Greater Tortue Ahmeyim (GTA) project - BP
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
pth De ter Wa 0 m ep th 5 D 28 ter Wa m 0 12 pth H De ter Wa m 30 O al r ate S in FP kw rm ea Br e /T b u H ls el w a se b u S D 5k is m 12 ta al nc e in fr om mr sh Te or e b u D G is m H N 45 ta nc FL k e fr om sh G or N e FL D km is 10 ta nc e fr om sh or e Greater Tortue Ahmeyim (GTA) project Committed to creating a sustainable legacy that supports communities and long-term economic development, whilst ﻭ ﻣﻌﺎﺩﻥ ﳏﺮﻭﻗﺎﺕ empowering people and helping to create a self-sufficient future.
Greater Tortue Ahmeyim (GTA) project On the maritime border between Mauritania and Senegal, bp and partners are developing Greater Tortue Ahmeyim field. With an estimated 15 trillion cubic feet of gas, GTA is forecasted to be a significant source of domestic energy and revenue. bp brings a long history of building energy potential across the world and is committed to playing a vital role in supporting both Mauritania and Senegal develop their world-class resources in a sustainable way.
Mauritania Supply People & Skills Social Chain Development Investment GTA Hub Nouakchott Economic Terminal Interactive Training Development Onshore Centre Activities Community English Classes Health National Technician Education Training Programme Environment Oil & Gas 101s
Multiple Locations / Supply Chain GTA Hub Terminal Onshore Activities ﻭ ﻣﻌﺎﺩﻥ ﳏﺮﻭﻗﺎﺕ 3 Rock transportation The Hub Terminal created over 1,000 direct local jobs in Mauritania. Enhanced capacity through a professional training programme building on transportation and road safety: 2 El Haira Dakhna Quarry (Akjoujt) 500 Mauritania 1 Bypass track construction 350 drivers Enhancing road safety by local employees were bypassing city traffic. recruited, trained and employed - including 100 supervisors, 200–300 36 HSE specialists local employed for bypass from local communities and mechanics Supply Chain track construction around the quarry itself 150 new trucks People & Skills Development 5 local companies involved Social Investment Economic Development Community Health It is estimated that Education 28 km 7,000 tonnes 2.5 million Environment of new track linking of rocks are produced each National Road 1 and day during peak operations tonnes National Road 2 will be needed to Back to Contents complete the Hub Terminal break water = 10 people 4
Multiple Locations / Supply Chain GTA Hub Terminal Onshore Activities 4 Stockpile People & Skills Development New storage area to be built that will be Those employed at the Hub Terminal Over 500 handed over to the port and significantly local personnel trained to enhance the country’s port capacity. have access to an extensive training programme at the newly international standards established training centre +160,000 m² Advanced driver training for rock transportation drivers in Mauritania Additional port capacity Mauritania 5 Jetty and dredging Allowed commercial ship usage of the port. Supply Chain 300,000 km³ Total sand dredged Enhanced port capacity Throughout these activities, safety People & Skills remains bp’s Development number 1 priority Social Investment Economic Development Community Health Education Environment Back to Contents 5
Nouakchott / People & Skills Development Nouakchott / People & Skills Development Nouakchott Interactive English Classes Training Centre Providing English classes for government officials to enhance their The Nouakchott Interactive Training Centre is designed to create investor relations capacity. a local talent pool and foster long-term investment in Mauritania’s future by international energy companies. Target users Mauritania O&G personnel, SMHPM, government officials and other trainees to maximise benefit. 20 Supply Chain trainees per session Programme One and Two successfully completed; Programme Three commenced in 3Q 2019. People & Skills Development 1 session per week Social Investment Economic Development Community Health Education To date, 90% of the construction is complete. Once finished, the Training 25,000+ hours of training delivered to date Environment Centre will be run by the Mauritanian government. since end of 2017 (across both Mauritania and Senegal) Back to Contents 6
Multiple Locations / People & Skills Development Being an apprentice National Technician ﻭ ﻣﻌﺎﺩﻥ ﳏﺮﻭﻗﺎﺕ of one of the biggest companies in the Oil Training Programme & Gas industry puts a lot of pressure on me. But that’s what makes As part of the GTA project, in 2019, bp started a campaign to recruit 50 national apprentice it motivational and technicians across Mauritania and Senegal to support the project’s phase 1 operations. challenging and that’s what will make me a successful person. Exchanging experiences The objectives of the National Apprentice Technician Training Programme are: with other countries like To train, develop and prepare national technicians across all disciplines (production, our neighbour Senegal mechanical, instrumentation & electrical) to work safely, efficiently and compliantly on will strengthen our Mauritania project’s facilities in Mauritania & Senegal Provide the national technicians with an internationally recognised accredited qualification relationship with it and will make us closer. bp’s & Senegal values are representing Train and develop local educational institutions to enable them to deliver future our values and our internationally recognised accredited apprentice technicians programmes duty is to respect it and make it our priority.” Khadijetou Cheikh Mohamed Vadel (Tata), Supply Chain More than 4,000 applications were received and screened 7 Mauritania across both countries. A unique recruitment process secured women the 50 hires (25 from Mauritania and 25 from Senegal) 43 men People & Skills The Programme includes: Development Being one of the beneficiaries of this programme is a dream come true but also a challenge. I have goals to reach and this programme will help me to strengthen my personality and set up a good career plan in the oil Social Investment and gas sector. Senegal is counting on us a lot and bp has invested a lot in us; we have a duty not to 2020 2021 2022 2023 Economic Development disappoint them. Working together 12-month tailored Technical training programme Secondment Deployment to Community Health with Mauritania will also strengthen English Language (overseas training centre) to bp operating GTA phase 1 intercultural exchange.” programme regions for on as qualified Education Mathieu Thiara Biangaize, Senegal (in-country) 3-month introduction to the job training technicians Environment oil and gas module held in country with INPG and ESP Back to Contents 7
Nouakchott, Dakar, Saint Louis / People & Skills Development Oil & Gas 101s ﻭ ﻣﻌﺎﺩﻥ ﳏﺮﻭﻗﺎﺕ bp’s Oil and Gas 101s aim to build people’s awareness and knowledge of the energy sector in both Mauritania and Senegal. The workshops are free to attend and tailored to the needs of the local audiences. To date, we’ve run two modules: Mauritania Oil & Gas Module 1 aimed at teaching oil and gas fundamentals Mauritania from exploration to production; what is LNG; what is local content & Senegal Oil & Gas Module 2 Since 2019, around aimed at raising awareness around 150 people regulation, legal framework and fiscal in Nouakchott aspects of oil and gas governance attended the training Supply Chain Senegal People & Skills As a member of a youth Development organisation, participating in this workshop allowed me to be better informed about the challenges of the oil and gas sector in Senegal. Thank you to the organisers for these moments of exchange. Social Investment I recommend that they continue both theoretically and practically. I really want to visit Economic Development Since 2019, an offshore platform.” Community Health 600 people Marie Mbathio Ndiaye, Senegal Education took part in the Oil and 7 6 Environment sessions Gas sessions in Saint sessions in Louis and Dakar in Dakar Saint Louis Back to Contents = 10 people 8
Ndiago / Social Investment Economic Development ﻭ ﻣﻌﺎﺩﻥ ﳏﺮﻭﻗﺎﺕ bp aims to support local economic development by investing in fishing community capacity building to sustain native resources, as well as in skills such as micro finance and know-how. Improved economic growth and SME development is key to supporting a vibrant national SME sector. 1 Overview Since 2019 there have been We have provided 7,614 156 1,500 Mauritania direct beneficiaries of bp’s 52.5% households with people with economic development in Ndiago: women water supply health care 32% 47.5% 1,769 206 youth economic jobs men opportunities Supply Chain 2 Access to capital People & Skills $840 Development 57 80 Micro-loan average value men women 137 Social Investment loans issued under micro-credit $126,000 Cumulative microfinancing issued Economic Development programmes 350 under micro-credit programmes Members of Community Community Health Savings Fund Education Environment $35,317 Savings in community 97.44% microfinance fund established by repayment rate social investment funding Back to Contents for micro-loans = 10 people 9
Ndiago / Social Investment Economic Development 3 Fishing value chain 37 27 fishermen, including fishermen and women 60 given entrepreneurial 12 women, given fishermen, including marketing training training 20 women, given Mauritania 158 management fishermen benefited from organisation training capacity building training 17 8 fishing cooperatives 35 people given fishing- related infrastructure $6,000 fishermen attended management training established marine safety training Supply Chain 3,464 fishing equipment made from sales from provided marine hardware shop 3x fishing-related People & Skills infrastructure Development constructed Social Investment Economic Development Community Health Education Environment Back to Contents 10
Ndiago / Social Investment Community Health ﻭ ﻣﻌﺎﺩﻥ ﳏﺮﻭﻗﺎﺕ Strengthening access to health services and promoting awareness of health, hygiene and sanitation for people in the community. 1 Improving access 2 Building community capacity 20,335 people have benefited 7x health infrastructure constructed or Mauritania indirectly for treatment or upgraded 15,000 consultation at health posts home visits conducted 310 children vaccinated in support of government 41,840 people visited at home vaccination programme Supply Chain 71 69 pieces of health health awareness equipment provided campaigns conducted People & Skills 10,033 Development directly treated or consulted 248% 40 via mobile clinics, medical increase in attendance communities reached caravans, or mass sessions at local clinics supported by social investment funding 3,153 people with increased awareness Social Investment of community health topics Economic Development 3 Enhancing quality Community Health 66,592 Education Improving technical Environment capacity of local health care providers 30 people sensitised via educational talks, home visits, mass sessions Back to Contents community relays hired and trained 11
You can also read