INTEGRATED NATIONAL ELECTRIFICATION PROGRAMME (INEP)
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
ADDITIONAL ELECTRIFICATION PROGRESS NEW HOUSEHOLD ELECTRIFICATION STRATEGY NON-GRID ASPECTS • Just above 6 million households were connected to the grid between 1994 and June 2014. On the 26 June 2013, the he ensure more connections, • More municipalities can be • In 1994 access to electricity was 36% , to date 88% Cabinet approved the including a workshop on assisted, but Councils are Department of Energy households have been electrified. implementing of the nenew the Plan to which all not taking resolutions with Matimba House, 192 Visagie Street Corner Paul Kruger & Visagie Street • In the period from 2002 to 2013/14, 82 517 households Pretoria, 0002 Private Bag x96, Pretoria, 0001 atio Household Electrification members of Cabinet would regards to non-grid Switchboard: (012) 406 7803 info@energy.gov.za were supplied with non-grid technology (Solar panels – Renewable Energy) Strategy based on the be invited to; and implementation; (1) agree www.energy.gov.za • Eastern Cape - 48 532 following focus areas: eas d. The consideration of the that non-grid be installed in http://www.facebook.com/pages/ Department-of artment- -Energy/316555815114240 5 • Kwazulu Natal - 46 532 a. The defining off universal un proposed delivery targets, municipal area and (2) that #Energy_ZA • Limpopo - 13 381 access as 97% % of taking into consideration a maintenance programme • Non-grid electrification programme will in future not only households, s, as full views with regard to: is been put in place. be implemented in concessionary areas, but in other areas tion is unlikely to electrification • The Department will be • the proposed change to the of the country, through the Master Plan Strategy. ible due to growth be possible conducting a non-grid delivery dates for universal elay in the process of and delays access from 2014 to 2025 electrification pilot in the CONNECTIONS BETWEEN 1994 - 2014 formalising malis informal informal settlements of the ettlem settlements; • the concern that the new Nelson Mandela Metro Province Electrified Houses: proposed target of 270 000 Municipalities & Eskom b. The electrification of about Municipality. The intention households will contribute is to provide total non-grid Free State sponsored by 90% of households through to the backlog with regard Eastern Cape 1 081 459 solutions in a form of Anglo Platinum. The fuel grid connection and the rest to the targets set by the Free State 370 260 with high-quality non-grid lighting in the houses, as cell technology has never Presidential Infrastructure well as security lights in a been tested for rural solar home systems or other Coordinating Commission Gauteng 694 814 form of solar street lights. electrification and is a possible technologies based (PICC); and KwaZulu Natal 1 006 108 on cost effective options in The pilot will assist us in ground breaking project for order to address current and • funding provided by the formulating policy in the the country to learn more Limpopo 1 043 401 National Treasury to speed future. about this sources of future backlogs; Mpumalanga 575 352 up connections • A fuel cell generation pilot energy and whether it can c. The development of a be considered in the future master plan to increase project has been installed in Northern Cape 136 280 for electrification purposes. efficiency in planning and Moqhaka Municipality in North West 694 505 the delivery process to Western Cape 403 150 Total 6 006 221 INTEGRATED NATIONAL ELECTRIFICATION PROGRAMME (INEP)
USING THESE RULES, IT IS EXPECTED TO DEPLOY AROUND 300 000 SOLAR HOME WAY - FORWARD SYSTEMS AND REACH UNIVERSAL ACCESS FOR FORMAL HOUSEHOLDS IN 2025 Focus on • management of roll out; • maintenance challenges and SOUTH AFRICA • further information on planning in relation to grid Total Connections 2013 - 2025 roll out. MILLION HOUSEHOLDS Provincial non-grid potential Need to transform the pilot non-grid programme to a sustainable programme in order to contribute to NON - GRID 10% 0.3 Thousand households 37 the target of universal access by 2025: a. Current concessioner/service providers programme to be transformed to a non-grid utility model; 4 26 16 b. Need model that will attract long-term non-grid entities that can run programme in a sustainable 84 manner; 11 c. Based on an national master plan to determine 28 grid and non-grid areas; 90% 3.1 GRID d. Roll-out and maintenance of systems and e. No only rural areas, but also to address backlogs 73 in informal urbanized areas. • Implementation of Master Plan • INEP need to be more involved in projects 19 The highest potential for undertaken by municipalities to ensure they Non-grid is in KZN and deliver on targets set. Creating of the steering Eastern Cape committees in the provinces with assistance by Municipality Infrastructure Support Agency to assist the non performing municipalities Time to electrify formal households 2025 1 • The Department should annually revise the cost per connection subsidy to keep up with price increases of electrification materials 1. Assumes existing INEP annual funding and DoHS contribution of R2,000 • Municipalities should fast track procurement per household for new RDP houses (40,000 houses per annum); processes and Council resolutions to enhance assumes total of 50,000 new formal households per year from DoHS the pace of electrification within their area. Giving formalization process municipalities R1,5mil each for the pre –engineering
Department of Energy Matimba House, 192 Visagie Street Corner Paul Kruger & Visagie Street Pretoria, 0002 Private Bag x96, Pretoria, 0001 Switchboard: (012) 406 7803 info@energy.gov.za www.energy.gov.za http://w www.facebook.com/paages/ Depa artment-of-E Energ gy/31655 55815114240 #Energy_ZA A
You can also read