East Birmingham Prospectus for growth - February 2015

Page created by Jonathan Grant
 
CONTINUE READING
East Birmingham Prospectus for growth - February 2015
East Birmingham
Prospectus for growth
             February 2015
East Birmingham Prospectus for growth - February 2015
Contents

                                                                         Foreword 								3

Contact

Planning and Regeneration
Economy Directorate
Birmingham City Council
                                                                         Introduction							                       4
Click:
E-mail:
rebecca.farr@birmingham.gov.uk

Call:                                                                    Context							                            6
Telephone:
(0121) 464 9857

Visit:
Office:                                                                  Our commitment					                      11
1 Lancaster Circus
                                                                          Employment and skills
Birmingham
B4 7DJ                                                                    Improved connectivity
                                                                          Delivering growth

Post:
PO Box 28
Birmingham
B1 1TU
                                                                         Development opportunities				            18
                                                                          Employment
                                                                          Local Centres
You can ask for a copy of this document in large
print, another format or another language. We aim to
supply what you need within ten working days.
Call (0121) 464 9857                                                     Making it happen					                    38

If you have hearing difficulties please call us via
Typetalk 18001 0121 464 9857 or e-mail us at the
address above.

Plans contained within this document are based upon Ordnance Survey
material with the permission of Ordnance Survey on behalf of the
Controller of Her Majesty’s Stationery Office.

© Crown Copyright. Unauthorised reproduction infringes Crown Copyright
and may lead to prosecution or civil proceedings.
Birmingham City Council. Licence number 100021326, 2015.

                                                                                                         contents / east birmingham prospectus for growth
East Birmingham Prospectus for growth - February 2015
2                                                                             Foreword                                                                                                    3

                                                                              These are exciting times in Birmingham; the arrival of High Speed
                                                                              rail and associated growth in the City Centre and at UK Central will
                                                                              bring physical change and economic growth which will benefit the
                                                                              whole City.

                                                                              For East Birmingham - located between these two key drivers - we
                                                                              now have a unique opportunity to capitalise on this growth, and to
                                                                              maximise local opportunities, to ensure that local people are able
                                                                              to reap the benefits.

                                                                              In particular we must seek to support local people into sustainable

                                                       “
                                                                              jobs by giving them the skills they need to compete in the labour
                                                                              market. We must deliver development which will provide new jobs,
                                                                              improve connectivity to enable people to access jobs, and also
                                                                              provide the conditions for business growth.
                                                            THE PROSPECTUS    Through this Prospectus we identify the opportunity for more than
                                                                              350,000sq.m (3.7 million sq.ft) of new employment floorspace and
                                                                              9,000 new jobs within East Birmingham, and for maximising the
                                                       FORMS A STARTING       benefits of growth here and elsewhere in the City for the residents
                                                                              of East Birmingham.

                                                       POINT FOR RENEWING     The Prospectus forms a starting point for renewing our commitment
                                                                              to East Birmingham by focusing on three key areas of activity -

                                                       OUR COMMITMENT TO

                                                       EAST BIRMINGHAM
                                                                          “   Employment and Skills, Improved Connectivity and Delivering
                                                                              Growth - which we will develop in partnership with Government.

                                                                              Sir Albert Bore
                                                                              Leader,
                                                                              Birmingham City Council.

                                                                              Councillor Tahir Ali
                                                                              Cabinet Member for Development, Transport and the Economy
                                                                              Birmingham City Council.

    east birmingham prospectus for growth / foreword                                                                                   foreword / east birmingham prospectus for growth
East Birmingham Prospectus for growth - February 2015
4   Introduction                                                                                                                                                                                                                                                                                                   5

    East Birmingham includes Erdington, Stockland Green, Nechells, Saltley,
    Washwood Heath, Hodge Hill and Shard End - an area with a population
    of more than 280,000 people.

    This Prospectus identifies the           East Birmingham sits between              other opportunities in the City, can
    issues which are limiting the            the City Centre, where the                be maximised for local people.
    potential for economic growth            Birmingham Curzon HS2 station
    in East Birmingham, as well as           will be the catalyst for significant      Maximising the benefits of                                                                                              A453

    highlighting the opportunities           investment and growth at Eastside,        the opportunities within East                                                                                          Wylde
    for the area. It then sets out           and UK Central, which includes            Birmingham, too, is important.                                                                                         Green

                                                                                                                                                                                                                                                                                                       2
                                                                                                                                                                                                                                                                                            M6 (T

                                                                                                                                                                                                                                                                                                     M4
    our commitment to working in             the airport, NEC and Resorts              In particular these include                                                                                                                                            A38

                                                                                                                                                                                                                                                                                              ll)o
    partnership with Government and          World development, and the HS2            opportunities for job creation. This
    local organisations to maximise          interchange station, and which will       Prospectus therefore identifies sites                                                                         Chester Road
                                                                                                                                                                                                                                                                                                      To Derby/
    these opportunities and improve          also be a focus for growth. It is vital   where new development can best                                                                                                         A452
                                                                                                                                                                                                                                                                                                     Nottingham

    the prospects for the area.              that the benefits of these, and of        be realised.                                                                                               Erdington         A5127
                                                                                                                                                                                                                                           Pype Hayes
                                                                                                                                                                                                                                           Park
                                                                                                                                                                                            A4040

    Our commitment will focus on                                                                                                                                                                                                                                                                          To
    three key areas of activity:                                                                                                                                                                                                                                                                       Leicester
                                                                                                                                                                                      Gravelley                         A38
                                                                                                                                                                                           Hill
    • Employment and skills.                                                                                                                                                                                                   The Fort

                                                                                                                                                                                                                                                                                 M
                                                                                                                                                                                                                              A47

                                                                                                                                                                                                                                                                                  6
    • Improving connectivity.                                                                                                                                                                   M6

                                                                                                                                                                    )
                                                                                                                                                                M
    • Delivering growth.                                                                                                                                                         Aston

                                                                                                                                                               8(
                                                                                                                                                             A3
    Despite numerous interventions                                                                                                                                                 A47                                          A4040

    over the past decade, East
    Birmingham continues to have an                                                                                                                               Duddeston

    employment rate that is too low,                                                                                                      City
                                                                                                                                                                                            Adderley
                                                                                                                                                                                            Park
                                                                                                                                                                                                                                          Stechford
                                                                                                                                                        Snow Hill
    high levels of worklessness and low                                                                                                   Centre
                                                                                                                                                                                                                                                                Lea Hall
    levels of skills whilst other parts of
                                                                                                                                                                                                                            Heartlands
    Birmingham have demonstrated                                                                                                                New Street   Moor Street
                                                                                                                                                                                   Birmingham City
                                                                                                                                                                                                                            Hospital

    improvement. Addressing this                                                                                                   Five
                                                                                                                                                                                   Football Club                                              A4040
                                                                                                                                                                                                                                                                              Marston
                                                                                                                                                                              Bordesley
    is one of the biggest challenges                                                                                              Ways
                                                                                                                                                                                                                                                                   Sheldon
                                                                                                                                                                                                                                                                              Green

                                                                                                                                                                                                                                                               Country Park
    for the area, and one which is to                                                                                                                                                     A45
                                                                                                                                                                                                                                                                                             National
                                                                                                                                                                                                                                                                                            Exhibition
    be addressed through the newly                                                                                                                                              Small
                                                                                                                                                                                Heath                                                                                                        Centre
                                                                                                                                                                                                                                                                                UK
    created Employment and Skills                                                                                                                                                                                                                                               Central
                                                                                                                                                                                                                                                                                                Birmingham
                                                                                                                                                                                                                                                                                                International
    Partnership for East Birmingham.                                                                                                                                                       A41                                 A4040                    A45

    The Partnership will launch its Plan
                                                                                                                                                                                A34             KEYTyseley                                                                                ✈
                                                                                                                                                                                                                                                                                     Birmingham
                                                                                                                                                                                                                                                                                        Airport
    in April 2015.                                                                                                                                                                                             City
                                                                                                                                                                                                                 To Boundary
                                                                                                                                                                                                                        Acocks                                                                            To
                                                                                                                                                                                                              Stratford Green                                                                           London

    However, measures to address                                                                                                                                                                              Motorway                      To
                                                                                                                                                                                                                                          Warwick
    these issues, and to improve                                                                                                                                                                              Main Road Network
    skills and employability, must                                                                                                                                   n                                        Rail Network
                                                                                                                                                                    NORTH
    be matched with available and                                                                                                                              NOT TO SCALE

    accessible jobs. Improvements to                                                                                           KEY
                                                                                                                                                                                                              Possible Reintroduction
                                                                                                                                                                                                              of Passenger Service
    connectivity which will allow better
    access to jobs, and growth which                                                                                                       City Boundary                                                      Proposed HS2 Line
    will create new jobs and raise                                                                                                         Motorway                                                           Metro Line
    aspirations will be important. These
                                                                                                                                           Main Road Network                                                  Metro Extension
    will be delivered in partnership
    with the Greater Birmingham and                                                                                                        Rail Network                                                       Rail Stations
    Solihull Local Enterprise Partnership                                                                                                                                                                     Proposed Station
                                                                                                                                           Possible Reintroduction
    (GBSLEP) and Government                                                                                                                of Passenger Service
    through, for example, the Growth
                                                                                                                                        Proposed HS2 Line
    Deal.                                    Birmingham Curzon concourse entrance                                              Plan 1 East Birmingham context
                                                                                                                                        Metro Line

    east birmingham prospectus for growth / introduction                                                                                   Metro Extension                                                                       introduction / east birmingham prospectus for growth
                                                                                                                                           Rail Stations

                                                                                                                                           Proposed Station
East Birmingham Prospectus for growth - February 2015
6   Context                                                                                                                                                                                                                                           7

    East Birmingham faces particular challenges, but is also uniquely placed
    to benefit from the sheer range of opportunities set to come forward both
    within the area and more widely.

    The significant growth                 A similar pattern is reflected in       by local residents. It also impacts       to ensure better responsiveness        Proposed local transport                  High Speed 2
    opportunities and transport            the skills levels of the area, with     on the type of jobs available to          of local and national providers to     improvements                              With an Interchange station at UK
    projects, alongside the                a higher proportion (28%) of East       those in employment, hinders              deliver against a shared agenda        Improvements which will better            Central and a new terminal station
    interventions emerging from the        Birmingham residents possessing         progression, and reinforces a             which maximises and better aligns      enable residents to access the jobs       at Curzon Street in Birmingham
    Employment and Skills Partnership      no qualifications than the city as      reliance on benefits including in-        the existing resources.                and training opportunities include:       City Centre, HS2 will change the
    for East Birmingham, will bring        a whole (21%). Fewer than a third       work benefits.                                                                                                             physical and economic landscape
    both economic and physical             of residents are qualified to NVQ                                                                                        • Highways improvements,                 of the City and wider region.
    improvements for the area and          level 3 or above, and fewer than a      The job mix in the City is forecast                                                 particularly at key junctions.         Journey times from London to
    enable the area to maximise the        fifth to Level 4 or above compared      to change, with fewer low skilled         Connectivity                                                                     Birmingham City Centre will be
                                                                                                                                                                    • Two rapid transit routes through
    benefits of growth.                    to a Birmingham average of 40%          jobs and more higher skilled jobs,        East Birmingham benefits from a                                                  reduced to just 49 minutes (38 to
                                                                                                                                                                       East Birmingham.
                                           and 25% respectively. This is           suggesting that lower skilled             number of high quality transport                                                 the Interchange station), and rail
    The following section summarises       reflected in the type of jobs held      residents may be less able to             links to the wider region including                                              passenger capacity increased,
                                                                                                                                                                    • Provision of new local rail services
    the key issues and opportunities for   by local people - only 27% are in       find work in the future. There is         good access to the motorway                                                      making the areas around the
                                                                                                                                                                       and stations in the Fort Parkway
    East Birmingham.                       the highest skilled occupations,        therefore a need to up-skill both         network at Juction 5 and 6 of the                                                stations especially attractive for
                                                                                                                                                                       and Castle Vale/Castle Bromwich
                                           compared to 38% for the City, and       those in employment and those             M6, and Junction 6 of the M42,            areas.                                 new investment. Masterplans
                                           17% are in elementary occupations       who are unemployed.                       and a conventional rail line linking                                             for Birmingham Curzon and UK
    Employment and skills                  compared to 13% for Birmingham                                                    the City Centre to UK Central and      • A package of wider connectivity        Central have been developed
                                           as a whole (ONS December 2014).         The poor employment and                   onwards to London.                        improvements associated with           to guide growth in these areas.
    East Birmingham unemployment                                                   employability rate in the area                                                                                             Construction is set to begin in 2017,
                                                                                                                                                                       HS2 which will ensure that local
    rates continue to lag behind the       This low skills base impacts on         also diverts public sector funding        However, local movement including                                                with the line operational from 2026.
                                                                                                                                                                       people and businesses are able
    city average, currently 9.5% as        the ability of local residents to       towards work related benefits and         public transport is hampered by           to access and reap the benefits of
    opposed to 6.5%. More than 20%         compete in the labour market with       other associated support services,        high levels of congestion which                                                  A wider package of connectivity
                                                                                                                                                                       the service.
    of these claimants are aged 18-24,     better qualified people both from       puts a brake on Birmingham’s              can make it difficult to travel to                                               improvements is proposed to
    with over a third being out of work    other parts of Birmingham and in-       growth prospects and undermines           work or do business both within        • Improved routes for cyclists.           maximise the benefits of HS2. In
    for more than a year. Despite being    commuters from the surrounding          investor confidence. This reinforces      and outside the area. There are
    home to 23% of the City’s working      areas. In fact some 10,000 jobs         the importance of effective               currently no local stations within
    age residents, the area accounts       remain vacant on a monthly basis        interventions in the area which are       the City on the rail line between
    for 30% of its JSA claimants (ONS      in the City, many at entry level,       rooted in maximising the benefits         Birmingham and Tamworth, limiting
    December 2014).                        which could, theoretically, be filled   for the local community and lead to       access to the rail network for a
                                                                                   sustainable employment.                   significant part of the population.

                                                                                   By ensuring that local residents          A lack of high quality pedestrian
                                                                                   have the right skills at the right time   and cycle routes in the area
                                                                                   there is tremendous opportunity           means that these are not currently
                                                                                   to tap into the latent talent in          attractive alternative modes of
                                                                                   the neighbourhoods of East                travel, particularly for people
                                                                                   Birmingham and develop a talent           travelling outside their immediate
                                                                                   pipeline that will support the            neighbourhoods.
                                                                                   physical development and other
                                                                                   business investment in the area.          Improving access from
                                                                                                                             neighbourhoods in East
                                                                                   Tackling the systemic problems            Birmingham to significant
                                                                                   that have led to a low employment         employment opportunities,
                                                                                   and skills rates within the local         including those in the City Centre,
                                                                                   population requires a locally             at UK Central, and across the
                                                                                   co-ordinated approach. Recent             wider region, as well as those in
                                                                                   changes in the skills funding system      the Prospectus area, is therefore a
                                                                                   have meant a move away from               priority.
                                                                                   any long term strategic planning
    Production at Jaguar Land Rover                                                of skills. The need, therefore, is                                               Sprint in Birmingham City Centre

    east birmingham prospectus for growth / context                                                                                                                                             context / east birmingham prospectus for growth
East Birmingham Prospectus for growth - February 2015
East Birmingham this will focus on        Growth                                East Birmingham                           Employment in the City Centre            Economy                                The area accommodates some
8   the A45 corridor and the proposed                                               The Birmingham Development                spans retail and hospitality,                                                   2,900 businesses ranging from           9
    Metro route through the heart of          Birmingham’s population is set        Plan identifies two significant areas     business professional and financial      Birmingham has an economic             international businesses to
    the area, as well as conventional         to grow by 150,000 over the next      of growth in the area covered by          services, and the creative and           output approaching £24bn a year,       numerous small and medium sized
    rail routes and the local transport       17 years, creating a need for         this Prospectus. The first, around        digital media sectors. Growth here       and is at the heart of the regional    enterprises. It saw 2,000 business
    improvements outlined above.              more than 50,000 new homes and        Bordesley Park, will see 3000             will enable additional activity in all   economy. Economic forecasts            start-ups in 2014. This compares
                                              100,000 jobs. The east of the City    new jobs created at a major new           of these sectors.                        show that economic output is           favourably with other parts of
                                              has the potential to accommodate      employment site, as well as new                                                    expected to grow by around 2.5%        the City outside the City Centre.
    Digital connectivity                      a significant amount of physical      homes and community facilities                                                     per annum from 2015 - a relatively     Birmingham as a whole saw more
    The right digital infrastructure and      growth, complementing the             in the surrounding area. The              The Hub @ UK Central                     healthy rate of growth, although       start-ups in 2014 than any city
    digital connectivity is recognised        growth in the City Centre and at      second - the Eastern Triangle             The Hub at UK Central will be            below the national rate of around      outside London. However, the
    as a core enabler of economic             UK Central, and to do so in a way     including Shard End - will include        home to the HS2 Interchange              3%. However, the growth rate for       business survival rates are low when
    growth. It can support new online         which also maximises benefits for     around 1,000 new homes and                station. The area, already home          East Birmingham is expected to be      compared to the national rate and
    business models, information              existing communities. However,        improvements to local community           to Birmingham Airport, the NEC           lower compared to the rest of the      GBSLEP area.
    provision, anytime, anywhere              the potential for employment          and shopping provision. Growth in         and Birmingham Business Park,            City.
    mobile working, access to services        growth in the east will not be        these areas will be complemented          will have the capacity to provide                                               East Birmingham, and the
    and communications, and therefore         sufficient to meet demand, and        by connectivity and environmental         significant growth.                      The key opportunities therefore        City as a whole, is faced with
    increase access to employment and         as such opportunities outside the     improvements, as well as the                                                       stem from the potential to use         a number of key challenges in
    training opportunities, create new        Prospectus area - and improving       development of individual sites           Furthermore, the four landowners         the Employment and skills,             stimulating enterprise, business
    jobs, and improve social inclusion        access to these opportunities - are   across the east of the City. The          of the site (including the               Connectivity and Growth actions,       growth and improving economic
    and mobility.                             of particular importance.             most significant of these sites           City Council) have signed a              to enable East Birmingham to           prosperity. These include the high
                                                                                    are set out in the ‘Development           collaboration agreement to bring         benefit from the growing Greater       unemployment rates and skills
                                                                                    Opportunities’ section of this            forward this significant opportunity     Birmingham economy.                    shortages already identified, but
                                                                                    document, and could deliver some          for growth.                                                                     also:
                                                                                    9,000 new jobs.                                                                    Approximately 25% of the jobs
                                                                                                                              UK Central will create jobs across       in the City are located in East        • Particularly low economic activity
                                                                                    The Jaguar Land Rover advanced            a range of sectors potentially           Birmingham, and nearly 40% of all         rates amongst women.
                                                                                    manufacturing facility at Castle          including business professional          manufacturing jobs. The advanced
                                                                                    Bromwich is benefiting from circa         and financial services, advanced         manufacturing sector, and              • Low business survival rates.
                                                                                    £400m investment to support               manufacturing, and research and          particularly the automotive sector,
                                                                                    the production of new models,             design. There will be a focus on         is important in the area. Over 3,000   • Failure of businesses to grow,
                                                                                    including the award winning Jaguar        connecting East Birmingham’s             people are employed at Jaguar             partly due to the lack of access
                                                                                    F-Type. This will drive local growth      residents and businesses with these      Land Rover in Castle Bromwich.            to best practice knowledge,
                                                                                    as supply chain opportunities are         opportunities.                           The site is home to some of the           approaches and support in
                                                                                    captured.                                                                          world’s most advanced aluminium           business development.
                                                                                                                                                                       body construction facilities and
                                                                                                                              Other areas of growth                    almost 340 body construction           • Lack of investment partly due
                                                                                    City Centre
                                                                                                                              To the south of the Prospectus area,     robots. On site are body shops,           to a market failure in finance for
                                                                                    The City Centre continues to
                                                                                                                              residential growth is envisaged at       paint and final assembly lines for        business.
                                                                                    be a focus for growth. The Big
                                                                                                                              Stechford and The Meadway, part          all models, as well as a press shop
                                                                                    City Plan proposed five areas of
                                                                                                                              of the Eastern Triangle, through the     which operates 24 hours a day.         • Key skills shortages.
                                                                                    transformation which will deliver
                                                                                    700,000sq.m of new office space           Birmingham Development Plan.
                                                                                                                                                                       Many of the supply chain               • Concentration in low value
                                                                                    and 160,000sq.m of new retail,
                                                                                                                              There are significant opportunities      opportunities from Jaguar Land            sectors and need to develop
                                                                                    creating some 50,000 new jobs,
                                                                                                                              for new employment uses at sites         Rover have been successfully              higher value activities and market
                                                                                    alongside 12,800 new homes, and a
                                                                                                                              within easy reach of the Prospectus      captured locally. Further                 opportunities.
                                                                                    range of civic and cultural uses. This
                                                                                                                              area. Sites remain at Minworth in        opportunities within the automotive
                                                                                    includes the City Centre Enterprise
                                                                                                                              Sutton Coldfield, and a new 80ha         and advanced manufacturing             • Under performance in innovation,
                                                                                    Zone.
                                                                                                                              employment site is expected to           supply chain make this area an            which can partly be attributed to
                                                                                    The arrival of HS2, with a new            be released at Peddimore. The            attractive place to locate.               a lack of access and engagement
                                                                                    station at Eastside, will be a catalyst   Advanced Manufacturing Hub at                                                      with knowledge base companies.
                                                                                    for growth of the City Centre to          Aston could accommodate 3000             Other significant local employers
                                                                                    the east, complementing existing          new jobs. Opportunities at the           include GKN in Erdington, and
                                                                                    employment and education                  Tyseley Environmental Enterprise         Heartlands Hospital, Royal Mail and
                                                                                    uses in that part of the City. The        District and at Garretts Green will      Alcoa in Hodge Hill.
                                                                                    Curzon HS2 Masterplan envisages           also accommodate new jobs.
                                                                                    600,000sq.m of employment space                                                    The local centres which serve the
                                                                                    accommodating 14,000 jobs and                                                      east of the City play a significant
                                                                                    contributing £1.3bn economic                                                       role in the local economy - both as
                                                                                    uplift.                                                                            centres for business activity and as
    New development at the Advanced Manufacturing Hub                                                                                                                  significant employment areas.

    east birmingham prospectus for growth / context                                                                                                                                             context / east birmingham prospectus for growth
East Birmingham Prospectus for growth - February 2015
10                                                                                                                        11

                                                         Our
                                                         commitment
                                                         Employment and skills
                                                         Improved connectivity
                                                         Delivering growth

     east birmingham prospectus for growth / the sites                the sites / east birmingham prospectus for growth
East Birmingham Prospectus for growth - February 2015
12   Our commitment                                                                                                                                                                                                                                   13

     Reflecting our commitment to East Birmingham, and to ensure a co-
     ordinated approach to maximising the benefits, delivery will be guided
     through the newly formed Employment and Skills Partnership for East
     Birmingham and ongoing work with the Greater Birmingham and Solihull
     Local Enterprise Partnership (GBSLEP).

     Delivery should be focused on maximising the benefits presented by the
     opportunities for the people of East Birmingham.

     This means delivering and supporting new employment growth, and
     ensuring that local people are able to access the jobs created - both in
     terms of physical access and transport connectivity, and in terms of being
     equipped with the appropriate skills and expertise, and the aspiration, to
     secure and progress in employment.

     Employment and skills                        and skills rates within the local     Emerging initiatives                   • A commitment to launch a              Raising aspiration                    This will be part of the Digital
                                                  population. We are building on        Through a re-invigorated                  campaign to get a minimum             We have made a commitment             Access Point bringing together
     The Employment and Skills                    existing partnership arrangements     partnership with Department for           of 10,000 work experience             through our Youth Promise to          key information for young people
     Partnership for East Birmingham              as well as creating new ones within   Work and Pensions (DWP), we have          opportunity pledges from              ensure that all young people          and their advisors in one place,
     will set out its Plan in April 2015,         the context of a broader approach     already agreed:                           employers to support the              have access to employment,            and building upon the Birmingham
     and will signal a step change                to improve the local responsiveness                                             transition from unemployment to       education, training, apprenticeship   Baccalaureate pilot in 2013-14.
     to ensure that the skills and                of the employment and skills          •M
                                                                                          ore than £1m of DWP                    employment.                           or experience of work within four
     employment system better matches             system through the GBSLEP and          Community Budget Grant                                                         months of leaving a job, education
     supply and demand, and delivers              Core Cities.                           Funding to be made available          The City Council has given               or training. The Youth Promise        Capturing High Speed 2 jobs
     the skills that businesses need and                                                 to provide enhanced targeted          a commitment to work with                will be fully operational during      The home for the new National
     the support that individuals require,                                               pre-employment training directly      partners, in particular the local        2015, and will enable young           College for High Speed Rail will be
                                                  This is the first part of a longer
     both now and in the future.                                                         linked to live vacancies and future   FE Colleges, to jointly develop,         people to access a wide range of      headquartered in East Birmingham,
                                                  journey that we are confident will
                                                  lay the foundations for systemic       jobs in key sectors in Birmingham     own and deliver a city-wide Skills       opportunities. Support will include   as well as having a split site in
     However, we are already working
                                                  change and provide greater impact      as well as opportunities identified   Investment Plan which will focus         specialist mentoring, support         Doncaster. This will be the national
     to tackle the systemic problems
                                                  in the long term.                      in this Prospectus.                   on reducing reliance on benefits         from the Birmingham Careers           centre of excellence to address the
     that have led to a low employment
                                                                                                                               and will be rooted in an employer        Service for those young people        broader needs of the rail industry
                                                                                        •C
                                                                                          ommitment to co-locate              led statement of current and future      not in education, employment or       and provide the capability to
                                                                                         DWP Job Centre Plus staff             skills needs.                            training, targeted funding, and       address current skills shortages,
                                                                                         and Birmingham City Council                                                    improvements to transport access.     and to service immediate and
                                                                                         staff. This will provide focus on     This will provide a better articulated                                         future demands of the sector. The
                                                                                         areas with the highest levels of      statement of employment and              To raise aspirations at a school      College will primarily be delivering
                                                                                         disadvantage, starting with the       skills needs captured through the        level, we are committed to            higher level skills training when
                                                                                         wards in the east of the City         broader activities of the Growth         improving links between               it opens in 2017 but in order to
                                                                                         which experience persistently         Hub leading to co-investment in          employers and schools. We have        fully capitalise on the siting of the
                                                                                         high unemployment rates. It will      skills development by businesses,        been working with employers           college in Birmingham we are
                                                                                         provide enhanced jobs matching        service providers and schools. It will   through their Corporate Social        developing aspiration and raising
                                                                                         and alignment of the existing         bring an improved responsiveness         Responsibility (CSR) agendas,         awareness through engaging with
                                                                                         incentives and programmes             of training providers to new and         and have established the CSR          schools and young people now
                                                                                         improving referrals from the          future skills needs by encouraging       City partnership to connect local     to provide a talent pipeline to the
                                                                                         unemployment register.                collaborative and flexible               employers with schools. More          College and the jobs that HS2 will
                                                                                                                               approaches to delivery.                  than half of the schools targeted     bring to East Birmingham.
                                                                                        •T
                                                                                          o explore the establishment                                                  through the partnership have been
                                                                                                                               These will be reinforced at a            in East Birmingham.
                                                                                         of a pop-up ‘Job Shop’, to
                                                                                                                               GBSLEP level through future
                                                                                         complement existing Job Centre
                                                                                                                               Growth Deal asks, where changes          We are also working with partners
                                                                                         activity, maximise footfall and
                                                                                                                               in policy or current process are         to implement a web-based skills
                                                                                         become the hub for employers
                                                                                                                               required, alongside strong local         passport which will allow young
                                                                                         with vacancies.
                                                                                                                               commitments, to deliver the              people to record employability
     Indicative development at the Birmingham Wheels site                                                                      optimum outcomes.                        skills and access careers support.

     east birmingham prospectus for growth / our commitment                                                                                                                           our commitment / east birmingham prospectus for growth
East Birmingham Prospectus for growth - February 2015
Improved connectivity                  Funding is in place, through the        Birmingham cycle revolution             • Technological intervention         • Installation of open access               • Intelligent energy infrastructure
14                                          Growth Deal, to extend Metro to         More than £24m has been                    including road user charging,         ducting infrastructure to support            or smart grids to support             15
     High quality transport and             Eastside, and additional funding        committed across the City to               electric vehicles, travel demand      an integrated approach to shared             district energy and local energy
     communications infrastructure is       is being sought to enable the           deliver improved cycle routes.             management methods, access            utility services, optical fibre to           generation.
     vital to the creation of successful    development of the route through        Two significant projects in East           controls, passenger information,      the premises, and shared use of
     places. The City’s vision for a        East Birmingham. Development            Birmingham will see enhancement            interactive websites etc.             wireless connectivity and power           • Enhancing and securing the
     connected transport network has        funding of the order of £1.5m           of the route between the City                                                    to street devices.                           digital capability of the locality
     been set out in the Birmingham         per annum will be required in the       Centre and Small Heath, and from                                                                                              through communication hubs and
     Connected White Paper. This puts       early stages of this work; once this    the City Centre via Adderley Park       High Speed 2                                                                          data exchanges.
                                                                                                                                                                  •D
                                                                                                                                                                    evelopment of ubiquitous,
     the user first, and aims to develop    is in place initial design work will    and Alum Rock to Fox and Goose.         We are working closely with HS2,       superfast and affordable wired              There will be a focus on
     a network to meet the needs of         commence, and will be used as the                                               Government and the GBSLEP to           and wireless connectivity.                  investments which support flexible
     people and businesses. Investing       basis for public consultation.          These routes will benefit from:         deliver Phase 1 of the High Speed 2
     in a radically improved integrated                                                                                                                                                                        working. A model for flexible
                                                                                                                            rail route (London to Birmingham),    • Installation of sensors and
     transport system will realise                                                  • Signage.                                                                                                                 ‘drop-in’ connected office spaces
                                            The development and delivery of                                                 construction of which is due to          monitoring stations to support
     the City’s potential to support                                                                                                                                                                           will be developed, and located
                                            Metro can take over eight years                                                 begin in 2017 and which will be          growth in data transmission for
     sustainable economic growth, job                                               •R
                                                                                      oad markings including cycle                                                                                            in accessible locations along key
                                            from the start of outline designs                                               operational in 2026. We continue         monitoring, management and
     creation and linking communities.                                               lanes.                                                                                                                    transport routes (for example Metro
                                            to the end of construction and                                                  to support Phase 2 (Birmingham to        control of existing and new               and Sprint routes, and in the area
                                            opening to service, given the           • Shared pavements.                     Manchester and Leeds), and the           services, e.g. smart metering,
     The City will continue to work with                                                                                                                                                                       around the HS2 stations).
                                            requirements of the Transport and                                               creation of a link between HS2 and       intelligent traffic management,
     the GBSLEP and partners including      Works Act Order processes. A tried                                              HS1 which would provide a direct
                                                                                    • Improvements to side road                                                     smart parking, electric                   The Smart City spatial
     Government to ensure that this         and tested delivery model has been                                              link to the continent.
                                                                                       junctions.                                                                    charging bays, or monitoring              demonstrator will also see
     vision is realised.                    put in place for the Metro delivery                                                                                      environmental conditions.                 the development of digital
                                            programme by Centro.                    •N
                                                                                      ew and improved signalised           The HS2 West Midlands                                                              programmes to help improve
                                                                                     crossings.                             Connectivity Package will maximise                                                 quality of life, for example access to
     Enhancement to the road                                                                                                                                      •E
                                                                                                                                                                    stablishing a digital platform to
                                            Funding of £50m has been                                                        access to the City Centre and                                                      digital learning, digital support and
     network                                                                        •R
                                                                                      educed vehicle speeds including                                             capture and make available data
                                            identified, including £35m from the                                             Interchange stations, and also to                                                  guidance for carers, or digital log-
     Road improvements are underway                                                  traffic calming.                                                              to support innovation.
                                            Growth Deal, for the Sprint (bus                                                maximise access from the stations                                                  books for social housing residents.
     at Chester Road Castle Bromwich,       rapid transit) route along the A45                                              along key transport corridors to
     which will support the Jaguar          by 2021.                                                                        developments and centres of
     Land Rover site with improved                                                  Green Travel Districts                  growth. The package will include
     access onto the M6 at Junction         Proposals to provide new railway        Two areas in East Birmingham            rapid transit/Metro, public
     5, as well as providing improved       stations at Fort Parkway and            have been identified as Green           realm/pedestrian connectivity
     connectivity for Castle Vale and       Castle Vale/Castle Bromwich             Travel Districts. These are Castle      enhancements and bus and rail
     other surrounding residential areas.   require the provision of significant    Vale/Castle Bromwich (including         routes. More than £80m is being
     Further improvements to include        additional rail network capacity        Jaguar Land Rover and surrounding       funded through the Growth Deal.
     the A4540 Middle Ring Road,            at Water Orton and into Central         employment areas) and the
     Stechford and others - significant     Birmingham. The Camp Hill               residential areas around Small
     priorities include Bromford            Chords, which would enable a            Heath and Bordesley Green.              Digital connectivity
     Gyratory, Gravelly Hill/Kingsbury      link into Birmingham Moor Street                                                The Birmingham Smart City
     Road, and the A4040 Outer Ring         Station, will cost in excess of £150m   As Green Travel Districts, the          Commission has committed
     Road/A5127 ‘Six Ways’ junction.        and therefore is likely to require      areas will benefit from a range         to support a Smart City spatial
                                            funding by Central Government.          of interventions designed to            demonstrator in East Birmingham.
     Improvements to junctions on the                                               put people before cars. The             The aim is to embed Smart City
     Ring Road will assist in managing      In the longer term, HS2 will free       interventions will be developed         principles (release, use and access
     congestion allowing better access      up capacity on the West Coast           to suit the different needs of each     to data; integration and use of
     to the City Centre and better links    Main Line, which should facilitate      area but will cover:                    digital technologies; and strong
     with East Birmingham. Work at          improved local rail services at                                                 citizen/business engagement)
     Bordesley Circus and Curzon Circle     Adderley Park, Stechford and            •B
                                                                                      ehaviour based interventions         to support economic growth
     will be carried out during 2015        Lea Hall stations and enable the         associated with smarter choices.       and reduce inequalities. This
     as part of a £7.3m programme.          restoration of direct local train                                               will capitalise on the skills and
     Ashted Circus, which will be           services across Birmingham City         • Infrastructure approaches            innovations that are expanding in
     redesigned as a signal controlled      Centre to Perry Bar, Walsall and           ranging from DDA improvements        high investment areas in the City
     junction, will be implemented in       Wolverhampton.                             (e.g. dropped kerbs) to major        Centre and around UK Central.
     2016/17.                                                                          infrastructure investment
                                            Public transport integration               (e.g. new public transport           Capital investment in digital
                                            including physical connectivity            interchange).                        infrastructure and technologies,
     Public transport                       between modes, smart ticketing                                                  particularly as part of new
     We have identified public transport    across networks and information         •S
                                                                                      patial planning, transport policy,   developments, may include:
     (especially Metro) as a priority to    integration will make movement           guidance and other governance
     unlock growth more widely.             easier and more affordable.              tools such as low emissions zones
                                                                                     or reduced car parking provision.                                            Indicative image of Metro through East Birmingham

     east birmingham prospectus for growth / our commitment                                                                                                                       our commitment / east birmingham prospectus for growth
East Birmingham Prospectus for growth - February 2015
Delivering growth                       the land at Washwood Heath              The programmes include:                  It is expected that further sites will                 There are also some significant
16                                           including the site of the Nechells                                               come forward both within the areas                     opportunities for housing                                                                     17
     Every development opportunity           gas holders, we will work with HS2      •A
                                                                                       Business Start-up Programme           identified and elsewhere, although                     development in East Birmingham
     is different, and our approach to       to ensure that it is released back       designed to stimulate and               it is likely that these will be on a                   - the area has the potential to
     delivery will be tailored to suit the   to the market in a timely manner         encourage self-employment. It           smaller scale; a similar commitment                    accommodate some 3,500 new
     needs of the site, the investor, and    and in such a configuration so as to     will offer advice and mentoring,        will be given to driving forward                       homes over the next 10 years.
     the sector. Our offer includes a        maximise use.                            counselling and business                delivery and to maximising the                         These opportunities are identified
     menu of interventions, and we are                                                planning support, as well as            benefits and jobs from new                             in a Housing Prospectus for the City
     now working with Government to                                                   financial assistance to set up          development for local residents.                       which will be launched later this
     develop these further.                  Infrastructure and access
                                                                                      viable and sustainable new                                                                     year.
                                             Where individual developments
                                                                                      businesses.
                                             are constrained by a lack of
     Simplified planning                     infrastructure, the City will work
     We will ensure that an appropriate                                              •A
                                                                                       Women’s Enterprise Hub,
                                             with stakeholders to develop
     planning framework is in place                                                   building on the model
                                             solutions which will unlock sites for
     to guide the development of all                                                  established in Digbeth and
                                             development as well as plugging
     of the opportunities identified                                                  on Ladypool Road, offering
                                             into established or improved public                                              Areas of growth
     here, and for other opportunities                                                mentoring and coaching,
                                             transport routes and improved
     emerging in East Birmingham. We                                                  business skills development,
                                             freight and servicing connectivity.
     will seek to simplify the planning                                               subsidised business space
     regime, for example through the                                                  including starter units, hot desk
                                                                                                                                                                                                                                              Minworth
     use of Local Development Orders,        BMHT                                     facilities and exhibition space.                                        Erdington                                                                     (Midpoint Park)
     and to reduce the requirements          Birmingham Municipal Housing
     on developers, where this is            Trust (BMHT) is the Council’s vehicle   •A
                                                                                       Business Development
     appropriate, and to encourage           and brand identity for building new      Programme to stimulate growth                                                                                            Castle
     the bringing forward of sites at        rented and market homes across           of existing SME’S and supply                                                                                           Bromwich

     higher densities adjacent to major      the City. Since 2009, the Council,       chain companies by offering
     transport corridors such as Metro       through BMHT, has become the             funding for relocation, new                                                                       Tyburn

     and Sprint.                             single largest housing developer         plant and machinery including                Advanced
                                                                                                                                  Manufacturing
                                             within Birmingham, and is now            installation, refurbishment,                    Hub

     Our Major Development Protocol          developing around 20% of all new         improved systems and processes,                                                Washwood
     has sped up the determination of        homes in the City. BMHT will be          new product and market                                                          Heath

     major planning applications and         key to delivering housing growth         development, and mentoring and
     added certainty to the application      in East Birmingham, developing a         coaching.                                                  Nechells
     process.                                number of the sites identified here                                                                                                                                          Shard End
                                             as well as smaller sites.               •A
                                                                                       Skills Growth Programme to
                                                                                      support skills development for
     Site assembly and availability                                                   existing employees, including               Eastside
     Where required we will work with        Business support and                     paid Graduate placement                                            Alum Rock
                                                                                                                                                                                                 Stechford
     developers to assemble sites for        development                              opportunities within SME’s                                                                                                              Kitts Green
     development. This will include          Birmingham City Council has              and placements for redundant                           Bordesley
     maximising the use of the City’s        developed and is successfully            workers.                                 City            Park
     landholdings, exploring funding         delivering £93m portfolio of                                                     Centre
                                             business support programmes                                                                                                                                                Meadway
     options, and making use of our
     CPO powers where appropriate.           across the City, GBSLEP and             Development opportunities in
                                             West Midlands. This has                 East Birmingham
     We are exploring funding                generated £115m in private sector       The following section sets out
     mechanisms with Government              investment and created 6,000 job        the development opportunities                                  Small Heath
     to support site assembly and            opportunities.                          in East Birmingham for growth

                                                                                                                                                                                                                                                   Ci
                                                                                                                                                                                                                                                    ty
     reclamation. These will build on                                                and investment which will create

                                                                                                                                                                                                                                                      bo
                                             It is proposed to target these

                                                                                                                                                                                                                                                        un
     those already secured through the                                               new employment opportunities.

                                                                                                                                                                                                                                                         da
                                                                                                                                                                        Tyseley
                                             successful models of support more

                                                                                                                                                                                                                                                           ry
     City Deal and Growth Deals.                                                     They includes both large, strategic                                             Environmental
                                                                                                                                                                       Enterprise
                                             specifically in East Birmingham,        sites which will play a significant                                                District
     We recognise the importance             to offer pragmatic solutions to         part in delivering the city’s growth                                                                                                                                       UK Central
     of maintaining a supply of high         business and provide tangible           ambitions and smaller sites which
     quality sites and making the most       benefit. The programmes will seek       may be better suited to small
     effective use of the land available     to improve economic prosperity,         businesses. There are also a
     in enabling a diverse and successful    improve business confidence,            number of opportunities within
     economic base. In relation to           encourage investment and                local centres in the east of the City.
     that land affected by the HS2           stimulate business activity, thus
     safeguarding but not required for       creating new job opportunities and                                                                                                                                                                                        n
                                                                                                                                                                                                                                                                      NORTH
     operational purposes, for example       safeguarding existing jobs.                                                                                                                                                                                            NOT TO SCALE

     east birmingham prospectus for growth / our commitment                                                                                                                                             our commitment / east birmingham prospectus for growth
18     Development opportunities                                                                                                                                                             19

       Employment
     The opportunities set out below are clustered by area. They total nearly
     120ha and include both significant sites and smaller opportunities
     within the existing employment areas. They have the potential to
     create 330,500sq.m (3.5m sq.ft) of new employment floorspace and
     accommodate 8,600 new jobs. They are:

     • Bordesley
                 Park                       a cleared site at Rupert Street,     Employment Sites Plan
        The area to the immediate east of     along with a handful of smaller
        the City Centre includes the 33ha     sites, could accommodate in
        Wheels site with the potential        the region of 24,000sq.m of new
        for more than 100,000sq.m of          employment floorspace.
        development accommodating
        some 3,000 jobs.                                                                                                                Erdington Industrial Park
                                            • Kitts Green                                                                              Opus Aspect
                                              The Yardley Brook Industrial
     • Washwood Heath                         Estate is an opportunity for some
       The former LDV and Alstrom             10,000sq.m of new development
       sites at Washwood Heath offer          adjoining well established
       some 64ha for development,             industrial uses in Kitts Green.            Jarvis Way                Fort Parkway
       which will include the HS2 Depot       The area between Garretts
       and Network Control Centre.            Green Lane and Mackadown                                       Washwood Heath
       More than 100,000sq.m of               Lane accommodates a range of
       development could be achieved          industrial uses and includes a
       on the residual land, depending        number of opportunities to reuse         Rupert Street
       on configuration.                      or redevelop sites. In particular
                                                                                      Winsor Street Gasworks
                                              sites at Ace Business Park and
                                              Central Business Park offer                                                                        Yardley Brook
     • Castle Bromwich
                                              immediate opportunities.                                                                           Industrial Estate
       The Castle Bromwich area is
       located to the south of Tyburn
       Road, and includes the JLR plant.                                                        Bordesley Park
                                            • Tyburn
       The sites identified - Erdington                                                                                                                    Ace Business Park
                                              The wider Tyburn industrial area,
       Industrial Park and Opus
                                              offers a range of opportunities                                                                              Central Business Park
       Aspect - amount to nearly 5ha.
                                              for reuse and redevelopment
       Alongside a number of smaller
                                              of smaller sites, as well as more
       sites, they have the potential to
                                              significant development at Jarvis
       accommodate some 50,000sq.m
                                              Way, immediately adjoining the
       of new employment floorspace.
                                              Gravelly Industrial Estate, and at

                                                                                                                                                              Ci
       Over time further sites within

                                                                                                                                                              ty
                                              Fort Parkway.

                                                                                                                                                               bo
       this area may come forward for

                                                                                                                                                                   un
                                                                                                                                                                   da
       employment uses.

                                                                                                                                                                     ry
                                            All of the sites fall within the
     • Nechells
                                            City’s Core Employment Land
       The industrial area of Nechells      as identified in the Birmingham
       lies to the north east of the City   Development Plan, and as such
       Centre and includes Windsor          are likely to be suitable for B1b
       Street, Aston Cross and the          (Research and Development),
       Salford Trading Estate. Two          B1c (Light Industrial), B2 (General
       more significant sites, the former   Industrial), and B8 (Storage or                                                                                                      n
                                                                                                                                                                                NORTH
       Windsor Street Gas Works and         Distribution).                                                                                                                    NOT TO SCALE

     east birmingham prospectus for growth / development opportunites employment
                                                                             •                             development opportunites employment / east birmingham prospectus for growth
                                                                                                                                   •
20   Bordesley Park                                                                                                                                                         Washwood Heath                       21

     Location:                               Current position:                              Location:                              indicate that approximately 15ha       Current position:
                                                                                                                                   of residual land would be available
     To the immediate south of the West      The opportunity is identified in the           The former Alstom and LDV sites                                               The site falls within the current
                                                                                                                                   for development following
     Coast mainline and east of the City     Birmingham Development Plan and                to the south of the M6 and A47,                                               HS2 safeguarded area and the HS2
                                                                                                                                   construction, potentially generating
     Centre, the Birmingham Wheels           will be brought forward through the            bounded to the north by the                                                   Select Committee in announcing
                                                                                                                                   up to 1,000 jobs. HS2 Ltd have
     site and environs presents the main     Bordesley Park Area Action Plan.               proposed HS2 route. There are                                                 its initial findings on the proposed
                                                                                                                                   not yet commenced the detailed
     opportunity at Bordesley Park.                                                         residential uses to the south and                                             depot at Washwood Heath,
                                                                                                                                   design stage, but as this progresses
                                             The site is currently occupied                 east.                                                                         reinforced the City Council’s
                                                                                                                                   both the City Council and one
                                             by a range of uses including                                                                                                 assurances by stating that “We
     Size of site:                                                                                                                 of the current major landowners
                                             employment uses and wheeled                                                                                                  impress on HS2 the need to
     33ha.                                                                                                                         will be pushing for an improved
                                             leisure activities. Having previously          Size of site:                                                                 adjust the scheme so that there
                                                                                                                                   design which both releases more
                                             accommodated brick pits                        64ha (approximately).                                                         is minimum land take and for
                                                                                                                                   land for development and at an
     Opportunity:                            and landfill the site is heavily                                                                                             the shortest time with sensible
                                                                                                                                   earlier stage. One of the major
                                             contaminated and requires                                                                                                    placing of balancing ponds and a
     The site has the capacity to                                                                                                  landowners has suggested that
                                             reclamation. Access and services               Opportunity:                                                                  hand-back configuration that after
     accommodate 100,000sq.m of new                                                                                                subject to the final design and
                                             are currently limited.                                                                                                       construction will attract maximum
     industrial and employment space                                                        On the presumption that the HS2        configuration of the depot there
                                                                                                                                                                          business use of the residual site”.
     in an attractive, purpose built                                                        Bill receives Royal Assent, a part     may be the opportunity for up to
                                             Funding has been identified
     environment with high quality new                                                      of the site will be required for use   33ha of development land which         The City Council will therefore
                                             through the City Deal and HCA’s
     access. It could create some 3,000                                                     as the Rolling Stock Maintenance       could accommodate 130,000sq.m          continue to work with landowners
                                             Asset Accelerator for additional
     new jobs. The development would                                                        Depot and Network Control Centre       of new floorspace and 2,300 jobs.      and with HS2 to maximise the
                                             feasibility work and to unlock the
     be complemented by new housing,                                                        for HS2. Although the final extent     This will be considered as part of     development opportunities and
                                             potential of the site.
     community and education facilities,                                                    of this has yet to be agreed, the      the design process.                    economic benefits for the site.
     as well as improvements to public                                                      City Council has agreed assurances
     transport and pedestrian routes in                                                     with the Secretary of State for
     the area.                                                                              Transport that the land required for
                                                                                            the operation of the railway and
                                                                                            for the depot will be minimised
                                                                                            as far as reasonably practicable,
                                                                                            and that upon completion of the
                                                                                            construction phase, residual land
                                                       d                                    will be made available to the
                                                 n Roa                                      market with appropriate vehicle
                                               e
                                           Ard                                              access in place as soon as is
                                                                                            reasonably practicable.
                                                                                                                                                                          M6 Motorway

                                                                                                                                                                                                Brom
                                                                                 Road

                                                                                            The Depot and Network Control
                                                                                            Centre will create an estimated

                                                                                                                                                                                                    ford
                                                                 Bordesley Green

                                                                                            640 jobs, with further jobs created

                                                                                                                                                                                                         Lane
                                                                                            during the construction of the
                                                                                            new rail line and supporting
                                                                                            infrastructure.

                                                                                            Residual land will be available
                                                                                            on the site for development
                                                                                            upon completion of the HS2
                                                                                            construction phase. The current                             Washwood Heath
                                                                                                                                                             Road
                                                                                            Bill proposals for the depot

                                 Garrison La
                                             ne

                              n
                             NORTH
                                                                                                                                                             n
                                                                                                                                                            NORTH
                           NOT TO SCALE                                                                                                                   NOT TO SCALE

     east birmingham prospectus for growth / development opportunites employment        •                                development opportunites employment / east birmingham prospectus for growth
                                                                                                                                                    •
22   Erdington Industrial Park                                                                                                                                  Opus Aspect              23

     Location:                                         Current position:                              Location:                                    Outline consent for the
                                                                                                                                                   development of the sites was
     Within the industrial park to the                 The site is currently being used on            Adjacent to the canal to the north
                                                                                                                                                   granted in 2010. For the western
     north of the junction of Chester                  a temporary basis by JLR for car               of Kingsbury Road in Tyburn. The
                                                                                                                                                   part of the site this comprised
     Road with Kingsbury Road.                         parking but will be made available             sites are accessed from Chester
                                                                                                                                                   3,700sq.m of B1c, B2 and B8 units
                                                       for employment uses in future.                 Road.
                                                                                                                                                   with external servicing and car
     Size of site:                                                                                                                                 parking, hard and soft landscaping.
                                                                                                      Size of site:
     2.81ha.                                                                                                                                       For the eastern part of the site,
                                                                                                      1.41ha and 0.43ha.                           fronting Chester Road, outline
                                                                                                                                                   consent was granted for two
     Opportunity:                                                                                                                                  options: the first being 6,615sq.m
                                                                                                      Opportunity:                                 of B1c, B2 or B8 floorspace; the
     Potential for a range of industrial or
     warehouse uses, with the potential                                                               The two remaining plots on the               alternative being a series of
     to accommodate 10-15,000sq.m                                                                     former GKN site offer the potential          car dealerships, incorporating
     of floorspace subject to satisfying                                                              for approximately 10,000sq.m of              showrooms and workshop areas.
     design and access requirements.                                                                  industrial floorspace.

                                                                                                                                                   Current position:
                                                                                                                                                   The sites are cleared and vehicular
                                                                                                                                                   access from Chester Road has been
                                                                                                                                                   provided.
                                   Elm
                                       fie
                                           ld
                                            Av

                                                                                                                                                      Ch
                                               en

                                                                                                                                                         es
                                                  ue

                                                                                                                                     d                      te
                                                                                                                                R oa                           rR
                                                                                                                             er                                   oa
                                                                                                                        u nt                                         d
                                                                                                                      G

          Ch
             es
                te                                                                                                                                                d
                   rR
                                                                                                                                                          r y Roa
                      oa                                                                                                                                u
                         d                                                                                                                      i n gsb
                                                                                                                                              K
                                                                          d
                                                                     R oa
                                                                  ry
                                                             s bu
                                                          ng
                                                       Ki

                                n
                               NORTH
                                                                                                                                  n
                                                                                                                                 NORTH
                             NOT TO SCALE                                                                                      NOT TO SCALE

     east birmingham prospectus for growth / development opportunites employment       •     development opportunites employment / east birmingham prospectus for growth
                                                                                                                        •
24   Windsor Street Gasworks                                                                                                                                               Rupert Street                  25

     Location:                                                Current position:                              Location:                                            Opportunity:
     Land to the north east of Windsor                        The site has been partially cleared            At the northern end of Rupert                        The site has the potential
     Street, adjacent to the gas storage.                     and remediation has been carried               Street in Nechells. There are                        to accommodate a range of
                                                              out. Part of the site is currently             industrial and storage uses to the                   employment uses including light
                                                              laid out for car parking and open              south and west; residential uses                     and general industrial. Proposals
     Size of site:                                            storage/depot uses. The site is                adjoin the site to the north.                        should take account of the
     2.87ha.                                                  owned by National Grid.                                                                             adjoining residential occupiers.

                                                                                                             Size of site:
     Opportunity:                                                                                            1.92ha.                                              Current position:
     The site could accommodate a                                                                                                                                 The site has been cleared for a
     range of employment uses; nearby                                                                                                                             number of years. Part of the site has
     uses include general and light                                                                                                                               previously had planning consent for
     industrial. It has good access to                                                                                                                            use as a self-storage facility.
     Aston University, Birmingham
     Science Park Aston and the City
     Centre.

                                                                      Av
                                                                         en
                                                                            ue
                                                                                 Ro
                                                                                    ad

                                                                                                                                      Rocky Lane
                                  et
                               re
                            St
                             d
                           ar
                        ch
                      Ri

                                                                                                                                                                     et
                                                                                                                                                                  tre
                                                Wi

                                                                                                                                                             rt S
                                                  nd

                                                                                                                       Av
                                                     sor

                                                                                                                          en

                                                                                                                                                           pe
                                                                                                                             ue
                                                     Str

                                                                                                                                                         Ru
                                                                                                                                  Ro
                                                        eet

                                                                                                                                     ad

                                    n
                                   NORTH
                                                                                                                                             n
                                                                                                                                            NORTH
                                 NOT TO SCALE                                                                                             NOT TO SCALE

     east birmingham prospectus for growth / development opportunites employment               •    development opportunites employment / east birmingham prospectus for growth
                                                                                                                                  •
26   Yardley Brook Industrial Estate                                                                                                                    Ace Business Park                      27

     Location:                                                  Current position:                                  Location:                           Opportunity:
     The industrial estate is in Shard                          The site is allocated for                          The site fronts Mackadown Lane in   The site could accommodate
     End, between Cole Hall Lane and                            employment uses in the City’s                      Kitts Green.                        approximately 2,000sq.m of
     Lea Ford Road.                                             Unitary Development Plan. It is                                                        floorspace and more than 50 jobs.
                                                                currently vacant. An access road is
                                                                in place from Lea Hall Road.                       Size of site:
     Size of site:                                                                                                                                     Current position:
                                                                                                                   0.5ha.
     8.5ha.                                                     The majority of the site is in the
                                                                                                                                                       The site is currently vacant, and has
                                                                ownership of the City Council, who
                                                                                                                                                       controlled access from Mackadown
                                                                will work with adjoining landowners
                                                                                                                                                       Lane, and is visible from the road.
     Opportunity:                                               and with developers to bring
                                                                forward a scheme.
     The site has the potential to
     accommodate around 34,000sq.m
     of new employment floorspace,
     subject to design, and more than
     900 new jobs.

     It is within an established
     industrial area, alongside existing
     manufacturing uses.
                                Cole Hall Lane

                                                                                                                                                                Sa
                                                                                                                                                                   int
                                                                                                                                                                       Gi
                                                                                                                                                                          les
                                                                                                                                                                              Ro
                                                                                                                                                                                 ad
                                                                                                oad

                                                                                                                                                         Ma
                                                                                              dR
                                                                                           For

                                                                                                                                                            cka
              Crossfield Road

                                                                                       Lea

                                                                                                                                                                dow
                                                                                                                                                                 Lann
                                                                                                                                                                     e
                                                    n
                                                   NORTH
                                                                                                                                           n
                                                                                                                                          NORTH
                                                 NOT TO SCALE                                                                           NOT TO SCALE

     east birmingham prospectus for growth / development opportunites employment                      •   development opportunites employment / east birmingham prospectus for growth
                                                                                                                                   •
28   Central Business Park                                                                                                                                       Jarvis Way      29

     Location:                            Current position:                                    Location:                                     Opportunity:
     To the south west of Mackadown       The site is currently vacant and                     Immediately adjoining Gravelly                The site offers the opportunity
     Lane in Kitts Green, the site is     shares access from Mackadown                         Industrial Estate between the                 for the expansion of the
     accessed from through the Rotadex    Lane with the adjoining occupier.                    Birmingham and Fazeley Canal and              Gravelly Industrial Estate or for
     site and adjoins the railway.                                                             the M6. Jarvis Way leads directly off         an independent development
                                                                                               Tyburn Road.                                  of in the region of 8,000sq.m,
                                                                                                                                             accommodating approximately 220
     Size of site:                                                                                                                           jobs.
                                                                                               Size of site:
     0.48ha.
                                                                                               3.5ha.
                                                                                                                                             Current position:
     Opportunity:                                                                                                                            The site is currently vacant. It
     The site could accommodate                                                                                                              has some constraints in terms of
     approximately 2000sq.m of                                                                                                               changes in level and the presence
     floorspace and more than 50 jobs.                                                                                                       of overhead electricity cables.

                                                                                                                                             A vehicular access is already in
                                                                                                                                             place from Jarvis Way.

                                                                                                                                        ad
                                                                                                                                     Ro
                                                                                                                          urn
                                                                                                                      Tyb
                                                                   Mac
                                                                       kad
                                                                           own

                                                                                                                                                            ay
                                                                          Lan

                                                                                                                                                        is W
                                                                              e

                                                                                                                                                   Jarv
                                                                               e
                                                                            ov
                                                                        n Gr
                                                                      o
                                                                  ckt                                          M6
                                                              Sto                                                 Mo
                                                                                                                     tor
                                                                                                                         way

                              n
                             NORTH
                                                                                                                         n
                                                                                                                        NORTH
                           NOT TO SCALE                                                                               NOT TO SCALE

     east birmingham prospectus for growth / development opportunites employment  •   development opportunites employment / east birmingham prospectus for growth
                                                                                                                 •
30   Fort Parkway                                                                                                                                                           31

     Location:                                           Current position:
     At the junction of Fort Parkway                     The site is identified for
     (A47) and Bromford Lane (A4040).                    employment uses in the City’s
                                                         Unitary Development Plan.
                                                         Planning consent was granted for
     Size of site:                                       aggregates recycling and ancillary
     1ha.                                                facilities in 2014.

     Opportunity:
     The site is currently vacant. The
     development potential of the site
     is limited due to being within the
     consultation zone of 2 hazardous
     installations (including being in the
     inner zone of the Esso Petroleum
     Ltd site where large volumes of
     flammable liquids are stored).
     Depending on use, however, as
     many as 100 jobs could be created
     here.
                      Bromford L
                                 ane

                                                                        Fort Parkway

                                                    ay
                                            o t orw
                                          M
                                       M6

                                          n
                                         NORTH
                                       NOT TO SCALE

     east birmingham prospectus for growth / development opportunites employment         •    development opportunites employment / east birmingham prospectus for growth
                                                                                                                      •
32     Development opportunities                                                                                                                                                                      33

       Local centres
     Local centres are at the heart of local communities across the east of
     the City. They provide shops, services, community facilities, leisure and
     business space in accessible locations; importantly they are significant
     centres of employment. Some of the larger local centres such as Erdington
     have the potential for growth to accommodate additional facilities and
     create more local jobs.

     Local centres are the preferred         • Pelham.                                Local Centre Sites Plan
     location for new retail, office
     and leisure development and for         • Shard End.
     community facilities (for example       • Lea Village.
     health centres, education facilities
     and religious buildings). We            • Timberley.                                                          Erdington
     will support the development
     of existing businesses as well          • Kingsbury.
     as growth, which should be              • Castle Vale.
     accommodated in ways which
     contribute to the diversity, vitality   • Slade Road.
     and environment of the centre.
                                             • Short Heath.
     There are 4 district centres within     • Ward End.
     the area covered by this document:

     • Erdington.                            These centres have less potential
                                             to accommodate growth, although
     • Alum Rock.                            proposals aimed at catering for
                                             the local catchment population will
     • Small Heath.                          be supported. They will however                               Alum Rock
     • Fox and Goose.                        remain important in providing local
                                             services and employment.
     Within these centres we will
     support growth in retail and            Across all centres we will support
     office floorspace in keeping            investment which makes centres
     with the size and function of           attractive for visitors. This will
     the centre. Erdington, Alum             include promoting a range of uses,
     Rock and Small Heath present            improving accessibility, and working
                                                                                                   Small Heath
     notable opportunities for growth;       with partners to ensure centres are
     opportunities at Fox and Goose are      well-managed.
     more limited, although it is set to
     benefit from further public realm

                                                                                                                                                                      Ci
                                                                                                                                                                       ty
     improvements in the area around

                                                                                                                                                                        bo
                                                                                                                                                                           un
     the shopping centre. More detail is

                                                                                                                                                                            da
                                                                                                                                                                             ry
     provided below.

     There are also a number of smaller
     local centres, which provide
     important local facilities:

     • Bordesley Green.

     • Green Lane.

     • Glebe Farm.                                                                                                                                                                        n
                                                                                                                                                                                         NORTH
                                                                                                                                                                                       NOT TO SCALE

     east birmingham prospectus for growth / development opportunites local centres
                                                                             •                                   development opportunites local centres / east birmingham prospectus for growth
                                                                                                                                          •
34   Erdington                                                                                                                                                                                                                                          Alum Rock    35

     Description:                                   Opportunity:                            The Central Square shopping            Description:                          Opportunity:                                         • Conversion of properties on
                                                                                            centre has been the subject of                                                                                                       the Alum Rock Road frontage
     Erdington is a traditional local               The Birmingham Development Plan                                                The principal local centre serving    Measures to maximise the use of
                                                                                            a number of proposals in recent                                                                                                      between Langton Road and
     ‘High Street’ with a range of                  identifies the potential for growth                                            Saltley and Washwood Heath,           existing space within the centre and
                                                                                            years. Measures to improve this                                                                                                      Naseby Road to local retail or
     shops, including multiples, smaller            in Erdington.                                                                  it comprises mainly traditional       to expand to the east are identified
                                                                                            centre, or more comprehensive                                                                                                        other appropriate local centre
     independent stores and indoor                                                                                                 terraced shops with some more         in the emerging Bordesley Park
                                                                                            proposals for redevelopment, will                                                                                                    uses.
     markets, as well as cafes and                  The former Colliers site to the                                                recent infill including a number of   Area Action Plan. These include:
                                                                                            be supported.
     pubs, and a range of services and              north of the centre benefits                                                   community uses. It serves a mainly
                                                                                                                                                                                                                              • Maximising the use of existing
     community facilities. The High                 from a planning consent for a                                                  Asian population, and its shops and   • The former Tilt Hammer Public
                                                                                            There are opportunities for                                                                                                          buildings, including use of upper
     Street is pedestrianised at the                foodstore, 3 smaller retail units                                              services strongly reflect the needs      House site has been vacant for
                                                                                            redevelopment and reconfiguration                                                                                                    floors and rear servicing.
     northern end providing a space                 and 15 residential units. The                                                  of the community. It also attracts       many years and is very visible
                                                                                            of retail floorspace and community
     for local events. On-street and                approved scheme includes access                                                visitors from a wider catchment          at the entrance to the centre.
                                                                                            uses within the centre, as                                                                                                        The majority of the sites are in
     off-street shoppers’ car parking is            from Sutton Road to rooftop car                                                area because of its specialisms in       Along with the adjoining land,
                                                                                            well as the potential to make                                                                                                     private ownership. The City Council
     provided, and it is well served by             parking and servicing. A number of                                             jewellery, fashion and textiles.         this presents an opportunity for
                                                                                            improvements to the public realm                                                                                                  will work with land owners to bring
     public transport.                              sites along Orphanage Road may                                                                                          development including retail and
                                                                                            and car parking provision.                                                                                                        development proposals forward
                                                    present further opportunities for                                                                                       car parking.
                                                                                                                                                                                                                              within the context of the Area
                                                    development, and would improve
                                                                                            New leisure facilities in the centre                                                                                              Action Plan. The expansion of the
                                                    the connectivity between the centre                                                                                  • The former Leyland Club has
                                                                                            will be supported, including the                                                                                                  centre will be kept under review
                                                    and the proposed foodstore.                                                                                             planning permission for a mixed
                                                                                            provision of a new swimming pool                                                                                                  with potential for further expansion
                                                                                                                                                                            retail, community and residential
                                                                                            at Hart Road.                                                                                                                     to be considered in the future.
                                                                                                                                                                            development which includes a
                                                                                                                                                                            significant underground car park.

                                                                                                                                                                                                         ad
                                                                                                                                                                                                      Ro
                                                                                                                                                                                                    th
                                                                                                                                                                                                ea
                                                                                                                                                                                                H
                                                                                                                                                                                              d
                                                                                                                                                                                            oo
                                                                      Ed

                                                                                                                                                                                         hw
                                                                         wa

                                                                                                                                                                                       as
                                                                                                                                                                                      W
                                               ad

                                                                            rds

                                                                                                                                                                                                                                                  oad
                                              Ro

                                                                                Ro
                                         ew

                                                                                                                                                                                                                                           ield R
                                                                                   ad
                                         N
                                     on
                                    tt

                                                                                                                                                                                                                                     Highf
                               Su

                                                                                                                                                                                                               Alu
                                                                                                                                                                                                                   m
                                                                                                                                                                                                                       Ro
                                                                                                                                                                                                                          ck
                                                                                                                                                                                                                             Ro
                                                                                                                                                                                                                                ad
                    W
                     oo
                        d
                       En
                          d
                            Ro
                               ad

                                     n
                                    NORTH
                                                                                                                                                                                                       n
                                                                                                                                                                                                      NORTH
                               NOT TO SCALE                                                                                                                                                         NOT TO SCALE

     east birmingham prospectus for growth / development opportunites local centres     •                                                                      development opportunites local centres / east birmingham prospectus for growth
                                                                                                                                                                                            •
You can also read