January 2022

Public Safety Director Brian Bassett is shown taking his Oath of Office at the January 11, 2022 Township Board of Trustees Meeting.

     Progress at a Glance
       PROGRESS AT A GLANCE PROVIDES A SHAPSHOT LOOK INTO THE ACTIVITIES OF YOUR
           MUNICIPAL GOVERNMENT, TOWNSHIP PROJECTS, AND SPECIAL SERVICES
Progress at a Glance - January 2022 - Chesterfield Township
TOWNSHIP UPDATE
JANUARY 2022

Upcoming Meeting Schedule
Planning Commission                   1/4, 1/18, 2/1, 2/15                           7:00 PM
Township Board                        1/11, 1/25, 2/8, 2/22                          7:00 PM
Zoning Board of Appeals (ZBA)         1/12, 1/26, 2/9, 2/23                          7:00 PM
Historical Society                    No January or February Meeting                 6:30 PM
Parks & Recreation Commission         1/26, 2/23                                     6:30 PM

Public Engagement: Looking Ahead

Township Offices closed January 17, 2022 for Martin Luther King Jr. Day.

Township Offices closed February 22, 2022 for Presidents Day.

Property Taxes are Due
Winter taxes are due February 14, 2022, and payable December 1 - February 14 without interest.

Chesterfield At Your Service Days
February 10, 2022 (4:30 - 7:30 PM)
March 24, 2022 (4:30 - 7:30 PM)
The team at Chesterfield Township is offering extended hours on two upcoming evenings. Multiple
departments will have staff available for you to chat and interact with.
The Clerk’s Office will be offering passport services by appointment only. To make an appointment please
register online at https://mi-chesterfieldtownship.civicplus.com/404/Events or call (586) 949-0400, opt. 5.

Leisure Services News
Visit Leisure Services online at parks.chesterfieldtwp.org for program availability and to register for events.
Park Rentals Begin February 1st For Residents
Rent our facilities beginning February 1st for residents and February 3rd for non-residents. Brandenburg Park is
open from Memorial Day through Labor Day and Pollard Park sport field rentals are available from April
through October. Call Leisure Services for more details.
Progress at a Glance - January 2022 - Chesterfield Township
Township Business

Notify Me Subscriptions
Click on the Notify Me button at chesterfieldtwp.org or follow the link below and sign up for Township-wide
notifications. It’s an incredibly easy way to keep up with what’s going on in our community!

There are three different options to choose from, Chesterfield Township News & Information, Emergency
Alerts, and Calendar Notifications.

Sign Up For Notify Me Today!

Go Paperless! Make Cost-Free Payments!
Paperless billing is now available for water bills through our vendor InvoiceCloud. As an added bonus, when
using InvoiceCloud and the BSA platform you are now able to make cost-free e-check* payments on tax and
water bills.

*e-check or electronic check is an automated withdrawal directly from your banking account. Fees may apply
for other payment methods.
Progress at a Glance - January 2022 - Chesterfield Township
TABLE OF CONTENTS

Project Management Reports
     1027-2020      Civic Center Bridge Construction

     1028-2020      Civic Center Pavement Rehabilitation

     1030-2021      Maurice DeMuynck Bay Harbor Pump Station Study

     1032-2021      Peggy Lane Water Main Project

     1033-2021      Jefferson Avenue Water Main Project - Phase 1

     1034-2021      2021 Sidewalk Program

     2022 Sidewalk GAP Program

     2022 Sidewalk GAP Program - Zone 1

     2022 Sidewalk Replacement Program

Special Assessment Districts (SAD) Reports

Building Reports

Monthly Service Metric Dashboard
Progress at a Glance - January 2022 - Chesterfield Township
January 2022

Project Management Reports
     Progress Status Update as of 12.31.2021
Progress at a Glance - January 2022 - Chesterfield Township
Maurice DeMuynck Anchor Bay Pump Station Study (1030-2021)
January 1, 2022                                                              Project Manager: Kevin J. Johnson

Funding Source: General Fund                              Phase: Complete
Estimated Project Budget: $162,097.00                     Project Cost to Date: $101,362.87
Estimated Substantial Completion Date: September 30, 2021

Project Details

The Maurice DeMuynck Anchor Bay Pump Station is in need of some overdue repairs and maintenance. While
Public Works has been maintaining the station to the best of its ability, there are some major maintenance and
repairs that need to be done that are beyond the scope of the department. We partnered with OHM Advisors to
create a package to bring to the board that can begin the overall assessment and recommendation of what needs
to be completed, and to create a capital improvement plan (CIP) that will help improve the station's functionality.
As of right now the station has four pumps on site, of which three are known to need a fair amount of
maintenance or replacement. The study will take roughly four months to complete.

Project Status

OHM Advisors, Public Works, and Engineering had a workshop on February 8 to discuss the project, as well as have
an on-site visit to the pump station to gather more information. A 360-degree walkthrough was created for the
building, giving a great depiction of the station and its operation.

Additional meetings were held to determine the potential configuration options of the four pumps currently in the
station. The meetings gathered information on the potential use of electric, diesel, or natural gas pumps in the
station.
Progress at a Glance - January 2022 - Chesterfield Township
A meeting was held with Detroit Pump on July 21 and it was determined that the entirety of the pump shaft and
column is beyond repair and will need to be fully replaced. The inspection of this shaft and column is the basis for
the condition of all four pumps. The Water and Sewer, Engineering, and Facilities & Operations Departments are
working together to determine the course of action to take on this station, as a replacement shaft and column has
a 30-week lead time for replacement.

Emergency backup plans are also being established in preparation for large rain events. A meeting scheduled for
October 5 will shed more light on the path of improvements and a determination on how to proceed with the
station moving forward.

Project report is complete and will be presented to the township board on January 11, 2022.

Change Orders

None
Progress at a Glance - January 2022 - Chesterfield Township
Peggy Lane Water Main Project (1032-2021)
January 1, 2022                                                     Project Manager: Kevin J. Johnson

Funding Source: Enterprise Fund                                Phase: Design
Estimated Project Budget: $2,179,500.00                        Project Cost to Date: $44,805.00
Estimated Completion Date: December 31, 2022

Project Details

The Peggy Lane Water Main Replacement Project includes replacing roughly 5,000 feet of water main
along the following roads:

           • Peggy Lane (Seaden to Sugarbush)
           • Short Court (off of Peggy Lane)
           • Seaden Drive (23 Mile to Bower Rd)

Project Status

A project kickoff meeting was held on April 23. OHM Advisors is currently beginning the design phase of
the project.

Design is currently 60% complete.

Meeting will be scheduled for January 2022 to go over design of project, make any necessary changes
before project goes out to bid in the first quarter of 2022.

Change Orders

None.
Progress at a Glance - January 2022 - Chesterfield Township
Jefferson Avenue Water Main Project – Phase 1 (1033-2021)
January 1, 2022                                                     Project Manager: Kevin J. Johnson

Funding Source: Enterprise Fund                                Phase: Design
Estimated Project Budget: $2,380,900.00                        Project Cost to Date: $52,035.00
Estimated Completion Date: December 31, 2022

Project Details

The Jefferson Avenue Water Main Replacement Project - Phase 1 includes the following water main
replacement:

        • Jefferson Avenue from William P Rosso Highway to 21 Mile Rd - Approximately 4,500 feet
        • Rosso Highway east of Jefferson Avenue - Approximately 1,000 feet

Project Status

A project kickoff meeting was held on April 23. OHM Advisors is currently beginning the design phase of
the project.

Design is currently 50% complete.

Meeting was scheduled for October 5 to go over design of project, OHM is making the necessary
changes before project goes out to bid during the first quarter of 2022.

Change Orders

None.
Progress at a Glance - January 2022 - Chesterfield Township
2022 Zone 1 Sidewalk Gap Program (23 Mile Road s. side – Fairchild
Rd. to Gratiot Ave.)
December 31, 2021                                               Project Manager: Mitch O’Connor

Funding Source: GL# 101-446-970.000.                            Phase: Design
Estimated Project Budget: $200,000.00                           Project Cost to Date: $0.00
Estimated Completion Date: Fall 2022

Project Details
Project will construct new sidewalks across developed, non-residential properties. Project is along south
side of 23 Mile Road – Fairchild Rd. to bus station on Gratiot Ave.

Per Township Ordinance, properties can choose to construct sidewalk. If not, Township Contractor will
construct sidewalk & Township will assess property owners.

Project Status
This project is currently in the design phase.

Change Orders
None.
2022 Sidewalk Gap Program
December 31, 2021                                              Project Manager: Mitch O’Connor

Funding Source: GL# 101-446-928.000.                           Phase: Design
Estimated Project Budget: $30,000.00                           Project Cost to Date: $9,000.00
Estimated Completion Date: Fall 2022

Project Details

Spalding DeDecker along with the Township personnel met with SEMCOG (Southeast Michigan Counsel
of Government) April 14, 2021 to discuss potential funding for future sidewalk gap closures and the
outcome of that meeting was that a planning level document was necessary to ensure that existing
sidewalk gaps are prioritized and funding applications completed within the application windows. This
study will utilize the Township’s Master Plan and prioritize projects by funding potential as well as
possible inclusion with the Township’s Sidewalk Replacement Program.

Project Status
This project is currently in the design phase.

Change Orders
None.
2022 Sidewalk Replacement Program
December 31, 2021                                                   Project Manager: Mitch O’Connor

Funding Source: GL# 101-446-928.000.                         Phase: Design
Estimated Project Budget: $400,000 ($300,000 assessable, $100,000.00 Township)
Project Cost to Date: $0.00                                 Estimated Completion Date: Fall 2022

Project Details

Area of work Zone 2 (see map)

This project is to remove and replace existing sidewalk that is rated a #5. Rating criteria is:

1. Lip Between Slabs
#5 - 1 Inch or More

2. Cracking in Slab
#5 - 2+ Cracks > 1/4 IN Wide length > 2FT

3. Cross Slope
#5 - Slope > 6%
4. Longitudinal Slope
#5 - Tilt >1IN per FT (>8.33%)

5. Surface of Slab Scaled
#5 - >25% Scaling > 1/4IN Deep

6. Water Ponding
#5 - Ponding ≥ 3/4IN Deep

Project Status

This project is currently in the design phase. Spalding DeDecker is completing field evaluations in Zone 2.

Change Orders
None.
January 2022

Building Reports
Progress Status Update as of 12.31.2021
149   Single Family Residential Permits Processed this fiscal year.                                                                                               1/11/2022
                                89   Multi-Family Residential Permits Processed this fiscal year
                                30   Minor Commercial/Industrial Projects (Interior Buildouts, Remodel, Miscellaneous Improvements ect…)
                              5006   Miscellaneous Permits Processed this fiscial yeat (Fence, Windows, Roofs, Sheds, Plumbing, Mechanical, Etc…)

-                                    Jan.                         Feb                               Mar.                    Apr.                    May               Jun.
Single Family                                                13                                 8                      39                       6                13                                         10
Multi Family                                                  0                                 0                       2                       0                29                                          0
Commercial/Industrial                                         1                                 2                       3                       4                 3                                          2
Total Permit:                                               268                               298                     359                     584               600                                        571

-                                    Jul.                         Aug.                              Sept.                   Oct.                    Nov.              Dec.
Single Family                                                 5                                10                       2                      14                28                                          9
Multi Family                                                 10                                 2                       0                      30                12                                          0
Commercial/Industrial                                         4                                 2                       2                       2                 2                                          3
Miscellaneous                                               433                               492                     420                     428               365                                        256

Plan Review Stage                                                                                             Milestone Dates
Project Name                         Address                      Project Type                      Applied           Permit Issued                 Final C/O         Status
Home 2 Suites                        29328 23 Mile Rd             New Building(Bldg)                   9/19/2018                                                                 Review in Process
                                                                  New Building(Eng)                      3/2/2019        11/15/2017                                                  Approved
4/11/2019 *Plan revision Submitted
Cabela's                    45959 Towne Center                    Addition/Remodel(Bldg)                   6/2/2020                                                          Ready for pick up 8/18/2021
                                                                  Addition/Remodel(Eng)                      N/A                                                                         N/A
*Re-submitting new Design
Gordon Foods              51630 Gratiot                           Remodel (BLDG)                        3/30/2021                                                      Review Complete, Permit Ready
                                                                  Remodel (ENG)                            N/A                                                                       N/A
Ascension St. Johns Health                                                                                                                                             Review in Process - Footing only
Center                               37000 26 Mile Rd             New Building (BLDG)                   8/10/2021                                                         permit issued 12/2/2021
                                                                  New Building(Eng)                     8/10/2021                                                            Review in Process
Faith Christian Church               46000 Gratiot                New Worship Hall                     11/19/2021                                                            Review in Process
                                                                  New Worship Hall                     11/19/2021                                                            Review in Process
National Research                    55911 Gratiot                Warehouse Add. (BLDG)                11/24/2021                                                            Review in Process
                                                                  Warehouse Add. (ENG)                     N/a                                                                       N/A
Dental Office                        50664 Waterside              Interior Bldg Out(BLDG)              11/30/2021                                                            Review in Process
                                                                  Interior Bldg Out(ENG)                   N/A                                                                       N/A
Vacant Industrial Bldg               30002 Commerce               New Industrial Bldg(BLDG)            11/30/2021                                                            Review in Process
                                                                  New Industrial Bldg(ENG)             11/30/2021                                                            Review in Process
LongHorn Steakhouse                  51295 Gratiot                Interior Bldg Out( BLDG)              12/3/2021                                                            Review in Process
                                                                  Interior Bldg Out (ENG)                  N/A                                                                       N/A

Construction Stage                                                                                            Milestone Dates
Project Name                         Address                      Project Type                      Applied            Permit Issued                Final C/O         Status
Tru Hotel                            45301 Market Place           New Building(Bldg)                    2/20/2019         6/10/2019                                             Under Construction
                                                                  New Building(Eng)                     1/16/2019         3/29/2019                                                  Approved
Town Place Suites                    45255 Market Place           New Building(Bldg)                    2/11/2018         6/10/2019                                             Under Construction
                                                                  New Building(Eng)                     7/24/2019         3/29/2019                                                  Approved
Great Lake Foot & Ankle              32743 23 Mile Rd             Interior Remodel(Bldg)               12/11/2019         6/30/2020                                             Under Construction
                                                                  Interior Remodel(Eng)                    N/A                                                                         N/A
Leo's Coney Island                   51848 Gratiot                Interior Remodel(Bldg)                8/17/2020         10/5/2020                                            Temp CofO 8/24/2021
                                                                  Interior Remodel(Eng)                    N/A                                                                         N/A
Gallo Companies                      45313 Market Place           New Building(Bldg)                     6/4/2020         10/8/2020                                             Under Construction
Chesterfield Corner, LLC                                          New Building(Eng)                     1/31/2020         9/28/2020                                             Under Construction
Villiage of East Harbor              Kiely                        New Building(Bldg)                   11/22/2019        11/24/2020                                             Under Construction
*Multi. Cottage Unit within PUD                                   New Building(Eng)                     10/1/2019         2/18/2020                                          Review Completed 2/18/20
Villiage of East Harbor              50900 Gerring Dr             New Building(Bldg)                   11/15/2019        11/24/2020                                             Under Construction
Independent Living Building                                       New Building(Eng)                     10/1/2019         2/18/2020                                          Review Completed 2/18/20
Villiage of East Harbor              33875 Kiely                  Addition(Bldg)                       11/15/2019        11/24/2020                                             Under Construction
(Additon to Existing
Heathcare/Wellness)                                               Addition(Eng)                         10/1/2019             2/18/2020                                  Review Completed 2/18/20
Monicatti Auto Sales                 55800 New Haven              New Building(Bldg)                    11/9/2020             11/25/2020                                     Under Construction
                                                                  New Building(Eng)                     11/9/2020             11/18/2020                                Review Completed 11/18/2020
                                                                  *In house Review
GT Auto                              54191 Gratiot                New Building(Bldg)                   10/21/2020              12/9/2020                                         Under Construction
*Multi-Unit Industrial Building                                   New Building(Eng)                                                                                                     N/A
Fitbody Boot Camp                    52396 Gratiot                Interior Remodel(BLDG)                1/8/2021               2/10/2021                                         Under Construction
                                                                  Interior Remodel(ENG)                    N/A                                                                          N/A
Clear Water Fresh Farm               50750 E. Russell Schmidt     Interior Remodel(BLDG)                1/8/2021               3/11/2021                                         Under Construction
                                                                  Interior Remodel(ENG)                    N/A                                                                          N/A
Prestige Commons                     33503 23 Mile Rd             Addition (BLDG)                       3/4/2021                   8/3/2021                                      Under Construction
                                                                  Addition (ENG)                        3/4/20201                                                                Under Construction
Motor City Stamping                  47783 Gratiot                New Building(Bldg)                    7/1/2021               7/13/2021                                         Under Construction
                                                                  New Building(Eng)                     7/1/2021                                                                 Under Construction
Chesterfield Laundromat              45429 Market Place           Interior Build-Out(Bldg)              6/25/2021              7/29/2021                                         Under Construction
                                                                  Interior Build-Out(Eng)                  N/a                                                                          N/A
Maxi Mini Storage                    47555 Gratiot                New Building(Bldg)                    6/19/2021              8/27/2021                                         Under Construction
                                                                  New Building(Eng)                     6/19/2021                                                                    Approved
New Restaurant                       27801 23 Mile Rd             Remodel (BLDG)                        9/13/2021              9/29/2021                                         Under Construction
                                                                  Remodel (ENG)                            N/A                    N/A                                                   N/A
23 Mile Senior                       31150, 31244, 31260          New Building(Bldg)                    9/23/2020              10/7/2021                                         Under Construction
Apartments                           23 Mile Rd                   New Building(Eng)                     9/23/2020                                                                Under Construction
HP Plaza                             30464 23 Mile Rd             Interior Remodel(BLDG)               10/25/2021             11/23/2021                                         Under Construction
                                                                  Interior Remodel(ENG)                    N/A                                                                          N/A
Completion / Certificate of Occupancy Stage                                                                       Milestone Dates
Project Name                    Address                           Project Type                          Applied           Permit Issued    Final C/O       Status
Burlington Coat Factory         50355 Waterside                   New Building(Bldg)                        12/4/2019         2/12/2020       2/19/2021                C of O Issued
                                                                  New Building(Eng)                        11/26/2019         2/12/2020       2/19/2021             Site Work Finaled
Beaumont Hospital               50630 Chestefield Rd              Interior Buildout(Bldg)                   8/17/2020         10/5/2020       3/2/2021                 C of O Issued
Suite Building Out                                                Interior Buildout(Eng)                       N/A               N/A          3/2/2021                      N/A
Beaumont - Ugrent Care          50964 Gratiot                     Interior Buildout(Bldg)                    9/3/2020        11/24/2020       3/2/2021                 C of O Issued
                                                                  Interior Buildout(Eng)                       N/A                                                          N/A
Green Car Wash                  45115 Market Place                New Building(Bldg)                         6/2/2020         7/15/2020      5/10/2021                 CofO issued
                                                                  New Building(Eng)                         5/12/2020                        5/10/2021              Site Work Finaled
Savvy Sliders                   27830 23 Mile Rd.                 New - Interior Build out (BLDG)           3/24/2021         4/13/2021        5/25/2021               C of O issued
                                                                  New - Interior Build out (ENG)               N/A                                                          N/A
Fire Station 1                  26001 22 Mile Rd                  Addition(Bldg)                            8/13/2019         9/10/2019      6/18/2021                 CofO issued
                                                                  Addition(Eng)                             8/13/2019                                                       N/a
Arctic Circle Brewery           27663 23 Mile Rd                  Interior Remodel(Bldg)                    3/23/2020         9/18/2020      6/4/2021                  CofO issued
                                                                  Interior Remodel(Eng)                        N/A                                                          N/A
Home Goods                      26303 Bay Vista Drive             New Building(Bldg)                         2/3/2020         9/26/2020      6/28/2021                 CofO issued
                                                                  New Building(Eng)                          2/3/2020         9/29/2020      6/28/2021              Site Work Finaled
Grace Assisted Living           29891 23 Mile Rd                  New Building(Bldg)                        8/28/2017        10/30/2017     12/21/2018                 CofO issued
                                                                  New Building(Eng)                          9/7/2017          1/2/2018      8/23/2021              Site Work Finaled
          5/23/2019             Operating under a Temporary Certificate of Occupancy *Site work under Construction
Leo's Coney Island              51800 Gratiot                     New Building(Bldg)                        4/15/2020        6/4/2020        8/11/2021                 CofO issued
                                51848 Gratiot                     New Building(Eng)                         4/15/2020                        8/11/2021              Site Work Finaled
Attendant Care Services         32525 23 Mile Rd                  Major Office Reno.(Bldg)                  8/18/2020       10/6/2020        8/13/2021                 CofO issued
                                                                  Major Office Reno.(Eng)                      N/A                                                        N/A
Macomb Power Sports             46301 Gratiot                     New Sales Facility(Bldg)                  8/30/2020       10/9/2020        8/31/2021                 CofO issued
                                                                  New Sales Facility(Eng)                   8/30/2020       9/25/2020        8/31/2021              Site Work Finaled
Kohl's                          50500 Gratiot                     Interior Remodel(BLDG)                    2/17/2021          3/24/2021        9/6/2021               CofO issued
                                                                  Interior Remodel(ENG)                        N/A                                                        N/A
Viscount Pools                  27659 23 Mile Rd                  New - Interior Build out (BLDG)           3/25/2021       5/19/2021           9/7/2021               CofO issued
                                                                  New - Interior Build out (ENG)               N/A                                                        N/A
Chesterfield Twp. PRV           31000 Concordia                   New Construction(Bldg)                    9/11/2020       9/25/2020        9/23/2021                 CofO issued
Station                         55800 Gratiot                     New Construction(Eng)                  In-House Review                                            In House Review
Serenity Village                47640 Gratiot                     New Building(Bldg)                        7/14/2016       9/12/2016        11/4/2021                 CofO issued
                                                                  New Building(Eng)                          6/6/2016       7/27/2016        11/4/2021              Site Work Finaled

Bayview Medical                 32743 23 Mile Rd Ste. 150 Remodel & Tank Install(BLDG)                        2/8/2021       2/25/2021         11/8/2021              CofO issued
                                                                                                                           2/2/21 Admin
                                                                  Remodel & Tank Install (ENG)               2/2/2021         Approval         11/8/2021            In House Review
Evident Church                  52101 Gratiot                     Addition (BLDG)                            3/15/2021       5/18/2021       10/13/2021                 CofO issued
                                                                  Addition (ENG)                             3/15/2021       5/18/2021       10/13/2021             Site Work Finaled
Dental Office                   52840 Gratiot                     New Building(Bldg)                         5/29/2020       10/7/2020      11/10/2021                  CofO issued
Sadikoff Dentistry              09-17-227-017                     New Building(Eng)                          5/29/2020       10/7/2020      11/10/2021              Site Work Finaled
US Mattress                     51405 Gratiot                     Build-Out(BLDG)                            5/12/2021       7/28/2021       11/26/2021                 CofO issued
                                                                  Build-out(ENG)                                N/A                                                         N/a
SE Michigan Vets Facility       Sugarbush                         New Building(Bldg)                         3/18/2019                                                 State Agency
                                                                  New Building(Eng)                          1/29/2019                                                 State Agency
                      5/23/2019 *State of Michigan Performing Insecptions and Approvals
January 2022

Monthly Service Metric Dashboards
         Progress Status Update as of 12.31.2021
(Goal 1) Chesterfield strives for a safe and desirable community with common
                                sense enforcement.
   ( Chesterfield Township is committed to being a community that focuses on the health, safety, and
                                  welfare of the residents it serves. )

                                # of Water Main Breaks                           0
                         Township Pathway / Sidewalk Project                     2
                          # of Code Enforcements Completed                      135

(Goal 2) Chesterfield works to promote sustainable growth while protecting and
                        enhancing its existing character
( Chesterfield Township will focus on preserving the open greenspace as well as creating character that is
                                         unique to Chesterfield. )

                               Active Residential Meters                       15062
                                Inspections Completed                           759
                               Residential Permits issued                       205

(Goal 3) Chesterfield works to provide engaging community activities for all ages
                    that are safe, convenient, and affordable.
  ( Chesterfield Township will focus on creating programs where residents of all ages can participate
during the year, close to their homes, and affordable. The township will also ensure that residents have
                           quality parks and open space to enjoy year-round. )

                   # of in "House" League Play (Baseball, Basketball,
                                Kickball, Cornhole, etc..)                      1706

                          # of Community Programs Offered                        25
                  # of Families interested in Leisure Service offerings        19,050
(Goal 4) Chesterfield works to provide sustainable, consistent, high quality
       services while protecting our environment and natural resources.
( Chesterfield Township will focus on current infrastructure and future needs of the community to make it
    sustainable for the long term and will continue to provide township services to the residents at an
                                             affordable rate. )

                               # of Passports Processed                          72
                            # of Passport Photos Processed                       73
                              # of Paperless Water Billing                      2231

   (Goal 5) Chesterfield strives to keep residents, visitors, and employees well
          informed with an accurate, effective, and consistent message.
   ( Chesterfield Township will work at increasing communication to our residents, stakeholders, and
 employees and will focus on clear, precise, messaging as well as creating a brand for our community in
                                  which everyone can simulate with. )

                     # of Social Media Followers for Parks & Rec.              12,305
                          # of Township Facebook Followers                     11,799
                   # of People reaching out on Township Facebook
                                         Page                                   813

 (Goal 6) Chesterfield strives to maximize utility within our monetary resources
                       protecting the citizen’s investments.
  ( Chesterfield Township will continue to concentrate on transparency with the tax-payers money and
investments and will focus on creating trust and confidence in the residents it serves while maintaining a
                                          competitive tax base. )

                   # of Agenda Items Processed for Board Meetings               31
                           # of Public Bid Opens Completed                       0
                               # of Reviewed Appraisals                         80
                          # of Property Transfers Processed                     139
Accident Locations

Incident Locations
Comp Hours earned to date:
Patrol:  4654.26 Dispatch: 1612.25
Comp Hours earned this period:
Patrol:  489.34     Dispatch: 124

**Overtime not yet approved is not reflected in this report.