The Regional Municipality of Niagara Public Information Centre #1 Summary Report York Road and Four Mile Creek Road Municipal Class Environmental Assessment Thursday, April 15, 2021 B001271 CIMA+ Contact 400-3027 Harvester Road Phil Weber, P.Eng. Burlington, ON L7N 3G7 phil.weber@cima.ca T 289 288-0287 F 289 288-0285 T 905 697-1005 ext. 6732 cima.ca
PIC #1 Summary Report – York Rd. and Four Mile Creek Rd. MCEA The Regional Municipality of Niagara PIC #1 Summary Report York Road and Four Mile Creek Road Municipal Class Environmental Assessment Project no. B001271 PREPARED BY: Elysia Friedl VERIFIED BY: Phil Weber, P.Eng. | B001271 i
PIC #1 Summary Report – York Rd. and Four Mile Creek Rd. MCEA Table of Contents 1 Introduction ............................................................................................................. 1 2 Project Team ........................................................................................................... 1 3 Notice of Public Information Centre #1 ................................................................. 1 4 Summary of PIC #1 ................................................................................................. 2 5 Summary of Comments and Responses .............................................................. 3 6 Conclusion .............................................................................................................. 7 List of Figures Figure 1: Map Showing the EA Study Area and Consultation Area ................................. 2 List of Appendices Appendix A: Notice of PIC #1 Appendix B: PIC #1 Presentation Slides Appendix C: Comment Forms | B001271 ii
PIC #1 Summary Report – York Rd. and Four Mile Creek Rd. MCEA 1 Introduction CIMA Canada Inc. (CIMA+) was retained by the Regional Municipality of Niagara (Region) to conduct a Municipal Class Environmental Assessment (EA) Study for the proposed intersection improvements at York Road (Regional Road 81) and Four Mile Creek Road (Regional Road 100). As part of this EA study, the project team held the first Virtual Public Information Centre (PIC) on Thursday March 25, 2021. The purpose of this report is to summarize the PIC and the comments received from the public and other stakeholders. 2 Project Team The following key project members attended the PIC and assisted in answering some of the inquiries: Niagara Region: • Maged Elmadhoon, Project Manager • Sulaf Alkarawi, Associate Director of Transportation Systems and Planning • Scott Fraser, Transportation Lead GO Implementation Office Town of Niagara-on-the-Lake • Mike Komljenovic, Supervisor of Engineering CIMA+: • Phil Weber, Project Manager • Stephen Keen, EA Coordinator 3 Notice of Public Information Centre #1 A Notice of PIC #1 was prepared to inform the public, agencies, stakeholders, and Indigenous Communities of the opportunity to review the project and provide input to the project team. The Notice of PIC #1 outlined the purpose of the meeting and identified the time, date, and format for the PIC. The Notice invited public comments on the study by either attending the virtual PIC or contacting the project team via an online comment form or email. The Notice was posted on the project webpage on the Region’s website and advertised in “Niagara This Week” and the “Niagara-on-the-Lake Local” for two consecutive weeks on March 11, 2021 and March 18, 2021. The Notice was also emailed to agencies, stakeholders, interested residents, Indigenous Communities and property owners within | B001271 Page 1 of 7
PIC #1 Summary Report – York Rd. and Four Mile Creek Rd. MCEA the Consultation Area as shown in Figure 1. A copy of the Notice is included in Appendix A. Figure 1: Map Showing the EA Study Area and Consultation Area 4 Summary of PIC #1 The PIC was held virtually on Zoom on Thursday March 25, 2021 from 6:00 PM to 8:00 PM. The format of the PIC was a live presentation provided, followed by a question-and- answer session. A copy of the PIC presentation slides is provided in Appendix B, and a summary of the key themes covered were: • Welcome and Introduction • Housekeeping Items • Format and Purpose of PIC #1 • Introduction of the Key Project Team Members • The Municipal Class EA Process • The Consultation Process • The Problem and Opportunity Statement • Land Use and Environment | B001271 Page 2 of 7
PIC #1 Summary Report – York Rd. and Four Mile Creek Rd. MCEA • Existing Transportation • Traffic Signal Concept • Roundabout Concept • Pedestrian and Cyclist Facilities at Roundabouts • Pedestrian Experience at Intersections • Pedestrian Safety at Roundabouts • Pedestrian Security at Roundabouts • Pedestrian Accessibility at Roundabouts • Traffic Signals vs. Roundabouts • Next Steps • How You Can Get Involved • Questions Eighteen (18) people signed into the Zoom presentation. The PIC was recorded, and all presentation materials were posted on the project webpage on the Region’s website. 5 Summary of Comments and Responses All comments received from the presentation were noted and a comment form was posted on the project webpage. Comment forms received by the project team are provided in Appendix C. The public was encouraged to provide input as this would be important in the evaluation process for the alternatives. While comments were always welcomed from the project team, comments specific to PIC #1 were requested to be submitted by April 8, 2021 to allow the project team to review and respond accordingly. The following provides a summary of the key comments and questions received during the PIC process, and the project team responses. Comment / Question Project Team Response Traffic Operations / Road Safety Opportunity for potential bus routes in The team has reached out to the Region's the future. transportation division, and there are no current plans for expansion of mass transit to this area; however, transit is being considered as part of the design process. Concerns about traffic loading at the Both alternatives under consideration, traffic intersection. signals and a roundabout, will be able to | B001271 Page 3 of 7
PIC #1 Summary Report – York Rd. and Four Mile Creek Rd. MCEA Comment / Question Project Team Response handle current and future traffic volumes at the intersection with no issues. Concern regarding truck traffic from Both York Road and Four Mile Creek Road businesses in the area. are Regional Roads, so they must remain open to truck traffic. Many concerns around speeding in This has been noted by the project team and the area if the roundabout is the preferred alternative, it will help to slow traffic down in the vicinity of the intersection. Concerns around drivers turning into The project team will look into a right-turn the St. Davids golf course and lane to help avoid these types of collisions. causing vehicle accidents. Inquiries on potential widening of There are currently no plans to widen York York Road and / or Four Mile Creek Road or Four Mile Creek Road. Road. Concerns regarding vehicles turning Given the distance between Warner Road off of Warner Road; will there be and York Road (about 200 m), the availability sufficient gaps in traffic to turn. of gaps in the traffic stream on Four Mile Creek Road should not change with a change from all-way stop control to traffic signals or a roundabout. Inquiries on how traffic data was Traffic volumes were collected by automatic collected. traffic recorders (the black rubber hoses left across the road for a few days), and through a turning movement count (where someone is physically at the intersection during the peak hours). Interest in discouraging larger trucks Both York Road and Four Mile Creek Road from using this intersection. are Regional Roads, so they must remain open to truck traffic. Consideration for Fire Hall / The project team has reached out to emergency response times. emergency services and will be sure to consider any impacts on response times. In other areas in Ontario, specifically Waterloo | B001271 Page 4 of 7
PIC #1 Summary Report – York Rd. and Four Mile Creek Rd. MCEA Comment / Question Project Team Response Region which has a lot of roundabouts, there has been no issues of roundabouts impacting response times. Concern around tourists using the The project team will ensure that appropriate roundabout. signage is in place to help tourists navigate the roundabout, should it be the preferred alternative. Concern regarding the sightlines from Elimination of the existing channelized right- Paxton Lane. turn lane at the Four Mile Creek Road intersection should help, as it should slow turning traffic. The team will also look into a right-turn lane into Paxton Lane. Pedestrian Safety Concern for pedestrian safety The project team is aware of the pedestrian especially children going to and from traffic in the area and are ensuring the elementary school west of the pedestrian safety is a high priority of this intersection and a discussion around study. If a roundabout is the preferred an education and awareness alternative, the Region will ensure there is an campaign for residents and educational campaign for the residents in the especially the elementary school. area to ensure the safe use of a roundabout Pedestrian traffic seems to be for both pedestrians and drivers. significant if this area. Active Transportation Length of potential new sidewalks; Active transportation is a key feature of this ensure connectivity to new study and the project team is looking to subdivision near Concession 3 Road. improve the connectivity to the new subdivision. Interest in Bike Lanes on York Road. The project team is investigating this as part of the evaluation. Consultation Area Inquiries as to why the elementary The Study Area is limited to the functional school was not included within the area of the intersection, approximately 250m Study Area. in all directions except to the east where it | B001271 Page 5 of 7
PIC #1 Summary Report – York Rd. and Four Mile Creek Rd. MCEA Comment / Question Project Team Response includes Concession 3 Road. Inquiries regarding the Consultation The Consultation Area was expanded north Area extending north, but not south. to account for the new developments that are currently underway and to ensure connectivity to these areas. Aesthetics / History of Area Interest in what the centre of the The project team is discussing different roundabout could include and options that could be used if a roundabout is potential landscaping options. selected as the preferred alternative. Options include a garden, monument, plaque, etc. Concerns around the two gardens at The project team is aware of the gardens the intersection – Pollinator Garden and will consider the impacts as the design on southeast corner and lavender progresses. garden in front of Avondale Food Stores. Concern over the impact of the The project team has a subconsultant historical sites present in the Study undertaking an Archaeological and Area. Cultural/Built Heritage Assessment. The team has also contacted the Ministry to ensure all areas of historical significance are protected. Construction Impacts Impacts to businesses, residents and The Region will ensure no driveways are Churches during construction – blocked during construction. driveways being blocked etc. Timeline of construction. This is not known yet. Cost of Project Consideration for budget to fix tire The project team will design the intersection marks from large trucks turning and to work for all vehicle types so this should not leaving the roadway leaving marks in be an issue. the grass. | B001271 Page 6 of 7
PIC #1 Summary Report – York Rd. and Four Mile Creek Rd. MCEA Comment / Question Project Team Response Clarification on whether the Town or The Region will pay for the construction of the Region will be paying for the new sidewalks; however, the Town will sidewalks in the area. maintain them once they are built. Other Comments Concern regarding the cemetery at The project team is currently in the process the St. Davids Queenston United of investigating this and will ensure that there Church and how the project could are no impacts to any burial area. encroach on this property especially any sidewalks. Inquires regarding the amount and If the roundabout is the preferred alternative, size of signage for the roundabout appropriate signage will be a part of the option. design to warn drivers. However, efforts will be made to limit the number and size of signs where possible (yet still maintain their effectiveness) out of respect for the area. Consideration for buying the The project team has noted this and will overhead utility lines. investigate its feasibility. Inquiry regarding the culvert under The project team is looking into this as the York Road and if it will need to be design progresses. replaced. 6 Conclusion The PIC was an opportunity to hear comments from the public on the existing conditions, problems identified within the study area and alternative planning solutions. All comments received will be reviewed by the project team and considered in the selection of the preferred solution. A second PIC is planned for late spring 2021 to present and receive feedback for the preliminary preferred alternative and associated design concepts. | B001271 Page 7 of 7
A Appendix A: Notice of PIC #1
Notice of Virtual Public Information Centre #1 Municipal Class Environmental Assessment for York Road and Four Mile Creek Road Intersection Improvements, St. Davids, Ontario The Study The intersection of Regional Road 81 (York Road) and Regional Road 100 (Four Mile Creek Road) is located in the heart of the community of St. Davids in the Town of Niagara-on-the-Lake. The intersection is currently controlled by an all-way stop, and during peak periods motorists experience high delays. The skewed angle of the intersection also creates vehicle safety issues, while there is an opportunity to improve pedestrian and bicycle facilities for the intersection and vicinity. The study area is shown below. The Regional Municipality of Niagara is undertaking a Municipal Class Environmental Assessment (EA) to address and improve conditions for all modes of transportation. The MCEA schedule will be determined when the study team confirms the potential cost of alternative implementation. This study will evaluate the need for additional transportation capacity, improve street lighting and illumination, enhance transit and active transportation through improved sidewalk connections and better pedestrian and cyclist facilities, conform to a complete streets approach, and strengthen the area’s relationship with its past. You are invited to participate! A key component of this study is public, agency, Indigenous, and stakeholder consultation. Two (2) virtual Public Information Centres (PICs) will be held to present the study findings and obtain public input. The first PIC will be held in an online format. As part of this event, the Study Team will deliver an online presentation followed by a Q&A on March 25, 2021 between 6:00 pm and 8:00 pm to provide members of the public and stakeholders with an opportunity to review the study background, existing conditions, problems and opportunities, alternative solutions, and the next steps in the study.
Information about the Online Public Information Centre #1 will be available on the project webpage starting March 25, 2021, and comments will be welcomed through one of the project managers below, until April 8, 2021. https://www.niagararegion.ca/projects/regional-road-100/default.aspx Stay Connected! If you would like to receive future notices via email, or if you have any questions or comments, please contact one of the project managers identified below: Maged Elmadhoon, M.Eng., P.Eng. Phil Weber, M.Eng., P.Eng. Manager, Transportation Planning Senior Project Manager Regional Municipality of Niagara CIMA+ 1815 Sir Isaac Brock Way 500 – 5935 Airport Rd. Thorold, ON L2V 4T7 Mississauga, ON L4V 1W5 Phone: 905-980-6000, ext. 3583 Phone: 905-695-1005, ext. 6732 Maged.ElMadhoon@niagararegion.ca Phil.Weber@cima.ca Under the Freedom of Information and Protection of Privacy Act and the Environmental Assessment Act, unless otherwise stated in the submission, any personal information such as name, address, telephone number and property location included in a submission will become part of the public record files for this matter and may be released, if requested, to any person. This notice was first issued on March 11, 2021
B Appendix B: PIC #1 Presentation Slides
WELCOME! Online Public Information Centre #1 York Road and Four Mile Creek Road Intersection Improvements Municipal Class Environmental Assessment Thursday March 25, 2021 Live Presentation 6:00 PM – 8:00 PM
Housekeeping Items • When joining the online meeting, we request that you please turn off your microphone and camera • There will be an opportunity at the end of the presentation to ask any questions or submit comments • This presentation is being recorded and will be posted on the project webpage following this meeting • In case you would like to submit your feedback later, the presentation materials and an online Comment Form are available on the project webpage: https://www.niagararegion.ca/projects/regional-road-100/default.aspx
Public Information Centre #1 Format for PIC #1 • Project team introductions • Presentation of PIC materials • Question and answer session Purpose of PIC #1 • To introduce the study to the public • To present reasoning for the study, current conditions and alternative solutions • To receive public input
Key Project Team Project Manager Project Manager Maged Elmadhoon Phil Weber Associate Director of Project Director/Lead EA Coordinator Transportation Systems & Planning Stephen Keen Sulaf Alkarawi
The Municipal Class EA Process • A Municipal Class EA is a planning and design process approved by the Ministry of Environment, Conservation and Parks (MECP) to meet the requirements of the Ontario Environmental Assessment (EA) Act, which has the phases depicted in the figure below • Either a Schedule ‘B’ or ‘C’ EA process will be selected once the impacts of the alternatives are more clearly defined Notice of Study Commencement Notice of Study January 2021 We are here PIC #2 Completion Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 • Identification • Alternative • Selection of • Environmental • Implementation of Problem Solutions Preliminary Study Report of Preferred and/or Identified Preferred (Schedule C) or Solution Opportunity Solution & Project File Alternative (Schedule B) – Design 30-day Concepts comment period
The Consultation Process • Notices were advertised in “Niagara This Week” and the “Niagara-on-the-Lake Local” on two consecutive weeks • Notices were also mailed to property owners within the consultation area depicted on the figure to the right • Notices were also emailed to all agencies, Indigenous Communities, special interest groups and interested persons • This Virtual PIC #1 is being hosted today to meet the requirements of the Municipal Class EA Process, and an additional PIC will be held at a later date to review the preferred solution and design concepts
Problem/Opportunity Statement Problems Opportunity • The intersection currently experiences some • Niagara Region is undertaking a Municipal peak hour capacity issues, which will Class EA to identify an implementation increase as traffic volumes grow strategy for the transportation infrastructure • The study area needs better pedestrian and requirements for the subject intersection cyclist facilities • This study will evaluate the need for • The location is listed under the Intersection additional transportation capacity, improve Improvement Program in the Region’s street lighting and illumination, enhance Transportation Master Plan (TMP) transit and active transportation through improved sidewalk connections and better pedestrian and cyclist facilities, conform to a complete streets approach, and strengthen the area’s relationship with its past
Land Use and Environment Old barn The Old Firehall restaurant Canada Post Ravine Vineyard Estate Winery St Davids Dental Four Mile Creek First Presbyterian Church St Davids Lions Park St Davids Queenston United Church Bloom & Co./Niagara-on-the-Lake Realty Vineyard Square development Avondale Food Stores
Existing Transportation Intersection is an all-way stop 20 m ROW and 50 km/h speed limit on York Rd. Narrow 16 m ROW and 50 km/h speed limit on Four Mile Creek Rd. Sidewalks transition to asphalt shoulders 65 m north of intersection No crosswalk on north leg of intersection, and no sidewalk on north side of York Rd. Sidewalk on south side of York Rd. only, east of intersection to United Church Sidewalks are narrow and close to road south of intersection
Traffic Signal Concept • Add traffic signals, left- turn lanes and medians on all approaches • Eliminate channelized right-turn lanes on southeast and southwest corners
Roundabout Concept • Install a roundabout with single-lane entries and exits • Diameter would be about 40 m, smaller than the roundabout on Niagara Stone Rd. and Concession 6 Rd.
Pedestrian/Cyclist Facilities at a Roundabout Regulatory crosswalk signs (may be supplemented with pedestrian- actuated rapid flashing beacons overtop) Zebra crosswalk markings Yield-to-pedestrian line (indicates where drivers are to stop for pedestrians, and cyclists walking their bikes) Share the lane with cyclists or “sharrow” marking Ramp to sidewalk, so that cyclists who don’t want to ride through the roundabout can walk around the outside using the sidewalks and crosswalks
Pedestrian Experience at Intersections • There are four components of the pedestrian experience at intersections Statistical Level Feeling of Safety Level of Convenience of Safety (Security) Accessibility
Pedestrian Safety at Roundabouts • Statistically, roundabouts (especially single-lane) are safer for pedestrians than traffic signals • This is because • Traffic speeds are lower, giving pedestrians and drivers more time to judge gaps and react to each other • The crossing distance is less • Pedestrians need only watch for traffic in one direction at a time • Drivers are more likely to be looking in the direction of pedestrians, instead of up at signals or left while turning right
Pedestrian Security at Traffic Signals • However, pedestrians often feel safer at intersections with traffic signals because of the pedestrian signals • This feeling of safety (security) happens when the signals tell them it’s “safe” to cross • Most crashes involving pedestrians occur when drivers turn left or right across the crosswalk while the pedestrian has a Walk indication
Pedestrian Accessibility at Roundabouts • Not everyone is comfortable finding or creating a gap in traffic in order to cross at a roundabout • Seniors can find this difficult • Children may not have the experience or confidence • Pedestrians with vision loss can find roundabouts even more difficult to navigate • Roundabouts can be made more accessible by ensuring they have tactile walking surface indicators and, if necessary, by installing rapid flashing beacons overtop the crosswalk signs
Traffic Signals vs. Roundabouts Typical advantages of signals over Typical advantages of roundabouts roundabouts over signals • Lower construction costs • Lower life cycle costs • Requires less property at an intersection • More efficient for motorists (especially during • May be perceived to be safer for pedestrians off-peak hours) and cyclists (security) • Lower traffic speeds • More accessible to persons with vision loss • Lower vehicle noise, fuel consumption and emissions • Statistically safer for motorists and pedestrians • Provides streetscaping opportunities
Next Steps • Review comments received from this PIC • Complete technical studies (environmental impact study, Cultural Heritage Report, Archaeological Report) • Select a preliminary preferred alternative • Develop design concepts for the preliminary preferred concept • Continue to meet with Stakeholders and Agencies • Present the preliminary preferred solution and the design concepts at PIC #2 in late spring 2021
How You Can Get Involved • Ask questions or discuss issues with the Project Team following this presentation • Request to be added to the project contact list to receive future project Notices • Attend PIC #2 – late spring 2021 • Please submit any comments using a Comment Form available on the project webpage by April 8, 2021 • Visit the project webpage for more information: https://www.niagararegion.ca/projects/regional-road-100/default.aspx
Questions? Maged Elmadhoon, M.Eng., P.Eng. Phil Weber, M.Eng., P.Eng. Manager, Transportation Planning Senior Project Manager Regional Municipality of Niagara CIMA+ Phone: 905-980-6000, ext. 3583 Phone: 905-695-1005, ext. 6732 Maged.ElMadhoon@niagararegion.ca Phil.Weber@cima.ca
C Appendix C: Comment Forms
Municipal Class Environmental Assessment for York Road and Four Mile Creek Road Intersection Improvements, St. Davids, Ontario Public Information Centre #1 - Thursday March 25, 2021 COMMENT SHEET COMMENTS My preference is for a mini-roundabout. I think that considerable public education will be required to fully ensure proper usage of the roundabout. This will be necessary for both motorists and pedistrians/cyclists Has a survey been undertaken regarding pedestrian usage? From a general observation pedestrian usage from the Avondale area to the Canada Post Office seems significant. Please return completed comment sheet to one of the Project Managers below by April 8th, 2021 Maged Elmadhoon, M.Eng., P.Eng. Phil Weber, M.Eng., P.Eng. Manager, Transportation Planning Senior Project Manager Regional Municipality of Niagara CIMA+ Phone: 905-980-6000, ext. 3583 Phone: 905-695-1005, ext. 6732 Maged.ElMadhoon@niagararegion.ca Phil.Weber@cima.ca PLEASE PRINT CLEARLY Name: Redacted for Privacy Address: Email: Postal Code:
Municipal Class Environmental Assessment for York Road and Four Mile Creek Road Intersection Improvements, St. Davids, Ontario Public Information Centre #1 - Thursday March 25, 2021 COMMENT SHEET COMMENTS 1. Will the 4 mile creetk culvert under York Road have to be replaced?? has been in place since the 50's 2. Sight lines from Paxton Lane to the corner should be a serious concern have witnested many near misses turning left from the lane onto York due to high speed exiting the corner traveling east 3. What are the plans for 2 major historical sites Please return completed comment sheet to one of the Project Managers below by April 8th, 2021 Maged Elmadhoon, M.Eng., P.Eng. Phil Weber, M.Eng., P.Eng. Manager, Transportation Planning Senior Project Manager Regional Municipality of Niagara CIMA+ Phone: 905-980-6000, ext. 3583 Phone: 905-695-1005, ext. 6732 Maged.ElMadhoon@niagararegion.ca Phil.Weber@cima.ca PLEASE PRINT CLEARLY Name: Redacted for privacy Address: Email: Postal Code: