METRO BOOKLET Japan International Cooperation Agency
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Japan International Cooperation Agency JICA | 01 “More than the generous funds received from Japan, what I feel more satisfied about is the work culture and ethics that we brought during the making of the metro. People stand in queue, they offer seat to those who need it more than them, clean platforms and soft-spoken, “ hard-working staff – these are my rewards too. Dr. E. Sreedharan, Former Managing Director of Delhi Metro, Popularly known as the Metro Man The quote was cited at a reception hosted in his honour by the Embassy of Japan in India on March 08, 2014, after he was conferred the Order of the Rising Sun, Gold and Silver Star award by the Government of Japan in November 2013. *The quote was published in PSU Connect Website on 8th March 2014. http://www.psuconnect.in/news/metro-man%60-e.-sreedharan-felicitated/2965
02 | JICA Japan International Cooperation Agency Foreword JICA has been actively contributing to the improvement of public transportation systems in India, in collaboration with our Indian partners, to ensure sustainable growth and environmental conservation. JICA’s activities seek to achieve accelerated development of Indo-Japan ties. India has become the world's fastest growing major economy. It shall also become home to the world's largest population by 2024. In this context, India’s development is of utmost importance. India has immense potential to emerge as an economic powerhouse and its strength is expected to bring stability and Mr. Katsuo Matsumoto, prosperity to the world at large. Chief Representative, JICA India To meet the rising aspirations of people, we would sincerely like to support the creation and expansion of world-class infrastructure in this country. We offer Japan’s expertise in the transportation sector, to help this revolution move forward. Metro projects in India are a shining example of Indo-Japanese partnership, and are an integral part of the legacy of JICA’s operations in India. As the largest bilateral development partner to India, JICA has been actively working towards development of transportation in India. The Metro Rail projects help reduce traffic congestion, ease travel and decrease pollution. JICA has extended ODA loans of over 1.3 trillion Japanese yen (approximately INR 81,000 crores) to develop metro systems in Delhi, Bengaluru, Kolkata, Chennai, Mumbai and Ahmedabad. These JICA supported projects are to meet India‘s growing demand for mobility by building a Mass Rapid Transit System that helps mitigate worsening vehicular traffic, curbs pollution, is timely and safe, and leads to sustainable urban development in the mega-cities of India. As friendship between India and Japan has deepened, cooperation between the two countries is expected to increase further. JICA would continue to contribute to the creation of world-class infrastructure in India, both technically and financially. This booklet provides an overview of JICA-supported Metro projects in India. It highlights the best practices implemented in various projects. These projects have been implemented through active collaboration between India and Japan, and have been executed by the Government of India. We sincerely hope that experiences from these JICA-supported metro projects would facilitate the development of other mobility projects in India. JICA is committed to continue supporting India’s transportation sector in the years to come.
Japan International Cooperation Agency JICA | 03 Message Urbanization is an important indicator for any country, as overall development of cities and towns act as major hub of economic activities, knowledge, technology, investment, skills and jobs. India is one of the rapidly urbanizing nations of the 21st century and it has led to inevitable challenges of urban mobility, with resultant congestion and pollution, being its most visible manifestation. Comprehensive framework to addresses the issue holistically requires creation of a network of affordable, safe, reliable and environmentally friendly transport system. Mass Rapid Transit Systems have emerged as Mr. Rajat Kumar Mishra, an effective, sustainable and green urban Joint Secretary (Bilateral Cooperation and International mobility network which not only facilitate easy Economic Relations), Department of Economic Affairs, and quick movement of people but also Ministry of Finance, Government of India mitigate challenges of traffic congestion and reduction in pollution, leading to a positive impact on quality of life in our cities though comparatively costly. Metro rail projects provide high capacity public transit and are technology intensive. However, considering the pace of urbanization and the impending need for augmenting mobility in cities through metro rail, it is imperative to explore alternative sources of funds to supplement the budgetary resources. JICA has been a committed partner in creating a robust network of Mass Rapid Transit Systems across the country and helping in re-designing the urban landscape through world class infrastructure, technology and green transportation systems. I am happy to note that JICA is bringing out a publication on JICA-supported Metro projects in India. I am hopeful that this booklet would serve as an important communication tool to spread information about success stories and best practices for development of urban mobility projects in India. We express our sincere appreciation for Government of Japan and JICA for being instrumental in helping India climb up the ladder in sustainable urban development. There has been significant deepening of Indo-Japan bilateral relations in recent past with growing convergence in our strategic and developmental interests. This partnership holds tremendous promise for further growth and in years to come, we hope to build this relationship for mutual benefit in key sectors of sustainable development.
METRO ODA LOANS TIMELINE DELHI | MUMBAI | KOLKATA | CHENNAI | BENGALURU | AHMEDABAD 1983 1997 2001 2002 ODA Loan Projects Calcutta Delhi Delhi Delhi Metro Railways Mass Rapid Mass Rapid Mass Rapid (Phase II) Transport System Transport System Transport System Construction Project Project (II) Project (III) Project 2010 2010 2009 2008 Chennai Kolkata Delhi Delhi Metro Project (II) East-West Mass Rapid Mass Rapid Metro Project (II) Transport Transportation System Project System Project (Phase 2) (IV) (Phase 2) (III) 2010 2011 2012 2013 Delhi Bangalore Delhi Chennai Mass Rapid Metro Rail Mass Rapid Metro Project (III) Transport Project (II) Transport System Project System Project (Phase 2) (V) Phase 3 2018 Chennai Metro Project (Phase 2) (I)
2003 2004 2005 2006 Delhi Delhi Delhi Bangalore Mass Rapid Mass Rapid Mass Rapid Metro Rail Project Transport System Transport System Transport System Project (IV) Project (V) Project (VI) 2008 2008 2007 2006 Kolkata Chennai Delhi Delhi East-West Metro Project Mass Rapid Mass Rapid Metro Project Transport Transport System Project System Project (Phase 2) (II) (Phase 2) (I) 2013 2014 2016 2016 Mumbai Delhi Ahmedabad Chennai Metro Line 3 Mass Rapid Metro Project (I) Metro Project (IV) Project Transport System Project (Phase 3) (II) 2018 2018 2018 2017 Delhi Kolkata Mumbai Chennai Mass Rapid East-West Metro Line 3 Metro Project (V) Transport Metro Project (III) Project (II) System Project (Phase 3) (III)
06 | JICA Japan International Cooperation Agency INDEX 08 Ahmedabad Metro 10 Bangalore Metro 12 Chennai Metro 14 Delhi Metro 16 Kolkata Metro 18 Mumbai Metro
Japan International Cooperation Agency JICA | 07 METRO RAIL PROJECTS of all cities JICA is funding large scale Metro Projects in metropolitan cities with an aim to realize the Government’s vision of making transportation in India swift, modern and reliable. JICA has not only provided financial support for these projects but they have also brought in elements of Japanese culture i.e. punctuality, entering in a queue, being respectful to fellow travelers by giving designated seats to women travelers or the elderly in every coach and building a separate coach for women ensuring their safety even during odd hours. Delhi Kolkata Ahmedabad Mumbai Bengaluru Chennai COMMON features Increases connectivity Interconnection with other Reduces noise level transportation modes Provides safety via cameras Helps in reducing traffic Utilizes solar energy congestion
08 | JICA Japan International Cooperation Agency 1 AHMEDABAD • ONGC • D-Cabin • Digvijaynagar Motera • Railway Colony Stadium • Visat Petrol Pump METRO • Ramnagar • Parvati Nagar Acher depot • Motera Stadium Motera Junction Sabarmati • Acher • Digvijaynagar • Ghanshyam Nagar • Chanakyapuri • Khodiyar Nagar • Sabarmati Police Stn. • Vrundavan Society • Abu Street Society • Parshwanath Nagar • Chandlodia • Sabarmati • Shayona City • Bhavana Society • Dharm Nagar • Ranip AEC • Sabarmati Railway Stn. • Anand Nagar • Anand Nagar Sabarmati Rly. Stn. • Sabarmati Jail • Torrent Power House • Torrent Power House Shreenath depot Ranip • Devi Multiplex Vadaj • Ghotlodiya • Akbar Nagar • Nirnay Nagar • S.G. Highway Nava Wadaj Terminus • Udham Nagar • RTO AIRPORT • Shenbhai Nagar • Akbarnagar Ranip • Keshav Nagar • New Vadaj • Naroda Workshop • Bhavsar Hostel • GSRTC • Pragatinagar • Sahijpur Bogha • Sarthak Circle • Sola •• OM OM Nagar Nagar • Sarvodya Nagar • Shastrinagar • Bhimjipura • Ramdev Pir No Tekro Vijay Nagar OBJECTIVE • Thaaltej • Parul Nagar • Krishna Nagar • Bhuyangdev • Karmchari Nagar • Jai Mangal • Shahibagh • Megani Nagar • Paresh Nagar Old Wadaj Terminus • Wadaj • Sola HSG. •Terminus Bhuyangdev Society • Sardar Colony • Old Wadaj • Priya Cinema • Memnagar • Memeco Thaltej Gam Thaltej • Sola Cross Road • Naranpura • Girdhar Nagar • Bajrang Ashram • Dudheshwar • Dudheshwar Gurukul • Sarathi Co-operative Housing Society • Kalapi Nagar • Sarjan Tower • Haripura Road • Shanti Nagar • Pritam Nagar • Thakkarbapa Nagar Usmanpura • Shree Valinath Chowk • Chamanpura Memco • Thakkarbapa Nagar Commerce • Asarwa • Nathalal Nagar • Nicol • Panchal Nagar Doordarshan Six Road • Usmanpura • Jhangirpuraa • Hirawadi • Dariapur • D Colony Kendra • Sunrise Park • Memnagar depot • Madhupura • Gurukul Gujarat • Sattar Shahpur University • University • Bodakdev • Amdupura • Shreyas Nagar Stadium • University Area • Swastik • Delhi Darwaja • Dariyapur Darwaja • Navrangpura • Delhi Chakla Old High Court • Shahpur • Prem Darwaja • Vastrapur Navrangpura Terminus • Prem Darwaja • Andhjan Mandal • Navrangpura Police Station • Satellite • Premchand Nagar • Mahavir Nagar Interchange • Mirzapur • Choka Bazar • Bapunagar • Khodiar Nagar • Satellite • Mithakali • Dariapur • Khodiar Nagar • Virat Nagar The population of Ahmedabad metropolitan • Avani Row House • Sakar Bazzar • Kalupur Terminus • Jayma Society • Himmatlal Park Gandhigram • CG Road Ghee Kanta • Khanpur • Gheekanta • Zaveriwad • Kalupur Kalupur Railway • Saraspura • Vallabha Nagar • Odhav • Satellite Police Stn. • ISKON • ISRO • Panjra Pole • Gulabai Tekra • Law Garden Station• Krishna Nagar • Viratnagar • Ratan Pole • Ellise Bridge • Lal Darwaja RAILWAY • Jodhpur Terminus and Depot • Bimanagar STATION • Rakhial • GIDC Industrial Area • Odhav • Shivranjani • Jhansi Ki Rani • Gujarat College AHMEDABAD OLD CITY Sarangpur • Rakhial Char Rasta • Vallabhnagar • Sarangpur • Nehrunagar Paldi • Pankore Naka • Danapith • Ajit Mills • Soni Ni Chaali increased from 5.1 million in 2001 to 6.3 million in Sukirti Tower • Khadia • Gomtipur • Ambavadi • Raipur • Gomtipur Kankaria East • Nehru Nagar • Raikhad • Sarangpur • Raj Ratan Soc. • Manek Baug • Mahajan No Vando • Satyam Nagar • Sonichal • Ram Rajya Shreyas Parasunku Society • Gita Mandir Nagar • Khamasa • Jodhpur • Astodia • Bhudarpura • Sherkotda • Ram Rajya Nagar • Rajpur • Adinath Nagar Apparel Park • Mthila Society Paldi • Kocharab • Gita Mandir • Shyamal Jn. Rajiv Nagar • Paldi • Shastri Nagar • Sahkari Lati Bazar Rabari • Sharda Society Jamalpur • Jamalpur 2011, increasing conveyance requirements, resulting • Vasna • Dharnidhar Derasar • Rajnagar Society Colony • Mahadev Nagar Apparel Park • Yashkamal Society • Vidya Nagar • Prahlad Nagar • Vejalpur Depot • Bhatta • • Amraiwadi Amraiwadi • Jagadamba Nagar Kankarti Lake Jivraj • Jivraj Park Jn. • Fatehpur • Motinagar • Behrampura • Rabari Colony Nirant • Anjali • Kankaria Lake • Calicomill • Pravin Nagar APMC Vasna • Pushpa Kunj Cross Rd. • ShahAlam • Sankit Nagar • Ranna Park • Swaminarayan College Vastral in the need for Ahmedabad Metro Project. JICA • Chandranagar • Vaikunthdham Mandir • Maninagar • Rambaugh • Arivind Estate APMC • Narayan Nagar • Maninagar Char Raste • Maninagar Rly. Stn. • Dani Limda Char Rasta • Meena Cinema • Hatkeshwar Terminus APMC Market • Maninagar Railyway Station • CTM • Makarba • Juhapura • Dani Limda • Bhairavnath RoadManinagar Terminus • Daxini Soc. Rly. Crossing • Arivind Estate • Khodiyar Nagar • P&T Colony • Shrinand Nagar • Revati Nagar • Jawar Nagar Chowk • Swami Narayan Mandir • Hatkeshwar • Vishala • Basant Nagar • CTM Junction • Behrampur Vastral Gam supported the 1st metro project in Gujarat, the • Chhipakuva Bhairavnath • Laxmi Narayan Society • Dakshini Society Gyaspur Deport • Shahalam Roja • Expressway Junction • Arshad Park • Chandola Talav • Hirabag Society • Chhipakuva • Chandola Lake • Jashoda Nagar • Jashoda Nagar • BRTS Workshop • Rajeshwari Society nation’s growth driver, which is intended to provide • Ghodasar • Sarkhej • Vatva • Kashiram Textile • Samrat Nagar • GIDC Vatva • Mukesh Industries • Narol • Ghodasar an alternate transportation choice to the city that will connect core districts of economic and cultural Alignment of Ahmedabad Metro Rail Project Phase - I activities. SN Section Name Alignment Length (km) Elvated U/G Total No. of Stations Elvated U/G Total 1 North-South Corridor: 18.522 - 18.522 15 - 15 APMC to Motera Stadium 2 PARTICULARS East-West Corridor: 14.402 6.335 20.737 13 4 17 Thaltej Gam to Vastral Gam Total 39.259 32 Under Ground Line (U/G) Deport GSRTC Ramp SCALE: - NTS Metro Station Railway BRTS JICA Funded Portion Executing Agency All system works (Rolling Stock, Signaling & Train Control System, Telecommunication system, Lift & Escalators, PSD, AFC, UG E&M, Track) are JICA funded. Gujarat Metro Rail Corporation Limited Ahmedabad Metro Estimated Project Cost Map JPY 246,219 Million (Rs. 15,388 Crore) Loan Amount JPY 82,434 Million (Rs. 5,152 Crore) Project Commencement ROUTE October 2015 Total Distance: 39.259 km Scheduled Project Completion Line 1: Priority Reach: March 2019 Number of Stations: 15, Route Length: 20.737 kms Entire Stretch: November 2020 Motera Stadium APMC Project Consultant Line 2: Consortium of SYSTRA S.A. (France), Number of Stations: 17, Route Length: 18.522 kms RITES Ltd. (India), Oriental Consultants Global Co. Ltd. (Japan), AECOM Asia Thaltej Gam Vastral Gam Co. Ltd. (Hong Kong) Total Number of Stations: 32 The first Ahmedabad Metro got launched on Apparel Park Station March 4th 2019 from the Vastral Gam Station Exchange Rate: INR 1=JPY 1.6 Completed Ongoing
Japan International Cooperation Agency JICA | 09 UNIQUE features • Provision of half height platform • Integration of ticketing system with • Full IP based telecom network- screen door in elevated station and other mode of transport using improves stability & availability full height platform screen door in open-loop systems under ground station for passenger • Adopting CBTC signaling systems safety “ Ahmedabad Metro Rail Project is being implemented by GMRCL with financial assistance from JICA to bring about environmental improvement and reduce travel time of commuters by introducing a Modern Mass Rapid Transit system in the city. Dr. I.P. Gautam, IAS (Retd.) Managing Director, Gujarat Metro Rail Corporation Limited (GMRCL) East Bound Tunnel- Launching Shaft Underground Ground-1 Viaduct Construction work near Paldi Station From Apprarel Park Depot towards Kankaria East (North-South Corridor) “ Ahmedabad Metro Project is unique in providing seamless multi-model connectivity and promoting efficient land use through construction of 8 kms of Metro on Railway corridor where Metro will pass above and below the Indian Railways. India's first integrated Railway and Metro Station at Gandhigram is unique feature of the project in addition to the interconnectivity with High Speed Rail (Bullet Train System) and Indian Railway at Ahmedabad Railway Station. The Metro will also provide a unique blend of heritage and modernity in India's first Heritage City. Mr. Kengo Akamine, Senior Representative, JICA India
10 | JICA Japan International Cooperation Agency 2 BANGALORE METRO Route Map of Bangalore Metro Rail Project Phase -1 Nagasandra Dasarahalli Jalahalli Peenya Industry Peenya Peenya Depot Goraguntepalya Metro Station OBJECTIVE Yeshwantpur Sandal Soap Factory Mahalakshmi Baiyappanahali Depot UG1 Rajajinagar Mahakavi The population of Bengaluru has drastically increased Kuvempu Road Baiyappanahali from 6.5 million in 2001 to 9.6 million in 2011, Srirampura Dr. B.R. Ambedkar Stn., Vidhana Soudha Trinity Indiranagar Swami Vivekananda increasing the number of people living per square Mantri Square Sampige Road Station Krantivira Sangoli Rayanna Railway Station Cubbon Park Road Halasuru kilometer in the city from 2,985 in 2001 to 4,378 in Magadi Road Mahatma Gandhi Road Sri Nadaprabhu Sir M. Visvesvarayan Stn., 2011. The Bangalore Metro Project aims at Balagangadharanatha Swamiji Stn. Hosahali Kempegowda Station, Majestic Central College UG2 transferring the advanced technology from Japan, Vijayanagar Chichpete Krishna Rajendra Market Jica Funded including project management, safety management, Attiguppe National College UG1 (3.97km) Deepanjali Nagar low energy consumption, etc. so that the citizens in Lalbagh UG2 (4.46km) Mysuru Road Majestic Under Bengaluru can enjoy safe, timely and comfortable Station South End Circle Ground Station Jayanagar Phase-1 Depot travel with high reliability of mobility services. Rashtreeya Vidalaya Road Banashankari PARTICULARS Jaya Prakash Nagar Yelachenahalli Station Executing Agency Bangalore Metro Rail Project Phase-1 Bangalore Metro Rail Corporation Limited Map Estimated Project Cost JPY 306,809 Million (Rs. 19,175 Crore) Loan Amount JPY 19,832 Million (Rs. 1,239 Crore) ROUTE Project Commencement Total Distance: 42.3 km January 2007 Purple Line: Scheduled Project Completion Number of Stations: 17, Route Length: 18.1 kms June 2017 Mysuru Road Baiyappanahalli Project Consultant Consortium of RITES Ltd. (India), Oriental Consultants Green Line: Global Co. Ltd. (Japan), Parsons Brinckerhoff Number of Stations: 24, Route Length: 24.2 kms International Inc (USA), SYSTRA S.A. (France) Nagasandra Yelachenahalli Total Number of Stations: 41 Commuters comfortably riding the metro People approaching to board the metro at MG Metro Station Exchange Rate: INR 1=JPY 1.6 Completed Ongoing
Japan International Cooperation Agency JICA | 11 UNIQUE features • Advanced Training Centre for train • The first underground line in • First time in India, with real time train operators, which can be utilized by South India surveillance from operational control other metros room • Successful tackling of rocky strata during underground construction “ With great sense of pride, Bangalore Metro acknowledges that JICA was the first bilateral financial institution to come forward to fund about 35% of the project cost in the form of sovereign loan as early as in 2006. Besides augmenting financial resources, BMRCL has tremendously benefitted by drawing upon JICA’s expertise in developing capabilities and gaining understanding of the best practices in procurement and contracting, including drafting of tender conditions, technical and financial evaluation. JICA has also been flexible in their approach which enabled BMRCL to modulate its requirements to suit the project needs. Thus by associating with JICA, BMRCL project could achieve financial closure of the Phase 1 of the project in the beginning itself. With the support of JICA, Phase 1 of the project was fully completed in June 2017. The ridership has been on the rise. Thus, BMRCL is able to achieve its project objectives. BMRCL is thankful to JICA for all the support and cooperation. I wish JICA more such success in its future endeavor through participation in the growth and development of our country. Mr. Ajay Seth, Managing Director, Bangalore Metro Rail Corporation Limited (BMRCL) “ The lack of mass transit public transportation systems in Bengaluru, one of the fastest growing cities in the world, which houses prominent Japanese corporates, had been a major hurdle to Bengaluru’s widespread economic growth and led to increased use of private vehicles. This in turn caused traffic delays, air pollution, wasteful fuel consumption, and economic losses through time wastage. JICA by providing advance technological support and financial assistance through long term financing structure supported BMRCL’s efforts to provide safe, effective and affordable public transport systems, which is the connectivity backbone of Bengaluru’s urban transport. Mr. Sho Naya, Representative, JICA India
12 | JICA Japan International Cooperation Agency WIMCO NAGAR WIMCO NAGAR DEPOT THIRUVOTTIYUR GOWRI ASHRAM THANGAL TOLLGATE TONDIARPET 3 CHENNAI KORUKKUPET SIR THIYAGARAYA COLLEGE WASHERMANPET METRO ANNA NAGAR TOWER ANNA NAGAR EAST METRO THIRUMANGALAM PACHAIYAPPA’S COLLEGE EGMORE METRO SHENOY NAGAR NEHRU PARK MANNADI HIGH COURT KILPAUK CENTRAL METRO KOYAMBEDU CMBT GOVERNMENT ESTATE OBJECTIVE KOYAMBEDU DEPOT ARUMBAKKAM LIC THOUSAND LIGHTS VADAPALANI AG - DMS The population of Chennai Metropolitan Area increased TEYNAMPET ASHOK NAGAR from 7.1 million in 2001 to 8.7 million in 2011, resulting NANDANAM CORRIDOR I - EXTENSION (BLUE LINE) ELEVATED in the need for implementation of Chennai Metro Rail SAIDAPET METRO UNDER GROUND EKKATTUTHANGAL LITTLE MOUNT Project. Given the growing population, the objective of GUINDY METRO CORRIDOR I (BLUE LINE) UNDER GROUND ELEVATED the Project was to provide improved access to public NANGANALLUR ROAD ALANDUR CORRIDOR II (GREEN LINE) transport for dense population comprising of industrial ST. THOMAS MOUNT METRO ELEVATED UNDER GROUND MEENAMBAKKAM METRO workers to move towards the central business districts AIRPORT DEPOT of the city for work. Chennai Metro Rail Project Phase-1 ABOUT Map Executing Agency Chennai Metro Rail Limited (CMRL) Estimated Project Cost Assissi Nagar Manjambakkam Phase 1: JPY 385,646 Million (Rs. 24,102 Crore) Velmurugan Nagar Venugopal Nagar Madhavaram Milk Colony Phase 2: JPY 725,415 Million (Rs. 45,338 Crore) MMBT Shastri Nagar Thapal Petti Murari Hospital Retteri Junction Moolakadai Loan Amount (JPY 306,809 Million) Kolathur Junction Srinivasa Nagar Sembiyam Perambur Market Phase 1: JPY 183,595 Million (Rs. 11,474 Crore) Villivakkam Metro Villivakkam Bus Terminus Perambur Metro Nadhamuni Ayanavaram ass Phase 2: JPY 357,476 Million (Rs. 22,342 Crore) Pattalam us yp Anna Nagar Depot Otteri Perambur Barracks Roads min Purasaiwakkam High Road eB Thirumangalam Kelleys Ter Project Commencement Date Kendriya Doveton Junction alle us Gra Vidyalaya KMC Kaliammankoil eB S tam Ela ai Nag in Ma di Chetpet Metro i am ad Street Jn. va alle ngo a rke November 2008 Na r Bus ot t CMBT av Sterling Road Jn. ha am g S Th on Va Alw ar Bus top ttu n Ch nC am Thousand Lights East on la a Nungambakkam llai Sto Ala Ka sara rtiru Po kk ya p Royapettah Govt. Hospital a Po Mu r n pa pa ab v N ara a akk ag ma k Scheduled Project Completion Date Gemini Radhakrishnan Salai Jn. Por kam kkam am ar K Na nag Subu llage Ku Light House Pa am i Co ro ur J Ka Jn. n. Alwarpet dam een e At ;ani bak aks Dam Pa ban lig hool Temple Stop am M us pa March 2020 Foreshore Road r rk c ram Mugalivakka a hi S h r H Vad t tro po Kutchery Road al g na rk aic spit ssin De Me al a ma Road DLF IT SEZ Sa o Av Mandaiveli m P k Ho Cro Jn us Sathya Nagar Na san ai Project Consultant al B we yil are da da Greenways Road Metro Th asan ss te ang anr CTC ypa Po n Bh yar G Adyar Junction Ko ach thid iru nth Butt Road ai B Ram Consortium of Egis Rail S.A (France), Maunsell Alandur apa Ad enn ara Adyar Depot lyy Ch St. Thomas Mount Indira Nagar Consultants Asia Ltd. (Hong Kong), Yachiyo Adambakkam Vanuvampet Thiruvanmiyur Metro Taramani Link Road Puzhuthivakkam Engineering Co. Ltd. (Japan), Egis India Consulting Madipakkam Nehru Nagar Kandanchavadi Engineers Pvt. Ltd. (India) and Balaji Railroad Kilkattalai Perungudi Echangadu Systems Ltd. (India). Kovilambakkam Thoraipakkam Mettukuppam ROUTE (Phase-1) Vellakkal PTC Colony Medavakkam Koot Road Okkiyampet Kamraj Garden Street Karapakkam Medavakkam Jn. Okkiyam Thoraipakkam Perumbakkam Global Hospital Sholinganallur Elcot Total Distance: 52 km Corridor 3 - 45.8 km Sholinganallur Lake Sri Ponniamman Temple (Madhavaram - SIPCOT) Sathyabama University St. Joseph’s College Corridor 1: Corridor 4 - 26.1 km Semmancheri (Lighthouse - Poonamallee Bypass) Gandhi Nagar Number of Stations: 25, Route Length: 31 kms Corridor 5 - 47 km Navallur (Madahvaram - Sholinganallur) Siruseri Sipcot 1 Wimco Nagar Chennai Airport JICA Funded Portion - 52 km (CMBT - Sholinganallur) Sipcot 2 Corridor 2: Number of Stations: 17, Route Length: 22 kms Chennai Metro Rail Project Phase-2 Chennai Central St. Thomas Mount Metro Map Total Number of Stations: 43 Exchange Rate: INR 1=JPY 1.6 Completed Ongoing
Japan International Cooperation Agency JICA | 13 UNIQUE features • Unlike other metro systems, this • Chennai Metro Rail Project is a Green • Provides free bicycle ride scheme for metro, in its first phase itself covers all Project as it utilizes Solar Energy its customers the important landmarks in the city “ JICA - assisted Chennai metro project is helping Chennai city to reduce congestion and bring down the transportation cost and pollution and also is safeguarding environment. Thiru Pankaj Kumar Bansal, Managing Director, Chennai Metro Rail Limited (CMRL) The commuters boarding Chennai Metro People queue after each other to access the token vending machine “ CMRL is incessantly aiming to ease mobility in this mega-city by bringing a modal shift in transportation. CMRL is an excellent example of what determined leadership and teamwork can achieve, given the constraints of implementation of the MRTS project in a time bound manner. Ms. Charu Sharma, Additional Lead Project Officer, JICA India
14 | JICA Japan International Cooperation Agency Rithala Samaypur BadLi Rive Rohini West r Ya mun Rohini Sec 18, 19 a Haiderpur-Badli Mor Rohini East Pitampura Jahangirpuri Shiv Vihar Adarsh Nagar 4 DELHI Kohat Enclave Azadpur Majlis Park Johri Enclave Model Town Gokulpuri Netaji Subhash Place Keshav Shalimar G.T.B. Nagar Maujpur - Babarpur Puram Bagh Vishwavidyalaya Shakur Pur Kanhaiya Vidhan Sabha Jafrabad Maharaja Nagar Brig. Bahad- Ghevro Nangloi Shastri Civil Lines Shastri Shaheed Rajendra Mohan Hoshiar urgarh Tikri Metro Railway Surajmal Peera Paschim Shivaji Nagar Pul Bangash Park Seelampur Shahdara Jhilmil Nagar Nagar Nagar Singh City Border Station Mundka Station Stadium Garhi Vihar (E) Park Kashmere Gate Hindon Ashok Park River Main Welcome Mansarover Dilshad Raj Shyam Pandit Tikri Mundka Rajdhani Nangloi Udyog Paschim Madipur Punjabi Inder Lok Pratap Tis Hazari Arthala Nagar Lal Quila Park Garden Bagh Park Shree Ram Kalan Industrial Park Nagar Vihar (W) Bagh Azad Nagar(E) Satguru Ram New Bus Sharma Area (MIA) Adda Punjabi Singh Marg Chandni Chowk Bagh (W) Jama Masjid Krishna Nagar METRO Janakpuri Subhash ESI Ramesh Chawri Bazar Delhi Janak Puri East Nagar Basaidarapur Nagar Kirti Nagar Gate Karkarduma Court West Patel Anand Vihar Vaishali Tilak Tagore Rajouri Moti Nagar New Delhi I.S.B.T. Nagar Garden Garden Shadipur Karol Nagar Bagh RK Ashram Uttam Nagar (E) Preet Vihar Karkarduma Kaushambi Rajendra Place Marg I.T.O. Barakhamba Nirman Vihar Jhandewalan I.P. Extension Rajiv Road Pragati Uttam Nagar (W) Dabri Mor - Maya Puri Chowk Laxmi Nagar Janakpuri South Shivaji Maidan Nawada Stadium Vinod Nagar(W) - Mandawali Naraina Vihar Yamuna Bank Mandi House Indraprastha Patel Chowk Janpath Vinod Nagar(E) - Mayur Vihar-II Dwarka Mor Akshardham Nangli Central Secretariat Dhansa Dashrath h Hazrat Mayur Bus Stand Dwarka Puri uk Udyog Nizamuddin Vihar-I Trilokpuri - Sanjay Lake Najafgarh m Bhawan Lok Khan Market Dwarka Sec 14 esh Kalyan Palam Delhi Cantt. D us Mayur Vihar ai mp Marg JLN Stadium Pocket-I ab Ca Bhikaji Ashram urg Cama Dwarka Sec 13 Dwarka Sec 12 D outh Place INA Jor Bagh Jangpura Vindoba Mayur Vihar Extention S Sadar Bazar Dhaula Kuan Puri Sir Sarojini South Lajpat Nagar Cantonment Dwarka Sec 11 M. Vishweshwaralah Nagar Extension New Ashok Nagar Dwarka Sec 10 Terminal I-IGI Moolchand Noida Airport Moti Bagh AIIMS Electronic City Kailash Colony Dwarka Sec 9 Green Nehru Vasant R.K. Noida Sec 15 Sec 62 Noida Dwarka Sec 8 Vihar Puram I.I.T. Park Place Kalkaji Okhla Sukhdev Airport Mandir N.S.I.C. Vihar Jamia Millia Noida Sec 16 Hauz Khas Govind Puri Islamia Sec 59 Noida Delhi Shankar Munirka k lash lave hi Aerocity Vihar Okhla Vihar ar Del Malviya Nagar Harkesh Nagar Noida Sec 18 lP Kai Enc Okhla Jasola Vihar Sec 61 Noida ee OBJECTIVE g Dwarka Shaheen Bagh ra er Sec 34 sh Botanical Garden ru Moulsari Saket Chi Sec 21 at Jasola Apollo Sarita Vihar ch Neh Avenue Noida Gre Sec 52 Noida Pan Qutub Minar Tughlakabad Kalindi Okhla Bird Mohan Estate Kunj Sanctuary Sec 51 Cyber City Phase 3 Station Golf Nodia City Sec 50 Chhattarpur Badarpur Border Course Centre Sultanpur Sarai Sec 76 Phase 2 Sec 101 Belvedere Towers Guru Dronacharya Mewala Maharajpur N.S.E.Z. Sec 81 IFFCO Ghitorni N.H.P.C. Chowk Chowk Rive Sec 137 Sec 83 M.G. Sikanderpur Arjan Garh Sector 28 Badkal Mor r Ya Phase 1 mun Sec 142 Depot Station Road Sec 143 GNIDA Office a Sec 42-43 Sec 144 Knowledge Pari Chowk Old Faridabad HUDA City * Neelam Chowk Sec 145 Centre Sec 146 Alpha 1 Sec 53-54 Ajronda Delta 1 Park II Bata Chowk Sec 147 Sec 54 Chowk Escorts Mujesar Sec 148 Sec 55-56 Sant Surdas (Sihi) Raja Nahar Singh The city expanded significantly resulting in a two-fold rise in population and a five-fold rise in the number of vehicles between 1981 and 1998.* Consequently, traffic Delhi Metro congestion and pollution soared, as an increasing Map number of commuters took to private vehicles with the existing bus system unable to bear the load. To curb frequent traffic congestions, the Delhi Metro was born which aimed at promoting a modal shift in ROUTE transportation, thereby bringing an era of smart, Total Distance: 259 km functional and economical transportation to India. Line 1: PARTICULARS Number of Stations: 21, Route Length: 25.9 kms Rithala Shahdara Dilshad Garden Executing Agency Line 2: Delhi Metro Rail Corporation Limited Number of Stations: 31, Route Length: 42.38 kms Estimated Project Cost Samaypur Badli Vishwa Vidyalaya Arjangarh (Haryana Border) Project JPY/Million Line 3: Phase 1: 695,565 Number of Stations: 29, Route Length: 33.67 kms Phase 2: 388,670 Phase 3: 277,952 Dwarka Yamuna Bank New Ashok Nagar Total: 1,362,187 (Rs. 85,136 Crore) Line 4: Loan Amount (As per Loan Agreement) Number of Stations: 5, Route Length: 6.17 kms Project JPY/Million Phase 1: 162,751 Yamuna Bank Anand Vihar Phase 2: 211,976 Line 5: Phase 3: 330,479 Number of Stations: 20, Route Length: 24.77 kms Total: 705,206 (Rs. 36,067 Crore) Inderlok/Kirti Nagar Mundka Tikri Border Project Commencement Line 6: July 2013 (Phase 3) Number of Stations: 23, Route Length: 29.53 kms Scheduled Project Completion Kashmeri Gate Central Secretariat Badarpur December 2021 (Phase 3) Line 7: Project Consultant Number of Stations: 38, Route Length: 58.42 kms Phase 1: CONSORTIUM of PCI, JARTS, TONICHI, Mukundpur (Majlis Park) Maujpur Shiv Vihar PBI & RITES Phase 2: CONSORTIUM of PCI/OCC, JARTS, Line 8: TONICHI, PBI & RITES Number of Stations: 23, Route Length: 33.49 kms Phase 3: CONSORTIUM of OCC, TONICHI, PBI & RITES Janakpuri West Kalindikunj Line 9: Acronyms: Number of Stations: 4, Route Length: 5.48 kms PCI - Pacific Consultants International (Japan) JARTS - Japan Railway Technical Service (Japan) Dwarka Najafgarh Dhansa Bus Stand TONICHI - Tonichi Engineering Consultants, Inc. (Japan) PBI - Parsons Brinckerhoff International Inc. (USA) RITES - Rail India Technical And Economic Services Ltd (India) Total Number of Stations: 194 OCG - Oriental Consultants Global Ltd. (Japan) *https://web.archive.org/web/20100925022045/http://www.delhimetrorail.com/needformetro/history.aspx Exchange Rate: INR 1=JPY 1.6 Completed Ongoing
Japan International Cooperation Agency JICA | 15 UNIQUE features • Certified by the United Nations (UN) • Highest generator of solar power • All stations opened so far in Phase-3 as the First Metro Rail system in the (23 MWp) in the transportation sector have been rated as ‘Platinum’ by the world to get carbon Credits for in India Indian Green Building Council for reducing Green House Gas Emissions adherence to Green Building norms • 1st project (phase 1) completed within the estimated cost and scheduled period “ The Delhi Metro has been instrumental in ushering a new era of Mass Rapid Transit System (MRTS) in country. JICA has supported us in all our projects and has helped us in transforming Delhi into a world class capital. Dr. Mangu Singh, Managing Director, Delhi Metro Rail Corporation (DMRC) Woman coaches enable woman to travel comfortably Automatic ticket vending machines at the station even at odd hours of the day “The unique work culture of DMRC and its proven record of completing projects on time has motivated many other cities in India to come up with their own Metro systems. Right now, 10 Indian cities have operational Metro networks and many other cities are either planning or constructing their own Metro systems, buoyed by the success of the Delhi Metro. Mr. M.P. Singh, Chief Development Specialist, JICA India
16 | JICA Japan International Cooperation Agency 5 KOLKATA METRO Elevated Corridor 5.8 kms ROUTE MAP Total 16.6 kms OBJECTIVE Underground Corridor 10.8 kms Central Park Station Phase-II 9.60 kms Underground Karunmoyee 10.8 kms The city of Kolkata has 190 km in area and 4,580,000 2 City Center Station Station in population, making the population density of 32,500 Elevated Viaduct Sector - V U/G Station: 6 nos. 5.8 kms per km2, which is considered as one of the highest in Bengal Chemical Station the world. The Kolkata Metro Project aims at mitigating bottlenecks in the city by employing most Howrah Tunnel under River Hooghly Phoolbagan Salt Lake Stadium Station Station Station advanced technology in the process. It will be the first RAMP Section Phase-I 7.00 kms Howrah metro in India that will have an underwater section Maidan which will help connect both sides of the river-divided Mahakaran nade Station Espla Sealdan Station city, responding to the growing traffic demands. Elevated Staion: 6 no PARTICULARS LEMEND Completed In Progress Underground [Tunneling] JICA FUNDED PORTION Elevated Executing Agency KOLKATA EAST - WEST METRO CORRIDOR Kolkata Metro Rail Corporation Limited Kolkata East-West Metro Corridor Estimated Project Cost Map JPY 133,143 Million (Rs. 8,321 Crore) Loan Amount JPY 55,742 Million (Rs. 3,483 Crore) Project Commencement Date ROUTE July 2008 Total Distance: 16.6 km Scheduled Project Completion Date Corridor 1: June 2021 Project Consultant Howrah Sector - V Consortium of Maidan • Maunsell Consultants (Hong Kong) • Egis Rail Ltd. (France) Total Number of Stations: 12 • Consulting Engineering Services (India) • Yechio Engineer Corporation (Japan) • Lee Harris Pomeroy Architects (USA) Completed Tunnel in Phase-II Completed Viaduct Exchange Rate: INR 1=JPY 1.6 Completed Ongoing
Japan International Cooperation Agency JICA | 17 UNIQUE features • First transportation tunnel under any • First tunneling project in Eastern India • Metro connecting mammoth railway mighty river in India using earth pressure balancing tunnel terminals at Howrah and Sealdah boring machine which are two largest terminals in the country “ Kolkata is a city on the bank of river Hooghly which has been developed over the last three centuries in a sporadic manner. To get rid of the mobility problem in this megacity with ever-growing population, Mass Rapid Transit System [MRTS] is an effective solution for this region. 46% of the project cost is being funded by JICA, which is a substantial financial assistance for delivery of the project. This city proudly boasts the first MRTS in the country popularly known as North-South Metro which is successfully operated by Indian Railways for the last three decades. Govt. of India has initiated further MRTS development in east west direction from Salt Lake Sector-V in the east to Howrah Maidan in the west which traverses in the busy central district of Kolkata. This 16.6 km corridor encompasses the first transportation tunnel in the country under the mighty river Ganges. Mr. Parashuram Singh, Managing Director, Kolkata Metro Rail Corporation (KMRC) Elevated Viaduct Rollling Stock in Depot “ East West Metro Project 16.55 km system connects the east-west parts of the City of Joy, Kolkata. It passes below Hooghly River and commercial hub, and most populous areas. The interconnectivity with Howrah and Sealdah railway stations and existing Metro station Esplanade would decongest city by paradigm modal shift. The underground 10.81 kms tunnelling including 520 meters below the Hooghly river, got successfully completed in 66 days of record time. The project having most sophisticated signalling and traffic control systems has an extraordinary team of professionals from India and abroad. JICA team wished expeditious commissioning and revenue operation of the project. Ms. Yuko Shinohara, Representative, JICA India
18 | JICA Japan International Cooperation Agency AAREY COLONY DEPOT N 26. SPEEZ 27. AAREY 25. MIDC 6 MUMBAI 24. MAROL NAKA 22. SAHAR ROAD 23. CSIA (INTERNATIONAL) 21. CSIA (DOMESTIC) METRO 20. SANTACRUZ METRO 19. VIDYANAGARI 18. BKC OBJECTIVE 17. DHARAVI 16. SHITLADEVI TEMPLE The population of Greater Mumbai increased from 15. DADAR METRO 11.91 million in 2001 to 12.48 million in 2011, 14. SIDDHIVINAYAK 13. WORLI subsequently increasing number of vehicles from 1.03 million in 2000 to 1.77 million in 2010, resulting in the 12. ACHARYA ATRE CHOWK need for Mumbai Metro Project. To curb frequent 11. SCIENCE MUSEUM traffic congestions, the Project aims at abatement of 10. MAHALAXMI METRO 9. MUMBAI CENTRAL METRO pollution and mitigation of traffic congestions, 8. GRANT ROAD METRO ensuring overall ease of commuting for the people. 7. GIRGAON 6. KALBADEVI PARTICULARS 5. CST METRO 4. HUTATMA CHOWK 3. CHURCHGATE METRO 2. VIDHAN BHAVAN Executing Agency Mumbai Metro Rail Corporation Limited 1. CUFFE PARADE Estimated Project Cost Mumbai Metro Line - 3 JPY 621,374 Million (Rs. 38,835 Crore) Map Loan Amount JPY 171,000 Million (Rs. 10,687 Crore) Project Commencement Date July 2013 ROUTE Scheduled Project Completion Date Total Distance: 33.5 km December 2021 Corridor 1: Project Consultant MAPLE (A consortium of AECOM Asia Co. Ltd. Cuffe Aarey (Hong Kong), PADECO Co. Ltd. (Japan), Parade Louis Berger Group Inc (USA) and Egis Rail (France)) Total Number of Stations: 27 Aerial view of North shaft at Bandra Kurla Complex Casting yard Exchange Rate: INR 1=JPY 1.6 Completed Ongoing
Japan International Cooperation Agency JICA | 19 UNIQUE features • 1st Fully underground metro in the • Interchanges at 6 locations with • Connects areas not served by country existing public transport, business and Suburban Rail employment centers “Mumbai Metro Line 3 (Colaba-Bandra-SEEPZ) is a long-awaited project of Mumbai. Involvement of JICA funding agency has provided impetus to the project that is most challenging in the country. MMRC has received good cooperation from JICA for the the swift release of funds. Mrs. Ashwini Bhide, IAS, Managing Director, Mumbai Metro Rail Corporation (MMRC) Bird-eye view of the Mumbai Metro’s Churchgate Station Construction work underway at the Mumbai Metro’s Hutatma Chowk Station “ Mumbai Metro Line-3 is undoubtedly the most important transport corridor in Mumbai as it connects several major landmarks, key educational institutions and key business centers of the city. It is expected to become the Lifeline of Mumbai and to have greater ridership than any other metro rail line in India. The inspirational leadership at MMRCL has succeeded in imparting a sense of ownership to Mumbaikars through their innovative approach in public outreach and communication with stakeholders. Mr. Mihir Sorti, Principal Development Specialist, JICA India
Japan International Cooperation Agency JICA India Office 16th Floor, Hindustan Times House, 18-20, Kasturba Gandhi Marg, New Delhi - 110001, India. T: (91-11) 4909 7000 Published in: May 2019 F: (91-11) 4909 7001/7002 W: www.jica.go.jp/english/index.html W: www.jica.go.jp/india/english/index.html www.facebook.com/jicaindiapr
You can also read