DVOKUT-ECRO Ltd. COMPANY PROFILE 2021.
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
DVOKUT-ECRO Ltd. Company Profile CONTENTS 1. INTRODUCTION 1 2. SCOPE OF SERVICES 2 3. TEAM OF EXPERTS 5 4. QUALITY ASSURANCE 6 5. LIST OF COMPANY EQUIPMENT AND PROPERTY 7 6. EXPERIENCE 9 7. STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) AND ENVIRONMENTAL IMAPCT ASSESSMENT (EIA) 10 7.1 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) ......................................................... 10 7.1.1 Strengthening capacities / consulting services _____________________________________ 10 7.1.2 Strategic Environmental Assessment (SEA) study preparation ________________________ 10 7.1.3 Preliminary strategic environmental assessment (SEA Screening) _____________________ 11 7.2 ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .............................................................. 12 7.2.1 Environmental impact assessment (EIA) studies ___________________________________ 12 7.2.2 Reports and requests for EIA scoping ____________________________________________ 18 7.2.3 Preliminary environmental impact assessments (EIA screening) ______________________ 18 7.2.4 Preparation of analysis of interventions changes in relation to previously implemented environmental impact assessment procedures __________________________________ 26 7.2.5 Reports on the main project compliance with the environmental protection measures and the monitoring programme prescribed by the decree on project acceptability _______ 26 8 NATURE PROTECTION (INCLUDING ECOLOGICAL NETWORK I.E. NATURA 2000), WATER AND SEA PROTECTION 30 8.1 APPROPRIATE ASSESSMENT (ECOLOGICAL NETWORK - NATURA 2000) ......................... 30 8.1.1 Appropriate Assessments ______________________________________________________ 30 8.1.2 Preliminary Ecological Network (Natura 2000) impact assessments ___________________ 31 8.2 REPORTS ON PROJECT IMPACT ON WATER BODIES STATE ............................................ 33 9 ENVIRONMENTAL MONITORING 33 9.1 PREPARATION OF ENVIRONMENTAL MONITORING PROGRAMMES .............................. 33 9.2 AMBIENT AIR QUALITY MONITORING (WITH REPORT PREPARATION) ........................... 33 9.3 AUTOMATED STATIONS FOR AMBIENT AIR MONITORING ............................................. 37 9.3.1 Consulting services ___________________________________________________________ 37
DVOKUT-ECRO Ltd. Company Profile 9.3.2 IMPLEMENTATION AND MAINTANENCE OF AUTOMATIC MONITORING STATIONS FOR AMBIENT AIR MONITORING _________________________________________________ 38 9.4 EMISSION MEASUREMENT FROM STATIONARY SOURCES ............................................. 38 9.5 LANDFILL GASES TESTING AND REPORT PREPARATION ................................................. 46 9.6 GEOTECHNICAL EXPLORATION WORKS (EXPLORATORY DRILLING) ................................ 48 9.7 WATER SAMPLING AND ANALYSIS ................................................................................. 50 9.8 SOIL SAMPLING AND ANALYSIS ..................................................................................... 50 9.9 BIOLOGICAL AND OCEANOGRAPHICAL EXPLORATION WORKS ...................................... 51 9.10 OTHER EXPLORATION WORKS ....................................................................................... 52 10. POLLUTION PREVENTION, CONTROL AND REMEDIATION (INCL. IPPC DOCUMENTATION) 52 10.1. IPPC DOCUMENTATION ................................................................................................. 52 10.1.1. Strengthening capacities / consulting services __________________________________ 52 10.1.2. Documentation necessary for obtainINg the environmental permit (IPPC) ___________ 53 10.2. DUE DILIGENCE REPORTS AND AUDITS .......................................................................... 54 10.3. INTERVENTION MEASURES PLANS AND SAFETY REPORTS ............................................. 55 10.4. SANATION PROGRAMS, PLANS AND REPORTS ............................................................... 55 10.4.1. Landslide sanation _________________________________________________________ 55 10.4.2. Landfill sanation __________________________________________________________ 56 10.5. OTHER ........................................................................................................................... 56 10.6. REPORTS - EMISSIONS ................................................................................................... 56 11. SERVICES IN THE FIELD OF WASTE MANAGEMENT 56 11.1 CONSULTING SERVICES .................................................................................................. 56 11.2 WASTE MANAGEMENT PLANS/ REPORTS ...................................................................... 56 11.2.1 Waste management plans _____________________________________________________ 56 11.2.2 Waste management reports ____________________________________________________ 57 12 VARIOUS REPORTS, ANALYSES, ENVIRONMENTAL PROTECTION PROGRAMS AND ACTION PLANS 60 12.1 OTHER ENVIRONMENTAL PROTECTION REPORTS (FOR PROJECT THAT ARE NOT LEGALLY OBLIGED TO UNDERGO EIA) ........................................................................ 60 12.2 ENVIRONMENTAL PROTECTION REPORTS FOR PROCURING FINANCING FROM EU FUNDS AND PROGRAMS ............................................................................................ 61
DVOKUT-ECRO Ltd. Company Profile 12.3 ENVIRONMENTAL STATE REPORTS ................................................................................ 62 12.4 ENVIRONMENTAL MANAGEMENT PLANS AND PROGRAMMES ...................................... 62 12.4.1 management plans ___________________________________________________________ 62 12.4.2 FOREST MANAGEMENT PLANS __________________________________________________ 63 12.4.3 Air quality protection and improvement programs _________________________________ 63 12.5 ENVIRONMENTAL PROTECTION PROGRAMS ................................................................. 64 12.6 RISK ASSESSMENTS AND SENSITIVITY REPORTS PREPARATION ..................................... 64 12.7 ENVIRONMENTAL ACTION PLANS .................................................................................. 64 12.8 SPATIAL AND ECOLOGICAL ANALYSES............................................................................ 64 12.9 ANALYSIS OF VISUAL IMPACT / LANDSCAPE STUDIES .................................................... 65 12.10 CLIMATE CHANGE ANALYSIS – IMPACT AND MITIGATION .......................................... 65 13. DESIGN PREPARATION AND ENVIRONMENTAL MONITORING DURING CONSTRUCTION 66 13.1. DESIGN PREPARATION ................................................................................................... 66 13.1.1. Water management infrastructure ___________________________________________ 66 13.1.2. Waste management infrastructure ___________________________________________ 66 13.1.3. Landscape design __________________________________________________________ 67 13.1.4. Other____________________________________________________________________ 67 13.2. ENVIRONMENTAL SUPERVISION DURING CONSTRUCTION ............................................ 68 14. FEASIBILITY STUDIES AND FINANCIAL-ECONOMIC ANALYSES 68 14.1. FEASIBILITY STUDIES ...................................................................................................... 68 14.1.1 Infrastructural projects – traffic sector ___________________________________________ 68 14.1.2 Infrastructural projects – energy sector __________________________________________ 68 14.1.3 Infrastructural projects – waste management _____________________________________ 68 14.1.4 Infrastructural projects – sewerage systems, water structures, irrigation systems and flood protection systems ________________________________________________________ 69 14.1.5 Industrial facilities____________________________________________________________ 70 14.1.6 Tourism sector _______________________________________________________________ 70 14.1.7 Other projects _______________________________________________________________ 70 14.2 COST BENEFIT ANALYSIS (CBA) ...................................................................................... 71 14.2.1 Infrastructural projects – traffic sector ___________________________________________ 71 14.2.2 Infrastructural projects – energy sector __________________________________________ 71 14.2.3 Infrastructural projects – waste management _____________________________________ 71 14.2.4 Infrastructural projects – sewerage systems, water structures, irrigation systems and flood protection systems ________________________________________________________ 71 14.2.5 Industrial facilities____________________________________________________________ 73
DVOKUT-ECRO Ltd. Company Profile 14.2.6 Tourism sector _______________________________________________________________ 73 14.2.7 Other projects _______________________________________________________________ 73 14.3 FINANCIAL ANALYSIS OF WATER UTILITY COMPANIES ................................................... 73 14.4 SOCIAL AND ECONOMIC INDICATORS ANALYSIS AND SERVICE AFFORDABILITY ANALYSIS ................................................................................................................... 75 14.4.1 Infrastructural projects – sewerage systems, water structures, irrigation systems and flood protection systems ________________________________________________________ 75 14.4.2 Tourism sector _______________________________________________________________ 77 14.5 PREPARATION OF EU FUNDING APPLICATIONS ............................................................. 77 14.5.1 Infrastructural projects – sewerage systems, water structures, irrigation systems and flood protection systems ________________________________________________________ 77 14.6 CALCULATION OF WATER SALE, PRODUCTION AND DISTRIBUTION PRICES ................... 78 14.7 PRE-FEASIBILITY STUDY ................................................................................................. 78 15 DEVELOPMENT PROJECTS 78 16 CAPACITY BUILDING, TRAINING, AND EDUCATION 1
DVOKUT-ECRO Ltd. Company Profile 1. INTRODUCTION DVOKUT-ECRO Ltd. is a service provider in the field of environmental and nature protection, based in Zagreb. It is a privately held company, originally established in 1991, and operating under its current name since 1995. Nowadays, DVOKUT-ECRO Ltd. is a renowned company with extensive experience from Croatia and the wider region: Albania, Bosnia and Herzegovina, Bulgaria, Montenegro, Hungary, Macedonia, Slovenia, Serbia, Turkey and Ukraine. Owing to the expertise of its employees and references, DVOKUT-ECRO Ltd. was among the first in Croatia, back in 1997, to fulfil the necessary professional and technical requirements for obtaining the licence to perform professional tasks related to preparation of expert input documents, EIA Screening Reports and EIA Studies from the then the competent authority, the National Directorate for Environmental Protection. That same year, a licence to perform professional tasks of monitoring air quality and emissions into the air as well as other expert tasks related to environmental monitoring was obtained thanks to the modern air quality monitoring equipment, the Mobile Ecologic Laboratory. In the meantime, as the regulations changed, an opportunity to expand the range of services presented itself and consequently licenses to perform other professional activities were obtained - today DVOKUT-ECRO holds 25 different licenses for providing services in the area of environmental and nature protection. Additionally, the Company offers to its Clients preparation of Feasibility studies, Design documentation, due diligence audits and reports. By constant investments in the expert team, which consists of thirty employees, as well as in the most advanced equipment, the company’s area of activity continuously expands and new services that can be offered to private and public clients are being developed. Along with our own expert team, we have developed long-lasting relations with numerous other experts from the region and beyond. Numerous foreign consulting companies have recognized DVOKUT- ECRO Ltd. as a valuable partner for projects in Croatia and other countries in the region. Nowadays, DVOKUT-ECRO Ltd. can boast having excellent cooperation with consulting companies from Austria, Belgium, Bosnia and Herzegovina, Czech Republic, Denmark, France, Italy, Hungary, Netherlands, USA, Slovenia, Serbia, Spain, United Kingdom… DVOKUT-ECRO is one of the founders of the Croatian Business Council for Sustainable Development (CR BCSD) and of the Croatian Association of Experts in Nature and Environmental Protection. The company is also a member of the Cooperative for Ethical Finance, the founder and sole shareholder of the Ethical Bank. 1
DVOKUT-ECRO Ltd. Company Profile 2. SCOPE OF SERVICES DVOKUT-ECRO Ltd. holds valid licenses from the Ministry of Environmental and Nature Protection of the Republic of Croatia to perform various environmental protection services: - Preparation of Strategic Environmental Assessment studies for strategies, plans or programmes including preparation of the documentation necessary for SEA screening and SEA scoping procedures - Preparation of Environmental Impact Assessment studies including preparation of the documentation necessary for EIA screening and EIA scoping procedures - Preparation of chapters or studies for Appropriate Assessments for strategies, plans, programmes or projects - Preparation of documentation necessary for determining the prevailing pubic interest with a suggestion of compensatory measures - Risk and sensitivity estimates for environmental constituents; - Preparation of an Environmental Monitoring Operational Program ; - Preparation of documentation related to the environmental permit issuing process including the drafting of the Core Report; - Preparation of an environmental program; - Preparation of a report on the state of the environment; - Preparation of safety reports; - Development of environmental protection data relating to interventions not subject to environmental impact assessment; - Development of special reports and reports for the assessment of the environmental constituents; - Preparation of remedies, programs and remedial reports; - Preparation of emission projections, policy implementation reports and emission reduction measures and the national climate change report; - Preparation of reports on the inventory of greenhouse gas emissions and other emission of pollutants into the environment; - Preparation and / or verification of special elaborations, budgets and projections for the needs of the constituents of the environment; - Environmental monitoring - Expert consultancy regarding the Environmental Pollution Registry (in Cr oatian: Registar onečišćavanja okoliša - ROO) - Assessment of environmental damage including threats; - Professional services for the Environmental Pollution Registry; - Professional services for the needs of the environmental management system and independent evaluation; - Preparation of documentation for obtaining “Friend of the Environment” environmental protection sign (in Croatian: znak zaštite okoliša “Prijatelj okoliša”) and EU Ecolabel sign 2
DVOKUT-ECRO Ltd. Company Profile - Preparation of a metrological evaluation report for a given product group for the award of the environmental mark "Environmental friend"; - Ambient air monitoring - Monitoring of emissions into air from stationary sources Strategic Environmental Assessment (SEA) and Nature (incl. Natura 2000 network), Environmental Monitoring Environmental Impact Assessment water and sea protection (EIA) SEA screening documentation Requests for a preliminary AA Monitoring Programme preparation SEA scoping documentation (preliminary assessment of acceptability Ambient air quality monitoring (imissions) SEA studies (can include the Natura for the ecological network) Measurements of emissions into air from 2000 Appropriate Assessment AA studies or chapters for strategies, stationary sources chapter) plans, programmes or projects (main Landfill gases testing EIA screening reports (include assessment of acceptability for the Sea current measurements Preliminary Natura 2000 Assessments) ecological network) Scuba-diving biological surveys EIA scoping reports Documentation for establishing the Water / sea water quality analyses EIA studies (can include the Natura overriding public interest with a Marine sediment analyses (mineral, 2000 Appropriate Assessment proposal of compensatory measures granulometric and chemical composition chapter) Studies on risk analysis for species analyses) Reports on compliance with spatial introduction or reintroduction and wild Soil analyses planning documentation, for acquiring species breeding/farming Geotechnical and geological site the Confirmation needed for initiating Reports on project impacts on investigations the EIA procedure waterbody state Reports on calculations of greenhouse Reports on Main design compliance gases emissions and other emissions of with environmental protection pollutants into the environment measures Preparation and / or verification of special reports, calculations and projections regarding environmental components Pollution prevention, control and Various reports, analyses, environmental Waste Management remediation (incl. IPPC documentation) protection programs and action plans Documentation for acquiring the Waste management plans Environmental protection reports (for Environmental Permit in accordance Waste management reports projects that are not obliged to undergo with the IPPC Directive Waste management project designs EIA or EIA screening procedures) Environmental due diligence reports Feasibility studies Special reports on state of individual (EDD) EIA studies or Screening reports environmental components Environmental, health and safety due Documentation for acquiring the Reports on state of the environment diligence reports (EHSDD) Environmental Permit in accordance Environmental protection programs (for Environmental, health and safety and with the IPPC Directive, including the regional and local government) social reports (EHSS) Baseline report (IPPC documentation) Environmental management programs Safety reports Landfill gases testing (EMP) Emergency measures plans ROO consultancy services Environmental and social action plans Assessment of environmental (Environmental Pollution Register) (ESAP) damage, including possible threats Remediation reports, remediation Documentation for obtaining the Remediation reports programs and remediation reviews environmental label “Friend of the Remediation programs Environment” Remediation review Spatial and ecological analyses Visual impact analyses / landscape analyses Analyses of climate change impact and adaptations Project design and environmental Feasibility Studies, financial and economic Capacity building, training and education supervision during construction works analyses Project design in the waste Feasibility studies (FS) preparation Environmental management for local management sector EU funds application preparation government Project design in the water Cost-benefit analyses (CBA) EMAS Seminars management sector Analyses of utility companies Environmental protection in petroleum Landscape designs Analyses of socio-economic indicators industry Other projects Affordability analyses Service of environmental supervision during construction 3
DVOKUT-ECRO Ltd. Company Profile DVOKUT-ECRO Ltd. is implementing several investment projects for which it provided grants from European Structural and Investment Funds in financial period 2014-2020: • InEnPro - Investment in Environmental Protection, KK.03.2.1.05.0171 (September 2017 – September 2019); in accordance with the call for proposals Competence and SME development • Internationalization of DVOKUT-ECRO Ltd. businesses by participation in international fairs, KK.03.2.1.16.0013 (May 2019 - ongoing); in accordance with the call for proposals Internationalization of SMEs - Phase 2 • Improvement of DVOKUT-ECRO Ltd. businesses by investing in information and communication technology, KK.03.2.1.19.0086 (October 2019 – February 2021); in accordance with the call for proposals Improving SMEs competitiveness and efficiency through information and communication technologies (ICT) – 2 4
DVOKUT-ECRO Ltd. Company Profile 3. TEAM OF EXPERTS Marta Brkić, mag. ing. prosp. arch. Director; Project manager / Expert Associate Ines Geci, mag. geol. Head of Department for Environmental and Nature Impact Assessment; Project manager / Expert Associate Mario Pokrivač, expert specialist engineer sec. - environmental Protection, mag. ing. traff. Head of Department for Prevention, Control and Remediation of Pollution; Project manager / Expert Associate mr.sc. Gordan Golja, mag. ing. cheming. Head of Department for Environmental Monitoring; Vodi Project manager / Expert Associate mr.sc. Ines Rožanić, MBA Head of Department for Financial and Economic Analysis; Project manager / Expert Associate Dr.sc. Tomi Haramina, mag.phys., PMP Head of business development department; Project manager / Expert Associate Tajana Uzelac Obradović, mag. biol. Head of Procurement and Contracting; Project manager / Expert Associate Igor Anić, univ. spec. eocoing., mag. ing. geoing. Project manager / Expert Associate Marijana Bakula, mag. ing. cheming. Project manager / Expert Associate mr.sc. Konrad Kiš, mag.ing.silv. Project Manager and Expert Associate; an authorized forestry engineer Daniela Klaić Jančijev, mag.biol. Project manager / Expert Associate Mirjana Marčenić mag. ing. prosp. arch. Project manager / Expert Associate Tomislav Hriberšek, mag. geol. Project manager / Expert Associate Valentina Šimićić, mag. oecc. Project manager / Expert Associate Ivan Juratek, mag. ing. prosp. arch Project manager and Associate Expert, Project Manager-Authorized Landscape Architect Imelda Pavelić, univ. spec. eocoing., mag. ing. agr. Project manager / Expert Associate Tereza Horvat, univ. bacc. oec. Expert Associate Najla Baković, mag. oecol. Expert Associate Vesna Žarak, mag.arch. Expert Associate Vanja Karpišek, mag. ing. cheming., univ. spec. oecoing. Expert Associate Sven Jambrušić, bacc. ing. evol. sust. Apprentice Katja Marković, mag. oecol. et prot nat Apprentice Ema Svirčević, mag.oecol. Apprentice Simon Petrović, mag.geol. Apprentice Tomislav Harambašić, mag. phys. geophys. Apprentice Anja Gselman Stanić, mag. comm. Office Manager 5
DVOKUT-ECRO Ltd. Company Profile 4. QUALITY ASSURANCE To ensure client satisfaction and services consistency, in 2006 the company acquired ISO 9001 and ISO 14001 certificates of international quality management standards. Since 2012 the company has been certified in the system for workplace health and safety management (then OHSAS 18001, now ISO 45001). From 2017., our Company was also certified in information security management system (ISO 27001). Company’s Environmental Monitoring Department is certified by testing laboratories in accordance to the standard HRN EN ISO/IEC 17025: 2017 by the Croatian Accreditation Agency for the area described in the Annex to Accreditation Certificate No. 1232. The company has been awarded the credit rating AAA in accordance with Bisnode credit rating system for 2014, 2015, 2016, 2017., 2018, 2019 and 2020. The company was the first company in Croatia to receive the Assurance Statement over the governance on Corporate Social Responsibility in line with the principles and guidelines set out in ISO 26000: 2010 norm. DVOKUT-ECRO Ltd. has been awarded with "CSR Index" award for achievements in the field of sustainable management in the category of small companies in 2011, 2012, 2016., 2017 and 2018, as well as in category for socials responsible community relations in 2019 and 2020. DVOKUT-ECRO was granted the right to use the trademark "Croatian Quality-Croatian Quality" for the Consulting Services in the Field of Natural Resources and Environmental Protection in 2019. The trademark was awarded by the Croatian Chamber of Economy Council for Visual Labelling for Croatian Products and Services. The right to use the trademark was realized through the project funded by the European Regional Development Fund under the Operational Program Competitiveness and Cohesion 2014-2020. In October 2017, the Company signed the Charter of Diversity. The signing of the Charter commits the signatories to promoting diversity and non-discrimination. DVOKUT-ECRO decided to sign the Charter to continue actively promoting the business cul ture and knowledge exchange with other organizations as well as contributing to the community. 6
DVOKUT-ECRO Ltd. Company Profile 5. LIST OF COMPANY EQUIPMENT AND PROPERTY The company owns its headquarter offices, which are located at Trnjanska 37 in Zagreb. The offices are equipped with all the necessary IT equipment, and we have an extensive library of scientific literature. The company owns two Mobile Ecological Laboratories – MEL, which are attractive, autonomous, modern and multifunctional technical units, intended for quick analysis and environmental assessment. Laboratories are equipped with instruments for measuring concentration of various gases in the air (sulphur dioxide (SO 2), nitric oxide (NO), nitrous oxide (NO 2), carbon monoxide (CO), carbon dioxide (CO 2), ozone (O 3), methane (CH4), hydrogen sulphide (H 2S), benzene, toluene, xylene). These valuable tools are used not only for measuring but also for various environmental protection promotions and educational activities. viad 7
DVOKUT-ECRO Ltd. Company Profile Along with the MEL, DVOKUT-ECRO also owns an oceanographic laboratory. This mobile work station is placed aboard Chris Craft 30' EXPRESS CRUISER boat, which is equipped with all the modern navigation equipment and radar. Research instruments aboard include a seabed classification probe (two frequency instrument, ROXANN GROUNDMASTER GD-X) and a sea current measuring instrument, AAnderaa SeaGuardII DCP, which measures speed and direction of sea currents. Further equipment for research and monitoring of marine environment includes two meteo-oceanographic buoys and a multiparametric probe YSI ProDSS. Buoys are equipped with instruments for measuring air temperature, relative and absolute humidity, barometric pressure, air density, wind speed and direction, and for the sea enviro nment there are probes for measuring temperature, dissolved oxygen, conductivity, salinity, water density, depth, turbidity and phycoerythrin pigment. Investing in these instruments and the vessel enable DVOKUT-ECRO to offer services in oceanographic research and monitoring in marine environment. Having an expert diver team of biologists and the necessary equipment for sea habitats inventarization DVOKUT-ECRO can offer services in marine biology as well. 8
DVOKUT-ECRO Ltd. Company Profile 6. EXPERIENCE Company references listed below are some of the projects that DVOKUT-ECRO team has worked on, which prove an extensive experience of many years acquired through continuous project documentation preparation for various project types (of differ ent scope and complexity) and for various investors. Many of the projects that DVOKUT-ECRO team has worked on were financed by the EU funds, the World Bank, EBRD and foreign Investors. The references listed below are divided into categories by services provided and sector. 9
DVOKUT-ECRO Ltd. Company Profile 7. STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) AND ENVIRONMENTAL IMAPCT ASSESSMENT (EIA) 7.1 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) 7.1.1 STRENGTHENING CAPACITIES / CONSULTING SERVICES 1. “Strengthening Capacities for Strategic Environmental Assessment at Regional and Local Level” Republic of Croatia, EuropeAid/131493/D/SER/HR (2014) 2. Environmental Impact Assessment for Development strategies – implementation of the SEA Directive, project PHARE, Europe Aid/119980/C/SV/HR (2007) 7.1.2 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) STUDY PREPARATION 7.1.2.1 Sectorial strategies / plans / programs 1. Strategic Environmental Assessment strategic documents for the development of inland waterways and ports in the Republic of Croatia, for Ministry of the Sea, Transport and Infrastructure (ongoing) 2. Preparation of a part of the Strategic Study for the National Energy and Climate Plan of Slovenia (2020) 3. Strategic Environmental Assessment for support to the implementation of the association agreement and of the national strategy in the transport sector in the Ukraine, EuropeAid/136284/DH/SER/UA (2019) 4. Strategic Environmental Assessment for Small Hydro Power Development Policy in Albania, a Comprehensive, Climate-Resilient Approach to Sustainable Hydropower for Albania (2017) 5. Strategic Environmental Assessment (SEA) for the Gas Development Master Plan – Priority Project Portfolio Identification in Montenegro – part of project Infrastructure Projects Facility; Technical Assistance 4 (IPF 4); Infrastructures: Energy, Environment, Transport and Social; WB10-MNE-ENE- 01 (2017) 6. Strategic Environmental Assessment for Regional Development Strategy of the Republ ic of Croatia until the end of the year 2020 (2017) 7. Strategic Environmental Assessment for Adriatic Water Resources Management Plan (Bosnia and Herzegovina) (2016) 8. Strategic Environmental Assessment of Northern Croatia integrated public transport Masterplan (2016) 9. Strategic Environmental Assessment for the Climate Change Strategy of Montenegro (EuropeAid/127054/C/SER/multi) (2015) 10. Strategic Environmental Assessment for the Waste Management Plan of Montenegro (EuropeAid/132633/C/SER/multi) (2015) 11. Strategic Environmental Assessment for the Physical planning development Strategy of the Republic of Croatia (2015) 12. Strategic Environmental Assessment of likely significant environmental impacts from Multiannual programme for construction of regulation and protection water infrastructure and melioration infrastructure for the period 2013-2017 (2015) 13. Scoping report for Strategic Environmental Assessment for the Ph ysical planning development Strategy of the Republic of Croatia (2014) 14. Strategic Environmental Assessment for Water Resources Management Plan (2013) 15. Strategic Environmental Assessment of Modernization of Pan-European Corridor X (2010) 16. CARDS 2003: Environmental Assessment of Development Strategies (SEA) (Project No. Europe Aid/119980/C/SV/HR) (2007) 17. SEA Neretva Bay and surrounding Adriatic Sea (Polluters Identification and Assessment) with Master Plan, TEBODIN – Netherlands (2005) 10
DVOKUT-ECRO Ltd. Company Profile 7.1.2.2 Operational Programmes 1. Strategic Environmental Assessment of the Cooperation Programme Slovenia-Croatia 2014-2020 (2015) 2. Strategic Environmental Assessment of the IPA Cross-Border Cooperation Programme Croatia– Bosnia and Herzegovina-Montenegro 2014-2020 (2015) 3. Strategic Environmental Assessment of the Croatia-Serbia IPA Cross-Border Cooperation Programme 2014-2020 (2015) 4. Strategic Environmental Assessment for the Operative Program for maritime affairs and fisheries in the Republic of Croatia for the programming period 2014- 2020 (2015) 5. Strategic Environmental Assessment for the Operative Program for Competitiveness and Cohesion for EU financial period 2014-2020 (2014) 6. Strategic Environmental Assessment for the National Strategic Plan and Operative Program for fisheries of the Republic of Croatia for the programming period 2007-2013 (2013) 7. Strategic Environmental Assessment for Operative Program for Transport for 2012 - 2013 (2012) 8. Strategic Environmental Assessment of Operational Program for Regional Competitiveness 2007- 2013 (2011) 7.1.2.3 Spatial plans 1. Strategic Environmental Assessment with the preparation of the Main assessment of acceptability for the ecological network for IV. amendments to the Spatial Development Plan of the Municipality of Velika Strategic Environmental Assessment for Marine Spatial Plan of Republic of Slovenia (ongoing) 2. Strategic Environmental Assessment for Second Amendments to the Spatial Plan of the Municipality of Končanica (ongoing) 3. Strategic Environmental Assessment for Spatial Plan of area of specific features for Regional centar for waste management (RCWM) Smiljevići, Bosnia and Herzegovina (ongoing) 4. Strategic Environmental Assessment of Changes and Amendments of Vukovarsko-srijemska County Spatial Plan (2020) 5. Strategic Environmental Assessment of Changes and Amendments of Dubrovačko -neretvanska County Spatial Plan (2019) 6. Strategic Environmental Assessment of Changes and Amendments of Primorsko-goranska County Spatial Plan (2018) 7. Strategic Environmental Assessment of Changes and Amendments of the Town Split Spatial plan (2017) 8. Strategic Environmental Assessment of Spatial Plan of Bjelovarsko-bilogorska County (2016) 9. Strategic Environmental Assessment of the Amendments of Spatial Plan of Požeško-slavonska County (2015) 10. Strategic Environmental Assessment of the Spatial Plan of Primorsko – goranska County (2012) 7.1.2.4 Development strategies and plans 1. Strategic Environmental Assessment for the Development Plan of Vukovar-Srijem County for the period from 2021 to 2027 (ongoing) 2. Strategic Environmental Assessment of County Development Strategy for Vukovar Srijem County till year 2020 (2018) 3. Strategic Environmental Assessment of County Development Strategy for Zadarska County till year 2020 (2017) 4. Strategic Environmental Assessment of Zagreb Development Strategy – ZAGREBPLAN 2020+ (2017) 5. Strategic Environmental Assessment of County Development Strategy for Dubrovačko-neretvanska County till year 2020 (2016) 7.1.3 Preliminary strategic environmental assessment (SEA Screening) 1. Preliminary strategical environmental assessment – Changes and Amendmends of the Urban spatial plan of tourism-hotel industry zone Marina Lučica (2019) 2. Preliminary strategical environmental assessment – Changes of the Urban spatial plan Veli Rat (2018) 3. Preliminary strategical environmental assessment - III. Changes and Amendments of the Town Senj Physical plan (2017.) 11
DVOKUT-ECRO Ltd. Company Profile 7.2 ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 7.2.1 Environmental impact assessment (EIA) studies Infrastructure projects – traffic sector Roads 1. EIA for state road junction Bobovica (A3) – Prigorje Brdovečko (D255), length cca 4,3 km (ongoing) 2. EIA for state road junction Gudovec (D12) – Bjelovar (D544), length cca 4 km (ongoing) 3. EIA for planned state road Imotski-Zagvozd, length cca 20 km (ongoing) 4. EIA for section Drvenik-Čvor Ravča, length 12 km (ongoing) 5. EIA for relocation of state road DC 306 to DC 8 on Bili Brig in Zadar, in length 2.5 km (ongoing) 6. EIA for Karlovac West bypass, length=4,00 km (ongoing) 7. EIA for expressway Dubrovnik-Airport (Ćilipi) (ongoing) 8. EIA for relocating part of the state road DC37 in Sisak (approx. length 3 km) (ongoing) 9. EIA for construction of bridge across Sava river by Kratečko and road connection to state road DC 224 (ongoing) 10. EIA for the Hrvatska Kostajnica northern bypass, approx. length 3,5 km (ongoing) 11. EIA for relocation of road D37 in Gora, (2019) 12. EIA for Nedelišća and Pušćina bypass (2019) 13. EIA for the expressway Požega – Pleternica – Brestovac, length approx. 25 km (2018) 14. EIA for relocating part of the state road D8 Makarska-Podgora (2016.) 15. EIA for settlement Janjine bypass, peninsula Peljašac (2015) 16. EIA for settlements Potomje and Pijavično Bypass, peninsula Peljašac, Municipality Orebić (2015) 17. EIA for Knin south bypass (2015) 18. Part of EIA for Petrijevci bypass (2013) – as external experts 19. EIA for Prelog bypass (2012) 20. EIA for expressway – Našice – Pleternica – Lužani (2011) 21. Part of EIA for Bjelovar-Virovitica-Republic of Hungary freeway (2011) – as external experts 22. EIA Hrvatska Kostajnica north bypass (2011) 23. EIA for expressway - south bypass of Kutina, from State Road D45 to County Road Ž31274 (2011) 24. EIA of State Road D219 Reconstruction, section Han-Bosnia and Herzegovina border, total length 12km (2009) 25. EIA of State Road D116 Construction, section Jelsa-Poljica, 1st Subsection (2009) 26. EIA for Donji Miholjac City bypass (2008) 27. Project of development Planning-study documentation for Corridor Vc Highway – EIA of highway construction, LOT1: Svilaj-Doboj Section (2006) 28. EIA of targeted content for state road D60 Lovreć-Imotski, Lovreć (2003) 29. EIA of targeted content for state road D54 Maslenica-Zaton Obrovački, Jasenice (2003) 30. EIA of targeted content for crossroad of state roads D8 and D512 Makarska East reconstruction, Makarska (2003) Railways 1. EIA for modernisation of railway M202 Zagreb GK – Rijeka, section Karlovac – Oštarije (ongoing) 2. EIA for the upgrade of the existing railway track and the construction of the second track of a double-track railway line Križevci-Koprivnica-State Border, EuropeAid/131240/D/SER/HR (2015) 3. EIA of the reconstruction of the Rijeka and Rijeka Brajdica railway stations in relation to the construction of a new container terminal in Rijeka (Zagreb pier) and the expansion of the existing one (Brajdica) (2014) 4. Preparatory EIA for construction of a new railway track Koprivnica – Kotoriba – state border (2014) 5. EIA for reconstruction of main railway M105 Novska – Vinkovci – Tovarnik – State border – Šid, section Novska-Okučani (2010) – part of the project Modernisation of the Pan-European Corridor X in Croatia 6. EIA Railway Gradec - Sveti Ivan Žabno (1997) Airports 1. EIA for Zadar airport reconstruction and additions (2015) 12
DVOKUT-ECRO Ltd. Company Profile 2. EIA for Dubrovnik airport expansion (2014) 3. EIA for airport Stankovci (2012) Sea ports 1. EIA for nautical sea port in Town Ploče (ongoing) 2. EIA for the new operational coastline in Batahovina area of port Dubrovnik (Gruž) (2017) 3. EIA of Local Public Seaport Vrnaža (Šibenik) (2015) 4. EIA of nautical port Šimuni, island of Pag (2013) 5. EIA of nautical port Žut, island of Žut (2011) 6. EIA of nautical port Palmižana, Pakleni otoci (2011) 7. EIA of seaport Tkon, island of Pašman (2011) 8. EIA for sport and recreational purpose port Jadrija, Šibenik (2009) 9. EIA Sport Marina Tkon, Tkon (2006) 10. EIA Seaport Kaštel Sućurac, Kaštel Sućurac (2005) 11. EIA of sport marine Milna, Brač (2004) 12. EIA Local port "Rovanjska", Jasenice (2004) 13. EIA Seaport "Premuda", otok Premuda (2003) 14. EIA Seaport "Kukljica", Kukljica (2003) 15. EIA Seaport “Mul”, Kali (2002) 16. EIA Seaport “Batalaža”, Kali (2002) River ports and navigable waterways 1. EIA for new port Sisak, as a part of the project Technical assistance for Masterplan new port, EuropeAid/130819/D/SER/HR (2015) 2. Part of EIA of rehabilitation of the Sava River Waterway and determining the Sava Regulation line from Rančinovci to Sisak (2009) – as external experts – Study was prepared by VPB d.d. 3. EIA – phase 1: Rehabilitation of the Sava River Waterway to Class IV (2009) 4. EIA – phase 2: Extending the navigation to Sisak, rkm 586,0, to Brežice (2009) 5. EIA – phase 3: Rehabilitation of the Sava River Waterway to Class Va of the Sava River Comission (2009) Infrastructure projects – energy sector 1. EIA with the Main assessment of the acceptability of the project for the ecological network for the wind power plant Vrbnik (ongoing) 2. EIA with the Main assessment of the acceptability of the project for the ecological network for the wind power plant Oton (ongoing) 3. EIA for the gas exploitation ta field Cerić and Berak, pipeline with station for Vermilon Zagreb Exploration (ongoing) 4. ESIA for Dumrea Natural Gas Storage (WB20-ALB-ENE-01), Albania (ongoing) 5. ESIA for Gas pipeline route trough Bosnia and Herzegovina – Southern Gas Interconnector: border with Republic of Croatia-Posušje-Novi Travnik with separate route for Mostar (ongoing) 6. EIA for the Main pipeline Slatina-Velimirovac DN 200/50 (ongoing) 7. ESIA for the Ionian Adriatic Gas Pipeline - Montenegro Section (ongoing) – as a part of a project Western Balkans Investment Framework Infrastructure Project Facility Technical Assistance 6 (IPF6); subproject WB15-REG-ENE-01 Preliminary Design of the Ionian Adriatic Gas Pipeline – Montenegro and Albania Sections 8. ESIA for the Ionian Adriatic Gas Pipeline - Albania Section (ongoing) – as a part of a project Western Balkans Investment Framework Infrastructure Project Facility Technical Assistance 6 (IPF6) ; subproject WB15-REG-ENE-01 Preliminary Design of the Ionian Adriatic Gas Pipeline – Montenegro and Albania Sections 9. Review of ESIA for project Integrated Water and Hydropower Development in the Drina River Basin (2020) 10. Part of EIA of the Main Gas pipeline Lepoglava – Krapina (Đurmanec) DN 250/50 (2019) 11. Part of EIA of the Main Gas pipeline Slatina - Velimirovac DN 200/50 (2019) 12. Part of EIA for MHE Otočac (2018) 13. Part of EIA for Hydro Power Senj2 (2018) 14. Part of EIA for Hydro Power Kosinj (2018) 15. Part of EIA of the International Gas pipeline Kovri – Koper DN 300/50 bar (2017) 16. Part of EIA of the Main Gas pipeline Kozarac-Slobodnica DN 800/75 bar (2015) 13
DVOKUT-ECRO Ltd. Company Profile 17. Part of EIA of the Main Gas pipeline Karlovac – Lučko DN 500/75 bar (2015) 18. Part of EIA of the Main Gas pipeline Bosiljevo- Karlovac DN 700/75 bar (2015) 19. Part of EIA of the Main Gas pipeline Kneginec – Varaždin II DN 300/50 Bar (2014) 20. Part of EIA of the Main Gas pipeline Omanovac - Daruvar DN 150/50 Bar (2014) 21. Part of EIA of the Main Gas pipeline Bosiljevo - Sisak DN 1000/100 bar (2014) 22. Part of EIA of the International Gas pipeline Zagvozd – Imotski - Posušje DN 800/75 bar (2014) 23. Part of EIA of the Gas pipeline Zadvarje - Brela DN 300/75 bar (2014) 24. Part of EIA of the Main Gas pipeline Kozarac - Sisak DN 1000/100 bar (2014) 25. Part of EIA for LNG terminal on Island of Krk (2014) – part of the project Infrastructure Projects Facility Technical Assistance Window (IPF TA) Western Balkans; EuropeAid/128073/C/SER/MULTI; WB5-HR-ENE-01 LNG RV - Conceptual Solution, Feasibility Study and EIA/SIA and Conceptual Design 26. ESIA (Environmental and Social Impact Assessment) of Ionian-Adriatic Pipeline route though Montenegro (2014) – part of the project Infrastructure Projects Facility Technical Assistance Window (IPF TA) Western Balkans; EuropeAid/128073/C/SER/MULTI; WB5-REG-ENE-03 FS and ESIA for the Ionian – Adriatic Pipeline (IAP) 27. Monitoring of ESIA (Environmental and Social Impact Assessment) of Ionian-Adriatic Pipeline route though Albania (2014) – part of the project Infrastructure Projects Facility Technical Assistance Window (IPF TA) Western Balkans; EuropeAid/128073/C/SER/MULTI; WB5-REG-ENE-03 FS and ESIA for the Ionian – Adriatic Pipeline (IAP) 28. Part of EIA of the Main Gas pipeline Donji Miholjac - Belišće DN 400/50 (2014) 29. Part of EIA of the Main Gas pipeline Zlobin – Bosiljevo DN 1000/100 bar (2013) 30. Part of EIA of the Main Gas pipeline Lička Jasenica - Bihać DN 500/75 bar (2012) 31. Part of EIA of the Main Gas pipeline Donji Miholjac – Osijek DN 800/75 bar (2012) 32. Part of EIA of Main Gas pipeline Ploče – Dubrovnik DN 1000/75 Bar (2012) 33. Part of EIA of the Main Pipeline Dubrovnik – Prevlaka – Dobrec (CG) DN 1000/75 bar (2012) 34. Part of EIA of the Gas Pipeline System of Central and Eastern Croatia, the Main Gas Pipeline Osijek- Vukovar (2011) 35. Part of EIA of the Main Pipeline Zlobin – Rupa DN 1000/100 bar (2011) 36. Part of EIA of the Gas Pipeline System of Central and Eastern Croatia, the Main Gas Pipeline Vukovar-Negoslavci DN 800/75 bar (2010) 37. Part of EIA of the Main Pipeline Slobodnica – Sotin DN 1000/75 bar (2010) 38. Part of EIA of Lika-Dalmatia Gas Pipeline System - Main Gas Pipeline Split-Ploče (2009) 39. Part of EIA of the Main Pipeline Kukuljanovo-Omišalj DN 500/100 bar (2009) 40. Part of EIA of the Main Pipeline Kutina-Dobrovac DN 200/50 bar (2009) 41. Part of EIA of the Gas Pipeline System of Central and Eastern Croatia, the Main Pipeline Slobodnica- Bosanski Brod (2009) 42. Target Content EIA of Mini-Hydro Electric Power Plant Pleternica (2008) 43. EIA for Biodiesel production plant, Beli Manastir (2008) 44. Part of Target Content EIA of the Main Gas Pipeline Vodnjan-Umag (2007) 45. EIA Wood Biomass Cogeneration Facility - Strizivojna Hrast (2007) 46. Part of Target content EIA of the Gas Pipeline Supply System of Lika and Dalmatia, 1st section Podrebar - Josipdol (2007) 47. Part of Target content EIA of the Gas Pipeline Supply System of Lika and Dalmatia, 2nd section Josipdol - Gospić (2007) 48. Part of Target content EIA of the Gas Pipeline Supply System of Lika and Dalmatia, 3rd section Gospić - Benkovac (2007) 49. Part of Target content EIA of the Gas Pipeline Supply System of Lika and Dalmatia, 4th section Benkovac - Split (2007) 50. Target content EIA of the exploitation field closure and rehabilitation of the natural gas exploitation field Veliki Otok (2004) 51. EIA Wind Power Plant "Ravna 1", Pag (2001) 52. EIA Plomin I/II – thermal power plant (1997) Infrastructure projects – waste management 1. ESIA (Environmental and Social Impact Assessment) of Landfill and Energy from Waste facility at site Vinča, Beograd, Srbija (2019) 2. EIA for Našicecement d.d. for disposal of multiple types of waste (2019) 3. EIA for treatment of hazardous and non-hazardous medical waste by steam sterilization, Remondis Medison d.o.o., Jastrebarsko (2019) 4. EIA of Landfill Diklo Remediation, Zadar (2016) 14
DVOKUT-ECRO Ltd. Company Profile 5. EIA of Landfill "Sozanj" Remediation, Municipality of Lastovo (2010) 6. EIA of Landfill "Trema-Gmanje" Remediation and Closure, Municipality of Sv. Ivan Žabno (2010) 7. EIA of Sanitary Landfill "Stražbenica", Gračac (2010) 8. EIA of Sanitary Landfill "Jezero", Plaški (2009) 9. EIA for Remediation and Continuous Operation of Landfill "Sodol", Ogulin (2007) 10. Target Content EIA of Sanitary Landfill "Barutana", Jasenovac (2007) 11. Elaborate for EIA of Remediation and Extension of Sanitary Landfill Ramići (2007) 12. EIA & Construction Project of Sanitary Landfill "Cetin", Vrbovsko (2007) 13. EIA & Construction Project of Sanitary Landfill "Ćore", Dvor (2007) 14. EIA of Sanitary Landfill "Zarabaniž", Kali (2007 15. Target Content EIA of Sanitary Landfill "Dočić", Sali (2006) 16. Target Content EIA of Sanitary Landfill "Šljukine Njive", Pirovac (2006) 17. Target Content EIA of Sanitary Landfill "Kik", Lovinac (2006) 18. Target Content EIA of Sanitary Landfill "Jelenik-Macure", Kistanje (2006) 19. Elaborate for EIA of 2nd Phase Construction of Salg and Ash Landfill „Jezero II", TE Tuzla (2006) 20. EIA of Sanitary Landfill Veliki Grđevac, Veliki Grđevac (2006) 21. EIA of Sanitary Landfill "Ćojluk", Udbina (2006) 22. EIA of Sanitary Landfill "Dolci", Stari Grad (2006) 23. EIA of Sanitary Landfill "Jagodnja gornja", Polača (2006) 24. EIA of Sanitary Landfill "Prapatna", Jelsa (2006) 25. EIA of Sanitary Landfill "Stanišće", Hvar (2006) 26. EIA of Sanitary Landfill "Ledine", Đelekovec (2006) 27. EIA of Sanitary Landfill "Ćuić brdo", Rakovica (2006) 28. EIA of Sanitary Landfill "Novi Dvori", Grad Zaprešić (2006) 29. EIA of Sanitary Landfill "Peski", Đurđevac (2006) 30. EIA of Sanitary Landfill Teleš, Općina Drnje (2006) 31. EIA of Sanitary Landfill Torčec-Rudičevo, Općina Drnje (2006) 32. EIA of Sanitary Landfill „Đurđenovac“, county Đurđenovac (2006) 33. EIA of Sanitary Landfill "Vidovac", Karlobag (2006) 34. EIA of Sanitary Landfill Donja Dubrava, Donja Dubrava (200 6) 35. EIA of Sanitary Landfill Novigrad, Novigrad (2005) 36. EIA for Collection, Storage and Pre-processing of Hazardous Waste "Nacional", Bjelovar (2004) 37. EIA Wastes dump Gornji Kneginec (2001) 38. EIA Hospital waste Incinerator – Opća bolnica Zadar (2001) 39. EIA Factory for animal waste treatment “Viljevo” (1999) 40. EIA Agroproteinka, Sesvetski Kraljevec (1999) Infrastructure projects – water management (sewerage systems, water facilities, irrigation systems, floods protection facilities/ systems) 1. EIA for the project of improving the water utility infrastructure of the agglomeration of Kostrena (Bakar-Kostrena) for co-financing from EU funds (in progress) 2. Part of EIA for construction of retention Reka-Donja Stubica (ongoing) 3. Part of EIA for EU flood protection project of Plitvice (ongoing) 4. Part of EIA for EU flood protection project of Rječina river basin (ongoing) 5. Part of EIA for EU flood protection project of Krapina river basin (ongoing) 6. Part of EIA for EU flood protection project of Karašica – Vučica river basin (ongoing) 7. EIA for multipurpose hydrotechnical system Osijek (ongoing) 8. EIA for the irrigation system of Bunina, Vrgorac (2019) 9. Part of EIA for EU flood protection project of Bednja river basin (2018) 10. EIA for the irrigation system of Vransko polje (2018) 11. EIA for the irrigation system of Imotsko polje (2016) 12. EIA for the irrigation system of Bekijsko polje (Bosnia and Herzegovina) (2016) 13. EIA for sewerage system and WWTP for the Split-Solin agglomeration (2016) 14. EIA for irrigation system of Baranja area (2013) 15. EIA for sewerage system and WWTP for the Čakovec agglomeration (2012) 16. EIA for Storage Lake Dubovnik construction (2010) 17. EIA for Storage Lake Breznica construction (2010) 18. EIA for WWTP for the Town of Hvar (2007) 19. EIA Water Supply, Sewerage System and WWTP for the City of Knin (2007) 15
DVOKUT-ECRO Ltd. Company Profile 20. Revision of the EIA Water Supply, Sewerage System and WWTP for the City of Drniš (2007 ) 21. EIA of Sewerage System for the city of Šibenik (2000) 22. EIA Water pumping site Šibice (1999) Farms 1. EIA for fish farm on location near island Maun (Pag, zone Z2 of physical plan), targeted breeding capacity up to 6,000 t / g (ongoing) 2. EIA of a Chicken Farm Luneta, Municipality of Sv. Đurđ (2013) 3. Part of EIA of a Poultry Farm EKO Kotor, Municipality of Kotoriba (2012) 4. EIA of Pig Farm Sokolovac (2011) 5. EIA of Pig Farm Gaj (2011) 6. EIA of Pig Farm Haljevo (2011) 7. EIA of Reconstruction of the Pig Farm Čeretinci 1 (2009) 8. EIA of Reconstruction of the Pig Farm Andrijaševci 1 (2009) 9. EIA of Reconstruction of the Pig Farm Podlugovi (2009) 10. EIA for a hatchery, Sućuraj (2007) 11. EIA of Reconstruction of Pig Farm Kozarac (2007) 12. EIA of Cow farm Hlebine (2006) 13. Target Content EIA of Chicken Farm "Patek" Upgrade (2005) 14. Target Content EIA for Construction of New Chicken Farm on Existing Facilities of "Sveta Marija" Chicken Farm, Sveta Marija (2005) 15. Target Content EIA for Construction of New Chicken Farm on Existing Farm "Slakovec", Nedelišće (2004) 16. EIA of Chicken Farm "Gospodarstvo Štefičar", Orehovica (2003) 17. EIA Chicken Farm "Bujanić", Čakovec (2003) 18. EIA of Chicken Farm "Mika", Čakovec (2002) 19. EIA for Repurposing Heifer Farm into Turkey Farm "Delovi", Municipality of Novigrad Podravski (2002) 20. EIA of Chicken Farm Petrijevci (2002) 21. EIA of Chicken Farm Stanetinec, Štrigova (2001) 22. EIA Chicken Farm Reka, Koprivnica (2001) 23. EIA Chicken farm Mačkovec, Čakovec (2001) 24. EIA Chicken farm Borje – Kalnik (2001) 25. EIA Chicken farm Bojnikovec (2001) 26. EIA Chicken farm “Sračinec”, Varaždin (2000) Raw materials and geothermal water exploitation 1. EIA for expansion of the existing exploitation field “Straža”, Municipality of Đurmanec (ongoing) 2. EIA for Quarry “Tusto Brdo”, island Hvar (ongoing) 3. EIA for Exploitation of technical-construction stone at the extended Mrkovac quarry (2014) 4. Part of EIA for Exploitation of technical-construction stone at the Veprštak quarry (2014) 5. Part of EIA for architectonic-construction and technical-construction stone at the future quarry Nada in Municipality Unešić (2013) 6. Part of EIA for Exploitation of technical-construction stone at the future Zapužane - Zdrug quarry in Municipality Polača (2012) 7. EIA for Exploitation of geothermal water at Velika ciglena exploitation field (2012) 8. EIA for Exploitation of technical-construction stone at the extended Gradišće quarry (2012) 9. EIA for Exploitation of technical-construction stone at the Giletinci quarry (2012) 10. EIA of Raw mineral exploitation for industrial processing and construction stone production on exploitation field "Kruševo", Obrovac (2010) 11. EIA of Quarry “Tusto Brdo”, Stari Grad (2009) 12. EIA of Carbon Raw Material Exploitation on Exploitation Field "Zut -Klašnice", Dvor (2008) 13. EIA of Plaster Quarry “Stipanovića greben - zapad”, Sinj (2008) 14. EIA of Quarry “Vojnić Breg”, Bedekovčina (2008) 15. EIA Quarry «Sv. Križ Rudomar» , Tuhelj (2007) 16. EIA of Brick Clay Exploitation on Exploitation Field "Tomašanci" (2007) 17. EIA of Quarry Gradišće, Žminj (2006) 18. EIA of Quarry „Pleterac“, Town of Čazma (2006) 16
DVOKUT-ECRO Ltd. Company Profile 19. EIA of Quarry "Sandarovo", Municipality of Kanfanar (2006) 20. EIA of Quarry Široko brdo - Vrata, Fužine (2006) 21. EIA of exploitation field of brick clay "Donja Čemernica - Gajevi", Municipality of Topusko (2005) 22. EIA of Quarry Križarovica, Gračišće (2005) 23. EIA of Quarry, asphalt base and concrete production plant "Straža - Vinceli", Municipality of Đurmanec (2004) 24. EIA of Quarry Podbadanj, Crikvenica (2004) 25. EIA Quarry “Tapanjska glava” , Perušić (2004) 26. EIA Quarry Lamjana, Ugljan (2003) 27. EIA Gravel pit “Sekuline”, Molve (2002) 28. EIA Quarry Gravanaća, Bibići (2002) 29. EIA Quarry Vršine, Baderna (2002) 30. EIA Quarry "Mrkovac", Mrkopalj (2001) 31. EIA Gravel Plant "Jamičak", Sv. Đurđ (2001) 32. EIA Gravel plant “Šibak”, Rugvica (2000) 33. EIA Quarry “Rakalj”, Pula (2000) 34. EIA Gravel pit Vukovina (1999) 35. EIA Gravel plant "Zajarki", Zaprešić (1999) 36. EIA of the quarry " Hrvatsko Selo ", Topusko, (1998) 37. EIA of the Quarry "Belski Dol-Gornji", (1997) Tourism sector 1. EIA for a sports and recreation centre within detailed spatial plan „Jezero-Ružica Grad- Hercegovac“, Orahovica (2013) 2. EIA of cableway Skrad-Zeleni Vir (2005) 3. EIA of Tourist Zone Saladinka-Sv. Martin, Poreč (2004) 4. EIA Ski yard «Bijela kosa – Pakal», Vrbovsko (2004) 5. EIA Golf playground, Tourist village & Marine “Porto Mariccio”, Barbariga (2002) 6. EIA of Reconstruction of Stonemin Podrola into Tourist Zone and Marina Rakalj-Sv. Agneza", Municipaliti of Marčana (2002) 7. EIA Tourist village "Alberi", Savudrija (2001) 8. EIA Tourist village Pineta Valbandon, (1999) Industrial plants 1. EIA for expansion of existing hazardous and non-hazardous waste management facilities at Našicecement d.d. (ongoing) 2. EIA for reconstruction (upgrading) of an old paper processing site with capacity increasing of the plant - DS Smith Belišće Croatia Ltd. (2019) 3. EIA for copper wire production line, EUROCABLE GROUP, Municipality Jakovlje (2017) 4. EIA for changes to the existing brickyard facility Cerje Tužno Ltd., Municipality Markuševec (2014) 5. EIA for the Reconstruction of Existing Facility - Construction of Additional Facilities, Adaptation of Facilities for Metal Processing, Vodnjan (2008) 6. EIA of Spring Water Factory Brušane, Gospić (2008) 7. EIA & Construction Project of Reconstruction of polyethylene factory, Omišalj (2008) 8. EIA for PS-E facility at the location of DINA Petrokemija d.d., Omišalj (2008) 9. EIA for Production line for wood products, Otok Oštarijski (2008) 10. EIA for explosive production and storage facilities, Glina (2007) 11. EIA of Cattle Feed Factory reconstruction, Belje d.d. (2007) 12. EIA of Wood Production Facilities, DI Spačva Inc., Vinkovci (2007) 13. EIA of Briquette Production Line in Production Facility Istarska ciglana Inc., Borut (2006) 14. EIA for Appliance of Alternative Fuel in Production Facilities of ITV Ltd., Most Raša (2006) 15. Target Content EIA of Facilities for Thermal Wood Processing - Boiler Facility and Dry-kiln, Belišće Inc. Wood Processing Company (2005) 16. EIA of Plaster and Glue Production Facilities ITV Ltd, Most Raša (2005) 17. EIA for Fruit, Vegetables and Drinks Production Facilities, Lipovac Inc. (2003) 18. EIA Food processing industry PURIS d.d., Pazin (2003) 19. EIA Leather factory "Duma – kože" d.o.o., Sesvetski Kraljevec (2001) 20. EIA Zinc manufacture in Dugo Selo (2000) 17
You can also read