Houston Business Roundtable Safety Excellence Awards Best Practices Seminar June 20th, 2019 - 32nd Annual Houston Safety ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
READINESS ASSESSMENT & THE RELATION TO SAFETY Our work contains inherent hazards. PREMISE: Planned, methodical work where hazards are identified and eliminated/mitigated is Safer to execute. Quality work reduces exposure to hazards - now and in the future. This is safer for Turnaround Contractors/Clients now – and Owner’s Operators and plant Maintenance personnel long term. 3
THE INTENT, PROCESS AND TIMING A process used to drive strategic and tactical decisions for implementation and execution success Provides real-time, comprehensive, multi-discipline assessment of an upcoming event’s preparation efforts - Tied to Customer’s Milestone Deliverables Schedule Interview-based approach with Field Walk Scope Review Begin early, sometimes multiple visits; rule of thumb T - 45 days 4
CATEGORIES ASSESSED Formal, independent, detailed assessment reviewing 17 major areas of potential risk and 6 JVIC Specialty Services disciplines: - Project Management - Planning, Scheduling - Work Scope: Turnaround, Capital - Project Controls, Field Accounting - Employment, Training - Safety, Environmental - QA/QC - Materials Management - Equipment, Tools - Logistics - Contracts, Subcontracts - Scaffolding - Specialty Services Bundle Extraction, Catalyst, Bolt Torqueing, Field Machining, Towers, and Automated Welding 5
TYPES OF QUESTIONS WE ASK Has the JVIC safety lead discussed site safety performances with the Client's safety representation (i.e. inquiries to facility safety performances and trends, unique site safety considerations, etc.)? Has the scope of work been reviewed (including scope walk down) with the Safety Lead? Does the work scope consist of flare work? If so, what measures have been exercised to ensure that Zachry/JVIC is in alignment with the Client's flare policy? Has the PPE been identified / approved (i.e. high-temp and/or flare PPE). Based on the known work scope are there any potential asbestos, lead, and/or silica hazards that should be identified within the scope planning / scheduling tool? Will the scope of work require any variances (i.e. cut-off discs, blinding - first flange, wedges other than brass, goose neck hammer wrenches, pipe wrenches, etc.)? What short-service worker initiatives will we have in place? 6
TYPES OF QUESTIONS WE ASK Are rescue plans in place for all confined space entries? Are ventilation plans required for confined space work? Who develops them? Hand Safety Specifically. Do we have adequate plans in place relative to hand PPE that clearly states PPE expectations (i.e. Cut 3 gloves while handling tower packing/demisters or milling flange faces)? Does the Client have specific expectations and/or initiatives with respect to Industrial Hygiene topics (i.e. weld fumes, Hex Chrome, gouging samples, etc.)? Has the contract been reviewed in an effort to understand PPE provisional responsibilities? Is there a clear and concise waste management plan supported by waste receptacle staging in place (i.e. non-haz waste, haz waste, etc.)? How will we ensure that the culture of "stop work authority" remains a present component to our culture? 7
TYPES OF QUESTIONS WE ASK Have Safety Action Plans and/or Project Closeout safety performances from previously executed jobs at the project been reviewed? Does the Safety Action Plan consider the following: a. PPE Requirements b. Training c. Fire/Hole Watch d. Permits e. Environmental f. LOTO g. Confined Space (regens and heaters, multiple crafts inside, communication plan, etc.) h. Unit Specific Issues (Regulated chemicals Alky, Benzene, H2S, NORM, etc.) i. JSA/JTA Process j. Fatigue Program k. Heat Stress Monitoring l. Special PPE condition zones (i.e. FCC structure requiring foam-lined eyewear when on the structure, flare suits, etc.)? 8
TYPES OF QUESTIONS WE ASK 9
HOW ASSESSMENTS CONDUCTED & WHO’S INVOLVED Onsite, 2 – 3 days Informal, 1-on-1 Interviews enhanced by Field Walk Scope Review Project Manager Superintendents General Foremen/Foremen Safety Lead QA/QC Lead Field Accountant Planner(s) Scheduler Materials Lead Specialty Services Leads (Bundle Extraction, Catalyst, Bolt Torqueing, Field Machining, Towers, Automated Welding) 10
SCALABILITY • From large-scale, multi-disciplined turnarounds or single- discipline specialty work, i.e., towers or catalyst work • Tools are adaptable to any type of event whether it be maintenance, capital, outage, turnaround, etc. 11
INFORMATION UTILIZATION • Real-time gap identification and analysis with agreed upon resolution • Corporate leadership support areas • Support department support/needs/deliverables • Supports Client discussions and internal Project Team efforts • Supports discussions between JVIC and Client executives • Reference library for future events • Provides starting point for post-event Closeout Assessment 12
13
You can also read