FY 2016 - 2020 Capital Improvement Program
                                                                         Water System

                                                                          Total   Appropriated                                                     Proposed
                                                                      Estimated       Through      Adopted    Proposed    Proposed    Proposed      FY 2020
                                                                          Costs       FY 2015      FY 2016     FY 2017     FY 2018     FY 2019   and Beyond
Priority Description

  1     Distribution Mains FY 2015 - 2020 (1001)                    18,578,506      2,793,506    2,270,000   3,015,000   3,500,000   3,500,000   3,500,000
  2     Meters and Services FY 2015 - 2020 (1002)                   10,150,344      1,520,344    1,070,000   1,560,000   2,000,000   2,000,000   2,000,000
  3     Customer Driven Meters and Services FY 2015 - 2020 (1003)    6,995,893      1,265,893     930,000    1,200,000   1,200,000   1,200,000   1,200,000
  4     Fire Protection System Improvements FY 2015 - 2020 (1019)    8,267,448      2,035,248     210,000    1,290,000   1,577,400   1,577,400   1,577,400
  5     Upgrade Well Pumps, Booster Pumps, Switchgears and           3,980,566      1,480,566           0     950,000     750,000     400,000      400,000
        Meters FY 2015 - 2020 (1020)
  6     Reservoir Improvements FY 2015 - 2020 (1037)                12,116,365       696,365      820,000     600,000    2,000,000   7,000,000   1,000,000
  7     Miscellaneous Water System Improvements FY 2015 - 2020       2,263,072       323,072      340,000     400,000     400,000     400,000      400,000
        (1006)
  8     Management Information Systems - Water and Power               726,564       451,564            0     100,000      75,000      50,000       50,000
        Department FY 2015 - 2020 (1025)
  9     Sunset Perchlorate Treatment Plant FY 2015 - 2020 (1062)     1,189,959       669,959      220,000     150,000      50,000      50,000       50,000
 10     Well Collector Pipelines (1044)                             12,609,718     12,609,718           0           0           0           0            0
 11     Arroyo Spreading Basins and Intake Structures (1040)        10,590,370      2,222,870    1,620,000   6,000,000    700,000      35,000       12,500
 12     Recycled Water (1013)                                       17,885,564     13,885,564           0    1,000,000   1,000,000   1,000,000   1,000,000
 13     Enterprise Resource Plan (ERP) - Water System (1072)           638,244       380,618      199,405      58,221           0           0            0
 14     Customer Information System (1011)                           2,589,585       965,585            0     650,000     550,000     224,000      200,000
 15     Water and Power Warehouse Modernization (1056)               1,769,047      1,769,047           0           0           0           0            0
 16     Water Telemetry and On-Line Water Quality Detectors FY         374,398       154,398       20,000      50,000      50,000      50,000       50,000
        2015 - 2020 (1034)
 17     Geographic Information System - Water and Power              1,028,903       703,903            0     100,000      75,000      75,000       75,000
        Department (1009)
 18     Field Service Automation (1012)                                538,678       318,678            0      55,000      55,000      55,000       55,000
 19     Monk Hill Perchlorate Treatment Plant (1063)                 4,655,148      3,005,148           0     500,000     200,000     450,000      500,000
 20     Radio Equipment Replacement (1065)                           1,102,827      1,052,827           0      25,000      25,000           0            0
 21     Interactive Voice Response System (IVR) (1016)                 302,101       220,851            0      25,000      18,750      18,750       18,750
 22     Devil's Gate Tunnels (1043)                                    391,278       351,278            0      10,000      10,000      10,000       10,000
 23     Facility Security Systems (1054)                             1,172,636       372,636            0     300,000     400,000      50,000       50,000

                                                                           15 - Summary
WATER SYSTEM - PINOCCHIO GETS EATEN BY A WHALE - City of Pasadena
FY 2016 - 2020 Capital Improvement Program
                                                                       Water System

                                                                        Total   Appropriated                                                        Proposed
                                                                    Estimated       Through      Adopted     Proposed     Proposed     Proposed      FY 2020
                                                                        Costs       FY 2015      FY 2016      FY 2017      FY 2018      FY 2019   and Beyond
Priority Description

 24       New Well Projects (Conjunctive Use) (1021)               3,275,880       275,880            0       85,000     2,915,000           0            0
 25       Water Quality Treatment (1041)                             394,459       394,459            0            0            0            0            0
 26       Enterprise Content Management System (1071)                 97,300         97,300           0            0            0            0            0
      Total                                                      123,684,853     50,017,277    7,699,405   18,123,221   17,551,150   18,145,150   12,148,650

                                                                         15 - Summary
WATER SYSTEM - PINOCCHIO GETS EATEN BY A WHALE - City of Pasadena
FY 2016 - 2020 Capital Improvement Program
                                                                         Water System
                                                              Distribution Mains FY 2015 - 2020
                                                                            1001

Priority Project No. Description                                             Total     Appropriated                                                                  Proposed
                                                                         Estimated         Through          Adopted       Proposed       Proposed     Proposed        FY 2020
    1      1001      Distribution Mains FY 2015 - 2020
                                                                             Costs         FY 2015          FY 2016        FY 2017        FY 2018      FY 2019     and Beyond

          Water Fund                                                   18,578,506        2,793,506       2,270,000      3,015,000      3,500,000     3,500,000      3,500,000
          Total                                                        18,578,506        2,793,506       2,270,000      3,015,000      3,500,000     3,500,000      3,500,000
                                                                     DESCRIPTION: This project provides for the installation of both new and replacement water
                                                                     distribution mains at various locations throughout the City. Work includes installation of new gate
                                                                     valves, water services, fire hydrants, and asphalt or concrete patching/resurfacing of the trenches as
                                                                     required by code. The actual amount of pipe installed can vary due to size and complexity of
                                                                     projects. There are approximately 500 miles of water distribution mains in the system. The average
                                                                     life expectancy of a water main is between 80 and 100 years. The goal of this project is to replace
                                                                     all water distribution and fire protection mains every 80 to 100 years, or as required.

                                                                     JUSTIFICATION: New and replacement distribution mains are required to fulfill increased
                                                                     service demand, capacity needs, and upgrades to aging infrastructure to ensure system operating
                                                                     efficiency. This project will ensure adequate water for fire protection in accordance with public
                                                                     safety requirements.

                                                                     SCHEDULE: The goal is to install three miles of new distribution and fire protection mains
                                                                     including installation/repair of 100 gate valves, water services, fire hydrants and related asphalt or
                                                                     concrete patching/resurfacing of trenches as required by code. The actual amount of pipe installed
                                                                     can vary due to size and complexity of projects. The goals and amount of cash flow requested is
                                                                     needed to meet the workplan goals for each fiscal year.

                                                                     RELATIONSHIP TO GENERAL PLAN: This project is consistent with Public Facilities
                                                                     Element of the General Plan by helping to achieve a high level of maintenance for existing
                                                                     facilities.

                                                                     IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena
                                                                     which is an area targeted for revitalization.

                                                                     HISTORY: This is an ongoing project that was created before 1980. The project was segmented
                                                                     into a multi-year phase starting in FY 2012. This is the new phase of this project for FY 2015 -
                                                                     2020.

                                                                                                                                     Responsible Department:
                                                                                15.1                                                 Water and Power Department
WATER SYSTEM - PINOCCHIO GETS EATEN BY A WHALE - City of Pasadena
FY 2016 - 2020 Capital Improvement Program
                                                                     Water System
                                                          Meters and Services FY 2015 - 2020
                                                                         1002

Priority Project No. Description                                          Total     Appropriated                                                                 Proposed
                                                                      Estimated         Through          Adopted      Proposed       Proposed     Proposed        FY 2020
  NEW      1002      Meters and Services FY 2015 - 2020
                                                                          Costs         FY 2015          FY 2016       FY 2017        FY 2018      FY 2019     and Beyond

          Water Fund                                                10,150,344        1,520,344       1,070,000      1,560,000     2,000,000      2,000,000     2,000,000
          Total                                                     10,150,344        1,520,344       1,070,000      1,560,000     2,000,000      2,000,000     2,000,000
                                                                  DESCRIPTION: This project provides for the installation of new water meters and services
                                                                  throughout the City. Work included in this project involves the replacement of worn-out meters,
                                                                  services, meter vaults, boxes, and steel plate covers, as needed. The installation of new automatic
                                                                  meter readers (AMR) is expected to end in FY 2016. Beginning FY 2017, the installation of new
                                                                  advanced metering infrastructure (AMI) systems and meters (Smart Meters) will begin. Additional
                                                                  meters will continue to be replaced on an as-needed basis. Installation of AMI meters will upgrade
                                                                  the technology available to the customer for monitoring their water use and will improve the
                                                                  method of collecting meter data for billing. The repair or replacement of steel plates and/or vaults
                                                                  will continue on an as needed basis.

                                                                  JUSTIFICATION: Upgrading the water metering technology will benefit the customer by
                                                                  allowing them greater access to their water use data. Enhancements to the billing system will also
                                                                  be realized. The replacement of old and non-functioning water meters, services, meter vaults,
                                                                  boxes, and covers is necessary to meet customer demand and provide a safe and efficient city
                                                                  infrastructure. Repair or replacement of steel plates and/or vaults have been included for the safety
                                                                  of pedestrians.

                                                                  SCHEDULE: Focus in FY 2016 will be on the installation of 2,000 small and 100 large AMR
                                                                  meters. An outside contractor may be used to install small meters. Additional work in FY 2016
                                                                  will include the installation of 200 new services and the replacement of approximately three meter /
                                                                  vault plate covers. The replacement of small meter box covers is expected to begin in FY 2016.
                                                                  The amout of cashflow requested is needed to meet the workplan goals of FY 2016.

                                                                  RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                  Element of the General Plan by helping to achieve a high level of maintenance for existing
                                                                  facilities.

                                                                  HISTORY: This is an ongoing project that was created before 1980. The project was segmented
                                                                  into a multi-year phase starting in FY 2012. This is the new phase of this project for FY 2015 -
                                                                  2020.

                                                                                                                                 Responsible Department:
                                                                             15.2                                                Water and Power Department
WATER SYSTEM - PINOCCHIO GETS EATEN BY A WHALE - City of Pasadena
FY 2016 - 2020 Capital Improvement Program
                                                                   Water System
                                                 Customer Driven Meters and Services FY 2015 - 2020
                                                                       1003

Priority Project No. Description                                             Total    Appropriated                                                                Proposed
                                                                         Estimated        Through         Adopted       Proposed       Proposed   Proposed         FY 2020
    3      1003      Customer Driven Meters and Services FY 2015 -
                                                                             Costs        FY 2015         FY 2016        FY 2017        FY 2018    FY 2019      and Beyond
                     2020

          Aid to Construction (Water)                                   6,995,893       1,265,893         930,000     1,200,000      1,200,000    1,200,000      1,200,000
          Total                                                         6,995,893       1,265,893         930,000     1,200,000      1,200,000    1,200,000      1,200,000
                                                                     DESCRIPTION: This project provides for the installation of new water meters, services, and
                                                                     mains as requested by customers and developers throughout the City. It also includes new fire
                                                                     hydrants and other requirements from the Fire Department for new building/development projects.

                                                                     JUSTIFICATION: Meeting customer and developer requests for new meters and services is an
                                                                     important priority in providing water service. Work is done in conjunction with the Fire
                                                                     Department requirements.

                                                                     SCHEDULE: PWP will install mains, meters, and services for customers upon request and at
                                                                     customers' expense.

                                                                     RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                     Element of the General Plan by helping to provide a high level of service and greater work
                                                                     productivity by using available technology.

                                                                     HISTORY: This project was originally created and received initial funding in FY 2007. The
                                                                     project was segmented into a multi-year phase starting in FY 2012. This is the new phase of this
                                                                     project for FY 2015 - 2020.

                                                                                                                                   Responsible Department:
                                                                               15.3                                                Water and Power Department
WATER SYSTEM - PINOCCHIO GETS EATEN BY A WHALE - City of Pasadena
FY 2016 - 2020 Capital Improvement Program
                                                                            Water System
                                                        Fire Protection System Improvements FY 2015 - 2020
                                                                                1019

Priority Project No. Description                                               Total     Appropriated                                                                Proposed
                                                                           Estimated         Through         Adopted       Proposed       Proposed    Proposed        FY 2020
    4      1019      Fire Protection System Improvements FY 2015 -
                                                                               Costs         FY 2015         FY 2016        FY 2017        FY 2018     FY 2019     and Beyond
                     2020

          Water Fund                                                      8,267,448        2,035,248         210,000     1,290,000      1,577,400     1,577,400     1,577,400
          Total                                                           8,267,448        2,035,248         210,000     1,290,000      1,577,400     1,577,400     1,577,400
                  Fire Protection System Improvements                  DESCRIPTION: This project provides for the installation of both new and replacement water
                                                                       distribution mains as necessary to sustain current fire protection requirements at various locations
                                                                       throughout the City. Work includes installation of new fire hydrants, gate valves, services, and
                                                                       asphalt/concrete patch/resurfacing as required by code. New developments will pay for required
                                                                       new mains. When mains are installed anticipating a future development, special connection charge
                                                                       and/or front footage charges are assessed and collected from property developers as covered under
                                                                       project #1003.

                                                                       JUSTIFICATION: This project will ensure adequate water for fire protection in accordance with
                                                                       public safety requirements.

                                                                       SCHEDULE: The goal is to install three miles of new distribution mains including installation /
                                                                       repair of 100 gate valves and asphalt / resurfacing as needed. Total miles installed will include CIP
                                                                       projects 1001, 1019 and 1063. The amount of cash flow requested for each CIP project is needed
                                                                       to meet the workplan goal for water distribution main installations in FY 2016. The actual amount
                                                                       of pipe installed may vary due to size and complexity of projects.

                                                                       RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                       Element of the General Plan by helping to ensure adequate water for fire protection.

                                                                       HISTORY: This is an ongoing project that was created before 1980. The project was segmented
                                                                       into a multi-year phase starting in FY 2012. This is the new phase of this project for FY 2015 -
                                                                       2020.

                                                                                                                                      Responsible Department:
                                                                                  15.4                                                Water and Power Department
WATER SYSTEM - PINOCCHIO GETS EATEN BY A WHALE - City of Pasadena
FY 2016 - 2020 Capital Improvement Program
                                                                 Water System
                                    Upgrade Well Pumps, Booster Pumps, Switchgears and Meters FY 2015 - 2020
                                                                     1020

Priority Project No. Description                                      Total     Appropriated                                                               Proposed
                                                                  Estimated         Through         Adopted      Proposed       Proposed    Proposed        FY 2020
    5      1020      Upgrade Well Pumps, Booster Pumps,
                                                                      Costs         FY 2015         FY 2016       FY 2017        FY 2018     FY 2019     and Beyond
                     Switchgears and Meters FY 2015 - 2020

          Water Fund                                             3,980,566        1,480,566               0      950,000        750,000      400,000        400,000
          Total                                                  3,980,566        1,480,566               0      950,000        750,000      400,000        400,000
                                                              DESCRIPTION: This project provides for the upgrading or replacing of older and less efficient
                                                              well and booster pumps, meters, and obsolete and outdated switchgears.

                                                              JUSTIFICATION: Some of the existing well and booster pumps and meters are old and
                                                              inefficient. Some of the switchgears are also old and may not meet current codes. Greater operating
                                                              reliability and efficiencies will be realized by these upgrades.

                                                              SCHEDULE: In FY 2016, design is expected to start on the upgrades to the Santa Anita Booster
                                                              Station. Additionally, rehabilitation of the Monte Vista Well is expected to be completed. Other
                                                              well, booster pump, meters and switchgear will be upgraded as required.

                                                              RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                              Element of the General Plan by helping to maintain a high level of service through more efficient
                                                              operation of our equipment.

                                                              IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena
                                                              which is an area targeted for revitalization.

                                                              HISTORY: This project was created and received initial funding in FY 1994. The project was
                                                              segmented into a multi-year phase starting in FY 2012. This is the new phase of this project for FY
                                                              2015 - 2020.

                                                                                                                            Responsible Department:
                                                                         15.5                                               Water and Power Department
WATER SYSTEM - PINOCCHIO GETS EATEN BY A WHALE - City of Pasadena
FY 2016 - 2020 Capital Improvement Program
                                                                    Water System
                                                       Reservoir Improvements FY 2015 - 2020
                                                                        1037

Priority Project No. Description                                         Total     Appropriated                                                                Proposed
                                                                     Estimated         Through         Adopted       Proposed       Proposed     Proposed       FY 2020
    6      1037      Reservoir Improvements FY 2015 - 2020
                                                                         Costs         FY 2015         FY 2016        FY 2017        FY 2018      FY 2019    and Beyond

          Water Fund                                               12,116,365          696,365         820,000       600,000      2,000,000     7,000,000      1,000,000
          Total                                                    12,116,365          696,365         820,000       600,000      2,000,000     7,000,000      1,000,000
                                                                 DESCRIPTION: This project will provide for major repairs and upgrades to the City's 15 existing
                                                                 water tanks and reservoirs. Most of the tanks and reservoirs are over 60 years old. Examples of the
                                                                 repairs and upgrades may include replacement of reservoir roofing, lining the reservoir floor with
                                                                 hypaton liners, changing old outlet and inlet valves, seismic upgrades, and replacement of structural
                                                                 supports.

                                                                 JUSTIFICATION: The reservoir repairs will improve overall reservoir integrity, seismic stability,
                                                                 and reduce or eliminate leaks.

                                                                 SCHEDULE: In FY 2016, construction is expected to start on upgrades to Murray Hydro-
                                                                 Pneumatic Zone and the design of the seismic upgrades to Sunset Reservoir.

                                                                 RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                 Element of the General Plan by helping to achieve a high level of maintenance for existing
                                                                 facilities, and it is also consistent with the Seismic and Safety Element by minimizing losses due to
                                                                 natural disasters.

                                                                 HISTORY: This project was created and received initial funding in FY 1994. The project was
                                                                 segmented into a multi-year phase starting in FY 2012. This is the new phase of this project for FY
                                                                 2015 - 2020.

                                                                                                                                Responsible Department:
                                                                            15.6                                                Water and Power Department
WATER SYSTEM - PINOCCHIO GETS EATEN BY A WHALE - City of Pasadena
FY 2016 - 2020 Capital Improvement Program
                                                                  Water System
                                             Miscellaneous Water System Improvements FY 2015 - 2020
                                                                      1006

Priority Project No. Description                                          Total     Appropriated                                                               Proposed
                                                                      Estimated         Through         Adopted      Proposed       Proposed    Proposed        FY 2020
    7      1006      Miscellaneous Water System Improvements FY
                                                                          Costs         FY 2015         FY 2016       FY 2017        FY 2018     FY 2019     and Beyond
                     2015 - 2020

          Water Fund                                                 2,263,072         323,072         340,000       400,000        400,000       400,000       400,000
          Total                                                      2,263,072         323,072         340,000       400,000        400,000       400,000       400,000
                                                                  DESCRIPTION: This project provides for miscellaneous distribution, purification, pumping
                                                                  plant, reservoir, ground water, gravity water, and general plant improvements to the water system at
                                                                  various locations throughout the City.

                                                                  JUSTIFICATION: This project is necessary to provide ongoing improvements as required to
                                                                  maintain water quality, improve the security and appearance of physical plants and reservoirs, and
                                                                  maintain adequate health standards.

                                                                  SCHEDULE: In FY 2016 miscellaneous projects will be constructed and water mixing equipment
                                                                  purchases and installations as required.

                                                                  RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                  Element of the General Plan by helping to ensure an adequate supply of safe potable water for
                                                                  consumption and adequate water for fire protection.

                                                                  HISTORY: This is an ongoing project that was created before 1980. The project was segmented
                                                                  into a multi-year phase starting in FY 2012. This is the new phase of this project for FY 2015 -
                                                                  2020.

                                                                                                                                Responsible Department:
                                                                             15.7                                               Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                Water System
                                  Management Information Systems - Water and Power Department FY 2015 - 2020
                                                                    1025

Priority Project No. Description                                          Total        Appropriated                                                             Proposed
                                                                      Estimated            Through       Adopted      Proposed       Proposed    Proposed        FY 2020
    8      1025      Management Information Systems - Water and
                                                                          Costs            FY 2015       FY 2016       FY 2017        FY 2018     FY 2019     and Beyond
                     Power Department FY 2015 - 2020

          Water Fund                                                   726,564            451,564              0      100,000         75,000        50,000        50,000
          Total                                                        726,564            451,564              0      100,000         75,000        50,000        50,000
                                                                  DESCRIPTION: This project provides for the development, upgrade, and maintenance of local
                                                                  area networks (LAN) at each of four departmental worksites; acquisition of equipment to
                                                                  interconnect substations, water facilities, and existing networks; and integration of all information
                                                                  critical to Water and Power (PWP) operations into the same, nonredundant database. It will further:

                                                                                 Install routers and firewalls in the Department's network structure;
                                                                                 Convert Water and Power documents and drawings to electronic format and
                                                                                   collect/validate field data;
                                                                                 Procure an Automated Data Collection/Bar Coding system for the Warehouse;
                                                                                 Convert the existing meter and transformer inventory system currently stored on the
                                                                                   HP into a client-server application; and
                                                                                 Clean existing data prior to beginning the conversion process.

                                                                  JUSTIFICATION: The Department's October 1991 MIS study found that considerable time
                                                                  savings, administrative and operational benefits would accrue if manual procedures were automated
                                                                  and if existing "islands of automation" were integrated. This would eliminate large amounts of data
                                                                  entry and re-entry performed by several groups, resulting in increased productivity and reduced
                                                                  errors. The barcode project will save time and money by automating inventory utilizing hand-held
                                                                  barcode readers and barcodes. These automated systems reduce time and labor required to perform
                                                                  inventory counts and virtually eliminate data entry errors, thus enabling the department to collect
                                                                  inventory accurately and efficiently at a lower cost and with greater integrity. The existing meter
                                                                  and transformer inventory systems are outdated and not serving the department's current needs and
                                                                  they need to be converted to a client-server type application.

                                                                  SCHEDULE: The workplan for FY 2016 includes: vulnerability assessment (cyber
                                                                  security/hacking) and implement assessment recommendations; IT upgrades pertaining to servers,
                                                                  switches, data center utilities; SAN enhancements; and miscellaneous hardware/software upgrades.

                                                                                                                                 Responsible Department:
                                                                                15.8                                             Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                              Water System
Management Information Systems - Water and Power Department FY 2015 - 2020
                                  1025

                            RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                            Element of the General Plan by helping to provide a high level of service through more efficient
                            management of resources.

                            HISTORY: This project was originally created in FY 1991 and received initial funding in FY
                            1992. The project was segmented into a multi-year phase starting in FY 2012. This is the new
                            phase of this project for FY 2015 - 2020.

                                                                                        Responsible Department:
                                      15.8                                              Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                       Water System
                                                     Sunset Perchlorate Treatment Plant FY 2015 - 2020
                                                                            1062

Priority Project No. Description                                           Total   Appropriated                                                       Proposed
                                                                       Estimated       Through    Adopted   Proposed       Proposed   Proposed         FY 2020
    9      1062      Sunset Perchlorate Treatment Plant FY 2015 -
                                                                           Costs       FY 2015    FY 2016    FY 2017        FY 2018    FY 2019      and Beyond
                     2020

           Water Fund                                                 1,189,959       669,959     220,000   150,000         50,000      50,000         50,000
           Total                                                      1,189,959       669,959     220,000   150,000         50,000      50,000         50,000

                                                                                                                       Responsible Department:
                                                                            15.9                                       Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                  Water System
Sunset Perchlorate Treatment Plant FY 2015 - 2020
                       1062
               DESCRIPTION: This project provides for the design and construction of a perchlorate treatment
               system, including a disinfection facility, for the Sunset Reservoir wells. Initially the plant will treat
               Bangham, Copelin and Sunset wells. Garfield and Villa wells may not need treatment depending
               on State Department of Health Services restrictions on blending and future maximum contaminate
               level requirements. The Sunset Reservoir wells were shut down in January 2002 when the State
               lowered its action level for perchlorate. An investigation is being conducted to determine the source
               of the perchlorate contamination affecting the Sunset Wells. Improvements and remediation to the
               contamination will be ongoing.

               JUSTIFICATION: Treating the Sunset Reservoir wells is essential to control the spread of the
               perchlorate contamination plume in the groundwater. With treatment the City can resume using its
               local water resources.

               SCHEDULE: Construction of the disinfection facility at Sunset Reservoir will continue through
               the second quarter FY 2016. The construction was delayed in FY 2015 due to a breach of contract
               (non-performance) and subsequent termination of the construction company originally hired. The
               project has since been redesigned and efforts to select a new contractor are underway. Construction
               is expected to resume in the fourth quarter of FY 2016.

               Efforts to locate the source of the perchlorate contamination of the Sunset Wells will continue in
               FY 2016 and are ongoing until final resolution. PWP will continue to negotiate with the JPL
               technical and legal teams to develop the planning and data needed to move forward with the
               construction of the perchlorate treatment system.

               RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
               Element Objective 1 by providing a high level of public service at minimum cost. The project is
               also consistent with Objective 2 by providing a more efficient utilization of public facilities. In
               addition, the project is consistent with Objective 5 by providing a high level of maintenance of
               existing facilities.

               IMPACT ON THE NORTHWEST: This project is located in Northwest Pasadena which is an
               area targeted for revitalization.

               HISTORY: This project was created and initially funded in FY 2005. The project was segmented
               into a multi-year phase starting in FY 2016.

                                                                              Responsible Department:
                          15.9                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                               Water System
                                                          Well Collector Pipelines
                                                                   1044

Priority Project No. Description                                    Total     Appropriated                                                                Proposed
                                                                Estimated         Through         Adopted       Proposed       Proposed     Proposed       FY 2020
    10     1044      Well Collector Pipelines
                                                                    Costs         FY 2015         FY 2016        FY 2017        FY 2018      FY 2019    and Beyond

           Water Fund                                         12,609,718       12,609,718                0             0              0             0               0
           Total                                              12,609,718       12,609,718                0             0              0             0               0
                                                            DESCRIPTION: This project provides for the collection of water from water wells through a
                                                            pipeline system and piping this water directly to reservoirs. There are two main collector pipelines.
                                                            The westside collector completed in 1999 conveys water flows from Garfield and Villa wells to
                                                            Sunset Reservoir. The eastside collector will convey water flows from Jourdan, Chapman,
                                                            Woodbury, Monte Vista, Craig, Twombly and Wadsworth wells to Jones Reservoir.

                                                            JUSTIFICATION: This project will allow the blending of well water in the reservoir to meet
                                                            current and future water quality regulations. Combining the well water flows will make future
                                                            water treatment of well water more efficient and less costly. Also, this project will eliminate any
                                                            entrained-air problems from wells.

                                                            SCHEDULE: Work in FY 2016 will include minor amounts of paving, calibration and monitoring
                                                            associated with the construction of the disinfection facility. This project is expected to be
                                                            completed in FY 2017.

                                                            RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                            Element of the General Plan by helping to ensure an adequate supply of safe potable water for
                                                            consumption.

                                                            HISTORY: This project was created and received initial funding in FY 1998. The westside
                                                            collector pipeline was completed in 1999.

                                                                                                                           Responsible Department:
                                                                      15.10                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                       Water System
                                                        Arroyo Spreading Basins and Intake Structures
                                                                           1040

Priority Project No. Description                                             Total     Appropriated                                                               Proposed
                                                                         Estimated         Through         Adopted      Proposed       Proposed    Proposed        FY 2020
    11     1040      Arroyo Spreading Basins and Intake Structures
                                                                             Costs         FY 2015         FY 2016       FY 2017        FY 2018     FY 2019     and Beyond

           Proposition 84                                               2,791,579                0        550,000     2,026,579        215,000             0             0
           Water Fund                                                   7,798,791        2,222,870      1,070,000     3,973,421        485,000        35,000        12,500
           Total                                                       10,590,370        2,222,870      1,620,000     6,000,000        700,000        35,000        12,500
                                                                     DESCRIPTION: This project provides for increased spreading of water runoff in the Arroyo
                                                                     Seco.

                                                                     JUSTIFICATION: This project will allow for the capture and spreading of water runoff in the
                                                                     Arroyo Seco. The work allows for the diversion of water to the existing ponds for storage used for
                                                                     groundwater recharge. In addition, it facilitates better management of local water resources and
                                                                     may help to reduce reliance on expensive imported water.

                                                                     SCHEDULE: Construction is expected to start in FY 2016 on the improvements to the Arroyo
                                                                     spreading basins. Work will include demolition of the existing parking lot (previously utilized by
                                                                     JPL employees), installation of 1/2 mile of distribution main, new recreational parking areas and
                                                                     construction of new spreading grounds.

                                                                     RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                     Element of the General Plan by helping to ensure an adequate supply of safe potable water for
                                                                     consumption and adequate water for fire protection.

                                                                     IMPACT ON THE NORTHWEST: This project is located in Northwest Pasadena which is an
                                                                     area targeted for revitalization.

                                                                     HISTORY: This project was created in FY 1995 and received initial funding in FY 2001.

                                                                                                                                   Responsible Department:
                                                                               15.11                                               Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                     Water System
                                                    Recycled Water
                                                         1013

Priority Project No. Description                         Total    Appropriated                                                        Proposed
                                                     Estimated        Through    Adopted    Proposed       Proposed   Proposed         FY 2020
    12     1013      Recycled Water
                                                         Costs        FY 2015    FY 2016     FY 2017        FY 2018    FY 2019      and Beyond

          Water Fund                               17,885,564      13,885,564         0    1,000,000     1,000,000    1,000,000      1,000,000
          Total                                    17,885,564      13,885,564         0    1,000,000     1,000,000    1,000,000      1,000,000

                                                                                                       Responsible Department:
                                                          15.12                                        Water and Power Department
FY 2016 - 2020 Capital Improvement Program
               Water System
              Recycled Water
                   1013
            DESCRIPTION: This project will involve an evaluation of potential sources to obtain recycled
            water, a determination of use base, and design/construction of facilities and infrastructure to
            provide and distribute recycled water. This includes the cost to participate in the expansion of the
            City of Glendale's recycled water system (contribution ends in FY 2017). Phase 1 will serve four
            customers (including Brookside Golf Course). The scope of work for this project will include the
            installation of a pipeline and a storage facility at Sheldon Reservoir site to capture tunnel water and
            store recycled water, and the installation of approximately 4.5 miles of 20" pipeline starting at the
            Scholl Canyon in Glendale to the Art Center College, Brookside Golf Course, and ending at the
            Brookside Park. The project will also include the evaluation and conversion of an existing drinking
            water tank to recycled water or installation of a new 1.25 MG storage tank at Scholl Canyon, one
            pressure reducing station on West Drive, and a 20" pipeline to Sheldon recycled water reservoir.

            JUSTIFICATION: Future water supplies in Southern California are expected to be limited.
            Recycled water can augment fresh water supplies through its use for golf courses, freeway
            landscaping, parks, schools, large turf areas, and industrial processes.

            SCHEDULE: Project design and EIR are expected to be completed in FY 2016 and necessary pre-
            construction permits will be obtained. Should outside funding become available, construction is
            expected to begin FY 2017 on Phase 1 of the non-potable/recycle water system. Phase 1 includes
            the installation of piping from the Scholl Canyon reservoir, installation of a pressure reducing
            station at West Drive, and installation of pipeline between Scholl Canyon and West Drive.

            Management is actively seeking outside sources of funding (governmental grants and loans).

            RELATIONSHIP TO GENERAL PLAN: This project is consistent with the General Plan and
            would allow the purchase of more economical water for specific use. It will also allow the
            Department to utilize existing water resources efficiently, and it is consistent with Land Use
            Element Objective 18 by increasing the efficiency of water use.

            IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena
            which is an area targeted for revitalization.

            HISTORY: This project was created and received initial funding in FY 1993.

                                                                           Responsible Department:
                      15.12                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                      Water System
                                                      Enterprise Resource Plan (ERP) - Water System
                                                                           1072

Priority Project No. Description                                          Total    Appropriated                                                       Proposed
                                                                      Estimated        Through    Adopted   Proposed       Proposed   Proposed         FY 2020
    13     1072      Enterprise Resource Plan (ERP) - Water System
                                                                          Costs        FY 2015    FY 2016    FY 2017        FY 2018    FY 2019      and Beyond

          Water Fund                                                   638,244        380,618     199,405    58,221              0           0              0
          Total                                                        638,244        380,618     199,405    58,221              0           0              0

                                                                                                                       Responsible Department:
                                                                           15.13                                       Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                Water System
Enterprise Resource Plan (ERP) - Water System
                     1072
             DESCRIPTION: This project provides for the replacement of the water systems' portion of the
             Enterprise Resource Planning (ERP) system that will seamlessly integrate all information from the
             financial, human resources, payroll, and budget systems. The scope of this multi-year initiative
             includes the analysis, selection, purchase and implementation of the software and hardware
             necessary to replace and integrate these systems under a single ERP system.

             JUSTIFICATION: The City of Pasadena's current financial system was implemented on July 1,
             1997 and the current version is no longer supported by the vendor. In addition, various components
             within this system are not integrated which results in numerous inconsistencies in the financial
             information provided. Further, this system is not integrated with the human resources, payroll, and
             budget systems. This non-integration requires extremely labor-intensive processes to validate the
             information for accuracy, which results in an increased risk for human error.

             An ERP system is a software package that can seamlessly integrate all information flowing through
             an organization from a single information repository, including financial and accounting, human
             resource information, payroll, budget, inventory, asset, customer information, and others. An ERP
             system can deliver new management capabilities, improve operating efficiencies by streamlining or
             eliminating inefficient manual processes, increase accuracy, and deliver real-time financial
             information and reporting to City management. In the process, it will eliminate disparate stand-
             alone systems, provide an opportunity to re-engineer processes with industry best practices and
             templates, and establish a backbone structure that can be leveraged to handle all operational
             processes.

             SCHEDULE: The ERP is an enterprise project being coordinated through DoIT.

             RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with Public Facilities
             Element Policy 202.0 by achieving a high level of public service through more efficient
             management and greater work productivity.

             SPECIAL CONSIDERATION: The budget includes the Water Fund's cost allocation for the
             ERP project and additional PWP costs to build interface solutions to Tyler Munis.

             HISTORY: This project was created as the Enterprise Resource Planning System (project 71149)
             in FY 2013 and initially funded with Water Fund in FY 2015.

                                                                         Responsible Department:
                       15.13                                             Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                  Water System
                                                          Customer Information System
                                                                      1011

Priority Project No. Description                                       Total     Appropriated                                                               Proposed
                                                                   Estimated         Through         Adopted      Proposed       Proposed    Proposed        FY 2020
    14     1011      Customer Information System
                                                                       Costs         FY 2015         FY 2016       FY 2017        FY 2018     FY 2019     and Beyond

          Water Fund                                              2,589,585         965,585                0       650,000       550,000       224,000       200,000
          Total                                                   2,589,585         965,585                0       650,000       550,000       224,000       200,000
                                                               DESCRIPTION: This project provides for the purchase and implementation costs to acquire a
                                                               new Customer Information and Utility Billing System. The ECIS (Customer Information System)
                                                               utility billing system has been in place for 10 years and is not keeping up with technology. ECIS is
                                                               an aging legacy system that is losing its capability to keep up with newer technologies to improve
                                                               meter reading, billing, customer payment and collection.

                                                               JUSTIFICATION: The ECIS utility billing system is vital to the security and timeliness of
                                                               customer information, meter reads, billing, customer payment and collection. As the system ages
                                                               and its capabilities become limited, the system does not deliver the service and information
                                                               customers expect. Further, the current system is not flexible, which requires vendor support at an
                                                               hourly rate for any changes needed to be made by the Department.

                                                               SCHEDULE: The workplan for FY 2016 will include selection of a consultant to complete the
                                                               requirement definition, develop an RFP and evaluate responses for upgrade or replacement of the
                                                               utility billing system.

                                                               RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Public
                                                               Facilities Element of the General Plan by helping maintain a high level of public service through
                                                               expanded services, efficient management and greater work productivity.

                                                               HISTORY: This project was created and received initial funding in FY 2000. One CIS system
                                                               software upgrade was completed in FY 2003, a second in FY 2007, and a third upgrade completed
                                                               in FY 2009.

                                                                                                                             Responsible Department:
                                                                         15.14                                               Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                   Water System
                                                     Water and Power Warehouse Modernization
                                                                       1056

Priority Project No. Description                                        Total     Appropriated                                                                  Proposed
                                                                    Estimated         Through          Adopted       Proposed       Proposed     Proposed        FY 2020
    15     1056      Water and Power Warehouse Modernization
                                                                        Costs         FY 2015          FY 2016        FY 2017        FY 2018      FY 2019     and Beyond

          Water Fund                                               1,769,047        1,769,047                 0             0              0              0              0
          Total                                                    1,769,047        1,769,047                 0             0              0              0              0
                                                                DESCRIPTION: This project provides for the modernization of the warehouse including the
                                                                upgrading of the freight elevator. Included in this plan is the enhancement of the existing fire
                                                                sprinkler system along with installation of new fire alarms to bring the building up to code. These
                                                                changes will allow the warehouse to operate with maximum efficiency using a computer inventory
                                                                tracking system. Racks, shelving, and bin systems will be replaced as needed, or if deemed to be
                                                                seismically unsafe. Racking and shelving will be a combination of open and closed for maximum
                                                                space utilization. Grip pallet racks for oversized or heavier-weight items will be installed and
                                                                current open racks retrofitted for weight-bearing loads. Materials handling equipment including
                                                                pallet jacks, carts, dollies, basket hampers, coil lifters, etc. will be replaced as needed.
                                                                Ergonomically correct workstations will also be installed throughout the warehouse.

                                                                JUSTIFICATION: The warehouse has not had any significant upgrades in approximately 30
                                                                years. Racking systems inside the warehouse are inadequate, undersized, and not properly laid out
                                                                to provide for efficient storage and retrieval of inventory. Exterior racks in the yards are not up to
                                                                code for heavy loads and are seismically unsafe.

                                                                SCHEDULE: Work on existing warehouse building is scheduled to continue in FY 2016 for
                                                                Water utility functions.

                                                                RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Public
                                                                Facilities Element of the General Plan by helping to maintain a high level of service through
                                                                efficient warehouse management and greater work productivity. It also provides a safe and secure
                                                                working environment for employees.

                                                                HISTORY: This project was created in FY 2003 and fully funded in FY 2012.

                                                                                                                                Responsible Department:
                                                                          15.15                                                 Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                   Water System
                                         Water Telemetry and On-Line Water Quality Detectors FY 2015 - 2020
                                                                       1034

Priority Project No. Description                                         Total     Appropriated                                                                Proposed
                                                                     Estimated         Through         Adopted       Proposed       Proposed    Proposed        FY 2020
    16     1034      Water Telemetry and On-Line Water Quality
                                                                         Costs         FY 2015         FY 2016        FY 2017        FY 2018     FY 2019     and Beyond
                     Detectors FY 2015 - 2020

          Water Fund                                                  374,398          154,398          20,000        50,000         50,000        50,000         50,000
          Total                                                       374,398          154,398          20,000        50,000         50,000        50,000         50,000
                                                                 DESCRIPTION: This project provides for upgrading the existing Supervisory Control and Data
                                                                 Acquisition (SCADA) system to make it more reliable under normal and major failure conditions.

                                                                 JUSTIFICATION: The current SCADA system for the Water Division was implemented in FY
                                                                 2001. The new system entails computer communication equipment, and instrumentation and
                                                                 controls at remote water division sites. The system provides reliable, accurate, and additional water
                                                                 system data through upgraded telemetry equipment and field instrumentation. It also provides more
                                                                 reliable and expandable service, reduces manual reporting, and allows integration of software
                                                                 programs such as inventory control and maintenance management.

                                                                 SCHEDULE: SCADA upgrade to automate the communication process and related fine tuning
                                                                 will continue into FY 2016.

                                                                 RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                 Element of the General Plan by helping to ensure an adequate supply of safe potable water for
                                                                 consumption and adequate water for fire protection.

                                                                 HISTORY: This project was created and received initial funding FY 1994.

                                                                                                                                Responsible Department:
                                                                           15.16                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                    Water System
                                             Geographic Information System - Water and Power Department
                                                                        1009

Priority Project No. Description                                         Total     Appropriated                                                                Proposed
                                                                     Estimated         Through         Adopted       Proposed       Proposed    Proposed        FY 2020
    17     1009      Geographic Information System - Water and
                                                                         Costs         FY 2015         FY 2016        FY 2017        FY 2018     FY 2019     and Beyond
                     Power Department

          Water Fund                                                1,028,903          703,903                0      100,000         75,000        75,000         75,000
          Total                                                     1,028,903          703,903                0      100,000         75,000        75,000         75,000
                                                                 DESCRIPTION: This project provides for the analysis, development, and procurement of a
                                                                 departmental geographic information system (GIS) for the Water and Power Department. The base
                                                                 map has been completed, followed by application development, hardware procurement and/or
                                                                 procurement of custom off-the-shelf programs, and conversion of utility data.

                                                                 JUSTIFICATION: The GIS will reduce the cost of maintaining manually produced and updated
                                                                 maps and record systems. It will also reduce duplicate record keeping by different sections of the
                                                                 department. In addition, it will provide greater reliability, faster data access, and more efficient
                                                                 processing of information.

                                                                 SCHEDULE: The FY 2016 workplan includes: web GIS enhancements; Mapplet implementation
                                                                 for iOS; Water Mobile GIS enhancements; ESRI and ArcFM software training; and miscellaneous
                                                                 upgrades.

                                                                 RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                 Element of the General Plan by helping to maintain a high level of public service through more
                                                                 efficient management and greater work productivity.

                                                                 HISTORY: This project was created before FY 1994 and received initial funding in FY 1994.

                                                                                                                                Responsible Department:
                                                                           15.17                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                Water System
                                                          Field Service Automation
                                                                    1012

Priority Project No. Description                                    Total     Appropriated                                                                Proposed
                                                                Estimated         Through         Adopted       Proposed       Proposed     Proposed       FY 2020
    18     1012      Field Service Automation
                                                                    Costs         FY 2015         FY 2016        FY 2017        FY 2018      FY 2019    and Beyond

          Water Fund                                             538,678          318,678                0       55,000         55,000        55,000         55,000
          Total                                                  538,678          318,678                0       55,000         55,000        55,000         55,000
                                                            DESCRIPTION: This project provides for the following upgrades for the Customer Service Field
                                                            Service Group Meter Readers and Reconnect:
                                                                    Automatic Meter Reads (AMR) - Radio Frequency Meter Reading Handheld Devices
                                                                      and drive-by meter reading equipment
                                                                    Upgrades of Meter Reading Software (MVRS)
                                                                    Meter Reading Training Software

                                                            This project is expected to help automate to the extent possible, utility meter reading and reconnect
                                                            processes.

                                                            JUSTIFICATION: Upgrades to the Customer Service Meter Reading Operation will reduce the
                                                            operational costs of meter reading and help improve billing accuracy by enabling the department to
                                                            obtain accurate reads from the field. AMR water meters are being installed throughout the City.
                                                            Meter Reading Handheld devices are being upgraded and enabled to read regular water meters and
                                                            AMR water meters. MVRS Meter Reading Software is being upgraded to accommodate changes in
                                                            the upload and download of information from the billing system. Meter Reader Training Software
                                                            will be upgraded to provide meter readers with the latest training tools. Other forms of meter
                                                            reading such as drive-by and remote reading technology will be investigated for possible pilot
                                                            programs. Mobile dispatching of service orders will also be investigated for a possible pilot
                                                            program.

                                                            SCHEDULE: In FY 2016, workplan includes on-going projects for software and hardware
                                                            upgrades to meter reading handheld device, water probes, electric probes, and meter reading
                                                            software.

                                                            RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Public
                                                            Facilities Element of the General Plan by helping to maintain a high level of public service through
                                                            expanded services, efficient management and greater work productivity.

                                                            HISTORY: This project was created and received initial funding in FY 2000.

                                                                                                                           Responsible Department:
                                                                      15.18                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                      Water System
                                                          Monk Hill Perchlorate Treatment Plant
                                                                          1063

Priority Project No. Description                                           Total     Appropriated                                                                 Proposed
                                                                       Estimated         Through          Adopted      Proposed       Proposed     Proposed        FY 2020
    19     1063      Monk Hill Perchlorate Treatment Plant
                                                                           Costs         FY 2015          FY 2016       FY 2017        FY 2018      FY 2019     and Beyond

           Federal Funds - NASA                                       4,655,148        3,005,148                0       500,000       200,000        450,000       500,000
           Total                                                      4,655,148        3,005,148                0       500,000       200,000        450,000       500,000
                                                                   DESCRIPTION: This project provides for the design and construction of a perchlorate treatment
                                                                   system for the Monk Hill wells. The plant will treat Arroyo, Well 52, Windsor and Ventura wells.
                                                                   Perchlorate was first detected June 1997, and by January 2002 all four wells were shut down when
                                                                   the State lowered its action level for perchlorate.

                                                                   JUSTIFICATION: Treating the Monk Hill wells will help control the spread of the perchlorate
                                                                   contamination plume in the groundwater. With treatment, the City can continue using its local
                                                                   water resources instead of relying on expensive imported water supplies. The responsible parties
                                                                   will pay the cost of this groundwater treatment process.

                                                                   SCHEDULE: The purchase of the Calgon perchlorate treating equipment for the Monk Hill
                                                                   Treatment plant will occur in FY 2016. In addition, work will begin at the Monk Hill facility
                                                                   during FY 2016 for the installation of a new backwash line and pipeline located in the former JPL
                                                                   parking lot.

                                                                   RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                   Element Objective 1 by providing a high level of public service at minimum cost. The project is
                                                                   also consistent with Objective 2 by providing a more efficient utilization of public facilities. In
                                                                   addition, the project is consistent with Objective 5 by providing a high level of maintenance of
                                                                   existing facilities.

                                                                   IMPACT ON THE NORTHWEST: This project is located in Northwest Pasadena which is an
                                                                   area targeted for revitalization.

                                                                   HISTORY: This project was created and received initial funding in FY 2006.

                                                                                                                                  Responsible Department:
                                                                             15.19                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                  Water System
                                                         Radio Equipment Replacement
                                                                      1065

Priority Project No. Description                                       Total     Appropriated                                                               Proposed
                                                                   Estimated         Through         Adopted      Proposed       Proposed    Proposed        FY 2020
    20     1065      Radio Equipment Replacement
                                                                       Costs         FY 2015         FY 2016       FY 2017        FY 2018     FY 2019     and Beyond

          Water Fund                                              1,102,827        1,052,827               0        25,000        25,000              0               0
          Total                                                   1,102,827        1,052,827               0        25,000        25,000              0               0
                                                               DESCRIPTION: This project provides for the research, analysis, procurement, and
                                                               implementation of new digital radio equipment for Pasadena Water and Power (PWP) field
                                                               operations. This project will also look into incorporating mobile data terminal technology or
                                                               vehicle locator devices for PWP vehicles.

                                                               JUSTIFICATION: The existing radio equipment does not conform to the upcoming Federal
                                                               Communications Commission rule requirements. Therefore, PWP plans to replace existing
                                                               equipment with digital radio equipment that conforms to the new requirements.

                                                               SCHEDULE: In FY 2016, additional radios will be purchased as needed.

                                                               RELATIONSHIP TO GENERAL PLAN: This project is consistent with Objective 4 of the
                                                               Public Facilities Element of the General Plan by helping to provide a high level of service and
                                                               greater work productivity by using available technology. This project is also consistent with Public
                                                               Facilities Objective 2 by providing more efficient development and utilization of public facilities.

                                                               HISTORY: This project was created and received initial funding in FY 2007.

                                                                                                                             Responsible Department:
                                                                         15.20                                               Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                      Water System
                                                        Interactive Voice Response System (IVR)
                                                                          1016

Priority Project No. Description                                          Total     Appropriated                                                                 Proposed
                                                                      Estimated         Through          Adopted       Proposed       Proposed    Proposed        FY 2020
    21     1016      Interactive Voice Response System (IVR)
                                                                          Costs         FY 2015          FY 2016        FY 2017        FY 2018     FY 2019     and Beyond

          Water Fund                                                   302,101          220,851                0        25,000         18,750        18,750         18,750
          Total                                                        302,101          220,851                0        25,000         18,750        18,750         18,750
                                                                  DESCRIPTION: This project will provide for the Water Division's share of the procurement of
                                                                  the Pasadena Water and Power's portion of an Interactive Voice Response/Interactive Web
                                                                  Response (IVR/IWR) system.

                                                                  JUSTIFICATION: The new IVR/IWR system will expand service to customers by providing
                                                                  immediate alternatives for automated information access and payments as well as personal
                                                                  assistance via telephone or the internet. It is an integral part of Pasadena Water and Power's effort
                                                                  to increase customer service levels while reducing operating costs in a deregulated environment.
                                                                  Integration of the IVR/IWR system with Orcom will bring call-back functionality to the system.

                                                                  SCHEDULE: The workplan for FY 2016 is to procure hardware and software for voice activated
                                                                  commands; convert a portion of the existing application to a conversation style IVR; and modify
                                                                  options to accommodate Electronic Bill Presentment and Payment (EBPP) functions.

                                                                  RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                  Element of the General Plan by helping to maintain a high level of public services, efficient
                                                                  management and greater work productivity.

                                                                  HISTORY: This project was created and received initial funding in FY 1999.

                                                                                                                                  Responsible Department:
                                                                            15.21                                                 Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                        Water System
                                                                     Devil's Gate Tunnels
                                                                             1043

Priority Project No. Description                                             Total     Appropriated                                                                    Proposed
                                                                         Estimated         Through           Adopted       Proposed       Proposed      Proposed        FY 2020
    22     1043      Devil's Gate Tunnels
                                                                             Costs         FY 2015           FY 2016        FY 2017        FY 2018       FY 2019     and Beyond

          Water Fund                                                      391,278           351,278                 0        10,000         10,000         10,000         10,000
          Total                                                           391,278           351,278                 0        10,000         10,000         10,000         10,000
                   Water flow from Devil's Gate Tunnel               DESCRIPTION: This project will rehabilitate the Devil's Gate Tunnels, upgrade pumping
                                                                     equipment to maximize the use of surface runoff water through Devil's Gate tunnels, and the
                                                                     installation of a metering system for water diverted for irrigation.

                                                                     JUSTIFICATION: Water from the Devil's Gate Tunnels can be diverted for irrigation at various
                                                                     locations and will reduce the use of groundwater and/or the purchase of more expensive imported
                                                                     water.

                                                                     SCHEDULE: Work during FY 2016 will include the continued environmental monitoring,
                                                                     mitigation and reporting, repairs to facility, and the calibration and testing of meters as part of this
                                                                     CIP project.

                                                                     RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                     Element of the General Plan by helping to maintain a high level of service through more efficient
                                                                     management of resources. It is also consistent with the Conservation Element by encouraging a
                                                                     more efficient utilization of the City's water resources.

                                                                     HISTORY: This project was created and received initial funding in FY 1996.

                                                                                                                                      Responsible Department:
                                                                               15.22                                                  Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                 Water System
                                                           Facility Security Systems
                                                                     1054

Priority Project No. Description                                     Total     Appropriated                                                                Proposed
                                                                 Estimated         Through         Adopted       Proposed       Proposed    Proposed        FY 2020
    23     1054      Facility Security Systems
                                                                     Costs         FY 2015         FY 2016        FY 2017        FY 2018     FY 2019     and Beyond

           Water Fund                                           1,172,636          372,636               0       300,000        400,000        50,000        50,000
           Total                                                1,172,636          372,636               0       300,000        400,000        50,000        50,000
                                                             DESCRIPTION: This project will provide for new security systems and upgrades to existing
                                                             security systems at all water facilities. These security systems include: new video monitoring
                                                             systems; electronic keying devices; security lighting; intrusion alarm upgrades; perimeter protection
                                                             upgrades; and gate entry protection upgrades.

                                                             JUSTIFICATION: This project will provide security systems at all water facilities consistent with
                                                             accepted industry standards. These security systems will reduce the water system's exposure to
                                                             security breaches.

                                                             SCHEDULE: Work planned in FY 2016 will include a study to develop the scope of work
                                                             necessary for the upgrade of security systems at all Water facilities, including new security
                                                             cameras, motion detectors, keycard access and installation of new gate entry systems.

                                                             RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Public
                                                             Facilities Element of the General Plan by helping to provide a high level of public service through
                                                             more efficient management of resources.

                                                             HISTORY: This project was created and received initial funding in FY 2003.

                                                                                                                            Responsible Department:
                                                                       15.23                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                     Water System
                                                         New Well Projects (Conjunctive Use)
                                                                         1021

Priority Project No. Description                                          Total     Appropriated                                                                Proposed
                                                                      Estimated         Through         Adopted       Proposed       Proposed     Proposed       FY 2020
    24     1021      New Well Projects (Conjunctive Use)
                                                                          Costs         FY 2015         FY 2016        FY 2017        FY 2018      FY 2019    and Beyond

          Water Fund                                                 3,275,880          275,880                0        85,000     2,915,000              0            0
          Total                                                      3,275,880          275,880                0        85,000     2,915,000              0            0
                                                                  DESCRIPTION: This project will provide for drilling new groundwater wells and recovery wells
                                                                  and capital facilities that could include aquifer recharge and storage. Recovery wells allow for
                                                                  injection of water into the groundwater aquifer. Groundwater wells have a useful life of
                                                                  approximately 100 years. Many of the Water and Power wells are at the end of their usefull life.
                                                                  Drilling new wells will serve to replace existing older wells.

                                                                  JUSTIFICATION: The option of refilling natural aquifers with injection or percolation is of
                                                                  increased in importance, particularly during long-term dought conditions. Economies of scale will
                                                                  be realized from efficient use of the available storage space in the underlying groundwater basin,
                                                                  and at the same time improve the reliability of water supplies during periods of drought.

                                                                  SCHEDULE: No work is anticipated for FY 2016. Work is expected to begin FY 2017 on a
                                                                  feasibility study to determine the best location for the installation of a new groundwater well.

                                                                  RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                                  Element of the General Plan by helping to maintain a high level of service through more efficient
                                                                  management of resources. It is also consistent with the Conservation element by encouraging a
                                                                  more efficient utilization of the City's water resources.

                                                                  OPERATING BUDGET IMPACT: The wells will permit greater purchases of MWD water at
                                                                  reduced rates. The result will be a reduction in annual operating expenses.

                                                                  HISTORY: This project was created and received initial funding in FY 1992.

                                                                                                                                 Responsible Department:
                                                                            15.24                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                              Water System
                                                         Water Quality Treatment
                                                                  1041

Priority Project No. Description                                   Total     Appropriated                                                                Proposed
                                                               Estimated         Through         Adopted       Proposed       Proposed    Proposed        FY 2020
    25     1041      Water Quality Treatment
                                                                   Costs         FY 2015         FY 2016        FY 2017        FY 2018     FY 2019     and Beyond

          Water Fund                                            394,459          394,459               0              0             0             0            0
          Total                                                 394,459          394,459               0              0             0             0            0
                                                           DESCRIPTION: This project provides for the design, engineering, and construction of facilities
                                                           to treat Pasadena area water for increasing contaminant levels (nitrate, perchlorate, etc.).

                                                           JUSTIFICATION: Pasadena wells are slowly showing increasing contaminant levels and will
                                                           exceed State maximum contaminant levels in the near future. These facilities will treat the local
                                                           well water. Local well water is cheaper than imported water.

                                                           SCHEDULE: Work is expected to begin on a study to explore the best method of biological
                                                           treatment for nitrates and perchlorates at various wells.

                                                           RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities
                                                           Element of the General Plan by helping to ensure an adequate supply of safe potable water for
                                                           consumption.

                                                           HISTORY: This project was created and received initial funding in FY 1996.

                                                                                                                          Responsible Department:
                                                                     15.25                                                Water and Power Department
FY 2016 - 2020 Capital Improvement Program
                                                                    Water System
                                                       Enterprise Content Management System
                                                                        1071

Priority Project No. Description                                         Total     Appropriated                                                                   Proposed
                                                                     Estimated         Through           Adopted       Proposed       Proposed     Proposed        FY 2020
    26     1071      Enterprise Content Management System
                                                                         Costs         FY 2015           FY 2016        FY 2017        FY 2018      FY 2019     and Beyond

          Water Fund                                                   97,300            97,300                0              0              0              0                0
          Total                                                        97,300            97,300                0              0              0              0                0
                                                                 DESCRIPTION: This project provides for the replacement of the document imaging and records
                                                                 management system. The replacement system, an Enterprise Content Management (ECM) system
                                                                 is expected to be used by all departments for document management needs and provide the
                                                                 following core feature functions: document imaging, content management, records management, e-
                                                                 forms, e-signatures, and automated workflow. The project will include the development of a
                                                                 standard taxonomy (document indexing scheme) and updated records retention schedules based on
                                                                 the taxonomy established per department.

                                                                 JUSTIFICATION: The current imaging and records management system, which is an electronic
                                                                 repository for all official City records, birth certificates, and planning and building permits, requires
                                                                 replacement after nearly ten years in service. In addition, nearly every City department identified
                                                                 document imaging, records management, automated workflow and e-forms as an efficiency and
                                                                 cost savings solution during the development of the Five-Year IT Strategic Plan. Electronic
                                                                 management of documents and other forms of content reduces the need for physical storage space,
                                                                 which reduces office space requirements and storage fees. Staff performing clerical duties such as
                                                                 copying and filing can be redirected to perform higher level functions and paper based processes
                                                                 and routing can be streamlined using automated workflow. Compliance with records and archiving
                                                                 policies will be greatly improved with features that include audit trails, permissions and digital
                                                                 signatures.

                                                                 SCHEDULE: No work is scheduled for FY 2016.

                                                                 RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Public
                                                                 Facilities Element Policy 202.0 by providing a high level of public service through more efficient
                                                                 management and greater work productivity.

                                                                 SPECIAL CONSIDERATION: This project is also shown in the Electric System (Project 3204)
                                                                 and Technology Projects Sections. The appropriate dollar amount is not included in the Category
                                                                 Summary total for the Technology Projects Section to avoid duplication. This project sheet is the
                                                                 Water System's portion of a larger project. The total estimated project cost is $400,000.

                                                                 HISTORY: This project was created and fully funded in FY 2013.

                                                                                                                                  Responsible Department:
                                                                           15.26                                                  Water and Power Department