Far Nor th District Council
           Our Draft 10 Year Plan

   Summary of Statement of Proposal
for the Draft Long Term Plan 2012-22
Far Nor th District Council - Our Draft 10 Year Plan - Summary of Statement of Proposal for the Draft Long Term Plan 2012-22
What do
you think?
This is a draft plan and we welcome
your views on what is proposed. Key
consultation questions are listed in the
submission form and highlighted in the
summary under ‘What do you think?’
You may find it easier to remove the
submission form from the booklet
before you start reading, so you can
answer the questions as you work your
way through the summary.

Kia ora koutou
Councils are required by law to publish       to shift the burden of costs to those who
a draft long term plan every 3 years          benefit most from services. For example,
setting out activities they will engage       Council collects about $200,000 in rates
in during the next 10 years. Our Draft        from the forestry sector per year. Yet
Long Term Plan 2012-22 keeps a tight          it spends $2.5 million annually repairing
lid on expenditure growth and limits          roads damaged by logging trucks. Most
spending to ‘must do’ works. We make          of these costs are met by the residen-       evenly across the district will expose
no apologies for taking a cautious            tial sector, despite the negligible damage   people to their scheme’s true costs. This
approach. The world financial crisis          that urban ratepayers’ motor vehicles        should result in resource consent sub-
and weak local economy have reduced           do to roads. This plan proposes to fund      mitters evaluating proposed upgrades
income from development contribu-             roads from a new targeted rate and use       of schemes more carefully and balancing
tions and put pressure on ratepayers’         rating differentials to spread road main-    the affordability of schemes with their
budgets. Because of this, we propose          tenance costs across rating sectors that     environmental performance.
no significant capital projects, apart from   rely on heavy vehicles. These are bold
                                                                                           These are just some of the things we
those Council has consulted on in pre-        new proposals and I urge you to find
                                                                                           are proposing in our plan. Please read
vious plans. We have focused instead          out how you will be affected.
                                                                                           this summary for a fuller understanding
on what is affordable and plan to limit
                                              The user pays principle is also behind       of the plan and tell us what you think via
capital spending to maintaining existing
                                              Council’s proposal to change the way         the submissions process.
assets and current service levels.
                                              it funds capital costs of its sewerage
Council regularly receives requests           and water schemes. At present, some
to make the rating system fairer. We          towns subsidise the capital costs of
re­­cognise that some ratepayer sectors       providing sewerage and water in other
pay a disproportionate share of the           areas. Asking those whose properties
costs of providing some Council serv-         are connected to the schemes to pay          Ka kite ano
ices. We propose to use targeted rates        these costs and charging operating costs     Wayne Brown - Far North Mayor

2                                                                        The top place where talent wants to live, work and invest
Far Nor th District Council - Our Draft 10 Year Plan - Summary of Statement of Proposal for the Draft Long Term Plan 2012-22
Fund B
                                                                                                       a
                                                                                            Airport y of Islands
                                                                                                       upgrad
                                                                                           The Ke
                                                                                                  rike
                                                                                                              e?
                                                                                          asked         ri Airp
                                                                                                  Counc           ort Wo
                                                                                                           il to co       rking
                                                                                          year fo                   ntribu          Party
                                                                                                  r five y                  te $16           has
                                                                                         costs o             ears to                 5 ,0 0 0
                                                                                                 f upgra             w ards $                  a
                                                                                        Airport            din                  5m
                                                                                                 . The N g Bay of Isla illion
                                                                                        would              orthlan               nds
                                                                                               match                 d Regi
                                                                                       Ideally          t h is cont           o n al Cou
                                                                                               , the Cr             ri                    ncil
                                                                                      balanc            own wo bution.
                                                                                              e. The               uld fu
                                                                                                       proposa            nd
                                                                                     a gene
                                                                                             ral rat             l would the $3.3
                                                                                                     e incre               r
                                                                                                              ase of 0 esult in
                                                                                                                        .28% if
                                                                                                                                   adopted
                                                                                                                                             .

                                                       The ceiling of the new Kaitaia library in Te Ahu Centre is designed to symbolise sand dunes.

Key decisions in this plan
Law changes, the weak economy and lower growth in the district have led to a number of significant
changes to the last Long Term Plan.

How should Council                            Change the rating system?
fund a development                            Council has found disparities between benefits different ratepayer sectors receive
contributions deficit?                        from Council services and how much sectors pay towards the costs of providing
                                              those services. New rating proposals in this plan charge sectors in proportion to
A number of projects were under-              how much they use Council services.
taken from 2005 to 2008 on the basis
that future growth would occur. That          Increase rates to pay for storm costs?
growth has not happened and the               Earthquakes in Christchurch have forced the insurance sector to reassess its risk.
development contributions deficit is          Council now has to pay the first $500,000 of any insurance claim for infrastructure
$21 million. Council proposes to fund         damaged by storms, which in the past has been up to 3 a year. Council plans to add
part of this deficit from water and           1% to the general rate to help create a fund to meet potential insurance shortfalls.
wastewater charges.
                                              Waive Uniform Annual General Charges on 2 or
                                              more adjoining properties?
                                              Council proposes to allow ratepayers with 2 or more adjoining properties to apply
Standardise road                              for a remission of Uniform Annual General Charges. Waiving charges on the 4,000-
maintenance?                                  5,000 properties that would qualify may increase rates for all ratepayers by 6-7%.

A hierarchy specifying the uniform level
of service for roads in the district should   A voice for Mˉaori?
give road users a better understanding        Council indicated in its last Long Term Plan that it would look for ways to better
of the maintenance Council will under-        involve Māori in its decision-making. Council’s priority is to pursue the creation of
take on any given road. Traffic volumes       a Far North Unitary Authority with direct Māori representation. Council recently
and a road’s importance in the network        resolved to hold a poll before the 2013 local elections on whether to introduce
determine its place in the hierarchy.         Māori wards. Council has also agreed to investigate the appropriate delegations for
                                              a Māori standing committee which could be created.

                                                                                                                                                   3
Far Nor th District Council - Our Draft 10 Year Plan - Summary of Statement of Proposal for the Draft Long Term Plan 2012-22
New rating system
                                                                                                              at a glance
                                                                                                           • Roading, which has a big budget, will
                                                                                                             be funded separately.

                                                                                                           • Services that provide benefits to all
                                                                                                             ratepayers (e.g. strategic planning)
                                                                                                             will be funded wholly or partly from
                                                                                                             the general rate or uniform annual
                                                                                                             general charge.

                                                                                                           • Differentials will be used to charge
                                                                                                             ratepayer sectors in proportion to
                                                                                                             how much they benefit from or use
                                                                                                             those services.

                                                                                                           • The capital costs of water and sew-
                                                                                                             erage schemes will be paid for by
                                                                                                             ratepayers with properties in those
A Chris Booth sculpture towers over a Council-hosted Investec SupeRugby match at the Kerikeri Domain.        schemes.

                                                                                                           • Operating costs of sewerage and

    Blueprint for a fairer                                                                                   water will be funded on a district-
                                                                                                             wide basis, paid by those who are
                                                                                                             connected to the scheme.

    rating system                                                                                          • Services will be funded by a land
                                                                                                             value-based rate where different
                                                                                                             land uses create different levels of
    The story so far                                                                                         demand for those services.

    Ratepayers have been telling Council for years that the rating system isn’t fair.
    Council proposed a change to a capital value-based rating system in its 2009-19
    10 year plan. The community opposed this, so councillors promised to look again at
    how Council set rates to see if it was possible to develop a system the community
    saw as being fairer to all ratepayers. Changes to the general rate were proposed
    in the 2010/11 Annual Plan, but submitters rejected these too. Council said in its
    2011/12 Annual Plan that it would prepare options for a new way of rating in the
    next Long Term Plan. These options are described in the next 3 pages. They are
    profoundly different to systems Council has looked at in the past so will need consid-
    erable thought and discussion if they are to be implemented.

     We’ve rethought rating
    Council has analysed its main service areas and quantified the benefits different cat-
    egories of ratepayers receive from these. This involved putting every property in the
    district into one of 9 categories (residential, lifestyle, commercial, industrial, general
    farming, horticulture, dairy, forestry and other) based on valuation land use codes or
    actual use as identified by Council. Council then asked whether each service benefit-
    ted every ratepayer equally or whether different land uses created different levels of
    demand for services. The objective in preparing the new rating proposals has been
    to try to match the benefits that different ratepayer categories receive from Council
    services with the level of rates they are asked to pay.

    4                                                                                   The top place where talent wants to live, work and invest
Far Nor th District Council - Our Draft 10 Year Plan - Summary of Statement of Proposal for the Draft Long Term Plan 2012-22
A targeted road rate?
Road maintenance costs will account for 51% of Council’s                    rate on very low-value properties will be minimal, so it also
planned expenditure of $365 million in the next 10 years.                   proposes to fund 10% of total road costs from a separate
Nearly half Council’s spending on roads is funded by the                    uniform charge.
general rate and most of this revenue comes from residen-
                                                                                                            WHO BENEFITS FROM ROADS?
tial ratepayers. Yet the motor vehicles of people who live in
towns cause negligible damage to roads. By contrast, logging
trucks cause more than $2.5 million worth of damage to

                                                                                                                                                   Horticulture
                                                                                                           Commercial
                                                                               Residential

                                                                                                                          Industrial
roads each year. Yet the forestry sector is only liable for

                                                                                                                                                                            Forestry
                                                                                              Lifestyle

                                                                                                                                        Farming

                                                                                                                                                                                        Other
                                                                                                                                                                   Dairy
about $200,000 in rates. Council believes it would be fairer
and more sustainable to fund road maintenance and general
                                                                                                                            % of funding
traffic costs from a targeted differential rate. This would
allow it to charge rating sectors according to how much                       23.5%          17.9%        7.7%           2.5%          15.5%      1.3%            9.84%    20.3%       1.36%

they benefit from these services and contribute to road                                                                 DIFFERENTIALS (TIMES)
costs. Council recognises that in some cases the level of the                     1            1          2.9             4.1           1.2       1.57             2.8     16.2         1

                                      Classic cars line up for a motorcade on Kerikeri’s Heritage Bypass.

                                                                                                                         What do
                                                                                                                         you think?
                                                                                                                         Should Council introduce a targeted
                                                                                                                         differential rate to fund road costs?

                                                                                                                                                                                                5
Far Nor th District Council - Our Draft 10 Year Plan - Summary of Statement of Proposal for the Draft Long Term Plan 2012-22
Differentials for different
demands?

                                                                                                                    Council’s Hokiang
                                                                                                                                       a Ferry provides a
                                                                                                                  transport link acro                     vital
                                                                                                                                      ss the Hokianga H
                                                                                                                                                        arbour.

Council plans to build new public toilets at tourist hot-spots Matauri Bay and Tokerau Beach.

The user pays principle that guided                                                  receives. For instance, Council sees cem-                              evenly across sectors - as is the case with
Council’s thinking when it developed the                                             eteries as mainly providing benefits to                                strategic planning - Council proposes to
differential roading rate is also behind                                             residential and lifestyle sectors. Because                             set differentials at one for all sectors. A
new rating proposals for other services                                              of this, it would like these sectors to con-                           complete list of services and Council’s
funded by the general rate. Council has                                              tribute the most money towards funding                                 analysis of which sectors benefit from
analysed the benefits different rating                                               these services. The commercial, industrial                             these can be found in the Revenue and
sectors receive from services. It has                                                and forestry sectors would not have to                                 Financing Policy in Volume II of the Draft
decided that where these benefits differ                                             contribute. However, the farming sector                                Long Term Plan. The General Rate table
significantly between sectors, differentials                                         would have to because farming proper-                                  shows how the total rate is allocated
should be applied to the general rate to                                             ties usually have households. Where ben-                               across the different categories.
reflect the level of benefits each sector                                            efits received from services are spread

                               WHO BENEFITS FROM CEMETERIES?                                                                                       GENERAL RATE - WHO PAYS?
                                                                     Horticulture

                                                                                                                                                                                       Horticulture
                                Commercial

                                                                                                                                              Commercial
    Residential

                                                                                                                 Residential
                                             Industrial

                                                                                                                                                              Industrial
                                                                                             Forestry

                                                                                                                                                                                                                Forestry
                   Lifestyle

                                                                                                                                 Lifestyle
                                                          Farming

                                                                                                                                                                            Farming
                                                                                                        Other

                                                                                                                                                                                                                            Other
                                                                                     Dairy

                                                                                                                                                                                                       Dairy

                                              % of funding                                                                                                     % of funding
    60%           26%           0%           0%           10%       1%              3%       0%         0%      42.2%          24.9%         10.2%          1.5%           14.4%      1.1%            3.3%     1.1%        0.9%
                               NOMINAL DIFFERENTIALS (TIMES)                                                                                               DIFFERENTIALS (TIMES)
       1          0.57          0            0            0.3       0.47            0.34     0          0           1          0.77          2.19           1.43           0.62       0.77            0.52     0.53        0.37

6                                                                                                                         The top place where talent wants to live, work and invest
Far Nor th District Council - Our Draft 10 Year Plan - Summary of Statement of Proposal for the Draft Long Term Plan 2012-22
e for Ka                 itaia?
Bus     iness rat                        iation ha
                                                     s
               B  u  s in ess Assoc              im p rove-
         aia                                 ess
The Kait                   v  y  a  b u s in
          uncil to le              usinesses
                                                 to raise
asked Co                   a ia  b
             on K     a it                          in the
 ment rate                   es s d ev elopment
             for bus     in
 $57,000                                      business
                  o s t to  th e average
             e  c
 town. Th             t $200 a
                                     year.
         b e  a b o u
  would

   Cyclists at the opening of the first finished section of the Twin Coast Cycle Trail (Pou Herenga Tai) which Council is developing to attract visitors to the district.

  Other rating proposals…
                                                              Get rid of ward rates?                                     Remove exemptions for
   What do                                                    Town maintenance, reserves, public                         Uniform Annual General
   you think?                                                 toilets, swimming pools, cemeteries,
                                                              halls and playgrounds are currently
                                                              funded from a ward services rate.
                                                                                                                         Charge
                                                                                                                         Some separately-used or inhabited
                                                              Council proposes to remove this rate                       parts of a rating unit are exempt
   1. Should Council use differentials                        and use an increased general rate to                       from the Uniform Annual General
      to charge ratepayer sectors in                          pay for most of these services. This                       Charge. Council proposes to simplify
      proportion to how much they                             would allow it to set district-wide                        the de­fi­­nition of a separately-used or
      benefit from or use services?                           standards for community services.                          inhabited rating unit, so that any
                                                              Communities would have the option                          property that contains 2 or more
   2. Should Council levy the Uni­
                                                              of requesting additional facilities if                     dwellings or businesses is liable for
      form Annual General Charge on
                                                              they agreed to pay for these via                           2 or more charges.
      all separately-used or inhabited
      rating units?                                           targeted rates.

   3. Should community services be
      funded from the general rate                            Increase the general rate to pay for storm costs?
      instead of a ward services rate?
                                                              Earthquakes in Canterbury have forced the insurance sector to assess its risk in New
   4. Should ratepayers with adjoin-                          Zealand. Council now has to pay an excess of $500,000 on each claim for storm
      ing properties have their uniform                       damage to above-ground assets instead of $2,500. Council plans to add 1% to the
      annual general charges waived?                          general rate to provide a contingency if and when needed.
   5. Should Kaitaia businesses have to
      pay a targeted rate to raise funds
      for business development?
                                                              Waive Uniform Annual General Charges on 2 or more
   6. Should 1% be added to the
      general rate to help meet the
                                                              adjoining properties?
      reduced level of insurance cover?                       Council proposes to alter its Remission of Charges on Contiguous Properties Policy
                                                              so ratepayers with 2 or more adjoining properties may apply for a remission of
                                                              those charges for the period they own the properties. Waiving the charges on the
                                                              estimated 4,000-5,000 properties that would qualify for the remission could increase
                                                              rates for all ratepayers by 6-7%.

                                                                                                                                                                        7
Far Nor th District Council - Our Draft 10 Year Plan - Summary of Statement of Proposal for the Draft Long Term Plan 2012-22
What is the problem?
                                                                                                    Water is becoming a scarce resource.

                        How should
                                                                                                    The Far North has difficulties finding
                                                                                                    new sources of water to supply its
                                                                                                    water schemes and to meet rising
                                                                                                    demand.

                        we pay for
                                                                                                    Significant water supply problems are
                                                                                                    developing in the Hokianga and water
                                                                                                    sources in the Bay of Islands are under
                                                                                                    increasing pressure.

                        water?                                                                      The investment Council has to make
                                                                                                    to maintain supplies and develop new
                                                                                                    sources will result in water costs rising
                                                                                                    from $8.8 million in 2012-13 to $12.2
                                                                                                    million in 2021-22.

What does Council propose to do about this?
Council has reviewed the way it funds             operating costs of the district’s water
its water schemes.                                schemes.
                                                                                                    What would the changes
                                                                                                    mean for you?
At present, ratepayers whose proper-              It would fund the remaining 20% of
ties are connected to a Council water             costs from a targeted capital rate that           If Council adopted this funding
supply pay a uniform connection charge            varied from scheme to scheme and also             policy, ratepayers whose properties
and a meter charge based on how much              applied to properties that aren’t con-            are connected to the Rawene and
water they use.                                   nected to a scheme but are able to be             Omapere/Opononi water schemes
                                                  connected.                                        would pay MORE for water in 2012-13.
Council believes it would be fairer and
more sustainable to ask these ratepay-            Increasing the meter charge for water             Ratepayers whose properties are
ers to pay some of the capital costs of           would force people to use it more spar-           connected to the Kaikohe, Kaitaia,
their water schemes, instead of charging          ingly and reduce the need for new infra-          Kawakawa, Kerikeri, Okaihau and
this uniformly.                                   structure.                                        Paihia schemes would pay LESS for
Council would retain a uniform meter              Only requiring ratepayers to pay some             water.
charge, but raise this from $2.82 per             of the capital costs of their water               The table shows how much ratepay-
cubic metre to $3 per cubic metre.                schemes would help to even out cost               ers with properties connected to
                                                  differences between schemes.                      Council’s bigger water schemes would
It would use revenue from the meter
charge to fund 80% of the capital and                                                               pay under the new funding policy.

                           PROPOSED WATER RATES FOR 2012/13

                                                                                                    What do
                        Current System                  Proposed System             Pay More
                Fixed      *Meter        Total    Capital    *Meter      Total       or Less
    Scheme                                                                            Under

                                                                                                    you think?
                Rate        Rate         Water     Rate       Rate       Water
                                         Rates                           Rates      Proposed
                                                                                     System?
 Rawene          $209        $620        $829      $385        $660      $1045      $216 more
 Omapere/        $209        $620        $829      $367        $660      $1027      $198 more       1. Should ratepayers with properties
 Opononi                                                                                               connected (or capable of being con-
 Kerikeri        $209        $620        $829      $101        $660       $761         $68 less        nected) to Council water schemes
 Paihia          $209        $620        $829      $126        $660       $786         $43 less        pay the capital costs of those
 Kaikohe         $209        $620        $829      $149        $660       $809         $20 less        schemes?
 Kaitaia         $209        $620        $829      $154        $660       $814        $15 less
                                                                                                    2. Should ratepayers with proper-
 Kawakawa        $209        $620        $829      $160        $660       $820          $9 less        ties connected (or capable of being
 Okaihau         $209        $620        $829      $163        $660       $823          $6 less        connected) to Council sewerage
*The meter rate is based on the average family consumption of 220 cubic metres of water a year.        schemes pay the capital costs of
                                                                                                       those schemes?

8                                                                                The top place where talent wants to live, work and invest
Far Nor th District Council - Our Draft 10 Year Plan - Summary of Statement of Proposal for the Draft Long Term Plan 2012-22
We encourage you to make a submission to the Far North District Council’s Draft

             Tell the          Long Term Plan 2012-22 online at www.fndc.govt.nz or by filling in this form and:

             Mayor and         1. Folding it as shown, securing it with      3. Handing the form to staff at a

                 Councillors
                                  staples or sticky tape and posting            Far North District Council
                                  it to the Far North District Council,         service centre or library

                 whatyou          Private Bag 752, Memorial Avenue,
                                  Kaikohe 0440
                                                                             4. Scanning and emailing an
                                                                                electronic copy of the form
                 think of      2. Faxing the form to (09) 401 2137              to submissions@fndc.govt.nz

                 their plan!   Council must receive your submission by 5pm on April 19.

                                                                                                                        re
                                                                                                                      he
                                                                                                                   F ol d

                                                                               New Zealand
                                                                             Permit No. 6124

                                                                 Draft Long Term Plan 2012-22 Submissions
                                                                 Far North District Council
                                                                 Private Bag 752
                                                                 Memorial Avenue
                                                                 KAIKOHE 0440

            re
       he
Fold

       HHeellppffuul l         1. Read the summary and refer to
                                  the full version of the plan if you
                                                                             4. Summarise your main points early
                                                                                if you are writing a submission.

       hhi ninttss for
                                  need more information.
                                                                             5. Consider speaking about your
                               2. Use simple language, be as clear              submission at a hearing.

                 making an
                                  as possible and keep to the point.

                 effective
                               3. Short sentences or bullet points
                                  work really well.

                 submission    This form and any other documents you send us will NOT be returned to you.
                               Please keep copies if you have asked to speak about your submission at a hearing.
Far Nor th District Council - Our Draft 10 Year Plan - Summary of Statement of Proposal for the Draft Long Term Plan 2012-22
What do                  Draft Long Term-Plan 2012-22
you think?               Submission Form
                         Do you want to speak about your submission at a hearing?
                         ☐ Yes                           ☐ No
This is your chance to
tell us what you think   Do you need a Mˉaori translator?
about the proposals in   ☐ Yes                           ☐ No
this summary of the
Draft Long Term Plan.    Which day would you prefer to attend a hearing? Please tick first and second choices.
                         Monday       14 May, Kaikohe Chambers          ☐ First choice                    ☐ Second choice
                         Tuesday   15 May, Kaikohe Chambers             ☐ First choice                    ☐ Second choice
This is not a complete
                         Wednesday 16 May, Kaitaia, Te Ahu Centre       ☐ First choice                    ☐ Second choice
list of proposals.       Thursday  17 May Kaitaia, Te Ahu Centre        ☐ First choice                    ☐ Second choice
                         Friday    18 May, Kerikeri, BOI sports complex ☐ First choice                    ☐ Second choice
We urge you to look      Monday    21 May, Kerikeri, BOI sports complex ☐ First choice                    ☐ Second choice
through the plan for a
                         Your contact details:
fuller picture of what
                         Please print your contact details clearly so Council staff can send an acknowledge-
we are planning in the   ment and outcome letter to you.
next 10 years.           Title (please tick a box)   ☐ Dr           ☐ Mr           ☐ Mrs          ☐ Ms           ☐ Miss

                         First name              ________________________________________________
The two volumes of
                         Surname                 ________________________________________________
the plan can be read
                         Organisation/group      _____________________ ___________________________
on Council’s website
                                                 Only name an organisation/group if you are making a submission on behalf of one
at www.fndc.govt.nz or
                         Postal address          ________________________________________________
browsed at its service
centres and libraries.                           ________________________________________________

                                                 ________________________________________________

                         Post code               ________________________________________________

                         Email address           ________________________________________________

                         Phone(daytime)          _____________________ Phone (evening)______________

                         Mobile phone            _____________________ Fax ________________________

                         Age group (optional)        ☐ 15-24                       ☐ 25-34                     ☐ 35-44
                                                     ☐ 45-54                       ☐ 55-64                     ☐ 65+

                         Ethnicity (optional)        ☐ Pakeha              ☐ Mˉaori
                                                     ☐ Other (please specify) _________________________
OFFICE USE ONLY:
                                                                 SUBMITTER NUMBER

Should Council:
1.   Introduce the proposed alternative rating system as proposed on pages 4-9?             ☐ Yes   ☐ Don’t Know ☐ No
2.   Implement the alternative rating system from 1 July 2012?                              ☐ Yes   ☐ Don’t Know ☐ No
3.   Phase the alternative rating system in over a period of years?                         ☐ Yes   ☐ Don’t Know ☐ No
4.   Introduce a targeted differential rate for roading as proposed on page 5?              ☐ Yes   ☐ Don’t Know ☐ No
5.   Increase the number of rates differential categories as proposed on page 6?            ☐ Yes   ☐ Don’t Know ☐ No
6.   Remove the ward rate as proposed on page 7?                                            ☐ Yes   ☐ Don’t Know ☐ No
7.   Levy the Uniform Annual General Charge on all separately-used or inhabited
     rating units as proposed on page 7?                                                    ☐ Yes   ☐ Don’t Know ☐ No
8.   Increase the general rate to pay for storm costs as proposed on page 7?                ☐ Yes   ☐ Don’t Know ☐ No
9.   Levy a business improvement rate on Kaitaia businesses as proposed on page 7?          ☐ Yes   ☐ Don’t Know ☐ No
10. Waive Uniform Annual General Charges on 2 or more adjoining properties
    as proposed on page 7?                                                                  ☐ Yes   ☐ Don’t Know ☐ No
11. Charge $3 per cubic metre for water and fund water supply
    capital costs on a scheme-by-scheme basis as proposed on page 8?                        ☐ Yes   ☐ Don’t Know ☐ No
12. Charge sewerage capital costs on a scheme basis and operational costs
    district-wide as proposed on page 9?                                                    ☐ Yes   ☐ Don’t Know ☐ No
13. Reduce the level of development contributions as proposed on page 10?                   ☐ Yes   ☐ Don’t Know ☐ No
14. Change the way it calculates contributions from commercial and industrial
    developments as proposed on page 10?                                                    ☐ Yes   ☐ Don’t Know ☐ No
15. Raise the threshold for development contribution discounts as proposed on page 11?      ☐ Yes   ☐ Don’t Know ☐ No
16. Reduce development contributions charged for smaller residential and retirement
    dwellings as proposed on page 11?                                                       ☐ Yes   ☐ Don’t Know ☐ No
17. Waive development contributions on first dwellings built on lots created
    before 1 July 2003 as proposed on page 11?                                              ☐ Yes   ☐ Don’t Know ☐ No
18. Charge contributions for water and sewerage on lots created after 1 July 2003
    and offset availability charges developers have paid as proposed on page 11?            ☐ Yes   ☐ Don’t Know ☐ No
19. Invest in the Local Government Funding Agency as proposed on page 12?                   ☐ Yes   ☐ Don’t Know ☐ No
20. Fund Kerikeri and Paihia parking wardens from a business rate as proposed on page 12?   ☐ Yes   ☐ Don’t Know ☐ No
21. Upgrade community halls to make them more user friendly for disabled                    ☐ Yes
                                                                                             ☐ Don’t Know ☐ No
    people as proposed on page 12?

22. Sell its pensioner flats at Kohukohu to a social housing provider as proposed
    on page 12?                                                                             ☐ Yes   ☐ Don’t Know ☐ No
23. Install tsunami sirens in coastal communities with a local response plan as
    proposed on page 12?                                                                    ☐ Yes   ☐ Don’t Know ☐ No
24. Offer a 3% discount to ratepayers who pay their rates in full by the first
    instalment due date as proposed on page 12?                                              ☐ Yes   ☐ Don’t Know ☐ No
25. Spend $30,000 on park and walkway improvements in the Eastern Ward as
    proposed on page 12?                                                                     ☐ Yes   ☐ Don’t Know   ☐ No
26. Spend an extra $70,000 on boat ramp and wharf maintenance as proposed
    on page12?                                                                               ☐ Yes   ☐ Don’t Know   ☐ No
27. Urge the Northland Regional Council to relax rules banning the use of oil sprays
    to suppress dust on metal roads as proposed on page 13?                                  ☐ Yes   ☐ Don’t Know   ☐ No
28. Reduce the hours that libraries are open at weekends as proposed on page 13?             ☐ Yes   ☐ Don’t Know   ☐ No
29. Contribute $165,000 a year for five years towards $5 million costs of upgrading
    Bay of Islands Airport as proposed on page 3?                                            ☐ Yes   ☐ Don’t Know ☐ No
30. Provide a higher level of service at Council service centres and libraries in Kaitaia,
    Kerikeri and Kaikohe, but review services in smaller towns as proposed on page 13?       ☐ Yes   ☐ Don’t Know   ☐ No
31. Replace Council libraries in smaller centres with community libraries run by
    volunteers as proposed on page 13?                                                       ☐ Yes   ☐ Don’t Know   ☐ No

Have your say
Items in the Draft Long Term Plan I support and my reasons for supporting them _____________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________

Items in the Draft Long Term Plan I oppose and my reasons for opposing them_ ______________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________

Items I would like added to the Draft Long Term Plan and my reasons for wanting them in the plan _______________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________

Continue on a separate sheet if necessary and enclose this with your submission form.
Council must receive your submission by 5pm on April 19.
How should we pay for sewerage?
 What is the problem?                                  What does Council propose to do about this?
 Rising environmental standards and                    Council has reviewed the way it funds      ing costs of schemes on a district-wide
 community demand for increasingly                     sewerage.                                  basis, because many of these costs are
 expensive sewage treatment schemes                                                               not incurred at a scheme level.
                                                       It believes it would be fairer and more
 are driving up the cost of sewerage
                                                       sustainable to go back to a funding        It is also more economic for the
 services.
                                                       system that operated in the district       Council to manage schemes collec-
 Council currently funds sewerage on                   some years ago.                            tively.
 a district-wide basis via a uniform rate.             Under this system, ratepayers would        The proposed system would result in
 This means ratepayers with proper-                    only be liable for the capital costs of    different sewerage costs across the
 ties connected to a Council sewer-                    the sewerage schemes their proper-         district.
 age scheme (or with properties that                   ties were connected to or able to be
                                                                                                  But it would encourage communities
 are able to connect to a scheme) pay                  connected to.
                                                                                                  to balance affordability with environ-
 the same rate per connection towards                  Council would collect this money via a     mental performance when making
 the capital and operating costs of all                targeted rate.                             submissions to resource consents for
 schemes in the district.                                                                         scheme upgrades.
                                                       It would continue to fund the operat-
 Under this funding system, economic
 schemes subsidise less economic
 schemes.                                                                  PROPOSED SEWERAGE RATES FOR 2012-13

 The true costs of inefficient or expen-                                Current                   Proposed
                                                                        System                     System                   Pay More or Less
 sive schemes are effectively hidden                   Scheme
                                                                       2012-2013      Capital     Operating       Total     Under Proposed
 from ratepayers whose properties are                                                                                           System?
                                                                      Uniform rate     Rate         Rate        Payment
 connected to those schemes.
                                                       Hihi            $813.30        $1467         $444         $1910       $1096.70 more
                                                       Russell         $813.30         $943         $444         $1387        $573.70 more
                                                       Kaeo            $813.30         $828         $444         $1272        $458.70 more
                                                       Rawene          $813.30         $548         $444          $992        $178.70 more

               changes                                 Kohukohu        $813.30         $527         $444          $971        $157.70 more
What would the                                         Kawakawa        $813.30         $483         $444          $927        $113.70 more

mean for you?                                          Paihia          $813.30         $431         $444          $875         $61.70 more
                                          ing          Kerikeri        $813.30         $403         $444          $846         $32.70 more
                     to adopt this fund
If Council decided                        are
                     whose proper ties
                                                       Kaitaia         $813.30         $184         $444          $628          $185.30 less
system, ratepayers                 w  ak aw a,         Kaikohe         $813.30         $265         $444          $709          $104.30 less
                    Hihi, Kaeo, Ka
 connected to the                      e  an d
                      , Paihia, Rawen                  East Coast      $813.30         $271         $444          $715           $98.30 less
 Kerikeri, Kohukohu                        pay
                      schemes would                    Opononi         $813.30         $290         $444          $733           $80.30 less
  Russell sewerage
                       e in 2012-13.                   Rangiputa       $813.30         $299         $444          $743           $70.30 less
  MORE for sewerag
                                             n-        Whangaroa       $813.30         $339         $444          $783           $30.30 less
                        proper ties are co
   Ratepayers whose                     C  oa st,      Ahipara         $813.30         $344         $444          $788           $25.30 less
                      Ahipara, East
   nected to the                            ut a,      Whatuwhiwhi     $813.30         $367         $444          $811            $2.30 less
                       Opononi, Rangip
   Kaikohe, Kaitaia,                       wer-
                       Whatuwhiwhi se
    Whangaroa and                            for       What is the alternative?
                       ould pay LESS
    age schemes w
    sewerage.                                          Council could keep the current funding system. But ratepayers would still face
                                            yers
                        how much ratepa                higher charges for sewerage in the next financial year, thanks to higher environ-
     The table shows                            il’s
                         nnected to Counc              mental standards and operating costs and the need to replace aging infrastructure.
     with proper ties co                      pay
                         schemes would
     bigger sewerage                                   Council proposes to raise the current uniform rate of $669.28 per connection to
                        nding policy.
      under the new fu                                 $813.30 in 2012-13 if it is retained.

                                                                                                                                        9
Council is upgrading Russell Wharf in a partnership with the Russell Wharf and Waterfront Trust.

Development contributions
Time for a change?                                                                                              Council proposes a number of
                                                                                                                   significant changes to its
                                                                                                                 Development Contributions
                                                                                                                 Policy to align contributions
Reduce development contributions?                                                                                 with infrastructure needs
The recessionary climate and reduced                 (see table). Keeping these at current                             and to encourage
need for growth-related infrastructure               levels could result in revenue exceed-                           new developments.
has prompted Council to consider                     ing growth-related infrastructure needs
lowering development contributions                   which the law does not allow.

                                                   TOTAL CONTRIBUTIONS (EXCLUDING GST)
                                                  2011-12 Annual Plan                                               2012-22 LTP
                                Bay of Islands/         Te Hiku             Kaikohe/          Bay of Islands/         Te Hiku         Kaikohe/
 Contribution Class
                                 Whangaroa                                  Hokianga           Whangaroa                              Hokianga
 Roading                             $2,077               $2,077              $2,077                $2,525             $4,442           $1,318
 Water Services                      $2,589               $2,589              $2,589                $1,825             $2,023           $1,756
 Wastewater Services                 $5,580               $5,474              $5,416                $5,143             $2,737           $2,650
 Stormwater Services                 $1,535               $1,368              $1,037                $1,285             $1,504           $1,092
 Community Infrastructure            $1,575                $989                 $128                $2,684             $1,075            $573
 Reserves                            $4,016               $1,106                $619                $1,680              $400             $300
 Total                             $17,372              $13,603              $11,866               $15,142            $12,181           $7,689

Change the way contributions are calculated for commercial and industrial projects?
Council currently bases contributions for            of equivalent household units of demand              would also mean Council wouldn’t have
commercial and industrial developments               created by the project. This would make              to cap road fees at 6% of the develop-
on floor area and traffic intensity factors.         it easier for developers to estimate the             ment’s value.
It now plans to base these on the number             contributions they would have to pay. It

10                                                                                  The top place where talent wants to live, work and invest
What do                                    Exempt first dwellings on lots subdivided before

you think?                                 1 July 2003?
                                           Council is considering whether to exempt developers from paying development
                                           contributions for the first dwelling on lots created before 1 July 2003. This would
1. Should development contributions        encourage them to develop subdivisions that have not been built on.
   be reduced?

2. Should the method of calculating
   development contributions for           Raise threshold for low-cost housing discounts?
   com­mercial and industrial develop-
                                           Council offers graduated discounts for contributions payable on residential subdivi-
   ments be changed?
                                           sions worth less than $122,000 per lot. It proposes to reduce the land value eligible
3. Should Council reduce the value         for a discount to $100,000. Keeping the eligibility threshold at the current level may
   of residential lots that are eligible   increase the number of lots eligible for the discount and reduce revenue by up to 15%.
   for discounts?

4. Should smaller residential and
   retirement dwellings pay reduced        Reduce development contributions for small
   contributions?                          residential and retirement dwellings?
5. Should lots created before 1 July       Council proposes to reduce contributions for small residential and retirement dwell-
   2003 be exempt from contribu-           ings in line with the lower infrastructure costs these developments create.
   tions for the first dwelling?

6. Should Council charge contribu-
   tions for water and sewerage on         Charge contributions for water and sewerage on lots
   lots created after 1 July 2003?         created after 1 July 2003?
                                           Council is considering whether to charge contributions for water and sewerage on
                                           lots created after 1 July 2003. Any availability charges paid by the developer would
                                           be deducted from the sum payable. Charging developers for these services would
                                           ensure they paid a reasonable contribution towards water and sewerage schemes.

                                                                                                                              11
Other key
                                                  proposals
                                                  Disabled access for community halls?
                  t Totara N    orth Hall
Disabled access a                                 Council plans to add wheelchair ramps to its community halls, where it is prac-
                                                  tical to do so, so they meet building standards for disability access. This would
                                                  cost $30,000 a year per ward and mean an increase in rates of less than 0.2%.
                                                  The alternative is to only install ramps when they are a requirement of building
                                                  consents for new building works.

   Sell pensioner flats in
   Kohukohu?
                                                  Invest to get cheaper credit?
   Council struggles to find tenants for its
   pensioner flats at Kohukohu. This may          Council may invest in the Local Government Funding Agency, which is a Council
   mean there is too much accommodation           controlled trading organisation, to access cheaper loans. The Authority has
   for the elderly in Kohukohu. The flats         a higher credit rating than Council can achieve and offers low-interest loans.
   may be better used by a wider range of         However, Council would need to buy shares in the Authority to borrow from the
   people with welfare needs. Council is          fund. It would also be held liable for a portion of other councils’ debts in case
   considering whether to sell the flats to a     of a default.
   social housing provider to reduce main-
   tenance costs which exceed rent income.

                                                  Discount for early payment of rates?
                                                  Council may offer a 3% discount for people who pay their rates in full before the
   Who should fund                                first instalment is due on 20 August 2012. This would reduce rates revenue, but
                                                  improve cash flows and cut administrative costs.
   parking wardens in
   Paihia and Kerikeri?
   Council is funding parking wardens in
   Kerikeri and Paihia during the peak visi­tor   Tsunami sirens for coastal communities?
   period from general rates. Council would
   like to know if ratepayers agree with an       Council plans to install 15 tsunami
   alternative to fund by a targeted rate.        warning sirens a year in coastal
                                                  communities with Civil Defence
                                                  response plans. This would cost
   More money for parks and                       $37,500 and incur interest and
                                                  depreciation costs of $15,000 per
   boat ramps?                                    annum which Council would fund
   Council plans to spend $30,000 improv-         from the general rate.
   ing popular parks and walkways in the          The alternative is to not install
   Bay of Islands-Whangaroa Ward and an           sirens and rely on local response
   extra $70,000 of rates money maintain-         plans and media to warn people
                                                                                           Flood dam
   ing boat ramps and jetties in the district.    of tsunami.                                        aged highw
                                                                                                                ay near K
                                                                                                                         awakawa

   12                                                                   The top place where talent wants to live, work and invest
An artificial kauri tree dominates Council's new Kaitaia Library at Te Ahu Centre.

Spray waste oil on metal roads to suppress dust?                                            Reduce serv
                                                                                                        ices at libra
                                                                                           and Council                ries
Council is urging the Northland Regional Council to relax Regional Plan                                  service centr
                                                                                           to save mon                  es
rules banning the use of waste oil sprays to suppress dust on metal roads.                             ey?
Allowing licensed contractors to apply a seal coat of waste oil to road                     Council is co
surfaces under controlled conditions would be a cost-effective alternative                                  nsidering w
                                                                                            services at it                hether to red
                                                                                                           s smallest li                uce
to more expensive glycerol sprays which have proved ineffectual.                           service centr                 braries and
                                                                                                         es so it can
                                                                                           services in K              increase thes
                                                                                                         aikohe, Kait                 e
                                                                                          It may also                  aia and Ker
                                                                                                        reduce week                   ikeri.
                                                                                         at libraries a              end opening
                                                                                                        nd replace C                  hours
                                                                                        in smaller ce                 ouncil libra
                                                                                                        ntres with co                ries
                                                                                        libraries run                 mmunity
                                                                                                        by volunteer
                                                                                                                      s.

                                                                                            What do
                                                                                            you think?
                                                                                            1. Should Council invest in the Local
                                                                                               Government Funding Agency?

                                                                                            2. Should Council continue to urge the
                                                                                               Northland Regional Council to allow
                                                                                               the use of waste oil sprays to sup-
                                                                                               press dust on metal roads?

                                                                                            3. Should Council install tsunami war­
                                                                                               ning sirens?

                                                                                            4. Should Council make halls easier for
                                                                                               disabled people to access?

                                                                                            5. Should Kohukohu pensioner flats be
                                                                                               sold for social housing?

                                                                                            6. Should parking wardens be funded
                                                                                               from a rate levied on Kerikeri and
                                                                                               Paihia businesses or should all rate-
                                                                                               payers pay for these services?

                                                                                            7. Should Council reduce services at
                                                                                               libraries and Council service centres
                                                                                               to save money?

                                                                                            8. Should Council offer a 3% discount
                                                                                               for early payment of rates?

                                                                                            9. Should Council spend extra mo­­ney
                                                                                               on parks, walkways, boat ramps and
                                                                                               jetties?

                                                                                                                                        13
Lobby government for unitary
authority status?
Council signalled its desire to become a unitary
authority in the last Long  Term Plan. Since then,
it and other Northland councils have commis-
sioned a report on governance options for the
region. Achieving unitary authority status would
require the councils to convince the govern-
ment of the need for a new governance model
in Northland.

Council sponsors the annual State Paihia Classic ocean swim from Russell to Paihia.

What else are we planning?                                                                             In the pipeline
                                                                                                       Council plans to spend up to $43.5
                                                                                                       million on sewerage and water supply
                                                                                                       upgrades that will reduce pollution of
New water source for Kaitaia                                                                           rivers and harbours and save money,
Council has applied for a resource consent to take water from the Sweetwater                           including:
Aquifer for the Kaitaia water supply. Capital works programmed for 2011/13 will
                                                                                                       • The Draft Plan includes a discussion
cost $500,000, but reduce the likelihood of Kaitaia facing the severe summer water
                                                                                                         of phase one of the BOI Sewerage
shortages it experienced in 2010.
                                                                                                         scheme but Council is planning to
                                                                                                         conduct a separate consultation
Mineral exploration                                                                                      over the full scheme over the next
                                                                                                         12 months. We will call for submis-
Council will continue to promote mineral exploration opportunities in the dis-                           sion on that proposal at that.
trict in partnership with the Ministry of Economic Development, GNS, Enterprise
Northland, the private sector and other local authorities. This will include market-                   • New sewer systems will be built at
ing the results of an aerial geophysical survey of Northland.                                            Awanui and Opua before the end of
                                                                                                         2013 at a combined cost of $9.4
                                                                                                         million
Converting waste to fuel
                                                                                                       • Asbestos-cement water pipes will be
Council is exploring technologies that would enable it to convert refuse and wood
                                                                                                         replaced in the next 10 years at
waste from forest harvesting operations into automotive diesel and synthetic fuels
                                                                                                         a cost of $2.5 million, resulting in
for electricity generation. This would create jobs and revenue streams for the dis-
                                                                                                         fewer pipe breaks and less water
trict and reduce waste disposal costs.
                                                                                                         wasted.

Twin Coast Cycle Trail (Pou Herenga Tai)
Council expects to complete an 83 km, government-funded                         promote the trail as a tourist attraction and support individuals
cycle trail it has been developing between Horeke and                           and organisations who are keen to capitalise on the economic
Kawakawa before the end of the year. It will continue to                        opportunities it offers.

14                                                                                                 where talent wants to live, work and invest
Rate Increase Strategy                                                                                    Financial
                                                                                                                                challenges
              7.00%

              6.00%

              5.00%                                                                                                             Factors expected to impact on Council
                                                                                                                                finances in the next 10-years include the:
                                                                                                                                • global economic slowdown
 % increase

              4.00%

                                                                                                                                • affordability of rate increases for low-
              3.00%                                                                                                                income ratepayers
                                                                                                                                • cost of providing services to a large,
              2.00%
                                                                                                                                   sparsely-populated district with diver­
                                                                                                                                   se communities
              1.00%
                                                                                                                                • frequency and severity of storms that
              0.00%
                                                                                                                                   damage infrastructure
                      2012/13   2013/14   2014/15   2015/16   2016/17   2017/18   2018/19    2019/20    2020/21    2021/22      • difficulties of collecting rates on Māori
                                                               Year                         FNDC Strategy         FNDC actual      Freehold Land.

Taking a conservative
approach
                                                                         What is our financial strategy?
Council plans to continue taking a
conservative approach to managing its                                    Limits on rates?
fi­n­ances until market conditions allow                                 Council draws about 89% of its income from rates because it doesn’t have alterna-
otherwise. It will focus on affordability                                tive revenue streams, such as significant investment funds. Council will try to keep the
and try to minimise financial risk by:                                   income required from rates steady and create predictability in the level of rates needed
• Carefully managing income from                                         to fund Council services. Ways it will manage the cost to the ratepayer include making
  rates                                                                  efficiencies, reducing services and disposing of surplus assets.

• Borrowing within its ability to pay                                    Limits on rate increases
• Trying to ensure that those who                                        Council proposes to limit the increase in the total amount of rates it levies to no
  create the demand for services pay                                     more than the % increase of the local government cost index (LGCI) plus 1% for
  for those services                                                     that year. Rate increase limits may differ at an individual community board level.
• Retaining a mixed rating structure
  which takes account of the diverse
                                                                         Limits on borrowing
  needs of the district’s communities                                    Borrowing ensures that current ratepayers pay for the services they use now and
                                                                         future ratepayers pay their share too. Council’s borrowing limits are currently linked
• Only providing new infrastructure
                                                                         to total revenue. However, Council’s only guaranteed revenue is from rates which
  when it is really needed and where
                                                                         make up about 89% of its total income. Council considers that borrowing external
  it is planned
                                                                         funds of up to 175% of its total revenue, excluding capital grants, to be financially
• Applying a principle of intergen-                                      prudent.
 erational equity so that current
 and future ratepayers pay their fair                                    Projected borrowing?
 share of costs
                                                                         Council expects externally funded borrowing to peak at $133.1 million in 2015-16
• Maintaining a disaster reserve fund                                    and tail off in the latter part of the plan. This demonstrates that Council has
  to pay for unforeseen works result-                                    the capacity to increase capital renewals or reserve-funded projects if required,
  ing from damaging natural events                                       particularly in the last half of the plan.

                                                                                                                                                                          15
Cover photo & design by Different Design, Waipapa - differentdesign.co.nz
Where can I get more
information about some-
thing in this summary?
The two volumes of the draft plan
include detailed information about
the proposals in this summary. These
can be read on Council’s website at
www.fndc.govt.nz or browsed at its
service centres and libraries. CDs with    Meeting Host                     Meeting Date      Meeting Venue
electronic copies of the plan are avail-   Kerikeri Business Association    20 March,   6pm Palmco Garden Lounge, Kerikeri
able by phoning 09 401 5200. You can
also put questions to elected members      Rawene Area Residents Association 22 March, 5:30pm Rawene Town Hall
and Council staff at public meetings       Kaikohe Business Association     10 April, 5:30pm Council Chambers, Kaikohe
hosted by Kaitaia, Kerikeri, Kaikohe and
                                           Kaitaia Business Association     11 April,   6pm Te Ahu Centre, Kaitaia
Paihia Business Associations and the
Rawene Area Residents Association in       Paihia Business Association      16 April,   7pm Details on Council’s website on April 13
March and April.

What do                                    Have your say!
you think?
Council invites you to make a sub-
                                           How do I make a submission?
mission on the Draft Long Term Plan        Simply complete the submission form in this booklet and return it to Council before
2012-22 from March 19 to April 19.         5pm on April 19.You can make a submission as an individual or on behalf of the group.
This is a one-in-three-year chance for     You can also ask to speak to councillors about your submission at one of the public
you to influence the direction of the      hearings scheduled for May 14-21.
district and Council. Councillors will
hear submissions from May 14-21 and        Make your submission online
deliberate over submissions on June 12
and 13 before finalising and adopting      You may find it easier to make your submission online if you have Internet access.
the plan on 21 or 25 June.                 A summary of the draft plan on our website at www.fndc.govt.nz is linked elec-
                                           tronically to the submission form so you can answer the multiple-choice questions
                                           while reading the summary.

                                           Will Council take any notice of my submission?
                                           Council notes all the points made to it during the submissions process. Previous
Far North District Council                 finalised Long Term Plans have included changes and additions that councillors
Memorial Avenue                            made after considering submissions. However, Council is often unable to meet
                                           requests for reasons of affordability. You need to be realistic when writing your
Private Bag 752
                                           submission and consider Council’s district-wide priorities if you are proposing local-
Kaikohe 0440
                                           ised projects.
Northland
Aotearoa/New Zealand
                                           What shouldn’t I make a submission on?
www.fndc.govt.nz
24-hour Freephone 0800 920 029             Don’t make submissions about matters that are outside the scope of the 10 year
or (09) 401 5200                           planning process. These include maintenance requests, building and resource