e-Governance in an Indian State (Andhra Pradesh) –
                            Implementation, Experience & People’s Perception
                                                 T. H. Chowdary
                                    Center for Telecom Management & Studies
                      Plot No. 8, P&T Colony, Karkhana (Secunderabad), Hyderabad - 500 009.

                                                               available. The revenue collections are also partial
                        Abstract                               involving both avoidance as well as evasion and
                                                               misappropriation by the collectors. State Governments are
          There has been           a spectacular rise of       very often having recourse to ways and means drawals,
Information Technology (IT) and software professionals         from the Reserve Bank of India because their treasury
and businesses in India in the decade 1994-2004. What          management is bad. Over time, Government has also
came to be known as Y2K problem, primarily in the              become the largest dispenser of welfare to people
developed countries gave the opportunity to tens of            especially, to certain sections on welfare hostels,
thousands of Indian software business and professionals        reimbursement of tuition fees in schools and colleges,
to enter international markets. The state Governments of       loans for weaker section housing and so on. Citizens’
Karnataka and Andhra Pradesh emerged as home for               grievances are attended if at all, with inordinate delay, if
hundreds of fastest growing ICT and software companies         at all. Citizens are being required to go to different offices
providing tens of thousands of well-paid jobs. In 1998,        to pay for services like water and electricity, property tax,
the new Government that took office in Delhi saw the           etc. Parents want caste and income and property
potential of IT and software for India to emerge as a          certificates when they seek admissions for children in
leading exporter of services. The Chief Minister of the        schools and colleges; citizens have to go to different
state of Andhra Pradesh evangelised ICTs and education         offices like the Regional Transport Authority or renewing
as the engine for economic development and good                their driving license, to the railways, airlines and
governance. A Vision document was prepared which               passenger bus transport companies for reservations. They
among others envisaged e-governance of the State and           are wasting lot of time and money and encounter
building up of the hard and soft infrastructures for           indifference and discourteous service. Use of information
exploitation of ICTs across the economy (industry,             technology (I.T) for computerization of all activities
business, education, health, Government, welfare,……).          connected with these, will greatly enhance efficiency and
While the educated and the enterprising were enthused          economy in Government and citizens will have less pain
and getting benefitted, the voting masses used to promises     and hence less disaffection for Government. It is these
of poverty-eradication, and subsidies for food, housing,       thoughts that led to the Government of Andhra Pradesh to
electricity, education, etc., saw ICTs as beneficial only to   the project for “electronic government”. A vision for this
the rich and as neglective of the poor. The benefits of        was created in 1997 and when the Prime Minister
the e-governance have not become ubiquitous to affect the      appointed the National Task Force for Information
common man’s life, especially rent-seeking by                  Technology and Software, the fully worked out ideas of
Government servants. The opposition political parties          the Chief Minister of Andhra Pradesh and his Adviser (the
were able to make the voting masses believe that the           author) were incorporated into the Task Force’s
promotion of ICTs and e-governance etc., were the reason       recommendations so that they would become all India
for the neglect of agriculture and hence the rural people,     policies.
especially the poor. This paper describes and discusses                   E-governance is one of the               important
envisionment, implementation, experience and people’s          applications of       information technology (I.T).        I.T
perception and lessons from all these.                         profoundly improves efficiency and effectiveness in
                                                               government and its responsiveness and transparency for
                                                               the public. Almost all of the State governments and
1. I.T for and in Government                                   the Union government in India are having a number of
                                                               e-governance projects under implementation . The
         Governments in the States and at the Center have      recommendation of the National Task Force on
become the largest takers and spenders of peoples’             Informatin Technology and Software constituted by the
money, collected by way of taxes and loans. There is lot       Prime Minister in 1998 that upto 2% of the government’s
of inefficient and ineffective spending because among          budget may be utilized for computerization of all work
others, information for management and control is not
in government         and introduction e-governance was         government records almost every family in the
aprpoved. A few governments like that of Andhra                 constituency must have been provided with one
Pradesh had even prepared a Vision 2020 document for            “weaker section housing”!         The expenditure
the all- round development of the State . IT is to be used      incurred was not unstaggering. He would then
extensively and intensively as an engine for powering           tell the MLA that get the following attended
the development works . This paper highlights some of           to immediately: get the completed houses
the gains, problems and experiences in evolving and             occupied by getting them electricity, water or a
implementing e-governance            projects with special      road or whatever is lacking;        expedite the
reference to Andhra Pradesh .                                   completion of the constructions that are already
          The use of management information system              in hand and are at various stages; if you get
(MIS) for optimizing the performance of an enterprise is        these done in the next 3 to 6 months , I will
known for long and is well established. The use of              sanction not the 250 that you are asking but
telecommunications and IT for MIS makes MIS a real              500 . A print out of all the record is given to the
time decision aid for Managers at all levels . In view of       MLA.      He     walks out satisfied and then
governments being the single largest takers of peoples          becomes as much responsible as the CM in
wealth (by taxes and loans) every year; as the largest          getting the work completed and getting the
spender and procurer of goods and services and also the         biggest bang for the buck. This is the power of
purveyor of welfare to millions of people, An ICT-              ICT in government for good governance.
enabled MIS greatly enhances the proper use of
resources and the most cost- effective way of dispensing        Soon after the monsoon rains there is the scourge
the costly welfare . In India the total cost of projects that   of gastro enteritis. The state Health Department,
are continuing uncompleted have already eaten up Rs.            the Water Supply Department and the
100,000 crore, ($ 22 bln.) without yielding any result,         government Information Department should all
some of them for over decades. How ICT-based MIS and            be brought together to tackle the possible
project management could have benefited us can be               incidence of gastro- enteritis and the consequent
gauged from a few illustrations:                                sickness and deaths . The CM calls for a video-
          An MLA meets with the Chief Minister (CM)             conference with all the District Collectors,
          and requests that 250 more houses should be           (District Magistrates) district Health Officers,
          sanctioned in his constituency under the weaker       Panchayat Raj engineers (in-charge of water
          section housing scheme. A first or second             supply) and the Information Department all over
          generation CM        would give one of the            the State. Every District Collectorate            is
          following responses: We don’t have funds; I           equipped with video-conferencing and all the
          will have the position         examined by the        districts are connected on the state -wide area
          Principal Secretary in-charge of welfare; I will      net-work ( SWAN) to the capital city . A video
          consider this in the next year’s programs. And        conference is held, district-wise by the CM and
          the MLA goes away dissatisfied. However a             the staff in the Secretariat; while the position of
          third generation CM like the IT-savvy CM of           preventive and tackling measures in a District are
          Andhra Pradesh responded as follows. All the          reviewed and directions are given, all are
          information about the weaker section hosing           listening and depending upon what type of
          schemes from the second 5-year plan onwards           questions are asked and what messages are given
          is available in the computerized data bank,           every one is preparing for an effective
          district -wise, Mandal (Tahsil) –wise, MLA and        exchange of information and discussion and
          MPs constituency-wise. He gets this information       decisions are taken. The figures for the previous
          on his lap-top for the constituency of the            years are available and the measurers to be taken
          interlocuting MLA and shows it to him and             and in what stage these are,             who are
          explains as to on how many schemes, how many          responsible for what,         as well as        the
          houses had been sanctioned year after year, how       performance of the concerned officers are all
          many were completed and occupied, how many            discussed. Such conferences have energized
          had come up to the roof level             but not     and activated the cutting edge officials and the
          completed, how many have come upto the                machinery. Almost every day, such a state-
          plinth level and stopped there; how many are          wise conference is being held on the SWAN.
          completed but not occupied for want of                The working of the public distribution system,
          electricity or water or a link road or any other      drought relief, flood control, performance of
          reason; and what is the expenditure incurred .        schools are all, periodically and systematically
          The figures tell a dismal and a fantastic story.      reviewed in this manner.
          According to the sanctions and expenditure
The radio, TV and the cable TV media are used        3. e-Governance Projects in Andhra Pradesh
         for enabling the public to interrogate officers
         and Ministers and for the latter to educate                  Some of the significant projects for electronic
         people and to explain to them the programs and       governance and Government services to citizens (C2G)
         policies of the government. For example, every       in Andhra Pradesh are briefly presented here.
         Monday, for one hour, the CM of Andhra
         Pradesh is on the radio and TV. The subject to       3.1. Conferencing
         be discussed along with a lot of explanatory and
         informative      material   is advertised     in     All the district towns are linked connected to the State
         newspapers two days before. The program              capital, Hyderabad by optical fiber cable based, 2-mbps
         opens with a 10 to 15 mintue talk by the CM          telecommunication links and networked APSWAN
         and questions are taken on toll-free telephones.     (Andhra Pradesh State Wide Area Network) is for
         There is no holds barred questioning. Answers        multiple uses like video conferencing, telephony and data
         are given most frankly, and the questions that       transmission. Every district headquarter is equipped for
         cannot be answered for want of time during the       video conferencing, accommodating 20-50 people. Issues
         program, could be sent by fax or email and           concerning every department are discussed in a video
         replies are sent in the next few days. Such          conference between the commissioners and the
         programs      are obligated on Collectors and        Secretaries and Ministers in Hyderabad and all district
         Superintendent of Police, and Municipal              level officers in the district towns of the State. These
         Commissioners using cable TV and radio.              conferences have been greatly enhancing the
                                                              implementation of various projects and schemes with
2. Infrastructure for e-Governance                            great speed and with least waste. The network is now
                                                              engaged for 15-16 hours a day and sometimes more to
    Reliable, secure, broad-band telecommunications           meet the requirements of various ministries and
covering the entire territory and all the administrative      departments.
units of the government upto Panchayat level are
essential . A state wide area network (SWAN) utilizing        3.2. Treasuries
optical fiber connectivity of the telephone companies to
link up all the district towns to the State capital and in            Work in about 240 treasuries of the State has
each town, linking up all government offices to the           been computerized The accounting for money received
Collectorate (that is where the SWAN acts as node) is to      and disbursed is transmitted daily to the Government in
be established. Leased lines and point to multi-point         Hyderabad facilitating the proper management of funds.
wireless are used below the district level . Although
Andhra Pradesh         was the first     with a SWAN                Currently work on the networking of all the
incorporating video conferencing capability, Gujarat          computerized treasuries is under way . When completed,
appears to have done the utmost by extending the              it will be possible for registration of documents
SWAN and video conferencing facility upto he Taluka           pertaining to the property in one town by people not
level all over the State. In order to         minimize the    having to go there but getting that work done in the
investment      and also to ensure      that the network      treasury office in any town in the State .
performs all the while, the system is contracted to a
private company with the government putting in 26%            3.3. e-Procurement
of the capital required and reserving right to acquire the
full ownership of the network after five years. Of course              The Government of Andhra Pradesh (GOAP)
government will never go for this option . GOAP is            buys goods and services to the extent of 10,000 cr. per
planning for a captive telecom network which will be for      year. There are a few thousand tenders        every year.
all services ( telephony, FAX, data, video) for all           Some of them especially regarding roads and buildings
government needs, with gateways to public-switched            are a big racket with contractor forming “rings”, hiking
telecom networks, at one or more towns in each district       the rates and distributing the           works between
for government –citizen communications.             Private   themselves. The time taken to decide a tender is
Telephone Companies are liberally given rights-of-way         unusually long with attendant cost and time over -runs.
for laying optical fiber cables and allowed to use            Government therefore in pursuit of reducing costs,
Government properties like tall buildings for mounting        improving efficiency and bringing about transparency
radio antennas and location of radio-base stations.           and to put out the “rings” decided on the project of e-
                                                              procurement.      Notices inviting tenders are put on a
                                                              website. These can be downloadable and no printed
copies are sold. Who is filling up tenders and from           pay on the property that is being transacted and then the
where is not known to the tenderers as the tenders are to     document is to be registered. This work in all the 240
be put electronically . Departments were asked to             registration offices in the State had been computerized..
volunteer to go in for e-procurement . The idea was that      Earlier, people had to make several visits to the registrar’s
unless there must be ownership of technology for the          office, spread over several days to get their documents.
new system to become a success.                               Now the ascertainment of the mutation/encumbrance and
         A few departments /offices were initially chosen     the stamp duty takes no more than 10-15 minutes. The
and the number is increasing. A few of the notable            registered document is given over to the party within half
achievements are:                                             an hour. The convenience to the citizens is immense.
    • In regard to the first complement of 52 e-tenders       When all these Registrars’ offices are all linked, then it is
         estimated to cost 350 cr., e-tendering saved 78      possible that a transaction, say in Visakhapatnam can be
         cr.     or 23%. The rings which used to be           completed from Hyderabad itself. We can guess how
         scandalously collusive are eliminated . The          greatly relieved the concerned citizens will be.
         anonymity from one another of the tenderers
         was the      greatest contributing     factor for    3.5. Electronic Seva or e-Seva
         elimination of rings . Tenders were electronically
         received from States other than Andhra Pradesh       This is one of the most beneficent and greatly appreciated
         also.                                                schemes of information technology and computerization
    • The manual tendering process was taking, on the         for the benefit of citizens. It was first implemented in
         average 150 days for award of the work. It is        Hyderabad and is being extended to over 40 more towns.
         now reduced to 20 days.                              Briefly, over 40 services like payment of property tax,
    • 394 tenders for works/goods amounting to Rs.            electricity and water bills, rail and bus reservations, filing
         1000 cr. were in the process of decision in          of applications for passports, and returns of income and
         Feb-2004. Another 423 tenders, estimated to          commercial tax returns, obtaining a caste certificate or
         amount Rs. 640 cr. were put on the web               renewal of driving licenses, municipal trade licenses and
    • The Commissionerate of Tenders processes the            drug licenses etc could all be done from one of the e-
         tenders and awards the contracts . It is a inter-    Seva centers which are spread all over the city/town. As
         departmental high-powered commission.                more and more are opened, the distance to be traveled by
    • Important         procurers are      Irrigation    &    citizen decreases, so does the time that he spends. That he
         Command Area Development;              Roads &       can transact 30 jobs at one place, by sitting in front of one
         Buildings, Public health, and Panchayati Raj; (      counter is an immense relief. Importantly, there is a
         engineering wings) APSRTC; Andhra Pradesh            change in the mentality of the Government servant at the
         Medical Health, Infrastructure Development           e-Seva centers. He no longer thinks that he is employee of
         Corporation, Tribal welfare and AP Technology        electricity or water board or railway department but he
         Services. Others being prepared are the              now thinks he is a servant of the people because he is
         Singareni-      Collieries,   Andhra      Pradesh    dispensing several services on behalf of several
         TRANSCO (electricity) and Andhra Pradesh             departments to the citizen.
         Discom       and Municipalities. When fully                The e-Seva is extended now (November 2003) to
         implemented, government will have savings of         117 Municipalities of the State . Some Municipalities
         Rs 2,300 cr. annually.                               like Visakhapatnam had launched their own e-Seva
    • The commission paid to the company for                  type facility under the name Saukaryam (Suvidha or
         maintaining and operating the e-tendering            convenience) . Such initiatives are most welcome . These
         system is 0.24% of the value of the tender           are integrated with the e-Seva and are co-branded.
         award. On Rs. 10,000 cr. of procurement, the
         outgo will be Rs. 24 cr. ( being negotiated to be    3.6. SKIMS (Secretariat Knowledge Information
         half) and the saving will be Rs. 2,300 cr.                 Management System - This was later
                                                                    renamed as SMARTGOV)

3.4. CARD (Computer Assisted Registration of                           There is a huge amount of file work in the
     Documents)                                               Government secretariat. Within the secretariat a large
                                                              number of files circulate and the delays are inordinate and
          Citizens have to go to Registrars’ Offices for      no body can get information quickly as to what matter
registering sale of properties. They would like to know       stands at what stage. In the project SKIMS the work in
the encumbrance or the mutations for say up to 50 years.      each department and commissionerate is being
They want to know what is the stamp duty they have to
computerized. The movement of a file is known. The            3.11. STD/ISD Booths as Internet & E-Seva
sections exchange information through e-mail.                 Outlets
3.7. A.P. Government Portal                                    Government has decided that all the STD / ISD public
                                                              telephones especially those in rural and remote areas
         If a citizen wants to place some grievance of his    must be transformed into public Internet kiosks so that
or seek information from the Government, he is at a loss.     those who can’t afford a private telephone and           an
He has to go from office to office or engage touts. This      Internet connection can still have access to the global
can be avoided. He could be navigated through the huge        telecoms and Internet for availing of all the benefits that
maze of Government office. The answer is Andhra               they confer. While in cities, the private ISPs are opening
Pradesh Government Portal. Persons can access this            public Internet kiosks because they are good business,
through the Internet and by a series of clicks on the         government must be responsible to get the operators of
mouse, he can go to the concerned department or               the STD/ ISD booths in rural areas to update themselves
commissioner or secretary and file his communication or       into Internet Kiosks. They would require subsidies
download the information he wants.                            especially because their earnings from telephony are
                                                              going down with the introduction of the inexpensive IP
3.8. e-Cops                                                   telephony. The Government of Andhra Pradesh is, in this
                                                              regard showing the way to the rest of the country. In a
         The work in the police stations, to start with in    private public partnership program 5000 operators of
Hyderabad, is computerized. FIRs and information can          the STD/ISD PTs in villages are being assisted by the
be filed by citizens from any Internet kiosk or from their    government by outright subsidy plus interest free loan to
own Internet -connected PC. The linking of the police         upgrade themselves . Banks are also brought into this
stations and the e-COP system is making their actions         scheme
swift and effective.
                                                              4. I.T. For Human Resource Development
3.9. FAST (Fully Automated Services of                 the
      Transport Department)                                   4.1. How is IT to be utilised for Economic and
                                                                   Human Development apart, from for
         Issuance of temporary and permanent and                   Efficiency    and      Transparency    in
regular     driving    license, registration of vehicles,          Government?
collection of fees and fines ( for polluting vehicles) are
computerized in 37 offices in the state.                                The result of this, quest is the Vision 2020
                                                              document. The greatest resource that a state or a country
3.10. OLTP (On Line Transaction Processing)                   or a nation can have is its people . For this purpose, they
                                                              are to be very well educated and should be aspiring and
         There are 1,140 Mandals (called Tehsils              enterprising . What is to be accomplished by them, so
elsewhere, the third tear of state administration). The       are in what areas, and in what manner by people and
work in and the services from the Mandal offices are          government is brought out in this document. What could
computerized. The Mandals are getting networked to            be the development projects, industries, trades and
cover hospitals, Public Health Centers (PHC) , municipal      services that are Could be most likely to succeed are
offices and Panchayats. Multipurpose information kiosks       captured in the Vision 2020 document. Since societies
are being opened in villages . The services are woven         and nations are rapidly evolving into knowledge based
around the citizen and land record data bases. A              economies and since that requires extensive use of IT &
comprehensive multi-purpose             house-hold survey     software with telecommunications as infrastructure,
(MPHS)      was carried out a few years ago creating          government has decided to make IT as the engine for
computerized records for over 15 mil house-holds in           efficiency in every branch of economy and life of the
respect of every citizen in the state. This can be accessed   people. Realizing that the largest market for Indian
from all the networked offices like Mandals. This will        professionals is in the area of IT and s/w and engineering,
speed up information transaction between the Mandal           government inspired and facilitated peoples’ enterprises
and the offices higher up in the hierarchy, in addition to    to put up colleges for engineering, MCA and MBA . For
speedy serving of information sought by citizens .            engineering alone, the number of colleges went up from
                                                              35 in 1997 to 220 by the year 2002.            Government
                                                              policies are to see, that these come up more or less
                                                              evenly in the entire territory of the state. These colleges
                                                              will be producing about 63,000 engineers per year of
whom about 15,000 would be in the IT and                      Government undertaking which is also equipped with a
communications area. The State is producing about             number of I.T. and software professionals. The concerned
10,000 MCAs ( Master of Computer Applications)                department, the APTSL and the I.T.&C Department work
Realizing that IT-Enabled services have a huge potential      in concert to develop the specifications, write the bids and
for job creation,    a course in BCA (Bachelor in             award the contracts. Everything is outsourced.
Computer Applications) was started in over 200 colleges.                A large number of initiatives were taken in the
Computer skills are compulsory for all teachers in every      last five years by the government of Andhra Pradesh
branch in the universities. Internet connection       is      for large scale computisation of government work ,
approved for all colleges, all public libraries and all       especially that which interfaces with citizens .
government offices and all Public Health Centers.             Government officials have been for long looked at
                                                              computerization with doubt and fright on counts like
4.2. Computer Education in Schools                            reduction in staff, transparency that might reduce their
                                                              power over citizens and of course, the natural reluctance
We are defining education to include computer skills .        to change their traditional style and purpose of work.
Therefore computer education is being imparted from           Very wisely, in which ever area like for ex: the
standard VI on wards to start with in 1000 government         registration department, computerisation was undertaken
high schools in the state. The equipment and teaching is      only after intensive and extensive interaction with the
outsourced so that the expense will have commensurate         staff. Very senior officers including the Minister spoke
the results. The private company imparting education          to the staff, invited questions and took them through
will be paid in relation to the results. Many high schools    training programs . The Director General of the
have already been imparting computer skills.                  registration department has himself become a computer -
                                                              skilled and savvy person and it was under his direction
      Outside the working hours of the school,         the    and none from outside that computersation all the 240
private company imparting computer education           can    offices was successfully completed. Since the design and
utilize the facility for training people in the village as    development of the applications involved the lowest
well as rendering Internet services for the villagers.        ranks of cutting edge government officials, the project
                                                              was a tremendous success. This is the lesson for other
5. Implementation                                             departments in government of Andhra Pradesh and
                                                              should be the lesson for all in India.
          How is this work being done? Tremendous                       The drafting of the specifications and the terms
preparation is necessary. Employees are informed of the       and conditions to be laid down in the bids were worked
objectives and enthused about the new way of doing            out in collaboration with the IT & s/w companies for,
work. Skills are imparted to the officials to work on PCs.    none in the government           has been having all this
For example, in the Secretariat there are 2,500 PCs, all of   expertise. The National Informatic Center (NIC) which
them on a network. The officials had to be trained. So        has been      computerizing       the statistical work in a
were the Secretaries and Ministers. Government set up a       number of departments, mainly with a view to aid the
special institution for this training. It is going to be      planning process        and the Computer Maintenance
supplemented by the National Institute for e-Governance       Corporation of India (till recently government -owned
that will be located in Hyderabad. The architecture for the   enterprise) were in the initial stages used as resources in
computerized offices of all the Government departments        order to train our own people in the Andhra Pradesh
was first laid down. Departments are given freedom to         Technology Service Ltd. (APTSL) . The APTSL was built
pick up works to be computerized first and also freedom       up as interface between government departments and
to award the work on their own. The newly created             private companies which were bidding for the work. In
Information Technology and Communications (ITC)               the process. APTSL itself has been gaining considerable
Department works provides all the know-how and advice         expertise for writing specification consultation with
to every department. Annual plans are drawn up. The           bidders, laying down parameters for selection, awarding
departments are required to volunteer for the programmes.     the work and getting it implemented. Committees
In each one of them, there is a Chief Information Officer.    evaluated tenders for award of the              work. In this
The idea is that the computerization work is owned by         fashion, the concerned departments are owning up the
each department and not thrust upon it. As every              project as theirs and not as one which is imposed from
department has to inter-work with several others, there is    outside. One of the         main reasons         for the not
an over -all plan as to which departments and what works      inconsiderable success is the self -motivated and
within the department will be computerized, in what           knowledgeable leadership of the Chief Minister himself
period so that maximum benefit of computerization is          of the e-governance projects. Frequent reviews and
achieved. Tendering and award is done by the Andhra           direction at various stages of the process ensured that
Pradesh Technology Services Limited (APTSL), a state          the considerable freedom given to departments did not
detract from the unity of the work . Misgivings,               this in every other state intending to computerizes its
reluctance or indifference had all been over-come              registration work ? Customization could be incorporated
because of the infectious enthusiasm and involvement of        in implementation to meet with each State’s specific
many of the secretaries and ministers.                         requirements. The country would be saving a lot of
          One important policy of the government Andhra        money as well as completing the e-governance project
Pradesh has been the private –public partnership (PPP). It     in much less time. Governments which are taking up
is known that no government is endowed with financial          the e-governance projects later are doing better in certain
resources and that government ownership of an enterprise,      respects compared to those who under took this much
be it in service or production area, is not a great success.   earlier; the later mover is having the advantage of
Therefore, we have been involving private enterprises          benefiting from experiences of the earlier movers.
for investment for implementation of the project and for                I believe that the IT department of the Union
its operation and management – a build -own -operate           government should call for a conference of the all the
(BOO) arrangement. Some times, government takes up             State governments and bring them to agree for mutual
an equity position to assure the private enterprise about      cooperation      division of work       and adoption and
the continued support by government for its viability          replication of applications and the best practices. Also,
and prestige. It is the CM’s involvement and inspiration       utilization of the common agencies in order to bring
that is bringing private enterprises into service which        about economies of scale as well as speed of work
are not expected to be remunerative for quite some time.       would be desirable. The aim should be not to curb the
(Ex: are AP Portal and E-Seva).                                initiatives and enthusiasm of the States but        to best
      For example, the APSWAN executed at a cost of Rs.        practices, pooling of the expertise and to help Indian
25 crores did not involve any capital outlay from the          companies grow to global capabilities; that is, the
Government. It was on the basis of “build, own and             companies that are carrying out e-government projects
operate”. The private company is paid for the use of the       in India should be able to export their know -how to
network. The e-Seva system is also a partnership between       other countries . The private –public partnership (PPP)
the Government and private companies. Government               model for e-governance projects adopted in Andhra
departments and corporations provide the information           Pradesh involves least capital expenditure by the
and the private company which put the capital gets paid        government; at the same time it helps the growth of
for every transaction from the participating departments/      Indian companies .
companies.                                                                Government procedures have evolved over a
          Various state-governments      and autonomous        period of two centuries in this country. Government has
bodies like municipalities are also embarking upon e-          come to mean delay unaccountability and waste . Quite
governance and e-service projects. It is unfortunate           often government officers (often, after retirement) as well
that even when we have got in Delhi a Ministry for I.T,        as Ministers talk about the need for process re-
every state is going through the same independent              engineering . The other day (Nov 2003 at the National
learning and implementation process. We could avoid lot        Conference on e-governance in Chennai) also said that
of costs and cut down time businesses if the expertise         unless the process of work and decision-making is re-
gained by any government department in any State in            engineered, computerization of the existing work,
computerisation is shared; in fact, is simply duplicated       retaining      the old practices will not produce the
with few changes in all other governments. There is not        optimum result . The resistance for re-engineering is
even a Journal which can disseminated information              immense . In fact, even computerization is some times
regarding what type of works, in what manner are               ornamental and not truly functional bringing about
getting computerised, at what costs and what benefits .        change in the mind-set of people is a challenging task.
Suggestions have been made to the Union Ministers of I.T       The government of Andhra Pradesh set up a Center for
for this purpose. We hope that such a journal and a            Good Governance in Dr. Marri Chennareddy Institute of
mechanism for sharing knowledge and experience and             Human Resource Development . The amount of training
for implementation of a successful program of one State        and retraining and getting people to accept change has
elsewhere by l simple replication will emerge.                 been immense. Departments were encouraged to compete
           What is amazing is the amount of duplication        with one and other to come forward to computerize their
that e-governments project as implemented in various           work. Those which were finally selected were taken
States is involving. For eg: Andhra Pradesh implemented        through an intense course for change management, for
a Computer Assisted         Registration    of Documents       imparting of skills and for cooperating with the company
(CARD). Other states are now doing but each one is             in the design of the system and its implementation . Each
going through a separate bidding process and fixing up         department has a Chief Information Officer (CIO) who
implementing companies . Why cannot the state-owned            would own the projects and is responsible for its
A P technology Services Ltd. (APTSL) which                     implementation . Unless the highest are involved, e-
implemented the CARD project be engaged to replicate           governance projects cannot be successful ; they will
become fashionable and ornamental but not functional.          voter can then be given an identity number which is
Andhra Pradesh was lucky in that its CM is in the              given as print -out after registration.
driver’s seat with full conviction and involvement. Very                 The next stage is the candidates canvassing for
pleasantly, and with very few parallels, many ideas            votes. Instead of requiring them to hold public rallies
emanated from the CM himself with the rest supplying           and meetings by collecting people from different places
the details. And in the process of            review and       and transporting them like cattle in lorries at huge cost to
implementation remarkable interventions were made by           rallies and demonstrations (actually this is the one which
the CM. These follow from the fact that the CM                 is becoming costlier and costlier and therefore requiring
conceived himself as the CEO of a company namely,              more and more black money), every Radio and TV
the GOAP. It is good to note that competition between          channel may as a condition of the license be required
States is emerging in regard to e-governance and               to give free time to the approved candidates, say 15
extensive use of ICTs in various fields of economic,           days before election time for specified hours, for
educational and entrepreneurial activities. It is true that    lecturing and appealing for votes. Each of the channels
most benefits will be realized by the educated and skilled.    must have toll -free telephone lines for the period.
In order to see that the benefits of ICTs reach the largest    When the candidates are speaking canvassing for votes,
number of people , it is essential that there is universal     citizens could phone in and then there could be a
education upto secondary level, preferably beyond that         dialogue or discussion . Meetings should be allowed
and that in the last few years of     secondary education      only in closed buildings, assembly halls or auditoria
itself, every student is    made computer -literate. Of        but not in the open, so that, these are not mammoth
course, all the teachers and lecturers will have to be         disrupting city life. The next step is actual voting. Voting
also computer -literate and skilled in Andhra Pradesh. A       must be registered only through the PCs in every booth.
start has been made by getting all the university level        The registered voter may appear before the camera -
teachers computer literate .                                   carrying PC. He may key in his voter number and look
                                                               into the Camera. The PC /camera will match the voter
6. e-Government Making                                         with the digital photo that is already installed and if
                                                               they don’t match, his vote would not be registered. A
          Finally, an e-governance project must also           list of such may be printed and he will be given a slip of
include e-government making; that is, elections to the         rejection for future appeal or whatever. The PCs in all
State Legislatures and the Parliament of India. The basic      the booths in a constituency may be linked to a central
source of corruption in the country is the huge                counting computer . In this system, 5 minutes past the
expenditure that parties and candidates seeking elections      closing time for balloting, the result could be out. I have
have to incur. State funding will not be a remedy . Just       presented this concept to the Union Home Minister. He
as business /government process re- engineering alone          appreciated but expressed difficulty in getting it
can deliver the full benefits of ICTs, election process        implemented . If this is taken as part of e-governance
must be re- engineered to minimize corruption. It must         project of the country and trial implementation is carried
start with the enumeration. Government officials should        out      either in bye- elections or for Zilla Parishad
not have to go from house to house to enroll voters.           elections, then in a period of 4 – 5 years, we may have a
People should be required to register themselves as            fool- proof working e-election system . That e-voting has
voters during a specified period and such registration         become very popular in several states like California
may be renewed periodically to drop the dead and               and elsewhere is very well known. The US will be trying
departed and include those who attain majority as well as      out e-voting in the Primaries for the Presidential
to see that all those who live in a place are registered.      election 2004 in some of the States. We should not be
Registration must be computer –based. After the                trailers but pioneers.
bonafides are publicly ascertained the registering officer
may require       the qualified and bonafide citizen     sit   7. Derogation of ICTs
before a PC with camera. All the details like residence,
age, parentage, constituency etc., may be entered and                   That the computers and software are producing
his picture / thumb impression recorded in the computer        jobs only for the highly educated and that particular
by digital imaging. Incidentally, registration instead of      professional education is costing very dear to the families
enumeration largely eliminates bogus voters          if the    is another argument against Government’s promotion and
registration takes place         publicly; that is, local      use of the information technology and software. For very
representatives of the political parties are allowed to be     good reasons like when the literacy is only 65% and that
present at the registration site so that in case of doubt,     therefore Governments should spend their resources for
one can raise objection and the registering officer can        elementary and secondary education and not on
have the case investigated before registering. Every           University especially professional education and that the
latter has to be financed by the beneficiaries is interpreted     the property-owners were allowed to add one or two more
as denial of education to the masses by costing it very           floors to their buildings. That was more than satisfying
high. For example, a student has to spend about                   compensation for the little space ceded by them for
Rs.500,000 ($ 11,000) which is 25 times the per capita            widening of the roads.
income, to get a B.Tech degree. The critics of IT and                       The Chief Minister of Andhra Pradesh became
software say that this type of education can be afforded          the chief marketing officer for the state to attract multi
only by the rich and it is only the children of the rich that     national companies from the US and Europe to locate
are benefitting by information technology and software            their business and development centers for IT and
use in the country. This is how the very beneficial IT and        software in Hyderabad. He was therefore seen in the
software both for the educated as well as for the                 company of big businessmen and worthies like Bill Gates
Government and the country are trashed among the voting           and the President of the USA, Bill Clinton and the Prime
masses. Indeed, the critics charged that the rich countries       Ministers of UK, Malaysia, Singapore, Germany etc. His
and multinational businesses are inveigling India to              critics said that he neglected the poor farmers and became
produce huge numbers of professionals whose services              oblivious to their woes attracted by the glitter and glow of
can be inexpensively utilised by the multi-nationals for          the company of the multi millionaires and imperial
their benefit.     Thus, when Bill Gates donated $ 200            powers. In obedience true the advice of the World Bank
Million to India for the control of HIV, his charity was          and IMF and other that international capital. It was not
dismissed as selfish by saying that Gates was afraid that if      that the Chief Minister did not visit the villages and talk to
the Indian youth are infected with HIV, Microsoft would           the farmers but since poverty and unemployment could
not get low-paid IT and software professionals from               not be eliminated especially among the unskilled and
India! His charity was because of selfish motive!                 hardly literate or illiterates within the 5 to 10 years, and
          Another canard widely propagated was that the           since his advice was that people have to
Government was investing heavily in information                   learn and earn (i.e., education and hard work) and not
technology and software education and facilities and the          depend on the programme of Government feeding
related infrastructure, firstly to benefit the multi-nationals;   (subsidized food-grains, sugar, kerosene, cooking oil) and
secondly, the rich classes and thirdly that it is at the cost     themselves breeding (too many children, poverty and
of agriculture, drinking water, health and education. The         have illiteracy, child labour) did not go well with the
truth is that the Governments merely created favourable           voter-masses. His critics conveyed that he was insincere
conditions for private domestic and foreign private               in his care or concern for the poor. He only cared for the
enterprises to invest in India. Good roads, steady                rich, for the elite for whom alone the IT and software
electrical power supply, telecommunications, good                 have some benefit.
transport services are what were encouraged; that is,
improvement in infrastructure. In what has come to be             8. Telephone’s Acceptability: Computers and
known as private public partnership (PPP) enterprises                IT as Threat
were floated to get ready-to-use building spaces and even
the State wide area broadband network for e-governance.                     The skepticism about and rejection of computers
In regard to e-services even, the Government investment           and information technology by the voting masses is in
was limited to 25% and in some cases, this was not in the         great contrast to their acceptance with enthusiasm of the
form of any money contribution. For example, for the              telephone. There was a time in the 70s and early 80s
Hitec and Hitex facilities for business space and                 when the ideologues mainly Marxists and communists
expositions in Hyderabad, the Government’s contribution           who had infiltrated into the Congress and its Government
was only its land which was initially worthless now               organs also were holding that telephones were only for the
valued at 26% of the cost of the project as contribution for      rich and Government should not invest its scarce
share capital. These facts were however, suppressed by            resources in telephones. But a determined effort by some
the critics of the Government. The Cyber Towers building          telecommunications, professionals in the Government to
proving 800,000 sq ft ready-to-use office accommodation           put telephones in every village for public use irrespective
for software companies, the Government put no cash. The           of the cost and the revenues. Has very tellingly
land it gave was valued at 26% of the total project.              demonstrated the benefits of (reduced travel to distant
Similarly, the improvement in the traffic flow in                 Government offices, access to market information, legal
Hyderabad was effected by construction of flyovers and            and medical advice, socialist etc.) telephone for the rural
widening of roads. Neither involved cash flow out from            masses. This was quickly followed by campaigns for
Government. Government’s land in the city outskirts               liberalisation, demonopolisation, private sector entry and
which could be developed was auctioned and the fantastic          foreign and domestic private investment into the telecom
amount realized was used to build two score fly-overs in          network and services. This demonopolisation and private
the city. Where private property on either side of the roads      sector entry were bitterly opposed by communists and
to be widened were acquired, no cash was paid. Instead,
trade unions led by them. They had even gone to the            discourse, debate and decision-promotion. The theme is
Supreme Court of India challenging the private sector          the Digital Divide. The UNDP/ITU have been holding
entry into telecom as an assault on socialism. Fortunately,    preparatory conferences for a World Summit on
the Supreme Court of India rejected their petitions. In the    Information Society (WSIS) to bridge the Digital Divide
last ten years if there is one sector in the country where     just like providing the Missing Link.           Developing
liberalization and private sector entry and competition are    countries must, to benefit from ICTs must prioritise the
universally accepted as benefiting the masses, it is the       following:
telecom. About 600,000 villages have each one public                    • Education for all including the acquisition of
telephone and 99% of the population is having access to                     skills by all to use the ICT gadgets and the
the phone. Competition has brought in new services like                     systems.
electronic mail and mobile telephony. Mobile telephony                  • Put Internet Kiosks for public use (just like
has become so cheap that every year 18 million mobiles                      public telephones) in rural areas (where
are being added to the country in contrast to about 3 to 4                  masses of voters live) and put agents to help
million fixed telephones. Five companies competing                          “un-fitted” people to get the information and
fiercely in every State have brought the mobile telephone                   services they want (including those
within reach of farmers, carpenters, electricians,                          connected with, for and by Government).
plumbers, vegetable vendors and students. Long distance                     Those will have to be subsidised to be
call prices fell by 80% and are still going down. It is this                affordable by the poor.
increasing affordability that has endeared the telephone                • Reduce hype but resolutely move over to e-
to the ordinary people. We can see daily rated labourers                    governance to realise and demonstrate the
working on commercial farms having a transistor radio                       benefits of ICTs.
and a mobile telephone on their person.       An year’s of              • Take measures to bring down the prices of
mobile telephone service is costing about 25% of the per                    all ICT equipment – computers, mobile
capita income whereas even the lowest priced computer is                    telephones, network equipment for some
costing 150% of the PCI; that is six times costlier than                    time at least by abolishing excise duties,
mobile telephone service. Technology and competition                        sales and service taxes, licence fees etc. Just
have made the telecom part of the ICTs acceptable to the                    as the radio has now become a commodity,
masses. It has no language limitation. And for the well                     so can information appliances should
educated it is giving access even to the internet. SMS                      become. ICTs based services should not be
messages are replacing postal mail and even email.                          viewed as new sources to Government but
                                                                            as aids for human resource development and
9. Conclusion                                                               for improving the efficiency in economy and
                                                                            governance. Just as education is not taxed so
         In the 1980’s we all talked of the “missing link”                  should not the ICT involving products and
telephones in rich countries and for the affluent only in                   services.
poor countries. The United Nations and the International                • All political parties should desist from
Telecommunications Union (ITU) made this a matter of                        viewing technological changes as threats to
worldwide discourse as a result of which villages and the                   the poor. They should on the other hand
poor in urban areas have been given access to public                        concentrate on demanding more and better
telephones. Structural reforms in the industry like                         education and affordability of the new
Government’s withdrawal and private sector’s                                devices and systems for increasing sections
competitive entry into the sector have brought in                           of the people.
revolutionary changes – application of latest technologies;             Finally, the wisdom contained in the following
costs and prices falling; telephones within the reach of the   quotes should reassure the pioneering advocates and
poor.                                                          implementers of e-governance to persist in their enterprise
         Concerned with what ICTs are doing for the            unmindful of the temporary adversity.
developed countries and their educated and enterprising
people, businesses and economies and governance, the
UN and the ITU are again engaged in another gripping
“Those who claim to lead the
        “Those who carry on great public                         masses must resolutely refuse to be led by
        schemes must be proof against the most                   them, if we want to avoid mob law and
        fatiguing delays, the most mortifying                    desire ordered progress for the country.
        disappointments, the most shocking                       I believe that mere protestation of one’s
        insults. And what is most of all the                     opinion and surrender to the mass
        presumptuous     judgment    of    the                   opinion is not only not enough, but in
        ignorant.”                                               matters of vital importance leaders must
                              – Edmund Burke                     act contrary to the mass of opinions if it
                                                                 does not commend itself to their reason.”
                                                                                    - Mahatma Gandhi

Appendix

                  Major EG Projects in Andhra Pradesh:

        •MPHS ..                          Building the citizen’s & land data base
        •CARD ..                          Registration of legal & sale deeds
        •FHIMS ..                         IT in Primary Health Sector
        •FAST..                           Transport services through IT
        •Compact..                        Streamlining commercial taxes
        •e-COPS ..                        IT in Police
        •SmartGov..                       Knowledge-led governance (Secretariat)
        •Core Projects..                  e-Procurement, IFIS, HRMS & SBMS
        •eSeva ..                         Redefining citizen services
        •APOnline ..                      Convergence of info, forms & services
        •Kiosks ..                        Network of internet kiosks in villages
        •OLTP ..                          Online Transaction Processing

e-Seva: Convenience & Comfort:

•Multiple services offered at each counter
•Utility / Tax Payments
           Electricity, Water, Property Tax, Telephone bills
           –Filing Sales Tax and Income Tax Returns
•Certificates
           –Birth / death certificates
           –Encumbrance certificates for property
•Passport and Licenses
           –Filing applications for passports
           –Municipal trade licenses, Learner’s License, Vehicle registration …
•Bus tickets … train tickets, airline tickets, travel bookings
•E-Payments on internet (www.esevaonline.com)
e-Seva in Andhra Pradesh :

• One-stop-Shop for G2C services
• 31 service centres, 6 bank branches, 81 ATMs (in Hyderabad)
• Volume of Transactions increasing
• 0.8 mil in April 2001
• 8.5 mil since Aug 03
• 46 services across any of 290 counters
• Extending to all urban areas by Dec 03
• 232 more eSeva Centres in 116 cities & towns &
• 5000 villages by Dec 2004

Complexities of a Solution for Secretariat:

•Over 2000 users in 12 levels
•30 departments with cross-cutting subjects
•Over 3600 subjects with unique work flow hierarchies
•Extremely compelling imperatives on
        –Security, availability, scalability
        –Conformance to Business Rules
•Largely computer-illiterate users
•Strongly entrenched legacy system of manual files
•Mindset

APNET:

•Use of satellite technology for
•Distance education
•Training of Govt employees & SHGs
•Pilot Project operational for 2 years
•Expansion at advanced stage
•Earth Station operational since 4/02
•Studio complex to be operational by 8/03
•Content development – current focus area
•2000 remotes operational
Size and Complexity of SmartGov:
76 Central Applications                     354 Department Applications
• Office Procedures
• Establishment                    • 5 functional groups
• Common Processes                 • Social          • Referral
                                    • Engg           • Regulatory
                                                     • Promotion

6 Core Applications                24 Technical Applications
• Knowledge Management
• Central Filing System            •Effort - 125 Person Years
• Security                         • 150 TCS Consultants worked on it at peak
• SKIMS Desktop / Intranet         time
                                   • Schedule - 11 months for development and 2
                                   months for Acceptance