Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
Main Roads WA
   Albany Ring Road Construction Impacts
CSBP Albany Depot Redevelopment Options
     Works Approval Supporting Document

                                 October 2020
Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
Abbreviations
    ARR        Albany Ring Road
    ASS        Acid Sulfate Soils
    BC Act     Biodiversity Conservation Act 2016

    BoM        Bureau of Meteorology
    CAWS Act   Country Areas Water Supply Act 1947
    CCI        Critical containment infrastructure
    DBCA       Department of Biodiversity, Conservation and Attractions
    DPLH       Department of Planning, Lands and Heritage
    DWER       Department of Water and Environmental Regulation
    EP Act     Environmental Protection Act 1986
    EPBC Act   Environment Protection and Biodiversity Conservation Act 1999
    IA         International Agreement

    OS         Other specially protected fauna
    PEC        Priority Ecological Community
    PDWSA      Public Drinking Water Source Area

    RIWI Act   Rights in Water and Irrigation Act 1914
    SMP        Site Management Plan
    TEC        Threatened Ecological Community
    WTP        Water treatment plant

                                GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                               CSBP Albany Depot Redevelopment Options, 12529600 | 1
Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
Executive summary
  Construction of the proposed Albany Ring Road (ARR) Stage 2, between chainage 15900 and 17300,
  will impact on infrastructure within the CSBP Limited Albany Fertiliser Distribution Facility (the
  Premises), located at 198 Hanrahan Road, Mount Elphinstone (comprising a portion of Lot 201 on
  Plan 76615), within the City of Albany.
  The CSBP depot operates under a Prescribed Premise licence, L8669/2012/1, under the
  Environmental Protection Act (1986) as administered by the Department of Water and Environmental
  Regulation (DWER) - Part V Licence L8669/2012/1 (the Licence).
  The impacts to the Premises resulting from the ARR encroachment will occur along the southern
  boundary and in particular the south-western corner, significantly impacting CSBP’s ability to continue
  operations and remain compliant with the current Licence with regards to onsite stormwater
  management and offsite discharge.

  This document has been prepared by GHD Pty Ltd (GHD) on behalf of Main Roads WA, to support a
  Works Approval Application for the relocation and rectification of CSBP infrastructure which will be
  impacted as a result of the construction of the proposed ARR.
  The purpose of this document is to provide information on the proposed works associated with
  construction and commissioning of relocated infrastructure, the potential impacts to sensitive receptors
  that may result from emissions or discharges associated with the project and detail how these impacts
  will be mitigated, minimised or adequately controlled. The primary intent of the relocation and
  rectification works proposed is to ensure that the Site continues to operate the same way (i.e. like for
  like) and in accordance with the current Licence water management and discharge parameters.
  This supporting document, together within the DWER Application Form, constitutes the Works
  Approval Application and includes technical information relevant to the proposed works.
  This Works Approval Application does not provide information on the specific ARR disturbance and
  construction impacts within the current Premises boundary and within the road design footprint as
  these approvals are being sought through a separate process by Main Roads WA.

  This report is subject to, and must be read in conjunction with, the limitations set out on the following
  page and the assumptions and qualifications contained throughout the Report.

                                             GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                            CSBP Albany Depot Redevelopment Options, 12529600 | 2
Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
Table of contents
  1.   Introduction .................................................................................................................................... 1
       1.1      Purpose of this report........................................................................................................... 1
       1.2      Works Approval application ................................................................................................. 1
       1.3      Application type.................................................................................................................... 2
       1.4      Works Application Fee ......................................................................................................... 3
  2.   Applicant details ............................................................................................................................. 4
       2.1      Applicant authorisation details .............................................................................................4
       2.2      Occupier status .................................................................................................................... 4
  3.   Premises details ............................................................................................................................. 5
  4.   Siting and location .......................................................................................................................... 7
       4.1      Climate ................................................................................................................................. 7
       4.2      Geology and soils ................................................................................................................ 7
       4.3      Hydrology and hydrogeology ............................................................................................... 9
       4.4      Contamination status .........................................................................................................10
       4.5      Environmentally Sensitive Areas ....................................................................................... 10
       4.6      Threatened and/ or priority ecological communities .......................................................... 10
       4.7      Threatened and/ or priority fauna ...................................................................................... 11
       4.8      Threatened and/ or priority flora ........................................................................................ 12
       4.9      Aboriginal and other heritage sites .................................................................................... 12
       4.10 Summary of nearby sensitive receptors and aspects ........................................................ 12
  5.   Project description........................................................................................................................ 15
       5.1      Prescribed premises infrastructure and equipment ........................................................... 15
       5.2      Extent of ARR encroachment ............................................................................................ 17
       5.3      Impacts to infrastructure along the southern boundary ..................................................... 19
  6.   Detailed description of proposed activities................................................................................... 20
       6.1      Water storage volume compensation ................................................................................ 20
       6.2      Relocation of discharge channel........................................................................................ 22
       6.3      Groundwater monitoring well replacement program.......................................................... 24
       6.4      Clearing activities ............................................................................................................... 24
       6.5      Proposed boundary realignment........................................................................................ 25
       6.6      Summary of proposed activities......................................................................................... 27
       6.7      Environmental commissioning ........................................................................................... 28
  7.   Emissions, discharges and waste ................................................................................................ 29
       7.1      Air emissions...................................................................................................................... 29
       7.2      Noise emissions ................................................................................................................. 29
       7.3      Waste and leachate emissions .......................................................................................... 30
       7.4      Wastewater discharges ..................................................................................................... 31
  8.   Other DWER approvals................................................................................................................ 32

                                                            GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                                                 CSBP Albany Depot Redevelopment Options, 12529600 | 3
Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
8.1      Pre-application scoping .....................................................................................................32
      8.2      Environmental impact assessment (Part IV of the EP Act) ............................................... 32
      8.3      Clearing of native vegetation (Part V Division 2 of the EP Act and Country Area
               Water Supply Act 1947) ..................................................................................................... 32
      8.4      Country Area Water Supply Act 1947 licence application ................................................. 32
      8.5      Water licences and permits (Rights in Water and Irrigation Act 1914) .............................. 32
9.    Other approvals and consultation ................................................................................................ 33
10.   Submission of any other relevant information .............................................................................. 34
      10.1 Detailed works program schedule ..................................................................................... 34
11.   Limitations .................................................................................................................................... 35
12.   References ................................................................................................................................... 36

                                                           GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                                                CSBP Albany Depot Redevelopment Options, 12529600 | 4
Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
Table index
  Table 1    Reference to DWER application form requirements............................................................ 1
  Table 2    Summary of applicant details............................................................................................... 4
  Table 3    Summary of premises details .............................................................................................. 5
  Table 4    Soil descriptions occurring within the Premises (GoWA, 2020a) ........................................ 8
  Table 5    Nearby environmentally sensitive receptors and aspects ................................................. 12
  Table 6    Summary of existing vs proposed unlined pond design parameters ................................. 21
  Table 7    CSBP’s proposed replacement program of monitoring wells ............................................ 24
  Table 8    Proposed activities and timeframes ................................................................................... 27
  Table 9    Licence monitoring requirements at SW4 (V-notch weir) .................................................. 31
  Table 10   Other approvals and consultation ...................................................................................... 33

Plate index
  Plate 1    Albany Site Number 9500 Climate Data (1877-2020) (BoM 2020) ..................................... 7
  Plate 2    Excerpt of ASS risk mapping overlain by the ARR footprint and CSBP site ....................... 8

  Plate 3    Survey model output of ARR construction footprint in relation to CSBP’s water
             storage infrastructure ......................................................................................................... 17
  Plate 4    Design showing ARR extent/ finishes near lined pond and minimum clearance
             at top of bank ..................................................................................................................... 18
  Plate 5    3-D Model output showing toe drain, fence and lined pond .............................................. 19
  Plate 6    Cross sectional representation of the ARR construction encroachment into the
             unlined pond ...................................................................................................................... 19
  Plate 7    3-D model output of the unlined pond following expansion to the east (looking
             north) .................................................................................................................................. 21

  Plate 8    Proposed diversion of the unlined drain on the southern boundary (looking
             north) .................................................................................................................................. 22
  Plate 9    Proposed diversion of the unlined drain on the southern boundary (looking
             south-east) ......................................................................................................................... 22
  Plate 10   Proposed new location and connections for the discharge channel ................................. 23

Figure index
  Figure 1   Premises Location and Boundary ........................................................................................ 6
  Figure 2   Premises Siting and Location ............................................................................................ 14
  Figure 3   Premises current licensed infrastructure and equipment .................................................. 16
  Figure 4   Proposed groundwater bore reinstallation program .......................................................... 26

                                                         GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                                              CSBP Albany Depot Redevelopment Options, 12529600 | 5
Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
Appendices
  Appendix A – Summary of cost estimate
  Appendix B – Proof of occupier status
  Appendix C – Proposed activities

  Appendix D – Indicative works schedule

                                           GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                          CSBP Albany Depot Redevelopment Options, 12529600 | 6
Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
1.   Introduction
     1.1       Purpose of this report
     Main Roads is proposing to construct and operate the Albany Ring Road (ARR). Construction of
     the proposed ARR will impact on infrastructure within the CSBP Limited Albany Fertiliser
     Distribution Facility (the Premises), located at 198 Hanrahan Road, Mount Elphinstone within
     the City of Albany.
     The impacts by the proposed ARR construction includes operating infrastructure inside the
     Premises boundary licenced under the Environmental Protection Act 1986, Part V Licence
     L8669/2012/1.
     The purpose of this document is to provide information on the proposed works associated with
     construction and commissioning of relocated infrastructure, the potential impacts to sensitive
     receptors that may result from emissions or discharges associated with the project and detail
     how these impacts will be mitigated, minimised or adequately controlled.
     This document has been prepared by GHD Pty Ltd (GHD) on behalf of Main Roads WA to
     support a Works Approval Application for relocation of CSBP infrastructure which will impacted
     as a result of the construction of the proposed ARR. This Works Approval Application does not
     provide information on the specific ARR disturbance and construction impacts within the current
     Premises boundary as these approvals are being sought through a separate process by Main
     Roads WA.
     This supporting document, together within the DWER Application Form, constitutes the Works
     Approval Application and includes technical information relevant to the proposed works.

     1.2       Works Approval application
     Information requested in the DWER Application Form is provided throughout this supporting
     report. Table 1 refers to where each requirement can be found in this document.
     Table 1      Reference to DWER application form requirements

      Application form requirements                                           Supporting report location
      Part 1: Application type                                                Section 1.3
      Part 2: Applicant details                                               Section 2
      Part 3: Premises details                                                Section 3
      Part 5: Index of Biodiversity Surveys for Assessment and Index          Not required
      of Marine Surveys for Assessment
      Part 6: Other DWER approvals                                            Section 8
      Part 7: Other approvals and consultation                                Section 9
      Part 8: Applicant history                                               Not required
      Part 9: Emissions, discharges, and waste                                Section 7
      Part 10: Siting and location                                            Section 4
      Part 11: Submission of any other relevant information                   Section 10
      Part 12: Proposed fee calculation                                       Section 1.4, Appendix A
      Part 13: Commercially sensitive or confidential information             Application form

                                          GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                         CSBP Albany Depot Redevelopment Options, 12529600 | 1
Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
Application form requirements                                           Supporting report location
 Part 14: Submission of application                                      Application form
 Part 15: Declaration and signature                                      Application form
 Attachment 1A: Proof of occupier status                                 Appendix B
 Attachment 1B: ASIC company extract                                     Appendix B
 Attachment 1C: Authorisation to act as a representative of the          Not required
 occupier
 Attachment 2: Premises map/s                                            Figure 1, page 6
 Attachment 3A: Environmental commissioning plan                         See Section 6.7
 Attachment 3B: Proposed activities                                      Appendix C
 Attachment 3C: Map of area proposed to be cleared (only                 Drawing C011, Appendix D
 applicable if clearing is proposed)                                     Note no native vegetation
                                                                         clearing is proposed.
 Attachment 3D: Additional information for clearing assessment           Not required
 Attachment 4: Marine surveys (only applicable if marine                 Not required
 surveys included in application)
 Attachment 5: Other approvals and consultation documentation            Not required
 Attachment 6A: Emissions and discharges                                 See Section 7
 Attachment 6B: Waste acceptance                                         Not required
 Attachment 7: Siting and location                                       Figure 2, page 14
 Attachment 8: Additional information submitted                          See Section 10
 Attachment 9: Proposed fee calculation                                  Appendix A
 Attachment 10: Request for exemption from publication                   Not required

1.3      Application type

1.3.1    Current application type

The current application is for a Works Approval under Part V, Division 3 of the Environmental
Protection Act 1986 (EP Act).

1.3.2    Prescribed Premise licence (L8669/2012/1) overview

The CSBP depot operates under a Prescribed Premise licence, L8669/2012/1, under the
Environmental Protection Act (1986) as administered by the Department of Water and
Environmental Regulation (DWER).

This licence expires 12 December 2021, therefore there are more than 90 days until the expiry
of the existing licence.

1.3.3    Premises categories

The site is a Category 33 licensed premise for “chemical blending or mixing: premises on which
chemicals or chemical products are mixed, blended, or packaged in a manner that causes or is
likely to cause a discharge of waste to the environment (up to 500 tpa)”.

                                     GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                    CSBP Albany Depot Redevelopment Options, 12529600 | 2
Main Roads WA Albany Ring Road Construction Impacts CSBP Albany Depot Redevelopment Options Works Approval Supporting Document October 2020 ...
The site licence requires that the stormwater from the site is managed by directing it away from
the areas where fertilisers and product materials are stored onsite (using lined perimeter
drains). It also requires that any stormwater and/or wastewater that is potentially contaminated
should be collected within the lined drains and go through the lined pond to the water treatment
plant onsite (stormwater overflows from high rainfall periods being an exception).
The licence also states that all wastewater from within the site should only be discharged
through the v-notch weir to the Munster Hill Drain with stipulated monitoring requirements and
licence limits for stormwater.

1.4      Works Application Fee
Using the Works Approval fee calculator available via the DWER website, the fee for this Works
Approval Application (WAA) is understood to be $3,857. This fee was calculated from the cost
of the works in accordance with Regulation 5BA and Schedule 3 of the Environmental
Protection Regulations 1987, including all costs associated with the construction and
establishment of the prescribed premises infrastructure. The estimated cost of the Project on
which the fee calculation is based is up to $387,000 (incl. GST).
A summary of the cost estimate is included in Appendix A.

                                   GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                  CSBP Albany Depot Redevelopment Options, 12529600 | 3
2.   Applicant details
     2.1       Applicant authorisation details
     The applicant details are summarised in Table 2 below.
     Table 2      Summary of applicant details
      Applicant name                         CSBP Limited
      ACN                                    008 668 371
      Authorised representative and          Name            Stephanie Felstead
      contact person                         Position        Environmental Superintendent
                                             Organisation    CSBP Limited
                                                             PO Box 345
                                             Address
                                                             KWINANA WA 6966
                                             Telephone       0448 794956
                                             Email           stephanie.felstead@csbp.com.au
      Registered office address, as
      registered with the Australian         'Brookfield Place Tower 2' Level 14, 123 St Georges
      Securities and Investments             Terrace, PERTH WA 6000
      Commission (ASIC)
      Postal address                         PO Box 345
                                             KWINANA WA 6966
      Contact person and technical           Name            Alison White
      enquiries                              Position        Senior Environmental Advisor
                                             Organisation    CSBP Limited
                                                             PO Box 345
                                             Address
                                                             KWINANA WA 6966
                                             Telephone       0419 904 608
                                             Email           alison.white@csbp.com.au

     2.2       Occupier status
     CSBP Limited is the registered proprietor on the certificate of title.
     Proof of occupier status is provide as per copies of the certificate of title for 198 Hanrahan Road
     and ASIC company extract are provided in Appendix B.

                                          GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                         CSBP Albany Depot Redevelopment Options, 12529600 | 4
3.   Premises details
     The Premises occupy a portion of Lot 201 on Plan 76615. Lot 201 on Plan 76615 is comprised
     of three portions, one on the northern side of Lower Denmark Road and two smaller portions on
     the southern side of Lower Denmark Road (Figure 1). The portion of Lot 201 on the northern
     side of Lower Denmark Road comprises the current Premises boundary and is therefore the
     defined Premises for the purposes of the Work Approval Application.
     The Premises details are summarised in Table 3 below and the location is presented in
     Figure 1.
     Table 3     Summary of premises details

      Aspect                         Details
      Premises description           A Portion of Lot 201 on Plan 76615 – formerly Lot 2 on Plan
                                     230541 prior to a cadastral boundary change when a portion
                                     of Lot 2, on the eastern side of Hanrahan Road, was sold to
                                     the City of Albany
      Premises street address        198 Hanrahan Road, Mount Elphinstone
                                     ALBANY WA 6330
      Premises name                  CSBP Limited Albany Fertiliser Distribution Facility
      Premise boundary               A portion of Lot 201 bounded to the west by Hanrahan Rd,
      description                    the east by the Munster Hill Drain and the south by the
                                     railway reserve adjacent to Lower Denmark Rd
      Local Government Authority     City of Albany
      area
      GPS (latitude and longitude)   The current Premises boundary GPS location (corners)
      coordinates                    includes:
      (GDA 1994 MGA Zone 50)              577,228 E, 6,125,391 N
                                          578,355 E, 6,125,380 N

                                          578,355 E, 6,125,284 N
                                          578,535 E, 6,125,281 N
                                          578,479 E, 6,124,287 N
                                          578,406 E, 6,124,212 N
                                          577,223 E, 6,124,539 N

                                       GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                      CSBP Albany Depot Redevelopment Options, 12529600 | 5
Legend
         Main Roads
         Minor Roads
         Track
         Current License
         Premise Boundary
         Lot 201 on Plan
         76615
                                                                                                                                                                                                                                                                                                                                N anarup R d

                                                                                     ba
                                                                                          ny

                                                                                    Al
                                                                                               Hw                                        Menang Dr
                                                                                                    y

                                                                                                                                                                                                 d
                                                                                                                                                                                               ss R
                                                                                                                                                                                               Pa
                                                                                                                                                                                          ster
                                                                                                                                                                                         Ch e

                                                                                                                                                                                                                                                                    Rd
                                                                                                                                                                                                                                                                  Low er King
                                                                           South C oast H w
                                                                                                y                                                                                                                                                                                               Mermaid Av
                                                                                                                                                                                                                                                                                     t   Dr

                                                                                                                                                                                                                                                           Tro
                                                                                                                                                                                                                                                              d                  oin
                                                                                                                                                                                                                                                         dR

                                                                                                                                                                                                                                                               ode
                                                                                                                                                                                                                                                     o
                                                                                                                                                                                                                                                  wo

                                                                                                                                                                                                                                                                         uP
                                                                                                                                          ALBANY !
                                                                                                                                                 (

                                                                                                                                                                                                                                                                   S
                                                                                                                                                                                                                                              g

                                                                                                                                                                                                                                                                       Em
                                                                                                                                                                                                             A ngo                       llin

                                                                                                                                                                                                                                                                    t
                                                                                                                                                                                              Nort                   ve R       o
                                                                                                                                                                                                     h Rd                   d C
                                                                                                                                             H anrahan R d

                                                                                                                                                                                                                                                        R  d
                                                                                                                                                                                                            Rd

                                                                                                                                                                                                                                                     ks
                                                Lower Denmark Rd

                                                                                                                                                                                                                                                   L in
                                                                                                                                                                                                        C ampbell
                                                                                                                                                                                                                      Mid

                                                                                                                                                                                                                                               lf
                                                                                                                                                                                                                                            Go
                                                                                                                                                                                                                            d le
                                                                                                                                                                                                                                   ton
                                                                                                                                                                                                                                         Rd
                                                                                                                                                             Pr
                                                                                                                                                                  inc
                                                                                                                                                                     e

                                                                                                                                                                                                York St
                                                                                                                                                                         ss R
                                                                                                                                                                                oy a l
                                                                                                                                                                                         Dr

                                                                                                                                                                           LITTLE GROVE
                                                                                                                                                                         (
                                                                                                                                                                         !

                                                                                                                                                                                                                                                                                                         Rd
                                                                                                                                                                                                                                                                                                     Ba y
                                                                                                                                                                                                                                                                                                   man
                                                                                                                                                                                                                                                                                               nch
                                                                                                                                                                                                                                                                                              F re

     (
     !
                                                         (
                                                         !
    DARKAN              WAGIN           DUMBLEYUNG
(
!                   (
                    !               (
                                    !

                                KATANNING
                            (
                            !
                  KOJONUP
              (
              !                                                    JERRAMUNGUP
                                    TAMBELLUP
                                           (
                                           !                       (
                                                                   !
                                (
                                !
                                CRANBROOK
                            (
                            !                                          BREMER BAY
                                                                                (
                                                                                !
                                    MOUNT BARKER
                                (
                                !

    WALPOLE             DENMARK
                                          ALBANY
(
!                   (
                    !                   ! LITTLE GROVE
                                        (
                                        (
                                        !

                                                                                                        Paper Size ISO A3                                                                                                           Main Roads WA                                                                              Project No.              12529600

                                                                                                                                           o
                                                                                      0                  1                2          3                                                                                   Albany Ring Road Construction Impacts                                                                Revision No.              0
                                                                                                                                                                                                                       CSBP Albany Depot Redevelopment Options                                                                        Date              13/10/2020
                                                                                                             Kilometres

                                                                                               Map Projection: Transverse Mercator
                                                                                                 Horizontal Datum: GDA 1994                                                                                         Premises Map - CSBP Limited Albany
                                                                                                 Grid: GDA 1994 MGA Zone 50
                                                                                                                                                                                                                       Fertiliser Distribution Facility                                                                                          FIGURE 1
                                                                                                                                                                                                                                                          Data source: GHD: Premises Boundary - 20200930; LGATE: Roads - 201910, Imagery accessed on 20201013. Created by: slei
4.   Siting and location
     4.1                   Climate
     Albany experiences a Mediterranean climate with cool, wet winters and warm, dry summers.
     Rainfall is generally received in winter (June - August). The area also receives periodic summer
     rainfall as a result of thunderstorm activity or rain-bearing depressions from tropical cyclones.
     The closest Bureau of Meteorology (BoM) weather station with sufficient historical data is
     Albany (site number 009500), located approximately 1.7 km east of the Project Area, at its
     closest point (BoM, 2020). Climate data from this station indicates the mean maximum
     temperature ranges from 22.9°C in February to 15.8°C in July. The mean minimum temperature
     ranges from 15.6°C in February to 8.2°C in July. The mean annual rainfall is 925.1 mm, with
     approximately 103 rain days a year (BoM, 2020).

                           25                                                                                  160

                                                                                                               140
                           20
                                                                                                               120
        Temperature (oC)

                                                                                                                     Rainfall (mm)
                           15                                                                                  100

                                                                                                               80
                           10                                                                                  60

                                                                                                               40
                           5
                                                                                                               20

                           0                                                                                   0
                                 Jan   Feb   Mar   Apr    May    Jun    Jul     Aug   Sep   Oct   Nov    Dec
                                                                  Month

                                        Mean monthly rainfall                 Mean maximum temperature
                                        Mean minimum temperature

     Plate 1                    Albany Site Number 9500 Climate Data (1877-2020) (BoM 2020)

     4.2                   Geology and soils

     4.2.1                 Regional geology

     Regional geological mapping (1:250,000) indicates the Premises area is underlain by Qc –
     Colluvium (sand, silt and clay) (Allen & Sofoulis, 1984).

     4.2.2                 Soils

     Three soils types have been mapped, by Department of Primary Industries and Regional
     Development (DPIRD), within the Premises area, however the Owingup Subsystem is the
     dominant soil type across the site (GoWA, 2020a). The soil unit ID, name, description and
     known salinity and water erosion risks for these soil types are presented in Table 4.

                                                         GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                                        CSBP Albany Depot Redevelopment Options, 12529600 | 7
Table 4         Soil descriptions occurring within the Premises (GoWA, 2020a)
 Soil unit ID     Name        Description                  Salinity risk         Water erosion risk
 242TbOW          Owingup     Plains with               3 to 10 % of map          3 to 10 % of map
                  Subsystem   swamps, lunettes              unit has a            unit has a high to
                              and dunes. Yellow         moderate to high           extreme water
                              solonetzic soils,         salinity risk or is          erosion risk.
                              organic loams and         presently saline.
                              diatomaceous
                              earth; Podzols on
                              dunes.
 242MmGAs         Gardner     Leached sands and
be acidified once oxidised) and will require treatment/management through liming when
excavated.
Further to this, it was inferred that the sand units in the unsaturated zone above the
groundwater table appeared to have already oxidised and represent an Actual ASS risk
(existing acidity). The unsaturated soil units will also require appropriate management if
disturbed however they are not expected to oxidise further and/or reactions are expected to be
at a much slower rate than the units below the water table.

4.3       Hydrology and hydrogeology

4.3.1     Groundwater

The Premises lie directly to the north of the Albany Groundwater Protection Area (GPA)
protected under the Rights in Water and Irrigation Act 1914 (RIWI Act). Lower Denmark Road
forms the northern boundary of this GPA (GoWA, 2020a).

The Premises are not intercepted by any Public Drinking Water Source Areas (PDWSA),
however the South Coast Water Reserve lies approximately 800 m to the south west. This
PDWSA is managed under the Country Areas Water Supply Act 1947 (CAWS Act) (GoWA,
2020a).
Historical data for June to August (winter months), for the groundwater wells that lie on the
southern boundary, the depth to water measured from below the top of casing (m bTOC) ranged
from 1.05 m in C12 (8.235 mAHD) to 2.92 m in C17 (10.395 mAHD). Generally though across
the site, groundwater is within 2-3 m of the ground surface depending on the time of the year.

4.3.2     Surface water

The area is located within the Princess Royal Harbour Catchment of the Albany Coast Basin in
the South West Division.
Lower Denmark Road is intercepted by a number of artificial channels, including the Munster
Hill Drain which lies on the western boundary of the Premises. This channel flows north to south
across Lower Denmark Road, connecting to Robinson Drain, and ultimately drains to Princess
Royal Harbour (GoWA, 2020a).
The Premises are not intercepted by any RIWI Act Rivers.

4.3.3     Wetlands

The Premises do not intercept any wetlands categorised as the following (GHD, 2020; GoWA,
2020a):
     The Department of Biodiversity, Conservation and Attractions (DBCA’)s Directory of
      Important Wetlands in Australia (DBCA-045)
     Redbook Recommended Conservation Reserves 1976-1991 (DBCA-029)
     South Coast Significant Wetlands (DBCA-018)

     Ramsar Sites (DBCA-010) and Water Information Reporting (DWER, 2019)
The closest Nationally Important Wetland is Oyster Harbour, which lies approximately 9.5 km to
the east of the Premises (GoWA, 2020a).

The Gledhow Conservation Category Wetlands, as mapped in the DBCA South Coast
Significant Wetlands dataset, are located approximately 650 m southwest of the Premises
boundary. In addition Conservation Category wetlands Seven Mile Creek, within the King River
Suite, are located approximately 7.7 km to the north west (GoWA, 2020a).

                                   GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                  CSBP Albany Depot Redevelopment Options, 12529600 | 9
4.4        Contamination status
CSBP has submitted documentation to DWER in support of reclassifying several portions of Lot
201, with an intent to achieved Remediated for restricted use under the Contaminated Sites Act
2003 for the Premises. Under such classification, the restrictions on use are likely to comprise
restrictions on groundwater abstraction and sub-surface excavation in certain areas (governed
by a Site Management Plan (SMP)).
An overview of the contamination concerns at the site (described by media) is provided below:
     Soils: primarily within the former Sulfur Pad Area, where there are buried wastes consisting
      of materials from historical site activities including manufacturing and production of
      chemicals (superphosphate and sulfuric acid). These areas are away from the proposed
      ARR alignment and the proposed areas requiring infrastructure realignment and are
      unlikely to be intercepted.
     Groundwater: elevated concentrations of nutrients and metals in groundwater are present
      within the CSBP depot site working area, resulting from historical activities of storages,
      spillages, disposal of product materials and wastes as well as manufacture and production
      of chemicals and fertilisers. GHD notes that the Hanrahan Road landfill site is located up-
      hydraulic gradient of the site and may also contribute to the water quality observed through
      landfill leachate migration in groundwater.
     Surface water: the surface water quality is expected to be largely free of contaminates
      other than residual products on the surface of the catchment area from product dust
      accumulation on roof and hard stand areas and operational spills (product or mechanical
      liquids from machinery/ vehicles onsite).
     Sediments: Aurora Environmental (2019a) undertook sampling and analysis of the
      sediments within the unlined pond (analysed for metals, trace elements, pH, nutrients,
      sulfate, and asbestos) and did not report anything above the assessment criteria.
      Desludged materials from the lined (treatment) pond are placed on hardstand areas or the
      drying beds adjacent to the water treatment plant (WTP) in accordance with the Licence.

4.5        Environmentally Sensitive Areas
No Environmentally Sensitive Areas (ESAs) have been identified within the Premises area,
during desktop and site investigations (GoWA, 2020a). The closest ESA is located
approximately 3.9 km to the east of the Premises on Mount Clarence, Albany (Figure 2).

4.6        Threatened and/ or priority ecological communities
During the Biological Survey of the ARR, Southern Ecology (2020) mapped the vegetation
within the area impacted by this Works Approval application as “Mature Planted Trees (Iron
Barks, Blue Gum, Tuart, other Eucalypts and Peppermint generally > 10 years old)”.

Southern Ecology (2020) did not identify any Threatened Ecological Communities (TECs) listed
under the Commonwealth EPBC Act or State Biodiversity Conservation Act 2016 (BC Act), or
Priority Ecological Communities (PECs) listed by DBCA within the Works Approval application
area.
Two TECs and four PECs were found to occur in the local area and include the following
(Southern Ecology, 2020):
     Subtropical and Temperate Coastal Saltmarsh TEC (Vulnerable) – occurs on the margin of
      Princess Royal Harbour and is confined to marine saline habitats therefore is not applicable
      to vegetation with in the Premises.

                                    GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                  CSBP Albany Depot Redevelopment Options, 12529600 | 10
     Proteaceae Dominated Kwongan Shrubland TEC (Endangered) – the Premises boundary
      is located outside the South East Coastal Botanical Provence, therefore this TEC is not
      present.
     Banksia coccinea Thicket (Priority 1), Coastal Melaleuca incana/ Taxandria juniperina
      (Priority 1) and Banksia littoralis/Melaleuca incana (Priority 1) have distinctive dominant
      species which are absent from the surveyed area.
     Astartea scoparia Swamp Thicket (Priority 1) may have previously occurred in the wetlands
      along Lower Denmark Road however this PEC was not identified during the Biological
      Survey as this area is now dominated by weeds, has a high level of disturbance and altered
      drainage.

4.7        Threatened and/ or priority fauna
Field assessments for the ARR Biological Survey confirmed that habitat within the Premises
may potentially be utilised by conservation significant fauna including (Southern Ecology, 2020):
     Baudin's Cockatoo (Calyptorhynchus baudinii) (Threatened-Endangered)
     Carnaby’s Cockatoo (Calyptorhynchus latirostris) (Threatened-Endangered)
     Forest Red-tailed Black Cockatoo (Calyptorhynchus banksii subsp. naso) (Threatened-
      Vulnerable)

     Western Ringtail Possum (WRP) (Pseudocheirus occidentalis) (Threatened-Critically
      Endangered)
     Quenda (Isoodon obesulus subsp. fusciventer) (Priority 4)

In addition to the above species, seven significant fauna species listed under state legislation
were considered to possibly occur within the ARR survey area despite not being recorded
during Southern Ecology (2020) field investigations, and therefore may also occur within the
Premises:
     South-western Brush-tailed Phascogale (Phascogale tapoatafa wambenger) (Conservation
      Dependent (CD))
     Masked Owl (Tyto novaehollandiae subsp. novaehollandiae) (Priority 3)
     Short-nosed Snake (Elapognathus minor) (Priority 2)
     Fork-tailed Swift (Apus pacificus) (International Agreement (IA))

     Woollybush bee (Hylaeus globuliferus) (Priority 3)
     Water-rat, Rakali (Hydromys chrysogaster) (Priority 4)
     Peregrine Falcon (Falco peregrinus) (Other specially protected fauna (OS)).
Of these, only Black Cockatoo are considered likely to utilise the non-native Mature Planted
Trees vegetation type that are proposed to be cleared for the project.

4.7.1      Black Cockatoos

Southern Ecology (2020) mapped the Mature Planted Trees vegetation type as high quality
potential roosting habitat for Black Cockatoo species. Survey of this vegetation by Biota (2019)
identified five potential Black Cockatoo trees, with a diameter at breast height (DBH) greater
than 500 mm, along the boundary of Lot 201 with Lower Denmark Road. However it is
considered that these trees will be avoided for clearing for relocation of CSBP infrastructure. No
roosting evidence was recorded during the survey (Biota, 2019).

                                     GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                   CSBP Albany Depot Redevelopment Options, 12529600 | 11
4.8       Threatened and/ or priority flora
There were no threatened or priority flora identified within the Works Approval application area
during the Biological Survey undertaken for the ARR (Southern Ecology, 2020).

4.9       Aboriginal and other heritage sites
A desktop search of the Department of Planning, Lands and Heritage (DPLH) Aboriginal
Heritage Inquiry System did not identify any Registered Sites or Other Heritage Places within
the Premises. The closest Registered Site (Site ID 22527) is approximately 600 m to the
northeast of the Premises boundary. The nearest Other Heritage Place (Place ID 23288) is
approximately 50 m to the south of the Premises boundary (DPLH, 2020).
A desktop search of heritage places on the Heritage Council inHerit database indicated that
there are no cultural places listed in the State Register of Heritage Places, local government
inventories and other lists, the Australian Government’s heritage list and other non-government
lists and surveys within the Premises boundary. The nearest heritage place is the Albany
Seaboard Bulk Fuel Oil Depot Site (Place Number 26441) located at Lots 76 and 877 Hanrahan
Road, directly adjacent to the east of the Premises boundary (GoWA, 2020b).

4.10      Summary of nearby sensitive receptors and aspects
Distance to nearby sensitive receptors from the Premises boundary and proposed impact
mitigation measures have been summarised in Table 5 and illustrated in Figure 2.
Table 5      Nearby environmentally sensitive receptors and aspects
 Type/              Description                     Distance +             Proposed controls to
 Classification                                     direction to           prevent or mitigate
                                                    premises               adverse impacts (if
                                                    boundary               applicable)
 ESAs               No ESAs have been               3.9 km to the east     NA
                    identified within the
                    Premises boundary
 Threatened         No TECs or PECs                 -                      As per current licence
 Ecological         identified within the Works                            conditions
 Communities        Approval application area
                    Subtropical and                 1.4 km to south
                    Temperate Coastal               east from
                    Saltmarsh TEC                   wastewater
                                                    discharge point
 Threatened         Black Cockatoos, WRP            Within Premises        A preclearance fauna
 and/or priority    and Quenda                      boundary               inspection prior to
 fauna                                                                     clearing vegetation for
                                                                           the purpose of this
                                                                           Works Approval
                                                                           application
 Threatened         No threatened or priority       -                      As per current licence
 and/or priority    flora identified within the                            conditions
 flora              Works Approval
                    application area
 Aboriginal and     Aboriginal Heritage             600 m north east       NA
 other heritage     Registered Site ID 2257
 sites
                    Other Heritage Place ID         50 m south             NA
                    23288

                                   GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                  CSBP Albany Depot Redevelopment Options, 12529600 | 12
Type/             Description                     Distance +             Proposed controls to
Classification                                    direction to           prevent or mitigate
                                                  premises               adverse impacts (if
                                                  boundary               applicable)
                  Heritage Council Place          Adjacent to the        NA
                  Number 26441                    east
Public drinking   South Coast Water               800 m south west       As per current licence
water source      Reserve                                                conditions
areas
Rivers, lakes,    Munster Hill Drain              Adjacent to the        As per current licence
oceans, and                                       west                   conditions
other bodies of
surface water,    Gledhow Conservation            650 m southwest        As per current licence
etc.              Category Wetlands                                      conditions
                  Nationally Important            9.5 km to the east     NA
                  Wetland – Oyster Harbour
Acid sulfate      The Premises are                Within Premises        Excavated spoil is
soils             mapped within an area of        boundary               proposed to be
                  high to moderate risk of                               assessed for ASS and
                  actual ASS and potential                               treated with lime (if
                  ASS occurring within 3 m                               required) suitable for
                  of the natural soil profile                            reuse onsite. No
                                                                         dewatering will be
                                                                         undertaken. Refer to
                                                                         Section 7.3.1 for
                                                                         proposed ASS
                                                                         management approach

                                 GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                CSBP Albany Depot Redevelopment Options, 12529600 | 13
Legend
      Natural Drainage Line
      Main Roads
      Minor Roads
      Track
      Current License Premise Boundary

                                                                                                                                                                                                                                          s Rd
      Public Drinking Water Source Areas

                                                                                                                                                                                                                                        Pas
      South Coast Significant Wetlands -

                                                                                                                                                                                                                                       s ter
      Conservation Class

                                                                                                                                                                                                                                   Ch e
Aboriginal Heritage Registered Sites
      Contact DAA                                                  South C oast
                                                                                H wy
      Registered Site
      Other Registered Site (Lodged, Stored
      Data/Not a Site)                                                                                                                                                                  C h

                                                                                                                                                                                     es
European Registered Heritage Places

                                                                                                                                                                                  te r P
                                                                                                                                                                                        as s R

                                                                                                                                                                                             ty
      State Registered Place
                                                                                                                                                                                                                                                   Nort
                                                                                                                                                                                                                                                          h Rd
      Municipal Inventory Place
      Albany Seaboard Bulk Fuel Oil Depot
      Site

                                                                                                                                                                                                                                                             Al
                                                                                                                                                                                                                                                                  ba
                                                                                                                                                                                                                                                                     n

                                                                                                                                             Hanrahan Rd
                                                                                                                                                                                                                                                                         yH
                                                                                                                                                                                                                                                                              wy

                                              Low
                                                  e   r De
                                                             nma
                                                                rk R
                                                                       d

                                                                                                                                                                                                                                                                                                                                   St Em
                                                                                                                                                   Albany Seaboard Bulk
                                                                                                                                                                                                                                                                                                                                 ie Way

                                                                                                                                                                                                                                                                                                                                         il
                                                                                                                            Frenchman Bay            Fuel Oil Depot Site

                                                                                                                                                                                                                                                                                                                               York St
                                                                                                                              Road Camp

                                                                                                                                                                                                                                         Princ
                                                                                                                                                                                                                                              ess
                                                                                                                                                                                                                                                        R oy a
                                                                                                                                                                                                                                                              l Dr
                                                                                                 Frenchman Ba
                                                                                                   y Rd

                                                                                             Paper Size ISO A3                                                                                         Main Roads WA                                                                         Project No.               12529600

                                                                                                                               o
                                                                                       0   100   200      300   400   500                                                                   Albany Ring Road Construction Impacts                                                           Revision No.               1
                                                                                                                                                                                          CSBP Albany Depot Redevelopment Options                                                                   Date               21/10/2020
                                                                                                   Metres

                                                                                   Map Projection: Transverse Mercator
                                                                                     Horizontal Datum: GDA 1994                                                                               Premises Siting and Location
                                                                                     Grid: GDA 1994 MGA Zone 50
                                                                                                                                                                                                                                                                                                                FIGURE 2
                                                                                                                                            Data source: GHD: Premises Boundary - 20200930; SHO: Aboriginal heritage registered sites, state registered sites - 20190820; LGATE: Roads - 201910, Imagery accessed on 20201021. Created by: slei
5.   Project description
     The proposed alignment of the ARR construction project (Stage 2), between chainage 15900
     and 17300 encroaches into the current CSBP depot at Lot 201 (198), Hanrahan Road. The
     impacts to the CSBP depot will occur along the southern boundary and in particular the south-
     western corner, significantly impacting CSBP’s ability to continue operations and remain
     compliant with the current licence with regards to onsite stormwater management and offsite
     discharge. The presence of the rail line to the south of the CSBP depot, and the necessary set
     back distances from that, dictate the location of the southern extent of the ARR project and
     construction boundary. Impacts to the CSBP property are unavoidable.
     An overview of the current Premises infrastructure and the impact on this infrastructure through
     the construction of the ARR is provided in the following sections. The proposed relocation and
     rectification works to account for the loss of infrastructure along the southern boundary of the
     Premises are presented within Section 6. Through the proposed activities, GHD has redesigned
     the stormwater management system to replicate the previous arrangement and to maintain the
     same performance as required under the conditions of the Premises Licence.

     5.1       Prescribed premises infrastructure and equipment
     Items of infrastructure and equipment identified within the boundary of the Prescribed Premises
     relevant to this application include:

          Lined Pond (SW11)
          Unlined Pond (SW08)
          Unlined Drains (southern)

          V-Notch Weir, connections, discharge channel and monitoring shed (SW04)
     The lined pond is used to store stormwater that may contain nutrients and trace elements from
     fertiliser and is considered low risk so not considered as critical containment infrastructure
     (CCI).
     Each item has also been identified and included on Premises map in Figure 3.

     5.1.1     Premises boundary change

     To facilitate the construction of the ARR, Main Roads WA are required to acquire a portion of
     land within the current CSBP Premises along the southern and eastern boundaries. The change
     in the final boundary of the Premises will require surveying and submission to DWER as part of
     the Licence amendment following the completion of the rectification works outlined within the
     WAA.

                                       GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                     CSBP Albany Depot Redevelopment Options, 12529600 | 15
Legend
                                                                                                                                                                                                                                                                                                                                                          Major Road
                                                                                                                                                                                                                                                                                                                                                          Minor Road
                                                                                                                                                                                                                                                                                                                                                          Lined Drains
                                                                                                                                                                                                                                                                                                                                                          Unlined Drains
                                                                                                                                                                                                                                                                                                                                                          Munster Hill Drain
                                                                                                                                                                                                                                                                                                                                                          Existing Drainage Channel
                                                                                                                                                                                                                                                                                                                                                          Existing treated water pipe
                                                                                                                                                                                                                                                                                                                                                          New Muster Drain Culvert
                                                                                                                                                                                                                                                                                                                                                          Open Drainage Channel
                                                                                                                                                                                                                                                                                                                                                          Cadastre
                                                                                                                                                                                                                                                                                                                                                          V - Notch Weir
                                                                                                                                                                                                                                                                                                                                                          Lined Drain Discharge
                                                                                                                                                                                                                                                                                                                                                          Channel
                                                                                                                                                                                                                                                                                                                                                          SW8 & SW11
                                                                                                           Northern
                                                                                                         unlined drain                                                                                                                                                                                                                                    Shed housing monitoring
                                                                                                                                                                                                                                                                                                                                                          equipment
                           Maintain Munster
                              Hill Drain                                                                                                                                                                                                                                                                                                                  WWTP

                                                Existing unlined
                                               drained linked to
                                               Munster Hill drain.
                                              Currently not in use.

                                                                                                                             Sludge beds

                                                                                                             WWTP

                                                                                      Existing treated
                                                                                        water pipe                       Emergency Access track
                                               SW11

                                                                                SW8

                                                                      V-notch weir and
                                                                      monitoring shed

                      New Munster
                      Drain Culvert

                                                                                                                                                  Lower Denmark Rd
         Hordern St

                 t
          gS
      rlin
Sti
                                                                                                                                                                             Paper Size ISO A3                                                                            Main Roads WA                                                                     Project No.               12529600

                                                                                                                                                                                                           o
                                                                                                                                                                      0     10    20    30    40    50                                                             Albany Ring Road CSBP Depot                                                             Revision No.               B
                                                                                                                                                                                                                                                                Redevelopment Options and Approvals                                                                Date               01 Oct 2020
                                                                                                                                                                                   Metres

                                                                                                                                                                     Map Projection: Transverse Mercator
                                                                                                                                                                        Horizontal Datum: GDA 1994                                                                     Premises current licensed
                                                                                                                                                                       Grid: GDA 1994 MGA Zone 50
                                                                                                                                                                                                                                                                     infrastructure and equipment                                                                              FIGURE 3
                                                                                                                                                                                                               Data source: GHD: Boreholes, Groundwater levels, Inferred granite outcrop and subcrop, CBSP Plan - 20200514; Landgate: Roads - 20190128, Imagery - 20190120 accessed 20200514. Created by: slei
5.2        Extent of ARR encroachment
To accurately depict the extent of encroachment onto the southern boundary of the CSBP site,
GHD modelled the latest site survey information (JKA, 2020) and latest ARR design (GHD,
2019). The extent of the ARR encroachment onto the Premises is shown on Plate 3.
As shown in Plate 3, the modelled output indicates that there is currently no encroachment of
the ARR into the lined pond (SW11) but there is encroachment into the unlined pond (SW08)
and southern unlined drain system, as well as complete filling over the current V-notch weir and
associated discharge drain.
Refer to Plate 3 for rendered output from the 3-D model with water level in the ponds set at
7.0 m AHD (unlined pond) and 7.35 m AHD (lined pond).

Plate 3       Survey model output of ARR construction footprint in relation to
              CSBP’s water storage infrastructure

5.2.1      Road setbacks from the lined pond

Based on the current design (GHD, 2019), the ARR northern footprint extent (as shown in
Plate 3) does not encroach onto the lined pond, however the road finishes adjacent to the top of
the embankment. The following design considerations are to be incorporated as part of the road
construction and approvals through Main Roads WA and not as part of the current WAA
proposed activities. These works are proposed to manage stormwater generated from the ARR
construction batter and allow CSBP vehicle access and a general maintenance area at the
maximum capacity level of the lined pond, including:
     The northern, final fill batter of the ARR is required to be at 1V:1.5H
     A drain will be installed at the toe of the northern ARR batter at 1:1 (rock pitching required
      and not earth). The drain will have a minimum 300 mm depth at the toe of the batter with
      0.5% fall from east to west toward the existing drain (towards the Munster Hill Drain)

                                      GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                    CSBP Albany Depot Redevelopment Options, 12529600 | 17
   A 2 m high boundary fence has been provisioned for installation on the north side of the toe
    drain
   A minimum of 3.1 m wide access (between boundary fence and top of bank) will be
    available to CSBP at the highest water level in the lined pond (7.98 m AHD)
   A 3 m wide unsealed access road on the top of embankment will be constructed with a one-
    way cross fall grading into the newly cut 1:1 drain (i.e. away from the lined pond)
   The design, with regard to the finished ARR boundary extent adjacent to the lined pond, is
    shown in Plate 4 and Plate 5 with the full drawing set presented in Appendix C.

Plate 4     Design showing ARR extent/ finishes near lined pond and minimum
            clearance at top of bank

                                  GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                CSBP Albany Depot Redevelopment Options, 12529600 | 18
Plate 5       3-D Model output showing toe drain, fence and lined pond

5.3        Impacts to infrastructure along the southern boundary
The construction of the ARR will have a significant impact to the water management
infrastructure along the CSBP southern boundary including the following key aspects:
     Unlined pond (SW08): part- storage capacity lost due to infill (approximately 475 m3 of
      storage volume to be lost with water level in the pond at 7.0 m AHD). Further to this the
      extreme event overflow connection between the unlined pond and the concrete discharge
      channel will be lost.
     Concrete V-notch weir and discharge drain: to be completely infilled
     Associated monitoring shed/ equipment connections within the V-notch weir: to be
      disconnected and relocated
     Groundwater monitoring bores to be lost/destroyed, including:

       o   Listed within the current Licence as part of the monitoring network: C12, C15 and C17
       o   Other bores onsite that will be lost/destroyed but are not included within the current
           Licence as part of the groundwater monitoring network: C1, C16, C18, AW3, AW19
           and AW23
     Southern unlined drain: to be completely infilled.
The extent of infill into the unlined pond is represented on the cross sectional representation
presented in Plate 6 and presented on the 3-D model output on Plate 3.

Plate 6       Cross sectional representation of the ARR construction
              encroachment into the unlined pond

                                     GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                   CSBP Albany Depot Redevelopment Options, 12529600 | 19
6.   Detailed description of proposed
     activities
     The overall proposed location and layout of the relocated infrastructure and presented in
     Drawing 12529600-C002 within Appendix C.
     A detailed description of the redesign and relocation of the impacted infrastructure within the
     Premises is provided in the following sections.

     6.1      Water storage volume compensation

     6.1.1    Lined pond system (SW11)

     The lined pond (SW11) is located at the south western corner of the Premises. The pond
     captures all of the stormwater runoff from the hardstand area (and from the lined drain network)
     and stores it ready to be processed through the water treatment plant (WTP). Please refer to
     Figure 3 for the location of these key infrastructure.
     As presented in Section 4.2, the ARR design does not impact on the storage capacity of the
     lined pond.

     6.1.2    Unlined pond (SW08) and unlined drain systems

     The current unlined pond volume from the survey with an overflow water level at 7.00 m AHD is
     1,758 m3. With the encroachment of the ARR into the site, the unlined storage pond has a
     remaining storage capacity of approximately 1,283 m3, resulting in a loss of capacity of
     approximately 475 m3.
     Due to the loss of capacity on the southern boundary through the construction of the ARR, the
     eastern end of the current unlined pond will be excavated to increase the overall capacity and
     maintain the same base area /footprint as the current pond. This ensures the modified pond
     intersects the same surface area of the groundwater table.
     As presented in Plate 7, and illustrated in orange, to expand the unlined pond further east to the
     extent of the current emergency access track, 2,111 m3 of soil is required to be cut. Once
     excavated to this extent, and with a revised overflow water height of 7.4 m AHD, the storage
     capacity of the unlined pond would be increased to 3,313 m3. This action will provide additional
     capacity for CSBP in the unlined pond system and will reduce the frequency of overflow events
     resulting in direct discharge to the Munster Hill Drain.
     The design drawings for the unlined pond are presented as Appendix C.

                                        GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                      CSBP Albany Depot Redevelopment Options, 12529600 | 20
Plate 7      3-D model output of the unlined pond following expansion to the
             east (looking north)

A summary of the proposed changes to the unlined pond system are presented in Table 6.

Table 6      Summary of existing vs proposed unlined pond design parameters

 Design element                    Existing unlined           Proposed unlined           Variance
                                   pond                       pond
 Pond base area                    3,152 m2                   3,231 m2
Plate 8      Proposed diversion of the unlined drain on the southern boundary
             (looking north)

Plate 9      Proposed diversion of the unlined drain on the southern boundary
             (looking south-east)

6.2       Relocation of discharge channel
The proposed location and layout of the new discharge channel and connections is shown in
Plate 10 with the detailed design drawing presented in Appendix C as 12529600-C004.

6.2.1     Discharge channel and V-notch weir

The discharge channel receives treated water from the treatment plant and monitors the outflow
rate (via a V-notch weir) and sampling. Monitoring equipment is housed within the monitoring
shed (located adjacent to the weir). The discharge channel provides the controlled and
managed release of water from the site (licenced discharge point) and into the Munster Hill
Drain situated along the western site boundary.
The current discharge channel runs between the lined pond and the southern boundary, a
location that will be completely filled by the ARR construction works and therefore requires
relocation.
The concrete discharge channel will be relocated to the northern side of the lined pond and
reconstructed, where there is an existing (unused) open channel that intercepts the Munster Hill
Drain (Plate 10 and Drawing C002, Appendix C).

                                   GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                 CSBP Albany Depot Redevelopment Options, 12529600 | 22
6.2.2    Connections to the discharge channel

The connections to the concrete discharge channel and the V-notch weir will be relocated. All
connections that will be recommissioned include:
   Water treatment plant outlet
   Extreme event overflow connection from the unlined pond
   Monitoring and sampling equipment from the monitoring shed
   Stairwell to access the weir for sampling (as per current arrangement).
The proposed location and layout of the new system is shown in Plate 10 with the detailed
design drawing presented in Drawing 12529600-C004 within Appendix C.

Plate 10    Proposed new location and connections for the discharge channel

As presented in Drawing C002 and C004 within Appendix C, the following key relocation and
connection elements to the discharge channel redevelopment:
   The monitoring shed will be reconstructed to be on the south-east side of the new
    discharge channel. The connections from the monitoring shed and the discharge channel
    are expected to be replicated as they are currently set up.

   The WTP outlet will run above ground due west of the plant over the lined drain and unlined
    drain and discharge into the newly formed overflow channel to the new V-notch weir. The
    new outlet pipe will have a bypass arrangement positioned above the lined drain to allow
    for maintenance.
   The overflow discharge outlet (for extreme rainfall events) for the unlined pond is proposed
    to be connected from the northern unlined drain from a concrete overflow weir box set at an

                                   GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                 CSBP Albany Depot Redevelopment Options, 12529600 | 23
overflow height of 7.4 m AHD. The overflow from the unlined system is proposed to be
         delivered to the V-notch weir via an open concrete channel.
        Electrical and communications connections will be re-established with the monitoring shed
         from the nearest underground inspection pit where the cables are currently located near the
         lined pond.

The new weir and open concrete channel will be made from precast concrete, and pipework
(where required) will be HDPE. All design will be carried out in accordance with:

        AS3600 2018 Concrete Structures
        AS3850 2015 Prefabricated Concrete Elements
        AS4678 2002 Earth Retaining Structures
As well as any other applicable codes and guidelines.

6.3           Groundwater monitoring well replacement program
CSBP propose to rationalise the current network of wells to nominate a new network of suitable
wells to be carried forward in their amended licence. The groundwater well replacement
program is outlined in Table 7 and shown on Figure 4.
Table 7           CSBP’s proposed replacement program of monitoring wells

    Potentially      Total Depth of   Current     Future                Relocation/Re-         Abandon
    impacted         Bore             Licence     Licence/SMP           installation
                     (m BTOC)
    C1               14.17                                                                     
    C15              15.07                                                                    
    C16                                                                                        
    C18              17.94                                                                     
    C8               30.45                                             x 2 (deep and
                                                                        shallow)
    C12              5.95                                             
    C17              18.7                                             
    AW3              4.71                                                                      amend
                                                                                               SMP to
                                                                                               monitor
                                                                                               AW18
                                                                                               and
                                                                                               AW19
                                                                                               instead
    AW19             5.03                         
    AW23             4.88                                              
The groundwater well decommissioning and relocation process is required to be undertaken in
accordance with the CSBP Bore Construction Maintenance and Decommissioning Procedure
(CSBP-DP-ENV-070-03) dated 14 May 2020, including a review of any DWER licensing
requirements.

6.4           Clearing activities
During the Biological Assessment of the ARR, Southern Ecology (2020) mapped the vegetation
along the southern boundary of the Premises as “Planted Trees” and is described as “Mature
Planted Trees (Iron Barks, Blue Gum, Tuart, other Eucalypts and Peppermint generally > 10

                                       GHD | Report for Main Roads WA - Albany Ring Road Construction Impacts
                                                      CSBP Albany Depot Redevelopment Options, 12529600 | 24