PREMIUM WATERFRONT RETAIL FOR LEASE - UNOapp
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
PROPERTY OVERVIEW 3,500 E S T. B U I L D I N G P O P U L AT I O N The Waterfront Innovation Centre (“WIC”) is located in the heart of Toronto’s East Bayfront on Queens Quay East. The area is one of North America’s largest redevelopment projects (approx. 2,400 acres), managed by Waterfront Toronto. Within steps of the future PATH connection and 30,000 2023 PROJECTED PRIMARY TTC LRT, WIC is a premium mixed-use development fronting A R E A P O P U L AT I O N onto Toronto’s exclusive Waterfront. WIC is an ~475,000 SF office and retail development, comprised of the two structures: the Hive (~375,000 SF) and the Exchange (100,000 SF). The office space is anchored by WPP plc (~260,000 SF), a multinational communications, advertising, public relations, technology, and commerce holding company, and MaRS Discovery District (~55,000 SF), North America’s largest innovation hub. WIC continues the growth of the South Core, Toronto’s fastest growing submarket. Situated adjacent to Canada’s Sugar Beach and Toronto’s iconic Redpath Sugar Factory, WIC is a rare beachfront retail opportunity in Toronto. 2 3
R E TA I L AVA I L A B I L I T I E S (Demising options available) RETAIL THE HIVE (EAST) Unit 1: 3,038 SF Unit 2: 12,757 SF AVAILABILITIES D E TA I L S THE EXCHANGE (WEST) Unit 3: 7,633 SF THE NEXUS (SECOND FLOOR) Kiosk 1: 241 SF Kiosk 2: 525 SF Kiosk 3: 553 SF Availability: Q4 2021 Term: 10 years Additional Rent: $24.42 (2020 est) HIGHLIGHTS: • Signature office development in the heart of Toronto’s East Bayfront • Direct exposure to the iconic Sugar Beach • Restaurant infrastructure in place for all retail units • Phenomenal frontage and exposure for all retail units • Approx. 15 FT ceiling heights • Unique 2nd floor kiosk opportunities in the Nexus area, a signature common area workspace • Commercial parking onsite • Potential for outdoor patio space (subject to municipal approval) 4 5
N THE HEART OF THE EAST BAYFRONT 1 2 5 Q U E E N S Q U AY E A S T MONDE CONDOS SHERBOURNE UNION STATION COMMON CITY OF THE ARTS PINNACLE MIXED USE MIXED USE ST. LAWRENCE GEORGE BROWN COLLEGE MARKET Waterfront Campus MENKES SUGAR WHARF LOBLAWS JACK LAYTON Ferry Terminal QUAYSIDE SUGAR BEACH REDPATH LAKE ONTARIO CORUS QUAY 6 7
AST RE ET E LOW TO N ST LOW LING WEL T ER S EAS ER J ET HER R E ST ARV N T BOU O FR IS URBAN STR RNE E E AD ET STR N LA SP EE E E TH T CONNECTIVITY XPR ESSWA Y YON MAP DIN ER E GAR G E ST 3 REE 6 T 5 3 1 1 WATERFRONT INNOVATION CENTRE T On-site customer parking available EAS AY QU NS EE 4 QU 2 QUEENS QUAY BAY Reimagined for pedestrians, STR bikes, cars and light rail E 5 ET 3 6A TTC BUS STOPS TO UNION 3 T 2 EE TR 4 FUTURE PATH CONNECTION RS OU RB 3 2 minute walk HA 5 FUTURE LRT STOPS MARTIN GOODMAN MULTI-USE TRAIL 6 POINT OF PICKUP “POP” SHUTTLE 7 BILLY BISHOP INTERNATIONAL AIRPORT 7 minutes to airport LAKE ONTARIO GO TRAIN/VIA RAIL SUBWAY 7 8 9
DEVELOPMENT TOTAL AERIAL 5 5 0 , 0 0 0 + S F R E TA I L PROPOSED/ APPROVED 13,500+ UNITS Central Waterfront | Toronto, ON Total Proposed/Approved Residential: 13,500 Units + Office: 3,100,000 SF + RESIDENTIAL Retail: 570,000SF + Lakeside Residences (Phase 1) 178 Queens Quay Developer: Greenland Canada Developer: Rom-Grand 1-7 Yonge St. Towers (Storeys): 3 (49, 39, 14) Towers (Storeys): 2 (14, 22) Developer: Pinnacle International Retail: 19,600 sf Retail: 25,000 sf Towers (Storeys): 5 (65, 95, 80, 22, 40) Office: none Office: none Retail: 83,800 sf Residential: 1,147 units Residential: 607 units Office: 1,146,000 sf Timing: 2023, pre-construction Timing: 2023, pre-construction Residential: 2,345 units Timing: 2021 – 2026 T3 Bayside 2.6MM+ SF 5 Phased development, phase 1 under Developer: Tridel, Hines construction Towers (Storeys): 1 (10, 10) LCBO Lands/ Sugar Wharf Quay House Monde Condos Developer: Menkes Developer: Empire Retail: 21,000 sf 3C Waterfront Developer: Great Gulf Towers (Storeys): 6 (25, 66, 61, 90, 87, 79) Towers (Storeys): 1 (21) Office: 500,000 sf Cityzen acquired the 13.8 Towers (Storeys): 1 (44) Retail: 255,000 sf Retail: 6,500 sf Residential: None acre site for $83.2M at $6M Retail: 9,300 sf Office: 550,000 sf Office: none Timing:Q2 2023 for phase 1 per acre on August 5, 2020 Office: none 11 Bay St. 2 phased development, phase 1 with no plans yet Residential: 4,375 units Residential: 463 units Residential: 551 units OFFICE Developer: QuadReal Property Group, under construction and phase 2 is a Timing: 2021 – 2026 Timing: 2024, pre-construction Timing: Completed in 2020 Towers (Storeys): 1 (54) mirror of phase 1 2 Phased development with 4 blocks, blocks Retail: 27,700 sf 1 & 2 under construction Office: 1,132,000 sf Residential: none Timing: TBD, pre-construction Quayside (Smart City) Developer: Waterfront Toronto 550,000+ SF Sidewalk Labs backed out of the 12 acre development in May 2020 R E TA I L Aqualuna Developer: Tridel, Hines Towers (Storeys): 2 (18, 17) Waterfront Innovation Centre Retail: 16,000 sf Developer: Menkes Aquavista Office: none Towers (Storeys): 2 (11, 11) Developer: Tridel, Hines, First Capital Residential: 241 units Retail: 25,000 sf Towers (Storeys): 1 (13) Timing: Q1 2025 Office: 450,000 sf Retail: 27,300 sf Residential: none Office: none Timing: 2022, under construction Residential: 307 units Tower at Pier 27 (Phase 2) Daniel’s Waterfront Timing: Completed in Q3 2019 Developer: Cityzen, Fernbrook Developer: The Daniels Corporation Towers (Storeys): 3 (35, 13, 13) Towers (Storeys): 4 (11, 14, 35, 45) Retail: 20,000 sf Office: none Retail: 36,500 sf Aqualina Aquabella Legend Office: 280,000 sf Developer: Tridel, Hines, First Capital Developer: Tridel, Hines Residential: 1,402 units Residential: 963 units Towers (Storeys): 1 (13) Towers (Storeys): 1 (14) Approved Developments Timing: 2020 – 2023 Timing: 2019 - 2021 Retail: 21,400 sf Retail: 8,000 sf Western tower complete, 2 more towers 2 Phased development, phase 1 Office: none Office: none under construction complete, phase 2 under construction Residential: 362 units Residential: 173 units Proposed Developments Timing: Completed in Q3 2017 Timing: Q2 2021, under construction Future Developments This map w as produced using data from private and government sources deemed to be reliable. The information herein is provided w ithout representation or warranty. Designed to be printed at 11” X 17”. October, 2020 10 11
SITE PLAN GROUND FLOOR QUEENS QUAY QUEENS QUAY EAST EAST THE EXCHANGE THE HIVE OFFICE ENTRANCE STAIR C OFFICE ENTRANCE VENT FEATURE STAIR UNIT 1:RETAIL 3,038 SF 271.96m2 / 2,927.4SF LOBBY LOBBY STAIR G ESCALATROR 1 ESCALATROR 2 MAIL MECH. RM CACF SHUTTLES PARKING P2 EL7 EL8 ELEC. GARBAGE/ ELEVATOR LOBBY ELEVATOR LOBBY EL3 RECYCLE LOADING UNIT 3: UNIT RETAIL 2: 12,757 SF EL6 EL9 KNAPP LANE P1 VENT EL2 RETAIL CISTERN 7,633 SF 703.05m2 / 1,163.12m2 / CORRIDOR STORAGE EL12 EL5 EL10 7,568SF 12,520SF EL1 CACF DOCK MSTR. EL4 EL11 STAIR A LOADING CORRIDOR CORRIDOR PARKING RAMP STOR. DN HYDRO VAULT MAIN ELEC. STOR. STOR. VENT UNI. WC PUMP & FILTER RM. STAIR D MECH. STAIR H BIKE STORAGE BIKE STORAGE VENT FEMALE MALE CHANGE RM CHANGE RM (LONG-TERM) (SHORT-TERM) B STAIR FEATURE STAIR SOUTH ENTRANCE DOCKSIDE DOCKSIDE DRIVEDRIVE 12 13
EAST RETAIL FLOOR PL AN - UNIT 1 AVAILABLE • Right-sized unit with ample frontage adjacent to main office entrance • Ideally suited for coffee, quick service restaurants and VENT amenity based uses FEATURE STAIR UNIT 1: 3,038 SF RETAIL 271.96m2 / 2,927.4SF LOBBY STAIR G MAIL MECH. RM SHUTTLES PARKING P2 EL7 EL8 GARBAGE/ ELEVATOR LOBBY RECYCLE LOADING P1 EL6 EL9 CORRIDOR STORAGE EL12 EL5 EL10 CACF DOCK MSTR. 14 15 EL4 EL11
AVAILABLE STAIR C EAST RETAIL FLOOR PL AN - UNIT 2 FEATURE STAIR LOBBY ESCALATROR 1 ESCALATROR 2 • Corner presence features glass curtain wall façade on CACF 3 sides of the premises SHUTTLES PARKING P2 ELEC. • Flexible demising options toEL3 accommodate various ELEVATOR LOBBY size requirements P1 UNIT 2: 12,757 SF VENT EL2 CISTERN RETAIL 1,163.12m2 / 12,520SF EL1 C STAIR A CORRIDOR DN HYDRO VAULT MAIN ELEC. S VENT UNI. WC PUMP & FILTER RM. STAIR H B R STAI FEATURE STAIR SOUTH ENTRANCE 16 17
AVAILABLE WEST RETAIL FLOOR PL AN - UNIT 3 LOBBY ESCALATROR 1 ESCALATROR 2 CACF • Signature retail premises overlooking Sugar Beach ELEC. • Direct exposure to main pedestrian walkway with ELEVATOR LOBBY EL3 potential for signature patio opportunity UNIT 3: EL2 RETAIL CISTERN 7,633 SF/ 703.05m2 7,568SF EL1 STAIR A CORRIDOR DN UNI. WC PUMP & FILTER RM. B R STAI FEATURE STAIR 18 19
EVENT FLEX SPACE ALL FFE REMOVABLE TO FLOOR INCREASE FLEXIBILITY FOR EVENTS FEATURE STAIR/LOUNGE BENCH SEATING 241 SF 525 SF VEST. PLAN GAMES AREA CAFE/BAR OPEN TO BELOW TERRACE FOCUS AREA CAFE/BAR POTENTIAL ACCESS POTENTIAL LOCATION FOR CONTROL POINT AT PEBBLE LOUNGE LARGE FORMAT SCREEN LEVEL 1 LOBBY DURING PLANTER BRIDGE ALCOVE W/ BANQUETTE SEATING BOOTH SEATING FOR EVENTS >100 PERSONS EVENTS SCREEN GLAZED SCREEN MTG RM MTG.RM VIEWS TO THE CITY MALE SERVERY UNI. WC T H E N E X U S (K I O S K AVA I L A B I L I T I E S ACCESS CONTROL POINT UP FEMALE ESCALATOR 2 ESCALATOR 1 COLLABORATION DN ELEV. LOBBY ELEV. LOBBY SECOND FLOOR) AREA SCREEN SCREEN CONFERENCE RM 1 CONFERENCE 2 CONFERENCE 3 SCREEN (32 PERSONS) LAKE LOUNGE CONFERENCE 1 POTENTIAL LOCATION FOR DN UP LARGE FORMAT SCREEN FOR EVENTS 100 PERSONS CONFERENCE RM 2&3 common space directly connected to Sugar RM 2 = 60 PERSONS 6392 RM 3 = 60 PERSONS COMBINED = 130 PERSONS CAFE OVERLOOK Beach connects the two office buildings on ROOF AREA (NOT ACCESSIBLE) ONTO FEATURE STAIR the second floor VIEWS TO THE LAKE R E/BA FEATURE STAIR/ CAF C:\Users\Shaun\Documents\1507_A_r19_WIC_Central_shaun@sweenyandco.com.rvt 8856 LOUNGE • Vision is to create a unique experience for VEST. building occupants providing collaboration TERRACE POTENTIAL ACCESS CONTROL POINT AT areas, curated retail and meeting spaces LEVEL 1 DURING EVENTS that will connect the building to the 553 SF community and vice versa DOCKSIDE DRIVE DOCKSIDE DRIVE SUGAR BEACH CORUS BUILDING 1 Level 2 DRP I.202 1 : 250 2020-07-13 8:49:27 AM 20 21
AREA DEMOGRAPHICS Primary Primary Secondary Greater (2020) (2023 Projections) N Total Population 5,714 29,578 39,588 45,302 Daytime 15,478 40,678 81,866 97,344 Population Median 33.7 N/A 37.2 36.7 Age Total 3,334 16,834 23,938 27,272 Households Average HH Income $143,681 N/A $125,820 $128,004 Total Expenditure (Per Household) $141,490 N/A $122,500 $124,822 Source: Statistics Canada, 2020 22 23
P R E M I U M WAT E R F R O N T R E TA I L F O R L E A S E 1 2 5 Q U E E N S Q UAY E A S T GRAHAM SMITH* BRANDON GORMAN* NICK ASPROS* Senior Vice President Senior Vice President Senior Vice President +1 416 855 0914 +1 416 855 0907 +1 416 938 9518 Graham.Smith@am.jll.com Brandon.Gorman@am.jll.com Nick.Aspros@am.jll.com Although information has been obtained from sources deemed reliable, neither Owner nor JLL makes any guarantees, warranties or representations, express or implied, as to the completeness or accuracy as to the information contained herein. Any projections, opinions, assumptions or estimates used are for example only. There may be differences between projected and actual results, and those differences may be material. The Property may be withdrawn without notice. Neither Owner nor JLL accepts any liability for any loss or damage suffered by any party resulting from reliance on this information. If the recipient of this information has signed a confidentiality agreement regarding this matter, this information is subject to the terms of that agreement. ©2020 Jones Lang LaSalle IP, Inc. All rights reserved. *Sales Representative.
You can also read