2020                            Review in Process

                                                   Interior Buildout(ENG)                     N/A                                                   N/A

Beaumont Hospital          50630 Chesterfield Rd   Interior Buildout(BLDG)                 8/17/2020    10/5/2020                            Review in process

Suite Buildout                                     Interior Buildout(ENG)                     N/A                                                   N/A

SE Michigan Vets. Factility Sugarbush              New Building (BLDG)                     3/18/2019                                         Review in process

                                                   New Building (ENG) Site                 1/29/2019                                           State Agency
         5.23.2019         * State of Michigan performing inspections and approvals.

COMPLETION / CERTIFICATE OF OCCUPANCY STAGE                                                             Milestone Dates
     Project Name                 Address                    Project Type                   Applied      Permit Issued    Final / C of O          Status
Kroger                     35000 23 Mile Rd        Remodel (BLDG)                          4/15/2018        7/6/2018        1/8/2019           C of O Issued
                                                   Remodel (ENG) Site                        N/A              N/A             N/A                  N/A
Meijer                     27255 23 Mile Rd        Remodel (BLDG)                          10/17/2017      12/7/2017       7/18/2018           C of O Issued
                                                   Remodel (ENG) Site                        N/A              N/A             N/A                  N/A
Genisys Credit Union       47930 Gratiot           New Building (BLDG)                      5/3/2018       6/27/2018       5/17/2019           C of O Issued
                                                   New Building (ENG) Site                 3/28/2018       5/17/2018       5/17/2019         Site Work Finaled
Storypoint                 51760 Gratiot           New Building (BLDG)                      5/8/2017       8/30/2017       7/15/2019           C of O Issued
                                                   New Building (ENG) Site                 4/20/2017       8/28/2017                         Site Work Finaled
Turri's Itialian Foods *   26750 23 Mile Rd        Remodel (BLDG)                          2/12/2019       2/15/2019       2/28/2019           C of O Issued
                                                   Remodel (ENG) Site                      7/23/2018       9/10/2018       2/28/2019         Site Work Finaled
Brico Properties           27089 Morelli Dr        New Building (BLDG)                     10/15/2018      10/25/2018      9/17/2019           C of O Issued
                                                   New Building (ENG) Site                   N/A              N/A             N/A                  N/A
Arnold Tool                48800 Structural Dr     New Building (BLDG)                     11/5/2018       3/15/2019       10/29/2019          C of O Issued
                                                   New Building (ENG) Site                  8/2/2018       1/11/2019       10/29/2019        Site Work Finaled
Comcast                    30036 Commerce          New Building (BLDG)                     3/22/2019        5/9/2019       12/9/2019           C of O Issued
                                                   New Building (ENG) Site                 3/22/2019        5/8/2019       12/9/2019         Site Work Finaled
         4.11.2019         *Preconstruction Meeting 5-1-2019 - Construction in progress.
MSGCU                      45120 Market Place      Major Renovations                        7/2/2019       7/26/2019        1/3/2020           C of O Issued
                                                   Renovations (ENG) Site                    N/A              N/A             N/A              Not Required