Multiple Connections. Unparalleled Experience. Space Reimagined.
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
BUILDING OVERVIEW >S kyway Centre offers flexible model suite sizes move-in ready. Property upgrades underway (Signage, wayfinding, landscaping, model suites). Located in first- class business corporate area. >O ffice space with tremendous amount of natural light and exposure to natural settings with private courtyard. >P rivate courtyard improvements underway providing tenants with the best possible experience, a healthier, more productive workplace. >P ublic transit stop located directly in front of the complex with access to Kipling GO Station and TTC. Premier office location with strategic Highway (27/427/409 and 401) and Airport access. >T rendy amenities within a short walk or drive (Chop, Milestones, Jack Astor’s, Montana’s, The Keg, Tim Hortons, Residence Inn by Marriott, Home Depot, Premier Fitness). 87-89-91-93 SKYWAY AVENUE 3
SKYWAY CENTRE INTERIOR SPACE MODEL SUITES MOVE-IN READY FLEXIBLE SIZES Skyway Centre offers flexible model suite sizes move-in ready. Office space with tremendous amount of natural light and exposure to natural settings. Newly built common area washrooms and hallways. Property upgrades underway (Signage, wayfinding, landscaping and model BUILT-OUT suites). SUITE Private courtyard to be improved with pathways, landscaping and seating area for tenants to enjoy lunch, outdoor meetins or a place to unwind creating a healthier, more productive workplace. NEWLY BUILT NEWLY BUILT COMMON HALLWAYS WASHROOMS 4 87-89-91-93 SKYWAY AVENUE
MODEL BUILT-OUT SUITE SUITE FLEXIBLE BUILT- SIZES OUT SUITE BUILT-OUT SUITE PLENTY OF NATURAL LIGHT 87-89-91-93 SKYWAY AVENUE 5
SKYWAY CENTRE EXTERIOR SPACE PROPERTY IMPROVEMENTS UNDERWAY PRIVATE COURTYARD WITH SEATING, LANDSCAPING, WAYFINDING, SIGNAGE AND MODEL SUITE PROGRAM - MOVE-IN READY. Skyway Centre offers a tremendous amount of natural light and exposure to natural settings with private courtyard and walkways. Private courtyard to be improved with pathways, landscaping and seating area for tenants to enjoy lunch, outdoor meetings or a place to unwind creating a healthier, more productive workplace. Walk to nearby trendy amenities such as (Chop, Milestones, Jack Astor’s, Montana’s, The Keg, Tim Hortons, Residence Inn by Marriott, Home Depot, Premier Fitness to name a few). Public transit stop located directly in front of Skyway Centre offering access to Kipling GO Station and TTC with expectations of becoming enhanced with the proposed Smart Track, Eglinton Crosstown (under construction) and BRT (under construction) and LRT systems (construction commencing 2018). Skyway Centre offers strategic Highway (27/427/409 and 401) and Airport access. Approximately 5 minute drive to Toronto Pearson International Airport. Ease of access to Downtown Toronto. Density can be accommodated due to the proximity to transit and connectivity with the TTC, MiWay and Brampton transit. All team up to provide access to a wide and diverse labour pool. *All renderings and photographs are artist’s concept and subject to change without notice e. & O.E COURTYARD SEATING 6 87-89-91-93 SKYWAY AVENUE
SKYWAY CENTRE Q. How im LOCATION, LOCATION, be clos TRENDS TRANSIT WHICH FACTORS MATTER MOST? LOCATION, LOCATION, TRANSIT The 10-minute barrier Q. How far away are you willing to be from the following? The accessibility to public transportation is overwhelmingly a The 10-minute barrier: 71% of The accessibility critical factor for many office tenants today since a whopping survey respondents said they wouldn’t consider options 771% Walking distance from local to public transportation Canadianis overwhelmingly more than a 10-minute walk from transit. With the harsh winters, who can blame them? public transit: Within 10 min. a critical factor for many This trend is office not new – in the tenants Colliers 2007 Tenant Survey, 4444% respondents rated “Location Close to Public Transport” at 8.7/10 today. Skyway has a inthistransit importance when stop directly attracting and/or retaining staff. Wein expect to become even more critical as the battle for talent ramps % Walking distance from undercover front of the building with access business cycle. to Kipling AY SUBWAY access to local or regional public transit: SUBW SUBWAY SUBWAY up again in this GO station and TTC. Tenant Also, trendy amenities action item: If you are concerned with talent attraction Within 15 min. Clusters are within walking distance. and retention, consider that your employees appreciate direct, With growing efficient and cost-effective accessibility to their office. 5533% Driving distance from home that reducing the n of tenants sur employees commute by public transit: Landlord action item: Audit your current office portfolio against Being in the “ walk times to major transit hubs. Think long and hard about 20 min. to 1 hr. interconnecte those buildings that don’t fall within the 10-minute mark as these attribut 54% 71% of tenants won’t even consider them. Think creatively: Furthermore, a shuttle bus service to your building or business park can Walking distance from regional that clusters r through suppo help mitigate any transportation issues and is considered a workable, practical solution. public transit: Within 15 min. 5 CLUSTERING Q. How important is it to Access to ATION, LOCATION, Being in the “right” area for business be close to the following? public transportation Organizations are shifting from vertical NSIT integration to clustering due to the low costPROPERTY and accessibility of benefits such as S MATTER MOST? 31% Critical 45% Important 18% 31% 41% Important 22% Nice IMPROVEMENTS knowledge sharing, far away are youlogistical sharing and Critical Nice Q. How willing Free parking Clients, vendors, partners Easy auto access rier even a common nsportation is overwhelmingly a employee catchment area. to be from the following? tenants today since a whopping aid they wouldn’t consider options 71% Walking distance from local rom transit. With the harsh public transit: 31% ame them? Critical Within 10 min. 37% Important Colliers 2007 Tenant Survey, Close to Public Transport” at 8.7/10 18% 27% 39% 22% 44% Nice Critical Important Nice g and/or retaining staff. We expect 29% tical as the battle for talent ramps AY Walking distance from undercover Critical 10% Nice SUBWAY e. SUBW SUBWAY SUBWAY access to local or regional public transit: 53% Important Within 15 min. Clusters are key e concerned with talent attraction our employees appreciate direct, With growing advancements in technology and increasing global competition cessibility to their office. 53% 53% Driving distance from home that reducing the need for offices to be located in the central business district, 72% of tenants surveyed emphasized the importance of being in the “right place.” Tenant action item: When considering your location options, take careful n neighbours and strategic positioning of the asset. You may be able to enjoy s employees commute by public transit: efficiencies if companies within your sector are close by. You will also have our current office portfolio against Being in the “right” area means business proximity to vendors, competitors, time luring top talent to your business if they don’t have far to move. bs. Think long and hard about 20 min. to 1 hr. interconnected companies and employees. Developing office space that fosters OPEN WORKPLACES / FLOOR within the 10-minute mark as these attributes will undoubtedly attract and support long-term tenants. Landlord action item: Organizations are shifting from vertical integration to 54% nsider them. Think creatively: Furthermore, for office buildings struggling with vacancy, repositioning a building clustering due to the low cost and accessibility of benefits such as knowled Walking distance from regional that clusters related and competitive tenants will create a competitive advantage DENSITY building or business park can through support, knowledge sharing, operating costs and logistical requirements. sharing, logistical sharing and even a common employee catchment area. L on issues and is considered a public transit: and developers should consider positioning assets to attract like-minded ten Within 15 min. similar industries. Our data shows that tenants are moving toward more open workplaces and denser workspace ratios. In Canada, the average square feet per employee could fall as low as 145 square feet by 2018. Current and future transit will assist higher density workplace at Skyway Centre. PROPERTY IMPROVEMENTS 87-89-91-93 SKYWAY AVENUE 7
SKYWAY CENTRE LOCATION Amenities TRENDY AMENITIES within walking distance from Skyway HOT 1 7 2 3 N nities 4 9 427 RD 5 2 IELD BELF 11 409 STO 6 HOTELS 7 HWY 1 6 BWP Toronto Airport Hotel 8 23 27 7 25 3 20 2 Days Hotel and Conference Centre9 RD KIPL 13 DIXO N 10 15 22 3 International Plaza Hotel 4 N ING AIR 19 POR 16 4 Residence Inn by Marriott MAR 9 12 AVE T RD FITN 18 21 5 Sheraton Toronto Airport Hotel TIN DR D 2 BEL FIEL SKYWAY CENTRE GRO 24 17 11 5 11 STORES VE R 409 HOTELS 401 12 D 10 13 6 Beer Store 1 BWP Toronto Airport Hotel 8 14 14 7 7 Home Depot 2 Days Hotel and Conference Centre HWY 15 3 International Plaza Hotel 8 LCBO 6 Toronto Pearson 23 N 27 25 1 4 Residence Inn by Marriott 9 International Airport 3 20 RD 9 RONA Home & Garden RES EW KIPL RD 13 DIXO N 5 Sheraton Toronto Airport Hotel N AV 10 TShoppers Drug Mart G O 2 BELF IELD 4 15 22 GLIN ING E 16 19 16 11 MAR 12 AVE 409 HOTELS STORES FITNESS / GAS / BANKS17 18 21 TIN SKYWAY CENTRE TORONTO 18 GRO 24 17 1 BWP Toronto Airport Hotel 6 Beer Store 11 Fitness 365 5 19 VE R 7 401and Conference Centre7 Home Depot 12 HSBC Bank 2 Days Hotel 20 HWY D 3 10 8 13 Premier Fitness 6International Plaza Hotel LCBO 21 23 N 14 600 METERS 27 25 4 Residence Inn by Marriott 8 14 RBC Royal Bank 22 9 RONA Home & Garden 20 RD KIPL 13 DIXO N 5 Sheraton Toronto Airport Hotel 10 Shoppers Drug Mart 15 Shell Gas Station 23 15 22 ING son19 11 24 16 1 MAR AVE irport HOTELS STORES FITNESS / GASW / BANKS RESTAURANTS 25 21 TIN V E ON A WAY CENTRE NGT EGLI 365 G 1 BWP Toronto Airport Hotel 6 Beer Store 11 Fitness 16 Boston Pizza ROV ER 2 401 Days Hotel and Conference Centre 7 Home Depot 12 HSBC Bank 17 Casey’s Bar & Grill D 3 International Plaza Hotel 6 10 8 14 8 LCBO 13 TORONTO Premier Fitness 18 Chop Steakhouse & Bar 4 Residence Inn by Marriott 9 RONA Home & Garden 14 RBC Royal Bank 19 Jack Astor’s Bar & Grill 5 KIPL Sheraton Toronto Airport Hotel 10 Shoppers Drug Mart 15 Shell Gas Station 20 Milestones ING 21 Montana’s Cookhouse 600 METERS MAR STORES FITNESS W/ GAS / BANKSRESTAURANTS AVE 22 St. Louis Bar & Grill TIN VE ON A 23 Swiss Chalet INGT EGL11 G 6 Beer Store Fitness 365 16 Boston Pizza ROV 24 The Keg Steakhouse ER 7 Home Depot 12 HSBC Bank 17 Casey’s Bar & Grill 25 Tim Hortons TORONTO D 10 8 LCBO 13 Premier Fitness 18 Chop Steakhouse & Bar 8 14 9 RONA Home & Garden 14 RBC Royal Bank 19 Jack Astor’s Bar & Grill 8 10 87-89-91-93 SKYWAY AVENUE Shoppers Drug Mart 15 Shell Gas Station 20 Milestones
Corporate Neighbours CORPORATE NEIGHBOURS 1 14 COR 9 4 7 12 N 1 17 2 427 RD ELD 10 3 B ELFI 4 409 5 6 te Neighbours 7 HWY 8 27 9 16 N RD 10 KIPL DIXO 11 ING AIR POR MAR 12 AVE T RD 8 TIN 13 SKYWAY CENTRE hbours GRO 14 VE R 401 15 1 14 D CORPORATE NEIGHBOURS 16 13 17 9 15 4 7 12 N 1 ABC Climate Control Systems 17 Toronto Pearson 2 BSM Wireless Inc. 2 RD IELD International BELF Airport10 11 3 Camino Modular Systems W Incorporated E 3 TO N AV 4 KodakEG LING Canada 1 14 409 6 CORPORATE NEIGHBOURS 5 LifeLabs Medical Laboratory Services 4 6 TORONTO Molson Coors Brewing Co. 12 N 1 ABC Climate Control Systems 7 MSB Plastics Manufacturing Ltd. HWY 2 BSM Wireless Inc. 8 Pro Pak Packaging 27 3 Camino Modular Systems Incorporated 9 Purolator Courier Ltd. 600 METERS 16 N RD 4 Kodak Canada 10 Rona Lansing Inc. KIPL DIXO 5 LifeLabs Medical Laboratory Services 11 Royal Selangor Inc. CORPORATE NEIGHBOURS ING MAR 6 Molson Coors Brewing Co. 12 S & C Electric Canada AVE 8 TIN 1 ABC Climate Control Systems 7 MSB Plastics Manufacturing Ltd. 13 Sanjay Enterprises Incorporated SKYWAY CENTRE GRO 2 BSM Wireless Inc. 8 Pro Pak Packaging 14 ShawCor Ltd. VE R 3 401 Camino Modular Systems Incorporated 9 Purolator Courier Ltd. 15 Sweda Canada Inc. D N RD 4 Kodak Canada 10 Rona Lansing Inc. 16 Toronto Congress Centre KIPL 5 13 Laboratory Services LifeLabs Medical 11 Royal Selangor Inc. 17 Venture Steel Inc ING 15 MAR 12 S & C Electric Canada AVE 6 Molson Coors Brewing Co. TIN 7 MSB Plastics Manufacturing Ltd. 13 Sanjay Enterprises Incorporated 2 G ROV 8 Pro Pak Packaging 14 ShawCor Ltd. 11 W 3Purolator Courier Ltd. AVE ER 401 9 15 Sweda CanadaOInc. I N GT N L D 16 EGCongress Toronto Centre 10 Rona 6 Lansing Inc. 11 Royal Selangor Inc. 17 Venture Steel Inc 12 S & C Electric Canada TORONTO 13 Sanjay Enterprises Incorporated 87-89-91-93 SKYWAY AVENUE 9
SKYWAY CENTRE LOCATION Transit TRANSIT ETOBICOKE N 427 RD IELD BELF 409 HWY 27 NR D KIPL DIXO ING AIR MAR POR T AVE RD TIN SKYWAY CENTRE GRO VE R 401 D Transit Toronto Pearson International Airport VE W ON A NGT EGLI TORONTO EXPRESS BUS ROUTE (MI-WAY TRANSIT) ETOBICOKE N EXPRESS BUS ROUTE (RUSH 600HOUR SERVICE) METERS 427 RD IELD LOCAL BUS ROUTE BELF (TTC) 409 EXPRESS BUS ROUTE GO TRAIN ROUTE (MI-WAY TRANSIT) ETOBICOKE N EXPRESS BUS ROUTE SMART TRACK HWY (RUSH HOUR SERVICE) (PROPOSED) RD 27 IELD LOCAL BUS ROUTE BRT CORRIDOR BELF NRD (TTC) (UNDER CONSTRUCTION) KIPL DIXO 409 ING GO TRAIN ROUTE MAR POR T AVE RD TIN SKYWAY CENTRE GRO SMART TRACK Transit stop located directly in front of Skyway(PROPOSED) Centre offering convenient access to Kipling GO HWY VE R 401 27 Station and TTC Dwith expectations of becoming enhanced with the BRT proposed Smart Track, Eglinton Crosstown (under D CORRIDOR NR (UNDER CONSTRUCTION) construction) DIXOand BRT (under construction) and LRT systems (construction commencing 2018). Improved transit KIPL ING creating a greater access to larger educated employee pool. MAR AVE TIN Toronto SKYWAY Pearson CENTRE GRO International Airport VE R EW N AV 401 GTO D EGLIN 10 87-89-91-93 SKYWAY AVENUE
Drivetime Analysis DRIVE-TIME ANALYSIS UR 407 23 min. 1 37 min. 2 3 9 min. 6 4 12 min. 5 8 6 410 401 7 4 min. 8 427 4 min. 9 9 e Analysis 6 min. SKYWAY CENTRE 6 min. 1 4 min. 3 4 4min. 4 min. 4min. 2 29 min. 5 52min. URBAN NODES 16 min. 7 19407 min. 2315min. min. 1 Toronto Pearson International Airport 3716min. min. 2 Downtown Toronto - Union Station 3 9 min. URBAN QEW NODES Highway 401 403 6 4 Highway 427 2 min. 8 23 min. 1 Toronto Pearson International Airport Lake5 Ontario Highway 403 6 Highway 404 37 min. 2 Downtown Toronto - Union Station 401 7 Queen Elizabeth Way (QEW) 4 min. 3 Highway 401 8 Highway 407 URBAN NODES 46 min. 427 4 Highway 427 9 Highway 409 9 5 Highway 403 6 min. 1 SKYWAY CENTRE Toronto Pearson International Airport 6 Highway 404 Normal Traffic 6 min.4012 1 Downtown Toronto - Union Station 7 Queen Elizabeth Way (QEW) Rush-hour Traffic 3 8 Highway 407 4 min. Highway 401 3 4 4min. 4 9 Highway 409 4 min. Highway 427 4min. 2 5 Highway 403 6 Highway 404 Normal29 min. Traffic Skyway 7 Centre located Queen Elizabeth Way (QEW) in the centre of it all. 52min. Skyway Centre offers strategic Highway (27/427/409 and 401) 5 Rush-hour and Airport access. Approximately 5 minute drive toTraffic Toronto Pearson International Airport. Ease of access to 6 min. 8 Highway 407 7 Downtown Toronto. 9 min. 9 Highway 409 15 min. 2 16 min. Normal Traffic 403 29QEW min. Rush-hour Traffic 87-89-91-93 SKYWAY AVENUE 11
IMPROVED TRANSIT The BRT (Bus Rapid Transit) will be completed in 2017. The BRT will provide more efficient and reliable service on a dedicated bus corridor running east- west connecting multiple communities. The 18-kilometre Transitway is to be completed in 2017. There will be 12 stations, including renovations to the existing hub in the city core with new bus shelters at MiWay’s City Centre Transit Terminal completed, and a new station building at GO Transit’s Square One Bus Terminal by the end of 2015. MiWay and GO Transit will operate along the Transitway, which will connect to the TTC at Renforth Station and Kipling Subway Terminal and GO Train. 12 87-89-91-93 SKYWAY AVENUE
PROPOSED TRANSIT Smart Track (Proposed) With the SmartTrack line, Toronto will join world-leading cities like London and Paris by building a Regional Express Rail (RER) surface subway. The SmartTrack line will provide service from the Air- port Corporate Centre in the west, southeast to Union Station and northeast to Markham in the east. It will have 22 new station stops and five interchanges with the TTC rapid transit network. The Line will be built in seven years, starting service in 2021. e. For this distance as 400 meters n (see wing shift ships within al estate and GTA East GTA North n increased premium stance of rapid public truction TA’s Central North sing hange es an overlying l’s extensive nsportation Central East GTA West Midtown ublic is in Class Pearson International Airport of their e markets Downtown f the GTA. Union Station Hub e-leasing GTA Major Highways blic Billy Bishop Current TTC Subway Airport Current GO Rail Transit on that’s Smart Track (Proposed) Eglinton Crosstown (Under Construction) ce to Sheppard East LRT (Proposed) e, Q2, Finch West LRT (Proposed) ce space Hurontario - Main LRT (Proposed) Toronto-York Spadina Subway 0 10 Extension (Under Construction) Scarborough Subway Kilometers Extension (Proposed) collierscanada.com/research 87-89-91-93 SKYWAY AVENUE 13
AVAILABILITY AVAILABILITY AREA SIZE RENT 87 Skyway, Suite 100 8,963 SF $14.00 NET PSF/ANNUM GROUND FLOOR 87 Skyway, Suite 200 3,730 SF $12.50 NET PSF/ANNUM 89 Skyway, Suite 101 3,101 SF SECOND FLOOR 89 Skyway, 2nd floor 18,508 SF ADDITIONAL RENT $10.29 PSF 2016 91 Skyway, Suite 100 3,131 SF 91 Skyway, Suite 106 3,300 SF TENANT INDUCEMENTS 91 Skyway, Suite 205 1,243 SF $25.00 PSF Tenant Improvement Allowance 93 Skyway, Suite 107 3,379 SF 93 Skyway, Suite 207 5,214 SF 14 87-89-91-93 SKYWAY AVENUE
OWNERSHIP DESJARDINS FINANCIAL SECURITY LIFE ASSURANCE COMPANY OWNERSHIP DESJARDINS FINANCIAL SECURITY LIFE ASSURANCE COMPANY Desjardins Group is the leading cooperative financial group in Canada and the sixth largest cooperative financial group in the world, with assets of $248.1 billion. It has been rated one of the Best Employers in Canada by Aon Hewitt. To meet the diverse needs of its members and clients, Desjardins offers a full range of products and services to individuals and businesses through its extensive distribution network, online platforms and subsidiaries across Canada. Considered North America’s strongest bank according to Bloomberg News, Desjardins has one of the highest capital ratios and credit ratings in the industry. https://www.desjardins.com/ca/ 87-89-91-93 SKYWAY AVENUE 15
FOR MORE INFORMATION, PLEASE CONTACT REMI NICKEL* COLLIERS INTERNATIONAL Vice President 401 The West Mall +1 416 620 2807 Suite 800 remi.nickel@colliers.com Toronto, ON M9C 5J5 MYLES KENNY* Sales Representative +1 416 620 2882 myles.kenny@colliers.com DOMENIC GALATI* Senior Vice President +1 416 620 2834 domenic.galati@colliers.com RON JASINSKI* Senior Vice President +1 416 620 2801 ron.jasinski@colliers.com *Sales Representative This document has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. Colliers International is a worldwide affiliation of independently owned and operated companies. This publication is the copyrighted property of Colliers International and /or its licensor(s). © 2017. All rights reserved. Colliers Macaulay Nicolls Inc., Brokerage.
You can also read